PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT

MANDIRI PERDESAAN
PNPM - MP
HASIL SURVEI HARGA BAHAN , ALAT DAN UPAH

Desa : Ranah Karya


Kecamatan : Lubuk Pinang
Kabupaten : Mukomuko

No Jenis Bahan / Alat Satuan Harga Jarak Harga Ditempat


A BAHAN
1 Pasir Urug M3
2 Tanah Urug M3
3 Semen Type I Zak
4 Pasir Pasang M3
5 Batu Bata bh
6 Batu Kali M3
7 Batu Pecah 2/3 cm M3
8 Keramik 30 x 30 Polos Mulia bh
9 Keramik 20x20 cm bh
10 Keramik 20 x 25 cm bh
11 Kloset Jongkok bh
12 Bak Mandi bh
13 Triplex 3 mm lbr
14 Kaca 3 mm Asahi M2
15 Cat Tembok / Plafond Metrolite Kg
16 Cat Kayu bee brand Kg
17 Dempul Kg
18 Minyak Cat Cobra Ltr
19 Amplas Lbr
20 Plamir Tembok Kg
21 Cat Menie Kg
22 Kayu 7/14 cm M3
23 Kayu 6/12 cm M3
24 Kayu 5/10 cm M3
25 Kayu 5/7 cm M3
26 Kayu 3/25 cm M3
27 Kayu dolken btg
28 Lis Plafond btg
29 Boven bh
30 Papan Bekisting M3
31 Paku Biasa Kg
32 Paku Campur Kg
33 Paku Halus Kg
34 Paku Seng Kg
35 Atap Gentang Metal LBR
36 Bubungan Genteng Metal M1
37 Kunci Tanam 2 Slaag bh
38 Engsel Pintu bh
39 Engsel Jendela bh
40 Grendel Pintu bh
41 Grendel Jendela bh
42 Hak Angin bh
43 Tarikan Jendela bh
44 Besi Beton KSTI Ø 6 SNI Btg
45 Besi Beton KSTI Ø10 SNI Btg
46 Kawat Beton Kg
47 Besi Plat Bh
48 Mur / Baut Bh
49 Pipa PVC 4 " Btg
50 Pipa PVC 3/4 " Btg
51 Pintu Fiber Bh
52 Kran Air Bh
53 Floor Drain Bh

B ALAT
1 Lori Bh
2 Palu Bh
3 Centong Bh
4 Sekop Bh
5 Ember Bh
6 Benang Rol
7 Cangkul Bh
8 Gergaji Besi Bh
9 Gergaji Kayu Bh
10 Linggis Bh
11 Skrap Semen Bh
12 Selang Air ( Watterpass ) M
13 Meteran 5 M Bh
14 Tapakan Semen Bh
15 Kuas Bh
16 Kunci Besi Bh
17 Catut Bh
18 Papan Proyek Bh
C UPAH
1 Tukang HOK
2 Pekerja Biasa HOK

Lubuk Pinang, ..Juli 2009

Mengetahui Dibuat Oleh


Ketua TPK Sekertaris TPK

MIHAYANI …………………………...
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT
MANDIRI PERDESAAN
PNPM - MP
HASIL SURVEI HARGA BAHAN , ALAT DAN UPAH

Desa : Ranah Karya


Kecamatan : Lubuk Pinang
Kabupaten : Mukomuko

No Jenis Bahan / Alat Satuan Harga Eskalasi Harga Upah Nilai RAB Keterangan
A BAHAN
1 Pasir Urug M3 100,000.00 100,000.00
2 Tanah Urug M3 100,000.00 100,000.00
3 Semen Type I Zak 55,000.00 55,000.00
4 Pasir Pasang M3 115,000.00 115,000.00
5 Batu Bata bh 650.00 650.00
6 Batu Kali M3 115,000.00 115,000.00
7 Batu Pecah 2/3 cm M3 300,000.00 300,000.00
8 Keramik 30 x 30 Polos Mulia bh 3,600.00 3,600.00
9 Keramik 20x20 cm bh 1,750.00 1,750.00
10 Keramik 20 x 25 cm bh 1,750.00 1,750.00
11 Kloset Jongkok bh 85,000.00 85,000.00
12 Bak Mandi bh 175,000.00 175,000.00
13 Triplex 3 mm lbr 45,000.00 45,000.00
14 Kaca 3 mm Asahi M2 120,000.00 120,000.00
15 Cat Tembok / Plafond Metrolite Kg 17,500.00 17,500.00
16 Cat Kayu bee brand Kg 45,000.00 45,000.00
17 Dempul Kg 25,000.00 25,000.00
18 Minyak Cat Cobra Ltr 20,000.00 20,000.00
19 Amplas Lbr 2,000.00 2,000.00
20 Plamir Tembok Kg 20,000.00 20,000.00
21 Cat Menie Kg 20,000.00 20,000.00
22 Kayu 7/14 cm M3 2,000,000.00 2,000,000.00
23 Kayu 6/12 cm M 3
2,000,000.00 2,000,000.00
24 Kayu 5/10 cm M3 2,000,000.00 2,000,000.00
25 Kayu 5/7 cm M3 2,000,000.00 2,000,000.00
26 Kayu 3/25 cm M 3
2,000,000.00 2,000,000.00
27 Kayu dolken btg 6,000.00 6,000.00
28 Lis Plafond btg 13,000.00 13,000.00
29 Boven bh 75,000.00 75,000.00
30 Papan Bekisting M3 1,900,000.00 1,900,000.00
31 Paku Biasa Kg 15,000.00 15,000.00
32 Paku Campur Kg 15,000.00 15,000.00
33 Paku Halus Kg 20,000.00 20,000.00
34 Paku Seng Kg 20,000.00 20,000.00
35 Atap Gentang Metal LBR 24,000.00 24,000.00
36 Bubungan Genteng Metal M1 36,000.00 36,000.00
37 Kunci Tanam 2 Slaag bh 175,000.00 175,000.00
38 Engsel Pintu bh 7,500.00 7,500.00
39 Engsel Jendela bh 7,500.00 7,500.00
40 Grendel Pintu bh 7,500.00 7,500.00
41 Grendel Jendela bh 7,500.00 7,500.00
42 Hak Angin bh 10,000.00 10,000.00
43 Tarikan Jendela bh 7,500.00 7,500.00
44 Besi Beton KSTI Ø 6 SNI Btg 42,500.00 42,500.00
45 Besi Beton KSTI Ø10 SNI Btg 70,000.00 70,000.00
46 Kawat Beton Kg 16,000.00 16,000.00
47 Besi Plat Bh 27,500.00 27,500.00
48 Mur / Baut Bh 15,000.00 15,000.00
49 Pipa PVC 4 " Btg 180,000.00 180,000.00
50 Pipa PVC 3/4 " Btg 20,000.00 20,000.00
51 Pintu Fiber Bh 250,000.00 250,000.00
52 Kran Air Bh 15,000.00 15,000.00
53 Floor Drain Bh 15,000.00 15,000.00
B ALAT
1 Lori Bh 320,000.00 320,000.00
2 Palu Bh 20,000.00 20,000.00
3 Centong Bh 8,000.00 8,000.00
4 Sekop Bh 35,000.00 35,000.00
5 Ember Bh 5,000.00 5,000.00
6 Benang Rol 3,000.00 3,000.00
7 Cangkul Bh 45,000.00 45,000.00
8 Gergaji Besi Bh 25,000.00 25,000.00
9 Gergaji Kayu Bh 45,000.00 45,000.00
10 Linggis Bh 15,000.00 15,000.00
11 Skrap Semen Bh 10,000.00 10,000.00
12 Selang Air ( Watterpass ) M 1,000.00 1,000.00
13 Meteran 5 M Bh 7,000.00 7,000.00
14 Tapakan Semen Bh 10,000.00 10,000.00
15 Kuas Bh 5,000.00 5,000.00
16 Kunci Besi Bh 10,000.00 10,000.00
17 Catut Bh 10,000.00 10,000.00
18 Papan Proyek Bh 350,000.00 350,000.00
C UPAH
1 Tukang HOK 70,000.00 70,000.00
2 Pekerja Biasa HOK 50,000.00 50,000.00

Lubuk Pinang, ..Juli 2009

Mengetahui Dibuat Oleh


Ketua TPK Sekertaris TPK

MIHAYANI …………………………...
PERHITUNGAN VOLUME ITEM PEKERJAAN

1 GALIAN PONDASI BOUWPLANK


V = P x L x t

P = panjang galian P = 72 M
= 72 m
L = lebar galian = 0.8 m
t = tinggi galian = 0.9 m
V = volume galian = 51.84 m3

2 PAS. PONDASI Astameng


V = P x L x t
La + Lb
V = x t x P
2 P = panjang galian
= 72 m
V = volume pondasi L = lebar = 0.8 m
La = lebar bag. Atas = 0.3 m t = tinggi = 0.2 m
Lb = lebar dasar = 0.6 m V = volume = 11.52 m3
t = tinggi pondasi = 0.6 m
P = panjang pondasi = 72 m = 72 m
V = 0.3 + 0.6
x 0.6 x 72
2
= 19.44 m3

3 URUGAN TANAH BAWAH LANTAI

1 Timbunan Bangunan Utama


Tebal Timbunan = 0.5 m
I = 6 x 6 x 2 = 64 M2
II = 3.5 x 8 = 28 M2
III = 3.5 x 2 = 7 M2
Luas = 99 M2
Volume : 0.35 x 99 = 34.65 M3

Timbunan Bawah Rabat Keliling

Panja = 8.2+8.2+15.5+15.5+5 = 52.4 M1


Lebar = 1.1
Tebal = 0.2
Volume = = 11.53 M3
Total Timbunan Tanah Bwh Lantai = 46.18 M3

4 URUGAN PASIR BAWAH LANTAI

V = P x L x t

P = panjang urugan = 15.5 m


L = lebar urugan = 6 m
t = tebal urugan = 0.05 m
V = volume pasir = 4.65 m3

5 PEMBETONAN
a. sloof
V = PxLxt

P = panjang total sloof = 72 m ( = pnjg galian pondasi )


L = tebal sloof = 0.15 m
t = tinggi sloof = 0.2 m
VS = volume beton sloof = 2.16 m3

b.ring balok
V = PxLxt

P = panjang ring blk = 72 m


L = tebal ring blk = 0.15 m
t = tinggi ring balok = 0.2 m
VRB = volume beton ring blk = 2.16 m3

c. kolom

** V = PxLxt KA
P = n x T
n = jumlah kolom = 14 bh
T = tinggi kolom = 4 m
= panjang total kolom = 56 m
L = lebar kolom = 0.15 m
t = tebal kolom = 0.22 m
VK2 = volume beton kolom = 1.848 m3

*** V = PxLxt KB
P = n x T
n = jumlah kolom = 10 bh
T = tinggi kolom = 4 m
= panjang total kolom = 40 m
L = lebar kolom = 0.13 m
t = tebal kolom = 0.13 m
VK3 = volume beton kolom = 0.676 m3
praktis

VK TOTAL = VKA + VKB


= 2.524 M3

VOLUME BETON TOTAL = VS + VRB + VK TOTAL


= 2.16 + 2.16 + 2.524
= 6.844 M3
6 PEMBESIAN

a. sloof
tulangan pokok = N x P = 288 m
N = jumlah besi = 4 m
P = panjang sloof = 72 m
Bsi Ø 10 = tulangan pokok / 12 m = 24 btg
Berat/m = 0.822 kg
Berat total = 236.736 kg

sengkang
J = jarak sengkang = 0.15 m
P = panjang sloof = 72 m
E = jumlah sengkang
= P : J = 480 bh
ts = tebal selimut beton = 0.015 m
d = tekukan = 0.004 m
p = panjang 1 bh sengkang = m
= [ ( tinggi sloof - selimut beton )+( lebar sloof - selimut beton )
+ ( tekukan bs ) ] x 2
= [( 0.20 - 0.015 ) + ( 0.15 - 0.015 ) + 0.004 )] x2
= ( 0.185 + 0.135 + 0.004 ) x 2
= 0.648 m
Bsi Ø6 = E x p
= 311.04 m = 25.92 btg
Berat / m = 0.226 kg
Berat total = 70.29504 kg

b. ring balok
tulangan pokok = N x P = 288 m
N = jumlah besi = 4 m
P = panjang ring blk = 72 m
Bsi Ø 10 = tulangan pokok / 12 m = 24 btg
Berat/m = 0.822 kg
Berat total = 236.736 kg

sengkang
J = jarak sengkang = 0.15 m
P = panjang ring blk = 72 m
E = jumlah sengkang
= P : J = 480 bh
ts = tebal selimut beton = 0.015 m
d = tekukan = 0.04 m
p = panjang 1 bh sengkang = m
= [ ( tinggi r. blk - selimut beton )+( lebar r. blk - selimut beton )
+ ( tekukan bs ) ] x 2

= [( 0.2 - 0.015 )+ ( 0.15 - 0.015 )+ ( 0.04 )] x2


= ( 0.185 + 0.135 + 0.04 ) x 2
= 0.72 m
Bsi Ø6 = E x p
= 345.6 M = 78.11 kg
= 28.8 BTG
c. kolom ………………………………………….

* kolom kntruksi KA

tulangan pokok = N x P = 336 m


N = jumlah besi = 6 m
P = panjang kolom total = 56 m ( jumlah kolom x panjang 1 bh kolom )
Bsi Ø 10 = tulangan pokok / 12 m = 28 btg
Berat/m = 0.822 kg
Berat total = 276.192 kg

sengkang
J = jarak sengkang = 0.1 m
P = panjang kolom total = 56 m
E = jumlah sengkang
= P : J = 560 bh
ts = tebal selimut beton = 0.015 m
d = tekukan = 0.004 m
p = panjang 1 bh sengkang = m HALAMAN 3
= [ ( tebal kolom - selimut beton )+( lebar kolom - selimut beton )
+ ( tekukan bs ) ] x 2

= [( 0.22 - 0.015 )+ ( 0.15 - 0.015 )+ ( 0.04 )] x2


= ( 0.205 + 0.135 + 0.04 ) x 2
= 0.76 m
Bsi Ø6 = E x p
Brt Bsi = 0.226 kg / m
= 425.6 m = 96.1856 kg
= 35.466667 Btg

BERAT BESI KLM = 372.3776 KG

* kolom praktis

tulangan pokok = N x P = 160 m


N = jumlah besi = 4 m
P = panjang kolom total = 40 m
Bsi Ø 10 = tulangan pokok / 12 m = 13.3333333333 btg
Berat/m = 0.822 kg
Berat total = 131.52 kg

sengkang
J = jarak sengkang = 0.1 m
P = panjang kolom total = 40 m
E = jumlah sengkang
= P : J = 400 bh
ts = tebal selimut beton = 0.015 m
d = tekukan = 0.004 m
p = panjang 1 bh sengkang = m
= [ ( tebal kolom - selimut beton )+( lebar kolom - selimut beton )
+ ( tekukan bs ) ] x 2
= [( 0.13 - 0.015 )+ ( 0.13 - 0.015 )+ ( 0.04 )] x2
= ( 0.115 + 0.115 + 0.04 ) x 2
= 0.54 m
Bsi Ø6 = E x p
Brt Bsi = 0.226 kg / m
= 216 m = 48.816 kg
= 18 Btg

BERAT BESI KLM PRAKTIS = 180.336 KG

KEBUTUHAN BESI KESELURUHAN

V BS TOTAL
besi 6 mm = 293.40224 KG
besi 10 mm = 881.184 KG

7 BAKESTINK
Perhitungan kebutuhan papan diperhitungkan berdasarkan luasan untuk pembetonan

a. sloof , luasan samping kanan kiri

S1 = bktg sloof
= t x p total x 2
= 0.2 x 72 x 2
= 28.8 m2
b. kolom , luasan kolom teras , kontruksi , praktis yang butuh bekisting

KA = a X JUMLAH 0.44
= 1.5 X 14
= 21 m2 0.006
166.7
KB = b X JUMLAH
=
= 0.98 X 10
= 9.75 m2

TOTAL LUAS BAKESTING KOLOM


LK = KA + KB
= 21 + 9.75
= 30.75 M2

c. rink balok , luasan ring balok, luasan balok gantung

R1 = 0.3 x 72 m
= 21.6 m2

8 KUSEN

A. Pintu TOTAL = 36.32 M 9.443


Kayu 7/14 cm = 9.08 btg = 9 btg
di pasaran panjang 4 m = 0.07*0.14*4*9
kebutuhan berdasar desain dan jumlah pintu = 0.3528 m3
= 0.4 m3
- P KM FIBER - PJ.2
= 2 + 2 + 0.7 = 2.25 + 2.25 + 1.6 + 2.3 + 1.52 + 1.52
= 4.7 m = 11.44 m
- PKM FIBER - PJ.3
= 2 + 2 + 0.7 = 2.16 + 2.16 + 1.2 + 1.92 + 1.3 + 0.8
= 4.7 m = 9.54 m
- P J1 = 19.08 M
= 2.15 + 2.15 + 1.5
= 5.8 m

Luas lobang kusen pintu total


LP = p x l x jumlah pintu
= 2.16 x 1.32 + ( 0.92 x 2.16 x 1 + 1.52 X 2 ) + 0.7 X 2 X 2
+ ( 2.16 X 0.92 + 0.8 X 1.32 ) X 2
= 16.0352 M2

B. Jendela TOTAL = 42.92 M 11.16


Kayu 7/14 cm = 0.07*0.14*42.92
di pasaran panjang 4 m = 0.420616 m3
kebutuhan berdasar desain dan jumlah jendela = 0.4 m3
- JD - J2
= 1.82*2 + 0.7*2 = 1.32*2 + 0.78*2
= 5.04 m X JUMLAH = 4.2 m X JUMLAH
= 5.04 x 2 = 4.2 x 1
= 10.08 m = 4.2 m

- J1
= 1.32*3 + 1.6*2
= 7.16 m X JUMLAH
= 7.16 x 4
= 28.64 m

LUAS LOBANG KUSEN JENDELA


LKJ = P X L X JUMLAH NYA
= 1.82*0.7*2 + 1.8*1.32*6
= 2.548 + 14.256
= 16.804 M2

TOTAL KEBUTUHAN = 0.8 m3 = 0.8 m3


kayu 7/14 cm
LOBANG KUSEN TOTAL = 16 + 16.8 + 0.87
= 33.7 M2
9 BOVEN JALUSI BOVEN KACA
Kayu 3/7 cm P= 0.7 CM
tinggi boven 0.37 m = 0.14 m2/bh T= 0.62 CM
jumlah boven berdasar desain = 29 bh L= 0.434 CM2
luasan boven 2 BH= 0.868 CM2
= 29 x 0.14 = 4.06 m2
10 PASANGAN DINDING BATU BATA

Ps BT = T X Ptot - Lk = 195.3008 m2
T = Tinggi pas. Bt bata = 3.6 m
Ptot = Panjang total ps batu bata = 64.5 m
Lk = Lubang kusen
= LP + LKJ + LB
= 16.0352 + 16.8 + 4.06
= 36.8992 M2

11 PLESTERAN DINDING

L = Luas ps bata x 2
= 195.3008 X 2
= 390.6016 m2

12 ACIAN DINDING

L = L plesteran
= 390.6016 m2

13 KERANGKA ATAP

Kuda-Kuda utama
Kayu 6/12 cm x 4m
Satu kuda-kuda Satu kuda-kuda
Besi plat = 4 bh
L = 6.2 + 4.6 + 4.6 + 1.6 + 1.6 Besi plat U = 3 bh
2.2 + 2.2 + 2.2 Mur + Bout = 9 bh

= 25.2 m
= 25.2 x 0.06 x 0.12
= 0.18144 m3

Total Kebutuhan = L x n Total Kebutuhan = x n


= 0.18 x 4
= 0.72576 m3 Besi plat = 16 bh
n = jumlah kuda-kuda Besi plat U = 12 bh
= 4 bh Mur + Bout = 36 bh

balok jepit kuda kuda


Kayu 5/10 cmx 4 m
Kebutuhan = 2 x jumlah kuda-kuda
= 2 x 4
= 8 btg 0.89
= 8 x 0.05 x 0.1 x 4
= 0.16 m3

Ikatan Angin
Kayu 5/10 cmx 4 m
Kebutuhan = 2 x jumlah jarak antar kuda-kuda
= 2 x 3
= 6 btg
= 6 x 0.05 x 0.1 x 4
= 0.12 m3

Gording
Kayu 5/10 cmx 4m

Kebutuhan Kayu
Berdasar Desain
G = panjang gording x jumlah gording
= 17.5 x 8 m
= 140 m = 35 btg
= 140 x 0.05 x 0.1 m3
= 0.7 m3

TOTAL KEBUTUHAN KAYU KUDA KUDA , BALOK JEPIT ,GORDING , IKATAN ANGIN
= 0.72576 + 0.7 + 0.12 + 0.16
= 1.70576 M3 = 1.6 M3

Kuda-Kuda teras dan WC


Kayu 6/12 cm x 4m
Satu kuda-kuda Satu kuda-kuda
Besi plat = 4 bh
L = 3.5 + 2.5 + 2.5 + 1 + 1 + Besi plat U = 3 bh
1 Mur + Bout = 9 bh

= 11.5 m
= 11.5 x 0.06 x 0.12
= 0.08 m3

Total Kebutuhan = L x n Total Kebutuhan = x


= 0.08 x 2
= 0.17 m3 Besi plat = 8 bh
n = jumlah kuda-kuda Besi plat U = 6 bh
= 2 bh Mur + Bout = 18 bh

Gording teras da WC
Kayu 5/10 cmx 4m

Kebutuhan Kayu
Berdasar Desain
G = panjang gording x jumlah gording
= 2.8 x 6 m
= 16.8 m = 4.2 btg
= 16.8 x 0.05 x 0.1 m3
= 0.084 m3

TOTAL KEBUTUHAN KAYU KUDA KUDA , GORDING


= 0.17 + 0.084
= 0.2496 M3 = 0.2 M3
= 0.4 M3
TOTAL UTAMA & TERAS = 2 M3
USUK/KASO + RENG

Z = Luasan Atap = dilihat dalam desain atap


= PxL
= 17.5 x 9.4 + 5.2 x 2 X 2
= 185.3 m2

14 ATAP GENTENG METAL

Z = Luasan Atap = dilihat dalam desain atap


= PxL
= 17.5 x 9.4 + 5.2 x 2 X 2
= 185.3 m2

15 BUBUNGAN

B = Panjang Bubungan

= 38.5 m

16 LISPLANK
Lisplank 3/25 cm x 4m
Lp = 17.5*2 + 8*2 + 1.8*4
= 35 + 16 + 7.2
= 58.20 M

= 14.55 M2

17 PLAFON

kerangka plafon
balok 5/7
gantungan 5/7
triplek

PL = p x l
= 17.5 x 8 + 1.8 x 5.5 X 2 = 159.8 M2

18 CAT KAYU
Luasan kayu = luasan yang terlihat ( kusen , daun pintu & jendela , lisplank )

= 9.44 + 11.16 + 15 + 2.5704 + 5.67


= 43.3928 M2

19 CAT TEMBOK DAN PLAFOND


Luas tembok dan plafond di cat tiga lapis
Luasan Cat = permukaan acian + plafond
= 391 + 159.8
= 550 m2

20 DAUN PINTU DAN JENDELA

LUAS PINTU PANEL


Kayu 3.5/20 cm x4m
PJ2,3 = T x L
N = 3 bh
T = Tinggi pintu = 2.1 m
L = Lebar pintu = 0.9 m
P1 = 1.89 m2 = 5.67 m2 utk 3 bh pintu

PD = T x L

T = Tinggi pintu = 2.16 m


L = Lebar pintu = 1.19 m
P2 = 2.5704 m2

** LUAS DAUN JENDELA / KACA HIDUP


Kayu 3.5/8 cm Kebutuhan Kaca 3 mm
di beli kayu 3.5/20 cm x 4 m adalah luasan jendela

JD = T x L 2 BH Kaca = 1.36 m2 *2 daun


Grendel = 4 bh
T = Tinggi Jendela = 1.7 m Engsel = 4 bh
L = Lebar Jendela = 0.4 m Tarikan = 2 bh
JD = 0.68 m2 / bh Tali Angin = 4 bh

J1 = T x L 4 BH Kaca = 3.36 m2 *4 daun


Grendel = 8 bh
T = Tinggi Jendela = 1.2 m Engsel = 8 bh
L = Lebar Jendela = 0.7 m Tarikan = 4 bh
J1 = 0.84 m2/bh Tali Angin = 8 bh

J2 = T x L 1 BH Kaca = 0.67 m2 *1 daun


Grendel = 2 bh
T = Tinggi Jendela = 1.2 m Engsel = 2 bh
L = Lebar Jendela = 0.56 m Tarikan = 1 bh
J2 = 0.672 m2/bh Tali Angin = 2 bh

J PJ2 = T x L 2 BH Kaca = 1.34 m2 *2 daun


Grendel = 4 bh
T = Tinggi Jendela = 1.2 m Engsel = 4 bh
L = Lebar Jendela = 0.56 m Tarikan = 2 bh
J2 = 0.672 m2/bh Tali Angin = 4 bh

J PJ3 = T x L 2 BH Kaca = 1.34 m2 *2 daun


Grendel = 4 bh
T = Tinggi Jendela = 1.2 m Engsel = 4 bh
L = Lebar Jendela = 0.56 m Tarikan = 2 bh
J2 = 0.672 m2/bh Tali Angin = 4 bh

TOTAL
Grendel = 20 bh
Engsel = 20 bh
Tarikan = 10 bh
Tali Angin = 20 bh

LUAS DAUN JENDELA


jendela hidup = 8.08 m2

BOVEN KACA MATI


TOTAL KACA = 8.78 M2
V = 2 BH
P = 0.7 M
T = 0.5 M
L = 0.7 M2

21 LANTAI

Rabat beton 1:3 :5 ( bawah lantai & kellng bangunan ) = LUASA PLAFON
VR = P X L X T
= 160 M2 X 0.06

= 9.6 M3

Pasangan Keramik

K = kebutuhan keramik 30X30 CM


= luasan lantai
= P x L
= 15.5 x 6 + 3.5 x 2
= 100 m2
= 100 boks

K = kebutuhan keramik 20X20CM


= luasan lantai
= P x L
= 2 x 3.5 - 0.6 x 0.6 x 2 - 0.5
= 5.78 m2
= 6 boks

K = kebutuhan keramik 20X25CM


= luasan dinding
= P x L
= 13.6 x 1.4 - 0.72 x 2
= 17.6 m2
= 18 boks

22 PASANGAN BATU BATA SALURAN KELILING

Ps BT =
T = Tinggi pas. Bt bata = 0.3 m
P = Panjang total ps batu bata = 52.4 m
L = Luas Pasangan Batu Bata = 15.72 m2
Total Pas.Batu Bata Saluran = 31.44 m2

23 PLESTERAN SALURAN KELILING

L = Luas ps bata
= 47.16 + 16
= 62.88 m2

24 ACIAN DINDING

L = L plesteran
= 62.88 m2

25 PASANGAN DINDING BATU BATA SEPIT TANK

Ps BT =
T = Tinggi pas. Bt bata = 1.3 m
P = Panjang total ps batu bata = 11.9 m
L = Luas Pasangan Batu Bata = 15.47 m2

26 PLESTERAN DINDING

L = Luas Plesteran
= 15.47 + 1.6
= 17.07 m2

27 ACIAN DINDING

L = L plesteran
= 17.07 m2
RENCANA ANGGARAN BIAYA PRASARANA

Propinsi : Bengkulu No. RAB : 01


Kabupaten : Mukomuko Program : PNPM - MP
Kecamatan : Lubuk Pinang Jenis Kegiatan : Gedung TAMAN KANAK-KANAK
Desa : Ranah Karya Ukuran : 6 m x 15.5 m

Volume
Kategori Harga Satuan Jumlah Total
Uraian dari Satuan
Total Dari Dana Swadaya PNPM-PPK
Biaya
Swadaya Rp. Rp. Rp.
I BAHAN
I.1 Pasir Urug 9.00 9.00 M3 I.a 100,000.00 900,000.00
1.2 Tanah Urug 55.00 55.00 M3 I.a 100,000.00 5,500,000.00
I.2 Pasir Pasang 47.00 47.00 M3 I.a 115,000.00 5,405,000.00
I.3 Batu Kali 36.00 36.00 M3 I.a 115,000.00 4,140,000.00
I.4 Batu Bata 19400.00 19400.00 Bh I.a 650.00 12,610,000.00
I.5 Batu Pecah 2/3 cm 14.00 14.00 M3 I.a 300,000.00 4,200,000.00
I.6 Semen Type I 50 Kg 270.00 270.00 Zak I.b 55,000.00 14,850,000.00
I.7 Semen Warna 200.00 200.00 kg I.b 1,800.00 360,000.00
I.8 Besi KSTI Ø 6 SNI 114.00 114.00 Btg I.b 42,000.00 4,788,000.00
I.9 Besi KSTI Ø 10 SNI 94.00 94.00 Btg I.b 70,000.00 6,580,000.00
I.10 Kawat Beton 18.00 18.00 Kg I.b 16,000.00 288,000.00
I.11 Keramik 30 x 30 cm MULIA 1100.00 1100.00 Bh I.b 3,600.00 3,960,000.00
I.12 Keramik 20X25 cm MULIA 360.00 360.00 Bh I.b 1,750.00 630,000.00
I.13 Keramik 20X20 cm MULIA 150.00 150.00 Bh I.b 1,750.00 262,500.00
I.14 Kloset Jongkok 2.00 2.00 Bh I.b 85,000.00 170,000.00
I.15 Pintu Fiber 2.00 2.00 Bh I.b 250,000.00 500,000.00
I.16 Kran Air 2.00 2.00 Bh I.b 15,000.00 30,000.00
I.17 Floor Drain 2.00 2.00 Bh I.b 15,000.00 30,000.00
I.18 Pipa PVC 4 " 4.00 4.00 btg I.b 180,000.00 720,000.00
I.19 Pipa PVC 3/4 " 6.00 6.00 btg I.b 20,000.00 120,000.00
I.20 Kaca 3 mm 9.00 9.00 M2 I.b 120,000.00 1,080,000.00
I.21 Kayu 7/14 cm 1.00 1.00 M3 I.a 2,000,000.00 2,000,000.00
I.22 Kayu 6/12 cm 1.00 1.00 M3 I.a 2,000,000.00 2,000,000.00
I.23 Kayu 5/10 cm 1.30 1.30 M3 I.a 2,000,000.00 2,600,000.00
I.24 Kayu 5/7 cm 5.00 5.00 M3 I.a 2,000,000.00 10,000,000.00
I.25 Kayu 3/5 cm 1.00 1.00 M4 I.a 2,000,000.00 2,000,000.00
I.26 Kayu 3/25 cm 0.70 0.70 M3 I.a 2,000,000.00 1,400,000.00
I.27 Kayu 3.5/20cm 0.30 0.30 M3 I.a 2,000,000.00 600,000.00
I.28 Triplex 3 mm 60.00 60.00 lbr I.b 45,000.00 2,700,000.00
I.29 Papan Cor 4.00 4.00 M3 I.a 1,900,000.00 7,600,000.00
I.30 Dolken 105.00 105.00 btg I.a 6,000.00 630,000.00
I.31 Boven 29.00 29.00 bh I.a 75,000.00 2,175,000.00
I.32 Paku Biasa 67.00 67.00 Kg I.b 15,000.00 1,005,000.00
I.33 Paku Campur 11.00 11.00 Kg I.b 15,000.00 165,000.00
I.34 Paku Seng 40.00 40.00 Kg I.b 20,000.00 800,000.00
I.35 Genteng Metal 464.00 464.00 lbr I.b 24,000.00 11,136,000.00
I.36 Bubungan Genteng Metal 42.00 42.00 M' I.b 36,000.00 1,512,000.00
I.37 Amplas 87.00 87.00 Lbr I.b 2,000.00 174,000.00
I.38 Dempul 6.00 6.00 Kg I.b 25,000.00 150,000.00
I.39 Minyak Cat 3.00 3.00 Ltr I.b 20,000.00 60,000.00
I.40 Cat Menie 15.00 15.00 Kg I.b 20,000.00 300,000.00
I.41 Cat Kayu 14.00 14.00 Kg I.b 45,000.00 630,000.00
I.42 Cat Tembok 145.00 145.00 Kg I.b 17,500.00 2,537,500.00
I.43 Kunci Tanam 4.00 4.00 Bh I.b 175,000.00 700,000.00
I.44 Engsel Pintu 14.00 14.00 Bh I.b 7,500.00 105,000.00
I.45 Engsel Jendela 20.00 20.00 Bh I.b 7,500.00 150,000.00
I.46 Tarikan Jendela 10.00 10.00 Bh I.b 7,500.00 75,000.00
I.47 Grendel Jendela 20.00 20.00 Bh I.b 7,500.00 150,000.00
I.48 Grendel Pintu 2.00 2.00 Bh I.b 7,500.00 15,000.00
I.49 Hak Angin 20.00 20.00 Bh I.b 10,000.00 200,000.00
I.50 Besi Plat U 18.00 18.00 Bh I.b 25,000.00 450,000.00
I.51 Mur Baut 54.00 54.00 Bh I.b 15,000.00 810,000.00
I.52 Besi Plat 24.00 24.00 Bh I.b 27,000.00 648,000.00
I.53 Shaklar Ganda 4.00 4.00 Bh I.b 15,000 60,000.00
I.54 Shaklar Tunggal 2.00 2.00 Bh I.b 15,000 30,000.00
I.55 Stop Kontak 3.00 3.00 Bh I.b 15,000 45,000.00
I.56 Lampu TL.20 Watt Lengkap (Philip) 5.00 5.00 Bh I.b 85,000 425,000.00
I.57 Lampu Down Light 18 Watt (Philip) 5.00 5.00 Bh I.b 80,000 400,000.00
I.58 Lampu Pijar 10 Watt 2.00 2.00 Bh I.b 10,000 20,000.00
I.59 Kabel Listrik 150.00 150.00 M` I.b 3,000 450,000.00
I.60 Papan Proyek 1.00 1.00 Bh II.a 300,000.00 300,000.00

Sub Total I 0.00 124,331,000.00


II ALAT
II.1 Benang 5.00 5.00 Rol II.a 3,000.00 15,000.00
II.2 Angkong 2.00 2.00 Bh II.a 320,000.00 640,000.00
II.3 Meteran 5 M 2.00 2.00 Bh II.a 7,000.00 14,000.00
II.4 Ember 12.00 12.00 Bh II.a 10,000.00 120,000.00
II.5 Sekop 2.00 2.00 Bh II.a 75,000.00 150,000.00

Sub Total II 0.00 939,000.00


III UPAH
III.1 Tukang 375.00 375.00 HOK III.a 70,000.00 26,250,000.00
III.2 Pekerja 521.00 521.00 HOK III.a 50,000.00 26,050,000.00
Sub Total III 896.00 52,300,000.00
Dari PNPM - MP 177,570,000.00
Sumber Dana
Total Biaya 177,570,000.00

Lubuk Pinang, … Juli 2009


Diketahui : Diperiksa Oleh : Dibuat Oleh :
PJOK FT Kecamatan Ketua TPK

MURSAL,SH WAHID,A.MD MIHAYANI


NIP: 196005031980021004
RENCANA ANGGARAN BIAYA PRASARANA

Propinsi : Bengkulu No. RAB :2


Kabupaten : Mukomuko Program : PNPM - MP
Kecamatan : Lubuk Pinang Jenis Kegiatan : MEUBELER
Desa : Ranah Karya Ukuran : 1 LS

Volume
Kategori Harga Satuan Jumlah Total
Uraian dari Satuan
Total Dari Dana Swadaya PNPM-MP
Biaya
Swadaya Rp. Rp. Rp.

I MEBULER
I.1 Meja Guru 2 2 Bh I.a 350,000.00 700,000.00

I.2 Kursi Guru 2 2 Bh I.a 150,000.00 300,000.00

I.3 Meja Anak 12 12 Bh I.a 100,000.00 1,200,000.00


I.4 Kursi Anak 24 24 Bh I.a 35,000.00 840,000.00

I.5 Almari Administrasi 2 2 Bh I.a 750,000.00 1,500,000.00

I.6 Almari / Rak Anak 2 2 Bh I.a 400,000.00 800,000.00

I.7 Papan Tulis 2 2 Bh I.a 150,000.00 300,000.00


Sub Total I 5,640,000.00

II ALAT MAINAN ANAK


II.1 Papan Jungkit 1 1 Bh I.a 1,500,000.00 1,500,000.00
II.2 Bola Putar 1 1 Bh I.a 2,100,000.00 2,100,000.00

II.3 Kursi Ayun 1 1 Bh I.a 2,100,000.00 2,100,000.00

II.4 Papan Luncur 1 1 Bh I.a 1,200,000.00 1,200,000.00


Sub Total II 6,900,000.00
Dari PNPM - MP 12,540,000.00
Sumber Dana
Total Biaya 12,540,000.00

Lubuk Pinang, …Juli 2009


Diketahui Diperiksa Oleh : Dibuat Oleh
PJOK FT Kecamatan Ketua TPK

MURSAL,SH WAHID, A.Md MIHAYANI


NIP: 196005031980021004
REKAPITULASI ANGGARAN BIAYA PRASARANA
Propinsi : Bengkulu
Kabupaten : Mukomuko
Kecamatan : Lubuk Pinang
Desa : Ranah Karya

Kegiatan : Gdg TK Kegiatan : MEUBELLER


Ukuran : 6 m x 15.5 m Bobot Ukuran :- Bobot Bobot
No Uraian Jumlah Total
Jumlah : 01 % Jumlah : % %
No. RAB : 01 No. RAB : 02
PNPM - MP Swadaya PNPM - MP Swadaya PNPM-MP Swadaya

I BAHAN 124,331,000.00 0.00 66.52 5,640,000.00 0.00 42.73 129,971,000.00 0.00 64.95
( tidak perlu dirinci )

II PERALATAN 939,000.00 0.00 0.50 6,900,000.00 0.00 52.27 7,839,000.00 0.00 3.92
( tidak perlu dirinci )

III UPAH 52,300,000.00 0.00 27.98 0.00 0.00 0.00 52,300,000.00 0.00 26.13
( tidak perlu dirinci )

JUMLAH 177,570,000.00 0.00 95.00 12,540,000.00 0 95.00 190,110,000.00 95.00

IV Operasional UPK 2 % 3,738,315.79 0 2.00 264,000.00 0 2.00 4,002,315.79 2.00


dibulatkan 3,738,000.00 264,000.00 4,002,000.00

V Operasional TPK 3 % 5,607,473.68 0 3.00 396,000.00 0 3.00 6,003,473.68 3.00


dibulatkan 5,607,000.00 396,000.00 6,003,500.00

JUMLAH TOTAL 186,915,000.00 100.00 13,200,000.00 100.00 200,115,500.00 100.00


Jumlah Biaya Upah 52,300,000.00 0.00 52,300,000.00
Jumlah HOK Kontruksi 896.00 HOK 0 HOK 896 HOK

Lubuk Pinang, …Juli 2009


PJOK Fasilitator Teknik Ketua TPK

MURSAL,SH WAHID, A.Md MIHAYANI


NIP: 196005031980021004
JADWAL PELAKSANAAN KEGIATAN
Propinsi
Kabupaten
Kecamatan
Desa

Jumlah Bobot Bulan


No Uraian Pekerjaan Biaya I II III Ket.
Rp % 1 2 3 4 1 2 3 4 1 2 3 4

I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH/PASIR
III PEKERJAAN BATU / BETON
IV PEKERJAAN KAYU / KACA
V PEKERJAAN ATAP
VI PEKERJAAN KUNCI / PENGGANTUNG
VII PEKERJAAN LANTAI KERAMIK
VIII PEKERJAAN PENGECATAN
IX PELAPORAN

JUMLAH
BOBOT RENCANA
KOMULATIF BOBOT RENCANA
BOBOT REALISASI
KOMULATIF BOBOT REALISASI
BOBOT DEVIASI

Teras Terunjam
Diketahui Dibuat Oleh
PJOK FT Ketua TPK

M SAYID AR TEGUH SANTOSO DOLAR


NIP . 730 004 231
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT
MANDIRI PERDESAAN
PNPM - MP T.A 2009
DAFTAR ANALISA PEKERJAAN

Desa : Ranah Karya Jenis Kegiatan : Prasarana Pendidikan


Kecamatan : Lubuk Pinang Pekerjaan : Pembangunan Gedung TK
Kabupaten : Mukomuko Volume : 6 x 15.5 m

Jumlah Kebutuhan
Volume
Analisa Uraian Pekerjaan Upah
Lapangan Bahan
T P
6.4 1 M Pasangan Bouwplank 72.00 M3
0.012 M3 kayu 5/7 cm 0.86
0.007 M3 Papan 0.50
0.020 Kg Paku Biasa
0.100 Tukang 7.20
0.100 Pekerja 7.20
0.000 Mandor

6.1 1 M3 Galian Tanah 51.84 M3


0.400 Pekerja 20,000
0 Mandor
1,036,800
6.9 1 M3 Urugan Tanah Dipadatkan 46.18 M3
1.200 Tanah Urug
0.192 Pekerja
0.000 Mandor

6.14 1 m3 Pasangan Batu Kosong 11.52 M3


1.200 M3 Batu Kali 13.82
0.300 M3 Pasir 3.46
0.000 Tukang 0.00
1.500 Pekerja 17.28
0.000 Mandor

6.11 1 M3 Urugan Pasir Bawah Lantai / Pondasi 4.65 M3


1.200 M3 Pasir Urug 5.58
0.300 Pekerja 1.40
0.010 Mandor

6.5 1 m3 Pasangan Batu Kali 1 : 4 19.44 M3


1.100 M3 Batu Kali
3.260 Zak Semen
0.520 M3 Pasir Pasang
0.600 Tukang 70,000 42,000 10.00
1.500 Pekerja 50,000 75,000 12.00
0.000 Mandor
117,000
6.11 1 M2 Pasangan Batu Bata 1 : 4 2,274,480
75.000 Bh Batu Bata
0.230 Zak Semen
0.043 M3 Pasir Pasang
0.100 Tukang
0.320 Pekerja
0.000 Mandor

6.4 1 M2 Plesteran Dinding+ Acian1 : 4 470.55 M2


0.104 Zak Semen 48.94
0.020 M3 Pasir Pasang 9.41
0.150 Tukang 70.58
0.200 Pekerja 94.11
0.000 Mandor

6.5 1 M3 Beton Cor 1 : 2 : 3 6.84 M3


0.780 M3 Batu Pecah 2/3 cm 5.34
0.540 M3 Pasir Beton 3.70
4.640 Zak Semen 31.76
0.250 Tukang 1.71
1.650 Pekerja 11.29
0.000 Mandor

6.25 1 kg Pembesian 1174.59 kg


1.050 Kg Besi Beton Ø 10 mm 881.18 925.24
1.050 Kg Besi Beton Ø 6 mm 293.40 308.07
0.015 Kg Kawat Beton 17.62
0.007 Tukang 8.22
0.007 Pekerja 8.22

6.29 1 M2 Begesting SLOOF 28.80 M2


0.040 M3 Kayu Kelas IV 1.15
0.300 Kg Paku 8.64
0.260 Tukang 7.49
0.300 Pekerja 8.64
0.000 Mandor

6.30 1 M2 Begesting KOLOM 30.75 M2


0.050 M3 Kayu Kelas IV 1.54
0.400 Kg Paku 12.30
2.000 btg kayu dolken 61.50
0.260 Tukang 8.00
0.300 Pekerja 9.23
0.000 Mandor

6.31 1 M2 Begesting balok 21.60 M2


0.040 M3 Kayu Kelas IV 0.86
0.400 Kg Paku 8.64
2.000 btg kayu dolken 43.20
0.330 Tukang 7.13
0.320 Pekerja 6.91
0.000 Mandor

6.1 1 M3 Beton Tumbuk 1 : 3 : 5 9.60 M3


0.870 M3 Batu koral 8.35
0.520 M3 Pasir 4.99
4.360 Zak Semen 41.86
0.250 Tukang 2.40
1.650 Pekerja 15.84
0.000 Mandor

6.2 1 M3 Kusen Pintu / Jendela 0.80 M3


1.200 M3 Kayu kls II 7/14 CM 0.96
0.100 Kg Paku Campur 0.08
18.000 Tukang 14.40
6.000 Pekerja 4.80
0.000 Mandor

6.5 1 M Lispank Papan 58.20 M


0.011 M3 Kayu 3/25 0.64
0.050 Kg Paku Campur 2.91
0.220 Tukang 12.80
0.110 Pekerja 6.40
0.000 Mandor

6.28 1 m 3 Kuda - Kuda + Gording 1.96 M3


1.100 M3 Kayu 6/12 0.89 0.98
1.100 M3 Kayu 5/10 1.06 1.17
12.000 Tukang 23.46
4.000 Pekerja 7.82
0.000 Mandor

6.35 1 m 2 Kaso + Reng 185.30 M2


0.014 M3 Kayu 2.59
0.200 Paku 37.06
0.100 Tukang 18.53
0.100 Pekerja 18.53
0.000 Mandor

6.4 1 M2 triplek 3 mm + Rangka 159.80 M2


0.375 Lbr. Plywood 59.93
0.017 M3 Kayu kls II 5/7 CM 2.72
0.040 Kg Paku Campur 6.39
0.030 Kg Paku Halus 4.79
0.100 Tukang 15.98
0.070 Pekerja 11.19
0.000 Mandor

19 1 M3 Perekat 0.00 M3
9.000 Zak Semen 0.00
1.080 M3 Pasir Pasang 0.00

6.47 1 M2 Pas Keramik lantai 30 x 30 Cm 100.00 M2


11.000 Bh Keramik 30 x 30 cm
0.227 Zak Semen 22.70
1.500 kg semen warna
0.042 M3 Pasir Pasang 4.20
0.350 Tukang 24,500
0.620 Pekerja 31,000
0.000 Mandor 55,500

6.44 1 M2 Pas Keramik lantai 20 x 20Cm anti slip 6.00 M2


25.000 bh Keramik 20 x 20 cm 150.00
0.285 Zak Semen 1.71
1.500 kg semen warna 9.00
0.042 M3 Pasir Pasang 0.25
0.350 Tukang 2.10
0.620 Pekerja 3.72
0.000 Mandor

6.68.a 1 M2 Pas Keramik dinding 20 x 25 cm 18.00 M2


20.000 Bh keramik 20 x 25 cm 360.00
0.233 Zak Semen 4.19
1.500 kg semen warna 27.00
0.018 M3 Pasir Pasang 0.32
1.000 Tukang 18.00
0.600 Pekerja 10.80
0.000 Mandor

6.2 1 M2 Pas Kloset Jongkok 2.00 M2


1.000 bh kloset porselin 2.00
0.120 Zak Semen 0.24
0.010 M3 Pasir Pasang 0.02
1.500 Tukang 3.00
1.000 Pekerja 2.00
0.000 Mandor

6.7 1 bh Pas bak mandi teraso 2.00 M2


1.000 bh Pas bak mandi fiberglas 2.00
0.120 Zak Semen 0.24
0.010 M3 Pasir Pasang 0.02
0.750 Tukang 1.50
2.100 Pekerja 4.20
0.000 Mandor

6.1 1 M2 Pintu Panel 8.24 M2


0.035 M3 Kayu 3.5/20 0.29
0.200 Kg Paku Campur 1.65
2.000 Tukang 16.48
0.800 Pekerja 6.59
0.000 Mandor

6.1 1 M2 Pintu WC 2.00 M2


1.000 M3 Kayu 3.5/20 2.00
0.200 Kg Paku Campur 0.40
2.000 Tukang 4.00
0.800 Pekerja 1.60
0.000 Mandor

6.16 1 M2 Jendela Kaca Hidup 3 mm 8.08 M2


1.100 Kaca 3 mm 8.89
0.150 Tukang 1.21
0.015 Pekerja 0.12
0.000 Mandor

H.8.b 1 M2 Atap Genteng Metal 185.30 M2


2.500 Lbr genteng metal 463.25
0.200 Kg Paku genteng 37.06
0.100 Tukang 18.53
0.200 Pekerja 37.06
0.000 Mandor

6.36 1 M' Bubungan Gentang Metal 38.50 M


1.100 M' bubungan gtg metal 42.35
0.050 Kg Paku 1.93
0.070 Tukang 2.70
0.150 Pekerja 5.78
0.000 Mandor

1 M2 Upah Pekerjaan Cat M2


0.045 Tukang
0.030 Pekerja
0.003 Mandor

6.12 1 M2 Cat Menie Kayu 43.39 M2


0.350 ltr Meni Kayu 15.19
0.000 Tukang 0.00
0.100 Pekerja 4.34
0.000 Mandor

6.9 1 M2 Cat Kayu Warna 43.39 M2


0.350 Kg Cat Kayu 15.19
0.150 Kg Dempul 6.51
0.057 Ltr Minyak Cat 2.47
2.000 Lbr Amplas 86.79
0.105 Tukang 4.56
0.070 Pekerja 3.04
0.000 Mandor

6.14 1 M2 Cat Tembok / Plafond 3 x cat 550.40 M2


0.260 Kg Cat Tembok 143.10
0.063 Tukang 34.68
0.020 Pekerja 11.01
0.000 Mandor

Ranah Karya, .. Juli 2009

Fasilitator Teknik Ketua TPK

W A H I D, A.Md MIHAYANI
AT

t p
3565584.65 341.11
375 521

unan Gedung TK

h Kebutuhan

Upah
ADANYA RABE
M

Tanah Urug 0.00 55


0.00

1 SEMEN 151.63 275.00


2 BT KALI 13.82 36.00
3 BT BATA 0.00 19400.00
4 PSR URUG 9.04 9.00
5 PSIR 26.37 47.00

6 split 13.69 14.00


7 BESI 10 925.24 94.00 93.8
smn wrna 36.00 200.00

0.00 8 BESI 6 308.07 114.00 113.596


9 KACA 8.89 9.00
14 GNT MTL 463.25 464.00
15 BBNGAN 42.35 42.00
16 KAYU 6/12 0.98 1.00
17 KAYU 7/14 0.96 1.00
0.05 18 KAYU 5/10 1.17 1.30
19 KAYU 5/7 6.17 5.00 3.26
20 KAYU 3/25 0.64 0.70 0.23
21 KAYU 3/5 1.00 1.00 0.104
22 KAYU 3.5/20 0.29 0.30
23 PAPAN COR 4.06 4.00
800,000 24 CAT KYU 15.19 14.00
600,000 25 CAT TBOK 143.10 145.00
1,400,000 26 DMPUL 6.51 6.00
27 MENI 15.19 15.00
(874,480) 28 MNYK CAT 2.47 3.00
29 AMPLAS 86.79 87.00
30 KWT BTN 17.62 18.00
31 KRAMIK 0.00 1100
pek 59.93 60.00
kubias 66.6400 67.00
kucam 11.030 11.00
kuseng 38.99 40.00

dolken 104.70 105


KERAMIK 150.00
KERAMIK 360.00

0.00

4.64

0.00

0.00

0.00
0.00

4.36

0.00

0.00

0.00

0.0045 0.83385
0.007 1.2971

0.00 1.579078
1.02

0.00
0.00

0.2276

0.00

0.00

0.12

0.00
0.00

0.00

0.00

0.00

463.25

0.00

0.00
0.00

0.00

0.00

rya, .. Juli 2009

HAYANI
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT
MANDIRI PERDESAAN
PNPM - MP T.A 2009
DAFTAR ANALISA PEKERJAAN

Desa : Ranah Karya Jenis Kegiatan : Prasarana Pendidikan


Kecamatan : Lubuk Pinang Pekerjaan : Pembangunan Gedung TK
Kabupaten : Mukomuko Volume : 6 x 15.5 m

Jumlah Kebutuhan
Volume
Analisa Uraian Pekerjaan Upah
Lapangan Bahan
T P M
6.4 1 M Pasangan Bouwplank 72.00 M3
0.012 M3 kayu 5/7 cm 0.86
0.007 M3 Papan 0.50
0.020 Kg Paku Biasa
0.100 Tukang 7.20
0.100 Pekerja 7.20
0.000 Mandor 0.00

6.1 1 M3 Galian Tanah 51.84 M3


0.400 Pekerja 20.74
0 Mandor 0.00

6.9 1 M3 Urugan Tanah Dipadatkan 46.18 M3


1.200 Tanah Urug 55.41
0.192 Pekerja 8.87
0.000 Mandor 0.00

6.14 1 m3 Pasangan Batu Kosong 11.52 M3


1.200 M3 Batu Kali 13.82
0.300 M3 Pasir 3.46
0.000 Tukang 0.00
1.500 Pekerja 17.28
0.000 Mandor 0.00

6.11 1 M3 Urugan Pasir Bawah Lantai / Pondasi 4.65 M3


1.200 M3 Pasir Urug 5.58
0.300 Pekerja 1.40
0.010 Mandor 0.05

6.5 1 m3 Pasangan Batu Kali 1 : 4 19.44 M3


1.100 M3 Batu Kali 21.38
3.260 Zak Semen 63.37
0.520 M3 Pasir Pasang 10.11
0.600 Tukang 11.66
1.500 Pekerja 29.16
0.000 Mandor 0.00

6.11 1 M2 Pasangan Batu Bata 1 : 4 242.21 M2


75.000 Bh Batu Bata 18165.81
0.230 Zak Semen 55.71
0.043 M3 Pasir Pasang 10.42
0.100 Tukang 24.22
0.320 Pekerja 77.51
0.000 Mandor 0.00
6.4 1 M2 Plesteran Dinding+ Acian1 : 4 470.55 M2
0.104 Zak Semen 48.94
0.020 M3 Pasir Pasang 9.41
0.150 Tukang 70.58
0.200 Pekerja 94.11
0.000 Mandor 0.00

6.5 1 M3 Beton Cor 1 : 2 : 3 6.84 M3


0.780 M3 Batu Pecah 2/3 cm 5.34
0.540 M3 Pasir Beton 3.70
4.640 Zak Semen 31.76
0.250 Tukang 1.71
1.650 Pekerja 11.29
0.000 Mandor 0.00

6.25 1 kg Pembesian 1174.59 kg


1.050 Kg Besi Beton Ø 10 mm 881.18 925.24
1.050 Kg Besi Beton Ø 6 mm 293.40 308.07
0.015 Kg Kawat Beton 17.62
0.007 Tukang 8.22
0.007 Pekerja 8.22

6.29 1 M2 Begesting SLOOF 28.80 M2


0.040 M3 Kayu Kelas IV 1.15
0.300 Kg Paku 8.64
0.260 Tukang 7.49
0.300 Pekerja 8.64
0.000 Mandor 0.00

6.30 1 M2 Begesting KOLOM 30.75 M2


0.050 M3 Kayu Kelas IV 1.54
0.400 Kg Paku 12.30
2.000 btg kayu dolken 61.50
0.260 Tukang 8.00
0.300 Pekerja 9.23
0.000 Mandor 0.00

6.31 1 M2 Begesting balok 21.60 M2


0.040 M3 Kayu Kelas IV 0.86
0.400 Kg Paku 8.64
2.000 btg kayu dolken 43.20
0.330 Tukang 7.13
0.320 Pekerja 6.91
0.000 Mandor 0.00

6.1 1 M3 Beton Tumbuk 1 : 3 : 5 9.60 M3


0.870 M3 Batu koral 8.35
0.520 M3 Pasir 4.99
4.360 Zak Semen 41.86
0.250 Tukang 2.40
1.650 Pekerja 15.84
0.000 Mandor 0.00

6.2 1 M3 Kusen Pintu / Jendela 0.80 M3


1.200 M3 Kayu kls II 7/14 CM 0.96
0.100 Kg Paku Campur 0.08
18.000 Tukang 14.40
6.000 Pekerja 4.80
0.000 Mandor 0.00
6.5 1 M Lispank Papan 58.20 M
0.011 M3 Kayu 3/25 0.64
0.050 Kg Paku Campur 2.91
0.220 Tukang 12.80
0.110 Pekerja 6.40
0.000 Mandor 0.00

6.28 1 m 3 Kuda - Kuda + Gording 1.96 M3


1.100 M3 Kayu 6/12 0.89 0.98
1.100 M3 Kayu 5/10 1.06 1.17
12.000 Tukang 23.46
4.000 Pekerja 7.82
0.000 Mandor 0.00

6.35 1 m 2 Kaso + Reng 185.30 M2


0.014 M3 Kayu 2.59
0.200 Paku 37.06
0.100 Tukang 18.53
0.100 Pekerja 18.53
0.000 Mandor 0.00

6.4 1 M2 triplek 3 mm + Rangka 159.80 M2


0.375 Lbr. Plywood 59.93
0.017 M3 Kayu kls II 5/7 CM 2.72
0.040 Kg Paku Campur 6.39
0.030 Kg Paku Halus 4.79
0.100 Tukang 15.98
0.070 Pekerja 11.19
0.000 Mandor 0.00

19 1 M3 Perekat 0.00 M3
9.000 Zak Semen 0.00
1.080 M3 Pasir Pasang 0.00

6.47 1 M2 Pas Keramik lantai 30 x 30 Cm 100.00 M2


11.000 Bh Keramik 30 x 30 cm 1100.00
0.227 Zak Semen 22.70
1.500 kg semen warna 150.00
0.042 M3 Pasir Pasang 4.20
0.350 Tukang 35.00
0.620 Pekerja 62.00
0.000 Mandor 0.00

6.44 1 M2 Pas Keramik lantai 20 x 20Cm anti slip 6.00 M2


25.000 bh Keramik 20 x 20 cm 150.00
0.285 Zak Semen 1.71
1.500 kg semen warna 9.00
0.042 M3 Pasir Pasang 0.25
0.350 Tukang 2.10
0.620 Pekerja 3.72
0.000 Mandor 0.00

6.68.a 1 M2 Pas Keramik dinding 20 x 25 cm 18.00 M2


20.000 Bh keramik 20 x 25 cm 360.00
0.233 Zak Semen 4.19
1.500 kg semen warna 27.00
0.018 M3 Pasir Pasang 0.32
1.000 Tukang 18.00
0.600 Pekerja 10.80
0.000 Mandor 0.00
6.2 1 M2 Pas Kloset Jongkok 2.00 M2
1.000 bh kloset porselin 2.00
0.120 Zak Semen 0.24
0.010 M3 Pasir Pasang 0.02
1.500 Tukang 3.00
1.000 Pekerja 2.00
0.000 Mandor 0.00

6.7 1 bh Pas bak mandi teraso 2.00 M2


1.000 bh Pas bak mandi fiberglas 2.00
0.120 Zak Semen 0.24
0.010 M3 Pasir Pasang 0.02
0.750 Tukang 1.50
2.100 Pekerja 4.20
0.000 Mandor 0.00

6.1 1 M2 Pintu Panel 8.24 M2


0.035 M3 Kayu 3.5/20 0.29
0.200 Kg Paku Campur 1.65
2.000 Tukang 16.48
0.800 Pekerja 6.59
0.000 Mandor 0.00

6.1 1 M2 Pintu WC 2.00 M2


1.000 M3 Kayu 3.5/20 2.00
0.200 Kg Paku Campur 0.40
2.000 Tukang 4.00
0.800 Pekerja 1.60
0.000 Mandor 0.00

6.16 1 M2 Jendela Kaca Hidup 3 mm 8.08 M2


1.100 Kaca 3 mm 8.89
0.150 Tukang 1.21
0.015 Pekerja 0.12
0.000 Mandor 0.00

H.8.b 1 M2 Atap Genteng Metal 185.30 M2


2.500 Lbr genteng metal 463.25
0.200 Kg Paku genteng 37.06
0.100 Tukang 18.53
0.200 Pekerja 37.06
0.000 Mandor 0.00

6.36 1 M' Bubungan Gentang Metal 38.50 M


1.100 M' bubungan gtg metal 42.35
0.050 Kg Paku 1.93
0.070 Tukang 2.70
0.150 Pekerja 5.78
0.000 Mandor 0.00

1 M2 Upah Pekerjaan Cat M2


0.045 Tukang
0.030 Pekerja
0.003 Mandor

6.12 1 M2 Cat Menie Kayu 43.39 M2


0.350 ltr Meni Kayu 15.19
0.000 Tukang 0.00
0.100 Pekerja 4.34
0.000 Mandor 0.00
6.9 1 M2 Cat Kayu Warna 43.39 M2
0.350 Kg Cat Kayu 15.19
0.150 Kg Dempul 6.51
0.057 Ltr Minyak Cat 2.47
2.000 Lbr Amplas 86.79
0.105 Tukang 4.56
0.070 Pekerja 3.04
0.000 Mandor 0.00

6.14 1 M2 Cat Tembok / Plafond 3 x cat 550.40 M2


0.260 Kg Cat Tembok 143.10
0.063 Tukang 34.68
0.020 Pekerja 11.01
0.000 Mandor 0.00

Ranah Karya, .. Juli 2009

Fasilitator Teknik Ketua TPK

W A H I D, A.Md MIHAYANI