You are on page 1of 1

Stifner t = 10 mm

WF 150.75.5.7
Atap CGSS lapis Zincalum 0.3 mm
Gording CNP 125.50.20.2,3
Baut gording 2 M 12 KEGIATAN
Baja siku L. 50.50.5
BANTUAN DANA ALOKASI KHUSUS ( DAK )
Trekstang besi Ø 12 mm PENYEDIAAN SARANA DAN PRASARANA
PENGELOLAAN SAMPAH
Baut Rafter HTB 12 mm
Kemiringan lantai beton 1,5%
Haunch WF 150.75.5.7 PEKERJAAN
WIre Mesh M 8 spacing 150 mm
Jarum keras Ø 16 mm 200 Lantai beton t = 8 cm
Ikatan angin Ø 16 mm PEMBANGUNAN TEMPAT PENGOLAHAN SAMPAH
Lantai kerja t = 5 cm
(TPS) 3R
Haunch WF 150.75.5.7 Urugan pasir t = 10 cm
Baut 2 HTB 12 mm Baja siku
300

Plat besi t = 10 mm LOKASI


L.30.30.3, jarak 1 m
Baja UNP 8 (80.45.6)
Baja siku
L.30.30.3, jarak 1 m
Seng BJLS 30 lebar=90 DS. TRAWAS KEC. TRAWAS
Besi beton Ø 10 mm KAB.MOJOKERTO
PROVINSI JAWA TIMUR
Baja UNP 8 (80.45.6) Pipa PVC Ø 3 "
Plat besi t = 10 mm DI BUAT OLEH
Baut 2 HTB 12 mm Klem pipa PVC Ø 3 "
KSM "TRAWAS BERSERI BERDIKARI"
DETAIL LANTAI HANGGAR
1100 Skala 1 : 20
MURYANTO
1350
DIPERIKSA OLEH
WF 150.75.5.7 1.50 1.50 1.50 TENAGA FASILITATOR LAPANGAN
TFL TEKNIS
ADI WIBOWO
REVISI TTD
DETAIL B
Skala 1 : 20 Kemiringan lantai beton 1,5%
NAMA GAMBAR SKALA
Wiremess M8-150 Wiremess M8-150 Wiremess M8-150 Wiremess M8-150
PENULANGAN PLAT HANGGAR 1 : 100
DETAIL 1 : 20
LANTAI HANGGAR
Skala 1 : 20
Kemiringan lantai beton 1,5%
Kemiringan lantai beton 1,5%
Kemiringan lantai beton 1,5%
KODE GAMBAR NO. LEMBAR JML. LEMBAR
4.50 4.50 4.50 4.50 ARS 06 13

You might also like