You are on page 1of 57

Unit Type Komatsu

No Description A B C
Cat 349 PC 300 LC-6 PC 400 LC-6
1 Dimension (meter)
a. Overall Length
b. Overall Weidth
c. Overall Height
2 Working Range (meter)
a. Max dumping height
b. Max digging depth
c. Effective dumping height
d. Effective digging depth
e. Min swing radius
3 Travel speed (Km/hrs)
a. High
b. Min
c. low
4 Productivity
a. Bucket Capacity (cu. meters) *' 2.3 1.2 1.8
1) Easy 2.53 1.32 1.98
2) Average 2.3 1.2 1.8
3) Rather Difficult 1.84 0.96 1.44
4) Difficult 1.61 0.84 1.26
b. Cycle Time (Second) *' 29 24 24
1) Digging 6 6 6
2) Swing load 5 5 5
3) Dumping 3 3 3
4) Swing empty 5 5 5
5) Uncondition 5 5 5
c. Productivity base on material
1) Easy 314 198 297
2) Average 286 180 270
3) Rather Difficult 228 144 216
4) Difficult 200 126 189
d. Productivy by Job effeciency
1) Good 261 164 247
2) Average 214 135 203
3) Rather Poor 153 96 145
4) Poor 116 73 110
e. Productivity eff. condition
1) OB (Bcm/hrs) 261 164 247
2) Coal (Ton/hrs) 339 214 320
f. Productivity poor condition
1) OB (Bcm/hrs) 153 73 110
2) Coal (Ton/hrs) 199 95 143
g. Productivity Average
1) OB (Bcm/hrs) 186 117 176
2) Coal (Ton/hrs) 242 152 229
5 Fuel consumtion *'
a. Low 12 20 27
b. Medium 14 23 31
c. High 18 35 48
d. Average 14.67 26.00 35.33
e. Consumtion Liter/Bcm
1) Effective 0.07 0.21 0.19
2) Average 0.08 0.20 0.18
3) Poor 0.08 0.27 0.25
6 Costing
a. OOC
1) Owning Cost $ 8.54 $ 13.79 $ 22.24
2) Operationg Cost $ 24.09 $ 35.89 $ 45.30
3) Fuel ($/hrs)
4) Maintenance $ 8.80 $ 8.80 $ 8.80
b. Rent Cost
1) Rent Cost ($/hrs) $ 13.75 $ 13.75 $ 26.00
2) Operationg Cost $ 19.04 $ 19.04 $ 45.30
3) Fuel ($/hrs)
4) Maintenance $ 19.04 $ 19.04 $ 45.30
c. Mining Contractor
1) Operationg ($/Bcm)
2) Rent cost ($/hrs)
3) Over haul distance ($/meter)

ID 15 16 1
ype Komatsu
D E No Parameter
PC 800-8 Cat 320 D2
1 Bucket Capacity
a. Easy
b. Average
c. Rather difficult
d. Difficult
2 Job efficiency
a. Good
b. Average
c. Rather Poor
d. Poor

3.1 1
3.41 1.1
3.1 1
2.48 0.8
2.17 0.7
32 25
6 7
6 6
3 3
6 5
5 4

384 158
349 144
279 115
244 101

318 131
262 108
187 77
142 58

318 131
142 58

227 94

37 51
47 64
67 94
50.33 69.67

0.21 0.71
0.21 0.68
0.26 0.87
ID

$ 39.87 $ 49.24
$ 57.23 $ 117.90 1120

$ 8.80 $ 7.63

$ 46.61 $ 57.55
$ 57.23 $ 119.33

$ 57.23 $ 119.33

2 3
Description Value

Natural ground of clayey soil, clay soft clay 1.1


Natural ground of sandy soil dry soil 1
Natural ground sandy soil with gravel 0.8
Loading blasted rock 0.7

Experience Operator and good condition 0.83


Experience Operator and poor condition 0.75
Experience Operator and conditional area 0.67
Newbie Operator 0.58
34.61972 57.234 8.8045263

29000
25.8928571428571
Unit
No Description 1 2
HD 465-7R HD 785-7
1 Dimension (m)
a. Overall Length 9.355 10.29
b. Overall Weidth 5.395 5.53
c. Overall Height 4.4 5.05
2 Working range
a. Loading Height 3.6 4.25
b. Minimum turning radius 8.5 10.1
c. Maximum steering angle 39 41
3 Travel Peformance (Km/hrs) *'
a. F1 7.5 7.5
b. F2 12.5 12.5
b. F3 17.5 17.5
b. F4 25 25
b. F5 33.5 33.5
b. F6 44.5 44.5
b. F7 56 56
4 Cycle Time *'
a. Manuver Loading 48 48
b. Traveling
1) Front to Ramp 72 72
2) Ramp to Surf. Pit 108 108
3) Disposal to Front Dumping 72 72
4) Dumping, Spot, & Delay 198 198
d. Total cycle time (min) 8.3 8.3
5 Capacity
a. Struck (cu. meter) 25 40
b. Heaped (cu. meter) 34 60
c. Payload (Ton) 55 91
6 Fuel Consumption (liter/hour)
a. Low 41.9 55.9
b. Medium 55.9 74.5
c. High 69.9 93.1
d. Average 55.9 74.5
6 Costing
a. OOC
1) Owning Cost $ 33.14 $ 51.75
2) Operationg Cost $ 81.97 $ 98.71
3) Fuel ($/hrs)
4) Maintenance $ 8.08 $ 10.83
b. Rent Cost
1) Rent Cost ($/hrs) $ 38.74 $ 60.49
2) Operationg Cost $ 81.97 $ 98.71
3) Fuel ($/hrs)
4) Maintenance $ 8.08 $ 10.83
c. Mining Contractor
1) Operationg ($/Bcm)
2) Rent cost ($/hrs)
3) Over haul distance ($/meter)
4) Total ($/bcm)

ID 4 5

Note :
1. Travel peformance average
2. Cycle time no include loading time
3. Cycle time no include travel to disposal
Unit
3 4 5 6
FM 260JD Scania P380 Nissan CWB FM 320 Distance
Disposal
Front to Ramp to
Front to Front
Ramp Surf.
Dump
100 200 300 200

7.5 7.5 7.5 7.5


12.5 12.5 12.5 12.5
17.5 17.5 17.5 17.5
25 25 25 25
33.5 33.5 30 30
44.5 44.5 40 40
56 56 54.7 54.7

48 48 48 48

48 48 48 48
72 72 72 72
48 48 48 48
198 198 198 198
6.9 6.9 7 7

10 12 14 14
12 15 18.5 16.15
26 27 27 27

10.3 13.2 13.24 13.24


15.1 19.4 19.41 19.41
28.3 36.4 36.35 36.35
15.1 19.4 19.41 19.41

$ 6.53 $ 10.21 $ 6.91 $ 6.91


$ 20.17 $ 22.45 $ 20.17 $ 20.17

$ 8.80 $ 8.80 $ 8.80 $ 8.80

$ 7.64 $ 11.93 $ 13.75 $ 13.75


$ 20.17 $ 22.45 $ 19.04 $ 19.04

$ 8.80 $ 8.80 $ 8.80 $ 8.80

6 7 26 26
Exavator
No Cap. Buc. CT. Buc. Fuel Prod
ID Type
(m3) (second) (liter/hrs) (bcm/hrs)
1 C PC 400 LC-6 1.8 24 35 176
2 C PC 400 LC-6 1.8 24 35 176
3 C PC 400 LC-6 1.8 24 35 176
4 #N/A #N/A #N/A #N/A #N/A
5 #N/A #N/A #N/A #N/A #N/A
6 #N/A #N/A #N/A #N/A #N/A
7 #N/A #N/A #N/A #N/A #N/A
8 #N/A #N/A #N/A #N/A #N/A
9 #N/A #N/A #N/A #N/A #N/A
10 #N/A #N/A #N/A #N/A #N/A
11 #N/A #N/A #N/A #N/A #N/A
12 #N/A #N/A #N/A #N/A #N/A
13 #N/A #N/A #N/A #N/A #N/A
14 #N/A #N/A #N/A #N/A #N/A
15 #N/A #N/A #N/A #N/A #N/A
16 #N/A #N/A #N/A #N/A #N/A
17 #N/A #N/A #N/A #N/A #N/A
18 #N/A #N/A #N/A #N/A #N/A
19 #N/A #N/A #N/A #N/A #N/A
20 #N/A #N/A #N/A #N/A #N/A
21 #N/A #N/A #N/A #N/A #N/A
22 #N/A #N/A #N/A #N/A #N/A
23 #N/A #N/A #N/A #N/A #N/A
24 #N/A #N/A #N/A #N/A #N/A
25 #N/A #N/A #N/A #N/A #N/A
26 #N/A #N/A #N/A #N/A #N/A
27 #N/A #N/A #N/A #N/A #N/A
28 #N/A #N/A #N/A #N/A #N/A
29 #N/A #N/A #N/A #N/A #N/A
30 #N/A #N/A #N/A #N/A #N/A
31 #N/A #N/A #N/A #N/A #N/A
32 #N/A #N/A #N/A #N/A #N/A
33 #N/A #N/A #N/A #N/A #N/A
34 #N/A #N/A #N/A #N/A #N/A
35 #N/A #N/A #N/A #N/A #N/A
36 #N/A #N/A #N/A #N/A #N/A
37 #N/A #N/A #N/A #N/A #N/A
38 #N/A #N/A #N/A #N/A #N/A
39 #N/A #N/A #N/A #N/A #N/A
40 #N/A #N/A #N/A #N/A #N/A
41 #N/A #N/A #N/A #N/A #N/A
42 #N/A #N/A #N/A #N/A #N/A
43 #N/A #N/A #N/A #N/A #N/A
44 #N/A #N/A #N/A #N/A #N/A
45 #N/A #N/A #N/A #N/A #N/A
46 #N/A #N/A #N/A #N/A #N/A
47 #N/A #N/A #N/A #N/A #N/A
48 #N/A #N/A #N/A #N/A #N/A
49 #N/A #N/A #N/A #N/A #N/A
42 #N/A #N/A #N/A #N/A #N/A

Exavator
No Cap. Buc. CT. Buc. Fuel Prod
ID Type
(ton) (second) (liter/hrs) (ton/hrs)
1 A Cat 349 3.0 36 15 242
2 A Cat 349 3.0 36 15 242
4 B PC 300 LC-6 1.6 30 26 152
5 B PC 300 LC-6 1.6 30 26 152
Hauler
Cap. Ves. Fuel Avg. Speed Distance CT Front CT Loading
ID Type
(m3) (liter.hrs) (Km/hrs) (m) (min) (min)
4 Scania P380 15 19.4 17.5 900 6.9 3.2
5 Nissan CWB 19 19.4 17.5 900 6.9 4.1
6 Nissan CWB 19 19.4 17.5 900 6.9 4.1
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A

Hauler
Cap. Ves. Fuel Avg. Speed Distance CT Front CT Loading
ID Type
(ton) (liter.hrs) (Km/hrs) (m) (min) (min)
3 FM 260JD 26 15.1 21.3 4,000 6.9 5.3
4 Scania P380 27 19.4 21.3 4,000 6.9 5.5
3 FM 260JD 26 15.1 21.3 4,000 6.9 8.3
4 Scania P380 27 19.4 21.3 4,000 6.9 8.7
Hauler
CT Travel Tot. CT Production Trip 1 unit Hauler Prod. Loss
(min) (min) Value Round Bcm/hrs Unit Bcm/hrs Bcm/hrs
3.1 13.2 4.54 4 58 4 198 22
3.1 14.1 4.26 4 74 3 189 13
3.1 14.1 4.26 4 74 3 189 13
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

Hauler
CT Travel Tot. CT Production Trip 1 unit Hauler Prod. Loss
(min) (min) Value Round ton/hrs Unit ton/hrs ton/hrs
11.3 23.4 2.56 2 52 5 221 21
11.3 23.6 2.54 2 54 5 230 12
11.3 26.5 2.26 2 52 3 133 20
11.3 26.8 2.23 2 54 3 138 15
Fleet Simulation Target Fleet OB
Prod Fuel Prod. (bcm) Logic. ID
FR Total
Bcm/hrs (Liter) Daily Weekly Mothly Logic. Match
176 113 0.64 2,286 16,001 59,433 2 Match 1
176 94 0.53 2,286 16,001 59,433 2 Match 2
176 94 0.53 2,286 16,001 59,433 2 Match 3
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -

Fleet Simulation Target Fleet OB


Prod Fuel Prod. (ton) ID
FR Total Fleet Logic.
ton/hrs (Liter) Daily Match
221 90 0.41 2,873 - - -
230 112 0.49 2,984 - - -
133 71 0.54 1,724 - - -
138 84 0.61 1,790 - - -
Costing
Cost Exca
Owning Rent Operating Maintenance All Owning All Rent
$ 22.24 $ 26.00 $ 45.30 $ 8.80 $ 31.05 $ 34.81
$ 22.24 $ 26.00 $ 45.30 $ 8.80 $ 31.05 $ 34.81
$ 22.24 $ 26.00 $ 45.30 $ 8.80 $ 31.05 $ 34.81
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
Costing
Cost Hauler
Owning Rent Operating Maintenance All Owning All Rent
$ 10.21 $ 11.93 $ 22.45 $ 8.80 $ 76.05 $ 82.95
$ 6.91 $ 13.75 $ 20.17 $ 8.80 $ 47.15 $ 67.67
$ 6.91 $ 13.75 $ 20.17 $ 8.80 $ 47.15 $ 67.67
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
EWH 13
Setting Working Geometry Fleet Sim.
Tinggi IB Luas Front Target Distance Total
Overburden (m) (ha) (bcm) (m) (fleet)
87,044 900 2

Fleet Matching
No ID
Excavator Hauler Prod
Type Type Unit (bcm/hrs) (bcm/fleet)
1 1 PC 400 LC-6 Scania P380 4 176 68,577
2 2 PC 400 LC-6 Nissan CWB 3 176 68,577
3 - - - - -
4 - - - - -
5 - - - - -
6 - - - - -
7 - - - - -
8 - - - - -
9 - - - - -
10 - - - - -

Setting Working Geometry


Tebal Coal Luas Inventory Target Daily Distance
Coal (m) (ha) (ton) (ton) (m)
0

Fleet Matching
No ID Excavator Hauler Prod
Type Type Unit (ton/hrs) (ton/fleet)
1 - - - - -
2 - - - - -
3 - - - - -
4 - - - - -
5 - - - - -
6 - - - - -
7 - - - - -
8 - - - - -
9 - - - - -
10 - - - - -
Kurs Rp 12,500
Fleet Sim. $ 0.88
Solar
Rp 11,000
Day

30

Cost
Excavator Hauler
Fuel Database
Owning Rent Owning Rent
(liter/hrs) FR $ ($/hrs) ($/hrs) ($/hrs) ($/hrs)
113 $ 0.64 $ 99.42 $ 31.05 $ 34.81 $ 76.05 $ 82.95
94 $ 0.53 $ 82.34 $ 31.05 $ 34.81 $ 47.15 $ 67.67
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -

Fleet Sim.
Total
Day
(fleet)

Cost
Fuel
(liter/hrs) FR $ (ton/hrs)
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
Cost
Total Exclude Fuel Total Include Fuel
Owning Rent OOC Rent + Operating
($/hrs) ($/Bcm) ($/hrs) ($/Bcm) ($/hrs) ($/Bcm) ($/hrs)
$ 107.10 $ 0.61 $ 117.75 $ 0.67 $ 206.52 $ 1.17 $ 217.18
$ 78.20 $ 0.44 $ 102.48 $ 0.58 $ 160.54 $ 0.91 $ 184.82
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
Fuel
Rent + Operating
($/Bcm)
$ 1.24
$ 1.05
-
-
-
-
-
-
-
-
Fleet Matching
No ID
Excavator Hauler Prod
Type Type Unit (bcm/hrs) (bcm/fleet)
1 1 PC 400 LC-6 Scania P380 4 176 68,577
2 2 PC 400 LC-6 Nissan CWB 3 176 68,577
3 3 PC 400 LC-6 Nissan CWB 3 176 68,577
4 - - - - -
5 - - - - -
6 - - - - -
7 - - - - -
8 - - - - -
9 - - - - -
10 - - - - -
11 - - - - -
12 - - - - -
13 - - - - -
14 - - - - -
15 - - - - -
16 - - - - -
17 - - - - -
18 - - - - -
19 - - - - -
20 - - - - -
21 - - - - -
22 - - - - -
23 - - - - -
24 - - - - -
25 - - - - -
26 - - - - -
27 - - - - -
28 - - - - -
29 - - - - -
30 - - - - -
31 - - - - -
32 - - - - -
33 - - - - -

HD 465-7R #VALUE!
HD 785-7 #VALUE!
FM 260 JD #VALUE!
Scania #VALUE!
Cat 740 #VALUE!
Cost
Excavator Hauler Total Exclude F
Fuel Database
Owning Rent Owning Rent Owning
(liter/hrs) FR $ ($/hrs) ($/hrs) ($/hrs) ($/hrs) ($/hrs)
113 0.64 $ 99.42 $ 31.05 $ 34.81 $ 76.05 $ 82.95 $ 107.10
94 0.53 $ 82.34 $ 31.05 $ 34.81 $ 47.15 $ 67.67 $ 78.20
94 0.53 $ 82.34 $ 31.05 $ 34.81 $ 47.15 $ 67.67 $ 78.20
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
Cost
Total Exclude Fuel Total Include Fuel
Distance
Owning Rent OOC Rent + Operating
($/Bcm) ($/hrs) ($/Bcm) ($/hrs) ($/Bcm) ($/hrs) ($/Bcm)
$ 0.61 $ 117.75 $ 0.67 $ 206.52 $ 1.17 $ 217.18 $ 1.24
$ 0.44 $ 102.48 $ 0.58 $ 160.54 $ 0.91 $ 184.82 $ 1.05
$ 0.44 $ 102.48 $ 0.58 $ 160.54 $ 0.91 $ 184.82 $ 1.05
- - - - - - -
- - - - - - - 1,000
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
2,500
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
4,000
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
OFR September 2014
Fle
Activity Target Exavator
Loc. Fleet (n)
Type
Waste Removal
1. Unload Toposil Lcm -
2. Mud Remove Lcm -
3. OB Removal 68,577 Bcm F1 1 PC 400 LC-6
18,468 Bcm 1 PC 400 LC-6
Coal Getting
1. Coal Getting Ton 1 -
Total
Overbudren 87,044 Bcm Produtivity
Mud 0 Lcm OB 352
Coal 0 Ton Mud 0
SR Non Mud #DIV/0! Coal #VALUE!
SR Include Mud #DIV/0! Fleet 3

Productivity
Activity Unit
PA Eff. Unit Prod

General Working
1. Cleaning Coal PC 200 85% 55%
2. Reshaping Slope - 85% 55%
3. Topsoil Rehandle - 85% 55%
4. Front Support D375-5 85% 55%
5. Dumping Support D375-5 85% 55%
D375-5 85% 55%
Support
1. Grader GD705-A4 85% 55%
2. Tower Lamp Tower Lamp 85% 55%
3. Water Pumping SYKESS-HH160i SS 55%
4. Compact -
5. Fuel Truck Fuel Truck 85% 55%
6. Lube Truck Lube Truck 85% 55%
Total Support Cost

Mining Operation (Exlude Man Power) Over Hauling Distance Average (A)
Exclude Fuel Price Var Price
1. Owning Cost A $ 2.33
a. Operation $ 156.41 B #VALUE!
b. Support $ 152.12
c. Blasting $ 0.44 Cost
d. Total $ 308.97
e. Cost $/Bcm $ 1.32
2. RentCost Over Hauling Distance Average (B)
a. Operation $ 204.96 Var Price
b. Support $ 189.49 A $ 2.33
c. Blasting $ 0.44 B #VALUE!
d. Total $ 394.89
e. Cost $/Bcm $ 1.57
Include Fuel
1. Owning Cost
a. Operation $ 321.09
b. Support $ 340.03
c. Blasting $ 0.44
d. Total $ 661.57
e. Cost $/Bcm $ 2.33
2. RentCost
a. Operation $ 369.64
b. Support $ 377.40
c. Blasting $ 0.44
d. Total $ 747.49
e. Cost $/Bcm $ 2.57
Fleet Setting Costing ($/hrs)
Hauler Distance Prod No. ID Excluce Fuel
Type Unit (meter) (Bcm/hrs) (Bcm/fleet) Owning

- - 1,000 - - -
- - 1,000 - - -
Nissan CWB 3 1,000 176 68,577 2 $ 78.20
Nissan CWB 3 1,000 176 68,577 2 $ 78.20

- - 4,000 - - 18 -

Total Cost OB $ 156.41


Bcm/hrs Total Cost Mud -
Lcm/hrs Total Cost Coal -
Ton/hrs Total Opr. Cost $ 156.41
Fleet

Costing ($/hrs)
ID Excluce Fuel Incluce Fuel
Owning Rent & Opr. Owning Rent & Opr.

15 $ 17.34 $ 18.79 $ 32.62 $ 34.07


- - - -
- - - -
21 $ 50.73 $ 69.24 $ 134.52 $ 153.02
21 $ 50.73 $ 69.24 $ 134.52 $ 153.02
21 $ 50.73 $ 69.24 $ 134.52 $ 153.02

20 $ 33.56 $ 37.74 $ 61.98 $ 66.16


19 $ 9.68 $ 9.82 $ 11.95 $ 12.10
25 $ 20.57 $ 22.56 $ 30.80 $ 32.79
- - - -
22 $ 20.05 $ 22.12 $ 37.11 $ 39.18
23 $ 23.18 $ 25.78 $ 40.23 $ 42.83
$ 152.12 $ 189.49 $ 340.03 $ 377.40

Distance Average (A)


Distance Over_Dist Unit Measure
1000
0 100
1000

#VALUE!
Distance Average (B)
Distance Over_Dist Unit Measure
1000
0 100
1000
OFR Oktober-Desember 2014
Costing ($/hrs)
Eff. Work
Excluce Fuel Incluce Fuel Eff. Prod. Activity
(%)
Rent & Opr. Owning Rent & Opr.
Waste Removal
- - - #VALUE! #VALUE!
- - - #VALUE! #VALUE!
$ 102.48 $ 160.54 $ 184.82 100% 176
$ 102.48 $ 160.54 $ 184.82 27% 47
Coal Getting
- - - #VALUE! #VALUE!
Total
$ 204.96 $ 321.09 $ 369.64
- - -
Estimate
- - -
$ 204.96 $ 321.09 $ 369.64

Activity

General Working

Support

Total Support Cost

Mining Operation (Exlude Man P


Exclude Fuel
1. Owning Cost
2. RentCost

Include Fuel
1. Owning Cost

2. RentCost
OFR Oktober-Desember 2014
Fleet Setting
Activity Target Exavator Hauler
Loc. Fleet (n)
Type Type
Waste Removal
1. Unload Toposil 0 Lcm - -
2. Mud Remove 30,948 Lcm F1 1 - -
3. OB Removal 137,153 Bcm F2, F3 2 - -
36,936 Bcm F4, F5 2 - -
Coal Getting
1. Coal Getting 50,000 Ton C1 1 - -
Total
Overbudren 174,089 Bcm Produtivity
Mud 30,948 Lcm OB 0 Bcm/hrs
Coal 50,000 Ton Mud #VALUE! Lcm/hrs
SR Non Mud 3.48 Coal #VALUE! Ton/hrs
SR Include Mud 4.10 Fleet 6 Fleet

Productivity
Activity Unit ID
PA Eff. Unit Prod

General Working
1. Cleaning Coal PC 200 85% 55% 15
2. Reshaping Slope - 85% 55%
3. Topsoil Rehandle - 85% 55%
4. Front Support D375-5 85% 55% 21
5. Dumping Support D375-5 85% 55% 21
D375-5 85% 55% 21
Support
1. Grader GD705-A4 85% 55% 20
2. Tower Lamp Tower Lamp 85% 55% 19
3. Water Pumping SYKESS-HH160i SS 55% 25
4. Compact -
5. Fuel Truck Fuel Truck 85% 55% 22
6. Lube Truck Lube Truck 85% 55% 23
Total Support Cost

Mining Operation (Exlude Man Power)


Exclude Fuel Eqipment
1. Owning Cost
a. Operation $ -
b. Support $ 152.12
c. Blasting $ 0.44
d. Total $ 152.56
e. Cost $/Bcm #VALUE!
2. RentCost
a. Operation $ -
b. Support $ 189.49
c. Blasting $ 0.44
d. Total $ 189.93
e. Cost $/Bcm #VALUE!
Include Fuel
1. Owning Cost
a. Operation $ -
b. Support $ 340.03
c. Blasting $ 0.44
d. Total $ 340.48
e. Cost $/Bcm #VALUE!
2. RentCost
a. Operation $ -
b. Support $ 377.40
c. Blasting $ 0.44
d. Total $ 377.85
e. Cost $/Bcm #VALUE!
Fleet Setting Costing ($/hrs)
Hauler Distance Prod ID Excluce Fuel
Unit (meter) (Bcm/hrs) (Bcm/fleet) Owning Rent & Opr.

- - - - - -
- 2,500 - - 15 - -
- 2,500 - - 13 - -
- 2,500 - - 11 - -

- 4,000 - - 21 - -

Total Cost OB $ - $ -
Total Cost Mud - -
Total Cost Coal - -
Total Opr. Cost $ - $ -

Costing ($/hrs)
Excluce Fuel Incluce Fuel
Owning Rent & Opr. Owning Rent & Opr.

$ 17.34 $ 18.79 $ 32.62 $ 34.07


- - - -
- - - -
$ 50.73 $ 69.24 $ 134.52 $ 153.02
$ 50.73 $ 69.24 $ 134.52 $ 153.02
$ 50.73 $ 69.24 $ 134.52 $ 153.02

$ 33.56 $ 37.74 $ 61.98 $ 66.16


$ 9.68 $ 9.82 $ 11.95 $ 12.10
$ 20.57 $ 22.56 $ 30.80 $ 32.79
- - - -
$ 20.05 $ 22.12 $ 37.11 $ 39.18
$ 23.18 $ 25.78 $ 40.23 $ 42.83
$ 152.12 $ 189.49 $ 340.03 $ 377.40
Costing ($/hrs)
Eff. Work
Incluce Fuel Eff. Prod.
(%)
Owning Rent & Opr.

- - - -
- - #VALUE! #VALUE!
- - #VALUE! #VALUE!
- - #VALUE! #VALUE!

- - #VALUE! #VALUE!

$ - $ -
- -
Estimate
- -
$ - $ -
Ops. 1
2014
Material
August September October November
Topsoil - 28,000
Overburden - 275,000 550,000 550,000
Mud - 30,948 30,948 30,948
Coal - 25,000 50,000 50,000
SR - 13.36 11.50 11.50
SR Non Mud - 11.00 11.00 11.00
Total
December

550,000 1,650,000
30,948 123,792
50,000 175,000
11.50 9.99
11.00 9.43
PARAMETER COST

Kurs 1 USD 9,500.00 IDR Rp 129,500,000.00 Shank


Price fuel (ltr) 10,800.00 IDR Rp 4,250,000.00 Shank Protector
Price Hydro\Trans\Final Drive (ltr) 17,000.00 IDR Rp 1,800,000.00 Point Ripper
Price Engine oil (ltr) 19,100.00 IDR Tyre Price ($)

Grease (kg) 20,850.00 IDR Rp 97,000,000.00 HD785


Operator Wage 3.00 $/hrs Rp 97,000,000.00 HD465
Eq. Price sudah termasuk delivery Price Rp 5,000,000.00 Scania
Resale value : 10% Rp 34,600,000.00 HM 400
Umur alat Rp 27,500,000.00 GD-825A-2 300 4200 Rp 38,220,000.00
Production Equipment 5 year Rp 27,500,000.00 GD705 Rp 98,912,885.60 18300 Rp 166,530,000.00
Support Equipment 4 year Rp 593,477,313.62 14100 Rp 128,310,000.00
Annual Rate 15% Rp 56,540,012.72 Rp 760,007,313.62
Rp 735,020,165.42 Rp 773,240,165.42
Rp 141,542,851.80 Rp (13,232,851.80)
25,272
$ 0.63
OWNING COST OPERATING COST

Net Depretiations Depretiations Depretiati Interest, Total Fuel by Transmiss Final Drive Hydroulic
ID EQUIPMENT Price PPN 10% WH/Years r factor tax, Owning Engine Oil Grease Filters Tyre
Value Time on Cost actual ion Oil Oil Oil
insurance Cost

1 HM 400 $ 371,000.00 $ 37,100.00 $ 333,900.00 4,056 20,280 $ 16.46 0.10 0.64 $ 7.90 $ 24.37 $ 38.65 $ 0.22 $ 0.21 $ 0.14 $ 0.09 $ 0.04 $ 0.33 $ 0.73
2 HD465 $ 504,538.00 $ 50,453.80 $ 454,084.20 4,056 20,280 $ 22.39 0.10 0.64 $ 10.75 $ 33.14 $ 73.89 $ 0.22 $ 0.21 $ 0.14 $ 0.09 $ 0.04 $ 0.33 $ 0.73
3 D375-5 $ 658,180.00 $ 65,818.00 $ 592,362.00 4,056 20,280 $ 29.21 0.10 0.64 $ 14.02 $ 43.23 $ 83.79 $ 0.24 $ 0.27 $ 0.13 $ 0.11 $ 0.09 $ 0.37
4 PC 1250-7 $ 749,654.00 $ 74,965.40 $ 674,688.60 4,056 20,280 $ 33.27 0.10 0.64 $ 15.97 $ 49.24 $ 110.27 $ 0.24 $ 0.09 $ 0.04 $ 0.25 $ 0.40 $ 0.31
5 PC2000-1 $ 1,589,209.00 $ 158,920.90 $ 1,430,288.10 4,056 20,280 $ 70.53 0.10 0.64 $ 33.85 $ 104.38 $ 80.49 $ 0.48 $ 0.11 $ 0.15 $ 0.47 $ 0.18 $ 0.60
6 GD705-5 $ 272,674.00 $ 27,267.40 $ 245,406.60 4,056 20,280 $ 12.10 0.10 0.64 $ 5.81 $ 17.91 $ 23.65 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 1.45
7 GD825 $ 453,244.00 $ 45,324.40 $ 407,919.60 4,056 20,280 $ 20.11 0.10 0.64 $ 9.65 $ 29.77 $ 35.24 $ 0.32 $ 0.07 $ 0.23 $ 0.16 $ 0.09 $ 0.39 $ 1.45
8 HD785 $ 787,861.00 $ 78,786.10 $ 709,074.90 4,056 20,280 $ 34.96 0.10 0.64 $ 16.78 $ 51.75 $ 87.88 $ 0.52 $ 0.38 $ 0.23 $ 0.14 $ 0.07 $ 0.64 $ 2.55
9 Fuel Truck $ 186,500.00 $ 18,650.00 $ 167,850.00 4,056 20,280 $ 8.28 0.10 0.64 $ 3.97 $ 12.25 $ 17.05 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
10 Crane Truck $ 185,895.35 $ 18,589.53 $ 167,305.81 4,056 20,280 $ 8.25 0.10 0.64 $ 3.96 $ 12.21 $ 17.05 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
11 Lube Truck $ 234,100.00 $ 23,410.00 $ 210,690.00 4,056 20,280 $ 10.39 0.10 0.64 $ 4.99 $ 15.38 $ 17.05 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
12 Drilling $ 765,000.00 $ 76,500.00 $ 688,500.00 4,056 20,280 $ 33.95 0.10 0.64 $ 16.30 $ 50.25 $ 45.47 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
13 Tower Lamp $ 20,540.00 $ 2,054.00 $ 18,486.00 4,056 20,280 $ 0.91 0.10 0.64 $ 0.44 $ 1.35 $ 2.00 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
14 Forklift 3 ton $ 52,275.00 $ 5,227.50 $ 47,047.50 4,056 20,280 $ 2.32 0.10 0.64 $ 1.11 $ 3.43 $ 2.27 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
15 Forklift 5 ton $ 65,915.13 $ 6,591.51 $ 59,323.62 4,056 20,280 $ 2.93 0.10 0.64 $ 1.40 $ 4.33 $ 3.41 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
16 Genset PL 380 $ 42,000.00 $ 4,200.00 $ 37,800.00 4,056 20,280 $ 1.86 0.10 0.64 $ 0.89 $ 2.76 $ 10.23 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
17 Genset PL 30 $ 10,500.00 $ 1,050.00 $ 9,450.00 4,056 20,280 $ 0.47 0.10 0.64 $ 0.22 $ 0.69 $ 9.09 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
18 MF290 $ 134,651.08 $ 13,465.11 $ 121,185.97 4,056 20,280 $ 5.98 0.10 0.64 $ 2.87 $ 8.84 $ 9.09 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
19 SCANIA P380 $ 155,418.42 $ 15,541.84 $ 139,876.58 4,056 20,280 $ 6.90 0.10 0.64 $ 3.31 $ 10.21 $ 13.64 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
20 PC800 $ 607,087.96 $ 60,708.80 $ 546,379.17 4,056 20,280 $ 26.94 0.10 0.64 $ 12.93 $ 39.87 $ 48.43 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
21 Hino FM260JD $ 99,473.68 $ 9,947.37 $ 89,526.32 4,056 20,280 $ 4.41 0.10 0.64 $ 2.12 $ 6.53 $ 11.37 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
22 WA500-3 $ 913,000.00 $ 91,300.00 $ 821,700.00 4,056 20,280 $ 40.52 0.10 0.64 $ 19.45 $ 59.97 $ 33.31 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
23 EX-CAT349DL $ 433,064.21 $ 43,306.42 $ 389,757.79 4,056 20,280 $ 19.22 0.10 0.64 $ 9.23 $ 28.44 $ 37.52 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
24 GS-CUMMINS S38G7 $ 16,500.00 $ 1,650.00 $ 14,850.00 4,056 20,280 $ 0.73 0.10 0.64 $ 0.35 $ 1.08 $ 10.23 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
25 SYKESS-HH160i SS $ 179,126.32 $ 17,912.63 $ 161,213.68 4,056 20,280 $ 7.95 0.10 0.64 $ 3.82 $ 11.77 $ 10.23 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
26 PC400LCSE-7 $ 338,684.21 $ 33,868.42 $ 304,815.79 4,056 20,280 $ 15.03 0.10 0.64 $ 7.21 $ 22.24 $ 36.49 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
27 GD705-A4 $ 376,894.74 $ 37,689.47 $ 339,205.26 4,056 20,280 $ 16.73 0.10 0.64 $ 8.03 $ 24.75 $ 28.42 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
28 Bomag BW 211D-40 $ 80,995.05 $ 8,099.51 $ 72,895.55 4,056 20,280 $ 3.59 0.10 0.64 $ 1.73 $ 5.32 $ 17.05 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
29 Tower Lamp $ 13,275.81 $ 1,327.58 $ 11,948.23 4,056 20,280 $ 0.59 0.10 0.64 $ 0.28 $ 0.87 $ 2.27 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
30 NISSAN CWB $ 105,263.16 $ 10,526.32 $ 94,736.84 4,056 20,280 $ 4.67 0.10 0.64 $ 2.24 $ 6.91 $ 11.37 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
31 Articulate CAT 740 $ 420,000.00 $ 42,000.00 $ 378,000.00 4,056 20,280 $ 18.64 0.10 0.64 $ 8.95 $ 27.59 $ 33.96 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
32 PC 200 $ 130,000.00 $ 13,000.00 $ 117,000.00 4,056 20,280 $ 5.77 0.10 0.64 $ 2.77 $ 8.54 $ 15.28 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
33 PC 300 $ 210,000.00 $ 21,000.00 $ 189,000.00 4,056 20,280 $ 9.32 0.10 0.64 $ 4.47 $ 13.79 $ 27.08 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26

ID Unit Owning Cost Total Operating Maintenace Own Operating Total All Prod.
Cost
26 1 PC400LCSE-7 $ 22.24 $ 45.30 $ 8.80 Scania $ 10.21 $ 22.45 $ 32.65 $ 97.96
20 2 PC800 $ 39.87 $ 57.23 $ 8.80 HD 785 $ 51.75 $ 98.71 $ 150.45 $ 451.36
4 3 PC 1250-7 $ 49.24 $ 117.90 $ 7.63 PC 400 $ 22.24 $ 45.30 $ 67.54 $ 67.54
2 4 HD465 $ 33.14 $ 81.97 $ 8.08 Total $ 518.91 180 $ 2.88
8 5 HD785 $ 51.75 $ 98.71 $ 10.83
21 6 Hino FM260JD $ 6.53 $ 20.17 $ 8.80
19 7 SCANIA P380 $ 10.21 $ 22.45 $ 8.80
3 8 D375-5 $ 43.23 $ 91.29 $ 7.50
27 9 GD705-A4 $ 24.75 $ 37.23 $ 8.80
6 10 GD705-5 $ 17.91 $ 32.64 $ 8.99
7 11 GD825 $ 29.77 $ 44.26 $ 9.02
29 12 Tower Lamp $ 0.87 $ 11.08 $ 8.80
9 13 Fuel Truck $ 12.25 $ 24.86 $ 7.80
25 14 SYKESS-HH160i SS $ 11.77 $ 19.04 $ 8.80
32 15 PC 200 $ 8.54 $ 24.09 $ 8.80
33 16 PC 300 $ 13.79 $ 35.89 $ 8.80
31 17 Articulate CAT 740 $ 27.59 $ 42.76 $ 8.80
18 - - - -
29 19 Tower Lamp $ 0.87 $ 11.08 $ 8.80
27 20 GD705-A4 $ 24.75 $ 37.23 $ 8.80
3 21 D375-5 $ 43.23 $ 91.29 $ 7.50
9 22 Fuel Truck $ 12.25 $ 24.86 $ 7.80
11 23 Lube Truck $ 15.38 $ 24.86 $ 7.80
16 24 Genset PL 380 $ 2.76 $ 20.04 $ 9.80
25 25 SYKESS-HH160i SS $ 11.77 $ 19.04 $ 8.80
30 26 NISSAN CWB $ 6.91 $ 20.17 $ 8.80
27 - - - -
28 - - - -
29 - - - -
30 - - - -
31 - - - -
32 - - - -
33 - - - -
34 - - - -
35 - - - -
36 - - - -
37 - - - -
38 - - - -
39 - - - -
40 - - - -
41 - - - -
42 - - - -
43 - - - -
44 - - - -
Operator Repair Tot Total RATE
GET Operating O & O Cost EXCLUDED
Wage Cost Maintenance
Cost FUEL

$ 3.00 $ 3.30 $ 8.08 $ 46.73 $ 71.10 $ 32.44 HM 400


$ 3.00 $ 3.30 $ 8.08 $ 81.97 $ 115.11 $ 41.21 HD465
$ 3.00 $ 3.30 $ 11.20 $ 7.50 $ 91.29 $ 134.52 $ 50.73 - D375-5
$ 3.00 $ 3.30 $ 1.43 $ 7.63 $ 117.90 $ 167.14 $ 56.86 PC 1250-7
$ 3.00 $ 3.30 $ 1.43 $ 8.29 $ 88.77 $ 193.15 $ 112.67 PC2000-1
$ 3.00 $ 3.30 $ 1.89 $ 8.99 $ 32.64 $ 50.54 $ 26.90 GD705-5
$ 3.00 $ 3.30 $ 1.89 $ 9.02 $ 44.26 $ 74.03 $ 38.78 GD825
$ 3.00 $ 3.30 $ 10.83 $ 98.71 $ 150.45 $ 62.58 HD785 0.1901885204 37.0714285714 185.333333333333
$ 3.00 $ 3.30 $ 7.80 $ 24.86 $ 37.11 $ 20.05 Fuel Truck 28.3461538462 258
$ 3.00 $ 3.30 $ 7.80 $ 24.86 $ 37.07 $ 20.01 Crane Truck 72.6666666666667
$ 3.00 $ 3.30 $ 7.80 $ 24.86 $ 40.23 $ 23.18 Lube Truck
$ 3.00 $ 3.30 $ 7.80 $ 53.28 $ 103.52 $ 58.05 Drilling
$ 3.00 $ 3.30 $ 7.80 $ 9.80 $ 11.15 $ 9.15 Tower Lamp
$ 3.00 $ 3.30 $ 7.80 $ 10.08 $ 13.51 $ 11.24 Forklift 3 ton
$ 3.00 $ 4.30 $ 8.80 $ 12.22 $ 16.54 $ 13.13 Forklift 5 ton
$ 3.00 $ 5.30 $ 9.80 $ 20.04 $ 22.79 $ 12.56 Genset PL 380
$ 3.00 $ 6.30 $ 10.80 $ 19.90 $ 20.59 $ 11.49 Genset PL 30
$ 3.00 $ 4.30 $ 8.80 $ 17.90 $ 26.74 $ 17.65 MF290
$ 3.00 $ 4.30 $ 8.80 $ 22.45 $ 32.65 $ 19.01 SCANIA P380 Rp 64,623,417.04 Rp 323,117,085.18
$ 3.00 $ 4.30 $ 8.80 $ 57.23 $ 97.11 $ 48.68 PC800 Rp 142,570,486.84 Rp 142,570,486.84
$ 3.00 $ 4.30 $ 8.80 $ 20.17 $ 26.71 $ 15.34 Hino FM260JD Rp 52,641,421.38 Rp 526,414,213.79
$ 3.00 $ 4.30 $ 8.80 $ 42.11 $ 102.08 $ 68.77 WA500-3 Rp 198,621,323.64 Rp 198,621,323.64
$ 3.00 $ 4.30 $ 8.80 $ 46.32 $ 74.76 $ 37.25 EX-CAT349DL Rp 110,684,925.74 Rp 110,684,925.74
$ 3.00 $ 4.30 $ 8.80 $ 19.04 $ 20.12 $ 9.89 GS-CUMMINS S38G7 Rp 34,870,485.63 Rp 34,870,485.63
$ 3.00 $ 4.30 $ 8.80 $ 19.04 $ 30.80 $ 20.57 SYKESS-HH160i SS Rp 69,701,068.80 Rp 69,701,068.80
$ 3.00 $ 4.30 $ 8.80 $ 45.30 $ 67.54 $ 31.05 PC400LCSE-7
$ 3.00 $ 4.30 $ 8.80 $ 37.23 $ 61.98 $ 33.56 GD705-A4
$ 3.00 $ 4.30 $ 8.80 $ 25.86 $ 31.18 $ 14.12 Bomag BW 211D-40
$ 3.00 $ 4.30 $ 8.80 $ 11.08 $ 11.95 $ 9.68 Tower Lamp
$ 3.00 $ 4.30 $ 8.80 $ 20.17 $ 27.09 $ 15.72 NISSAN CWB Rp 53,881,385.18 Rp 269,406,925.90
$ 3.00 $ 4.30 $ 8.80 $ 42.76 $ 70.35 $ 36.39 Articulate CAT 740
$ 3.00 $ 4.30 $ 8.80 $ 24.09 $ 32.62 $ 17.34 PC 200
$ 3.00 $ 4.30 $ 8.80 $ 35.89 $ 49.68 $ 22.60 PC 300
$ 31,831.58
PARAMETER COST

Kurs 1 USD 9,500.00 IDR Rp 129,500,000.00 Shank


Price fuel (ltr) 10,800.00 IDR Rp 4,250,000.00 Shank Protector
Price Hydro\Trans\Final Drive (ltr) 17,000.00 IDR Rp 1,800,000.00 Point Ripper
Price Engine oil (ltr) 19,100.00 IDR Tyre Price ($)

Grease (kg) 20,850.00 IDR Rp 97,000,000.00 HD785


Operator Wage 3.00 $/hrs Rp 97,000,000.00 HD465
Eq. Price sudah termasuk delivery Price Rp 5,000,000.00 Scania
Resale value : 10% Rp 34,600,000.00 HM 400
Umur alat Rp 27,500,000.00 GD-825A-2 300 4200 Rp 38,220,000.00
Production Equipment 4 year Rp 27,500,000.00 GD705 Rp 111,897,319.43 18300 Rp 166,530,000.00
Support Equipment 4 year Rp 671,383,916.56 14100 Rp 128,310,000.00
Annual Rate 15% Rp 56,540,012.72 Rp 837,913,916.56
Rp 735,020,165.42 Rp 773,240,165.42
Rp 63,636,248.85 Rp 64,673,751.15
25,272

OWNING COST OPERATING COST

Net Depretiations Depretiations Depretiati Interest, Total Owning Engine Transmiss Final Drive Hydroulic
ID EQUIPMENT Price PPN 10% WH/Years r factor tax, Fuel Grease Filters Tyre
Value Time on Cost insurance Cost Oil ion Oil Oil Oil

1 HM 400 $ 371,000.00 $ 37,100.00 $ 333,900.00 4,056 16,224 $ 20.58 0.10 0.64 $ 7.90 $ 28.48 $ 38.65 $ 0.22 $ 0.21 $ 0.14 $ 0.09 $ 0.04 $ 0.33 $ 0.73
2 HD465 $ 504,538.00 $ 50,453.80 $ 454,084.20 4,056 16,224 $ 27.99 0.10 0.64 $ 10.75 $ 38.74 $ 73.89 $ 0.22 $ 0.21 $ 0.14 $ 0.09 $ 0.04 $ 0.33 $ 0.73
3 D375-5 $ 658,180.00 $ 65,818.00 $ 592,362.00 4,056 16,224 $ 36.51 0.10 0.64 $ 14.02 $ 50.53 $ 83.79 $ 0.24 $ 0.27 $ 0.13 $ 0.11 $ 0.09 $ 0.37
4 PC 1250-7 $ 749,654.00 $ 74,965.40 $ 674,688.60 4,056 16,224 $ 41.59 0.10 0.64 $ 15.97 $ 57.55 $ 110.27 $ 0.24 $ 0.09 $ 0.04 $ 0.25 $ 0.40 $ 0.31
5 PC2000-1 $ 1,589,209.00 $ 158,920.90 $ 1,430,288.10 4,056 16,224 $ 88.16 0.10 0.64 $ 33.85 $ 122.01 $ 80.49 $ 0.48 $ 0.11 $ 0.15 $ 0.47 $ 0.18 $ 0.60
6 GD705-5 $ 272,674.00 $ 27,267.40 $ 245,406.60 4,056 16,224 $ 15.13 0.10 0.64 $ 5.81 $ 20.93 $ 23.65 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 1.45
7 GD825 $ 453,244.00 $ 45,324.40 $ 407,919.60 4,056 16,224 $ 25.14 0.10 0.64 $ 9.65 $ 34.80 $ 35.24 $ 0.32 $ 0.07 $ 0.23 $ 0.16 $ 0.09 $ 0.39 $ 1.45
8 HD785 $ 787,861.00 $ 78,786.10 $ 709,074.90 4,056 16,224 $ 43.71 0.10 0.64 $ 16.78 $ 60.49 $ 87.88 $ 0.52 $ 0.38 $ 0.23 $ 0.14 $ 0.07 $ 0.64 $ 2.55
9 Fuel Truck $ 186,500.00 $ 18,650.00 $ 167,850.00 4,056 16,224 $ 10.35 0.10 0.64 $ 3.97 $ 14.32 $ 17.05 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
10 Crane Truck $ 185,895.35 $ 18,589.53 $ 167,305.81 4,056 16,224 $ 10.31 0.10 0.64 $ 3.96 $ 14.27 $ 17.05 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
11 Lube Truck $ 234,100.00 $ 23,410.00 $ 210,690.00 4,056 16,224 $ 12.99 0.10 0.64 $ 4.99 $ 17.97 $ 17.05 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
12 Drilling $ 765,000.00 $ 76,500.00 $ 688,500.00 4,056 16,224 $ 42.44 0.10 0.64 $ 16.30 $ 58.73 $ 45.47 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
13 Tower Lamp $ 20,540.00 $ 2,054.00 $ 18,486.00 4,056 16,224 $ 1.14 0.10 0.64 $ 0.44 $ 1.58 $ 2.00 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
14 Forklift 3 ton $ 52,275.00 $ 5,227.50 $ 47,047.50 4,056 16,224 $ 2.90 0.10 0.64 $ 1.11 $ 4.01 $ 2.27 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
15 Forklift 5 ton $ 65,915.13 $ 6,591.51 $ 59,323.62 4,056 16,224 $ 3.66 0.10 0.64 $ 1.40 $ 5.06 $ 3.41 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
16 Genset PL 380 $ 42,000.00 $ 4,200.00 $ 37,800.00 4,056 16,224 $ 2.33 0.10 0.64 $ 0.89 $ 3.22 $ 10.23 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
17 Genset PL 30 $ 10,500.00 $ 1,050.00 $ 9,450.00 4,056 16,224 $ 0.58 0.10 0.64 $ 0.22 $ 0.81 $ 9.09 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
18 MF290 $ 134,651.08 $ 13,465.11 $ 121,185.97 4,056 16,224 $ 7.47 0.10 0.64 $ 2.87 $ 10.34 $ 9.09 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
19 SCANIA P380 $ 155,418.42 $ 15,541.84 $ 139,876.58 4,056 16,224 $ 8.62 0.10 0.64 $ 3.31 $ 11.93 $ 13.64 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
20 PC800 $ 607,087.96 $ 60,708.80 $ 546,379.17 4,056 16,224 $ 33.68 0.10 0.64 $ 12.93 $ 46.61 $ 48.43 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
21 Hino FM260JD $ 99,473.68 $ 9,947.37 $ 89,526.32 4,056 16,224 $ 5.52 0.10 0.64 $ 2.12 $ 7.64 $ 11.37 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
22 WA500-3 $ 913,000.00 $ 91,300.00 $ 821,700.00 4,056 16,224 $ 50.65 0.10 0.64 $ 19.45 $ 70.10 $ 33.31 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
23 EX-CAT349DL $ 433,064.21 $ 43,306.42 $ 389,757.79 4,056 16,224 $ 24.02 0.10 0.64 $ 9.23 $ 33.25 $ 37.52 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
24 GS-CUMMINS S38G7 $ 16,500.00 $ 1,650.00 $ 14,850.00 4,056 16,224 $ 0.92 0.10 0.64 $ 0.35 $ 1.27 $ 10.23 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
25 SYKESS-HH160i SS $ 179,126.32 $ 17,912.63 $ 161,213.68 4,056 16,224 $ 9.94 0.10 0.64 $ 3.82 $ 13.75 $ 10.23 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
26 PC400LCSE-7 $ 338,684.21 $ 33,868.42 $ 304,815.79 4,056 16,224 $ 18.79 0.10 0.64 $ 7.21 $ 26.00 $ 36.49 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
27 GD705-A4 $ 376,894.74 $ 37,689.47 $ 339,205.26 4,056 16,224 $ 20.91 0.10 0.64 $ 8.03 $ 28.94 $ 28.42 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
28 Bomag BW 211D-40 $ 80,995.05 $ 8,099.51 $ 72,895.55 4,056 16,224 $ 4.49 0.10 0.64 $ 1.73 $ 6.22 $ 17.05 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
29 Tower Lamp $ 13,275.81 $ 1,327.58 $ 11,948.23 4,056 16,224 $ 0.74 0.10 0.64 $ 0.28 $ 1.02 $ 2.27 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
30 NISSAN CWB $ 105,263.16 $ 10,526.32 $ 94,736.84 4,056 16,224 $ 5.84 0.10 0.64 $ 2.24 $ 8.08 $ 11.37 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
31 Articulate CAT 740 $ 420,000.00 $ 42,000.00 $ 378,000.00 4,056 16,224 $ 23.30 0.10 0.64 $ 8.95 $ 32.25 $ 33.96 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
32 PC 200 $ 130,000.00 $ 13,000.00 $ 117,000.00 4,056 16,224 $ 7.21 0.10 0.64 $ 2.77 $ 9.98 $ 15.28 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
33 PC 300 $ 210,000.00 $ 21,000.00 $ 189,000.00 4,056 16,224 $ 11.65 0.10 0.64 $ 4.47 $ 16.12 $ 27.08 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26

asumsi PA = 85 %, UA = 60% 4406.4 1 tahun Hauler


22032 5 tahun
17625.6 4 tahun

ID Unit Owning Cost Total Operating Maintenace


Cost
26 1 PC400LCSE-7 $ 26.00 $ 45.30 $ 8.80
20 2 PC800 $ 46.61 $ 57.23 $ 8.80
4 3 PC 1250-7 $ 57.55 $ 119.33 $ 9.06
2 4 HD465 $ 38.74 $ 81.97 $ 8.08
8 5 HD785 $ 60.49 $ 98.71 $ 10.83
21 6 Hino FM260JD $ 7.64 $ 20.17 $ 8.80
19 7 SCANIA P380 $ 11.93 $ 22.45 $ 8.80
3 8 D375-5 $ 50.53 $ 102.49 $ 18.71
27 9 GD705-A4 $ 28.94 $ 37.23 $ 8.80
6 10 GD705-5 $ 20.93 $ 34.53 $ 10.88
7 11 GD825 $ 34.80 $ 46.15 $ 10.91
29 12 Tower Lamp $ 1.02 $ 11.08 $ 8.80
9 13 Fuel Truck $ 14.32 $ 24.86 $ 7.80
25 14 SYKESS-HH160i SS $ 13.75 $ 19.04 $ 8.80
32 15 PC 200 $ 9.98 $ 24.09 $ 8.80
33 16 PC 300 $ 16.12 $ 35.89 $ 8.80
31 17 Articulate CAT 740 $ 32.25 $ 42.76 $ 8.80
18 - - - -
29 19 Tower Lamp $ 1.02 $ 11.08 $ 8.80
27 20 GD705-A4 $ 28.94 $ 37.23 $ 8.80
3 21 D375-5 $ 50.53 $ 102.49 $ 18.71
9 22 Fuel Truck $ 14.32 $ 24.86 $ 7.80
11 23 Lube Truck $ 17.97 $ 24.86 $ 7.80
16 24 Genset PL 380 $ 3.22 $ 20.04 $ 9.80
25 25 SYKESS-HH160i SS $ 13.75 $ 19.04 $ 8.80
26 - - - -
27 - - - -
28 - - - -
29 - - - -
30 - - - -
31 - - - -
32 - - - -
33 - - - -
34 - - - -
RATE
Operator Repair Total Total EXCLUDED
GET Maintenan Operating O & O Cost
Wage Cost ce Cost FUEL
($/hrs)

$ 3.00 $ 3.30 $ 8.08 $ 46.73 $ 75.21 $ 36.56 HM 400


$ 3.00 $ 3.30 $ 8.08 $ 81.97 $ 120.71 $ 46.81 HD465
$ 3.00 $ 3.30 $ 11.20 $ 18.71 $ 102.49 $ 153.02 $ 69.24 - D375-5
$ 3.00 $ 3.30 $ 1.43 $ 9.06 $ 119.33 $ 176.89 $ 66.61 PC 1250-7
$ 3.00 $ 3.30 $ 1.43 $ 9.72 $ 90.21 $ 212.22 $ 131.73 PC2000-1
$ 3.00 $ 3.30 $ 1.89 $ 10.88 $ 34.53 $ 55.46 $ 31.82 GD705-5
$ 3.00 $ 3.30 $ 1.89 $ 10.91 $ 46.15 $ 80.95 $ 45.71 GD825
$ 3.00 $ 3.30 $ 10.83 $ 98.71 $ 159.20 $ 71.32 HD785 0.1901885 37.071429 185.333333333333
$ 3.00 $ 3.30 $ 7.80 $ 24.86 $ 39.18 $ 22.12 Fuel Truck 28.346154 258
$ 3.00 $ 3.30 $ 7.80 $ 24.86 $ 39.13 $ 22.08 Crane Truck 72.6666666666667
$ 3.00 $ 3.30 $ 7.80 $ 24.86 $ 42.83 $ 25.78 Lube Truck
$ 3.00 $ 3.30 $ 7.80 $ 53.28 $ 112.01 $ 66.54 Drilling
$ 3.00 $ 3.30 $ 7.80 $ 9.80 $ 11.38 $ 9.38 Tower Lamp
$ 3.00 $ 3.30 $ 7.80 $ 10.08 $ 14.09 $ 11.82 Forklift 3 ton
$ 3.00 $ 4.30 $ 8.80 $ 12.22 $ 17.28 $ 13.87 Forklift 5 ton
$ 3.00 $ 5.30 $ 9.80 $ 20.04 $ 23.26 $ 13.03 Genset PL 380
$ 3.00 $ 6.30 $ 10.80 $ 19.90 $ 20.71 $ 11.61 Genset PL 30
$ 3.00 $ 4.30 $ 8.80 $ 17.90 $ 28.24 $ 19.14 MF290
$ 3.00 $ 4.30 $ 8.80 $ 22.45 $ 34.38 $ 20.74 SCANIA P380 Rp 64,623,417.04 Rp 323,117,085.18
$ 3.00 $ 4.30 $ 8.80 $ 57.23 $ 103.84 $ 55.41 PC800 Rp 161,359,996.64 Rp 161,359,996.64
$ 3.00 $ 4.30 $ 8.80 $ 20.17 $ 27.81 $ 16.44 Hino FM260JD Rp 52,641,421.38 Rp 526,414,213.79
$ 3.00 $ 4.30 $ 8.80 $ 42.11 $ 112.21 $ 78.90 WA500-3 Rp 226,878,880.20 Rp 226,878,880.20
$ 3.00 $ 4.30 $ 8.80 $ 46.32 $ 79.57 $ 42.05 EX-CAT349DL Rp 124,088,361.04 Rp 124,088,361.04
$ 3.00 $ 4.30 $ 8.80 $ 19.04 $ 20.30 $ 10.07 GS-CUMMINS S38G7 Rp 34,870,485.63 Rp 34,870,485.63
$ 3.00 $ 4.30 $ 8.80 $ 19.04 $ 32.79 $ 22.56 SYKESS-HH160i SS Rp 69,701,068.80 Rp 69,701,068.80
$ 3.00 $ 4.30 $ 8.80 $ 45.30 $ 71.30 $ 34.81 PC400LCSE-7
$ 3.00 $ 4.30 $ 8.80 $ 37.23 $ 66.16 $ 37.74 GD705-A4
$ 3.00 $ 4.30 $ 8.80 $ 25.86 $ 32.08 $ 15.02 Bomag BW 211D-40
$ 3.00 $ 4.30 $ 8.80 $ 11.08 $ 12.10 $ 9.82 Tower Lamp
$ 3.00 $ 4.30 $ 8.80 $ 20.17 $ 28.25 $ 16.89 NISSAN CWB Rp 53,881,385.18 Rp 269,406,925.90
$ 3.00 $ 4.30 $ 8.80 $ 42.76 $ 75.01 $ 41.05 Articulate CAT 740
$ 3.00 $ 4.30 $ 8.80 $ 24.09 $ 34.07 $ 18.79 PC 200
$ 3.00 $ 4.30 $ 8.80 $ 35.89 $ 52.01 $ 24.93 PC 300
TARGET PER TAHUN NO DISKRIPSI
1 TARGET VOL OB PRODUKSI 6,600,000 BCM 1 BAHAN PELEDAK
2 TARGET VOL OB BLASTING 5,280,000 BCM AMONIUM NITRAT (AN)
3 TARGET PELEDAKAN 360 KALI DINAMIT (DODOL)
4 TARGET METER DRILL 213,333 METER ELECTRIC DETONATOR
5 TARGET HOLE DRILLING 42,667 HOLE INHOLE DELAY 500MS6M
INHOLE DELAY 500MS9M
TARGET PER BULAN SURFACE DELAY 25MS6M
1 TARGET VOL OB PRODUKSI 550,000 BCM SURFACE DELAY 25MS9M
2 TARGET VOL OB BLASTING 440,000 BCM SURFACE DELAY 42MS6M
3 TARGET PELEDAKAN 30 KALI SURFACE DELAY 42MS9M
4 TARGET METER DRILL 17,778 METER SURFACE DELAY 67MS6M
5 TARGET HOLE DRILLING 3,556 HOLE SURFACE DELAY 67MS9M
SURFACE DELAY 109MS9M
TARGET PER HARI SURFACE DELAY 109MS6M
1 TARGET VOL OB PRODUKSI 18,333 BCM PLASTIK LINIER
2 TARGET VOL OB BLASTING 14,667 BCM
3 TARGET PELEDAKAN 1 KALI 2 FUEL (BBM)
4 TARGET METER DRILL 593 METER FUEL MIXING
5 TARGET HOLE DRILLING 119 HOLE FUEL SARANA BLASTING
FUEL UNIT DRILLING
FUEL SARANA DRILLING

3 SERVICE BLASTING
JASA PELEDAKAN
SEWA MMU

4 SERVICE DRILLING
BIAYA METER DRILLING
RENCANA BIAYA DIVISI DRILLING & B

SATUAN HARGA
JANUARY FEBRUARY MARCH APRIL
KG $ 0.70 91,904 91,904 91,904 91,904
KG $ 3.62 1,778 1,778 1,778 1,778
PCS $ 1.55 35 35 35 35
PCS $ 4.43 3,556 3,556 3,556 3,556
PCS $ 4.49 0 0 0 0
PCS $ 4.15 1,422 1,422 1,422 1,422
PCS $ 4.83 0 0 0 0
PCS $ 4.15 1,067 1,067 1,067 1,067
PCS $ 4.83 0 0 0 0
PCS $ 4.15 711 711 711 711
PCS $ 4.83 0 0 0 0
PCS $ 4.15 356 356 356 356
PCS $ 4.83 0 0 0 0
ROLL Rp 560,000.00 53 53 53 53

LITER Rp 13,500.00 4,411 4,411 4,411 4,411


LITER Rp 13,500.00 550 550 550 550
LITER Rp 13,500.00 11,556 11,556 11,556 11,556
LITER Rp 13,500.00 400 400 400 400

$ 7,475.00 $ 7,475.00 $ 7,475.00 $ 7,475.00 $ 7,475.00


Rp 20,000,000.00 $ 1,666.67 $ 1,666.67 $ 1,666.67 $ 1,666.67
$ 9,141.67 $ 9,141.67

$ 3.57 $ 63,466.67 $ 63,466.67 $ 63,466.67 $ 63,466.67


YA DIVISI DRILLING & BLASTING

MAY JUNE JULY AUGUST SEPTEMBER


91,904 91,904 91,904 91,904 91,904
1,778 1,778 1,778 1,778 1,778
35 35 35 35 35
3,556 3,556 3,556 3,556 3,556
0 0 0 0 0
1,422 1,422 1,422 1,422 1,422
0 0 0 0 0
1,067 1,067 1,067 1,067 1,067
0 0 0 0 0
711 711 711 711 711
0 0 0 0 0
356 356 356 356 356
0 0 0 0 0
53 53 53 53 53

4,411 4,411 4,411 4,411 4,411


550 550 550 550 550
11,556 11,556 11,556 11,556 11,556
400 400 400 400 400

$ 7,475.00 $ 7,475.00 $ 7,475.00 $ 7,475.00 $ 7,475.00


$ 1,666.67 $ 1,666.67 $ 1,666.67 $ 1,666.67 $ 1,666.67

$ 63,466.67 $ 63,466.67 $ 63,466.67 $ 63,466.67 $ 63,466.67


OCTOBER NOVEMBER DECEMBER JUMLAH
91,904 91,904 91,904 1,102,848
1,778 1,778 1,778 21,333
35 35 35 414
3,556 3,556 3,556 42,667
0 0 0 0
1,422 1,422 1,422 17,067
0 0 0 0
1,067 1,067 1,067 12,800
0 0 0 0
711 711 711 8,533
0 0 0 0
356 356 356 4,267
0 0 0 0
53 53 53 640

4,411 4,411 4,411 52,937


550 550 550 6,600
11,556 11,556 11,556 138,667
400 400 400 4,800

$ 7,475.00 $ 7,475.00 $ 7,475.00 $ 89,700.00


$ 1,666.67 $ 1,666.67 $ 1,666.67 $ 20,000.00

$ 63,466.67 $ 63,466.67 $ 63,466.67 $ 761,600.00

Rupiah
Dolar
Cost/Bcm
TOTAL BIAYA
$ 771,993.60 Bulan 12
$ 77,226.67 Kurs $ Rp 12,000.00
$ 641.70 PF 0.21 kg/m³
$ 189,013.33 Burden 4.5 m
$ - Spasi 5.5 m
$ 70,826.67 Depth Hole 5m
$ - Steaming 2.1 m
$ 53,120.00 Charging 2.4 m
$ -
$ 35,413.33
$ -
$ 17,706.67
$ -
$ 29,866.67
Rp 14,949,703,600.00

Rp 714,645,504.00
Rp 89,100,000.00
Rp 1,872,000,000.00
Rp 64,800,000.00
Rp 2,740,545,504.00

Rp 1,076,400,000.00
Rp 240,000,000.00
Rp 1,316,400,000.00

Rp 9,139,200,000.00
Rp 9,139,200,000.00

Rp 28,145,849,104.00
$ 2,345,487.43
$ 0.44
Kekurangan
1. OHDA Price per jarak 100 m
2. Working hour masih tinggi
3. Harga fuel belum aktual
4. Perhitungan unit support belum menyesuaikan actual
5. Perhitungan solar di unit support