No Description A B C
Cat 349 PC 300 LC-6 PC 400 LC-6
1 Dimension (meter)
a. Overall Length
b. Overall Weidth
c. Overall Height
2 Working Range (meter)
a. Max dumping height
b. Max digging depth
c. Effective dumping height
d. Effective digging depth
e. Min swing radius
3 Travel speed (Km/hrs)
a. High
b. Min
c. low
4 Productivity
a. Bucket Capacity (cu. meters) *' 2.3 1.2 1.8
1) Easy 2.53 1.32 1.98
2) Average 2.3 1.2 1.8
3) Rather Difficult 1.84 0.96 1.44
4) Difficult 1.61 0.84 1.26
b. Cycle Time (Second) *' 29 24 24
1) Digging 6 6 6
2) Swing load 5 5 5
3) Dumping 3 3 3
4) Swing empty 5 5 5
5) Uncondition 5 5 5
c. Productivity base on material
1) Easy 314 198 297
2) Average 286 180 270
3) Rather Difficult 228 144 216
4) Difficult 200 126 189
d. Productivy by Job effeciency
1) Good 261 164 247
2) Average 214 135 203
3) Rather Poor 153 96 145
4) Poor 116 73 110
e. Productivity eff. condition
1) OB (Bcm/hrs) 261 164 247
2) Coal (Ton/hrs) 339 214 320
f. Productivity poor condition
1) OB (Bcm/hrs) 153 73 110
2) Coal (Ton/hrs) 199 95 143
g. Productivity Average
1) OB (Bcm/hrs) 186 117 176
2) Coal (Ton/hrs) 242 152 229
5 Fuel consumtion *'
a. Low 12 20 27
b. Medium 14 23 31
c. High 18 35 48
d. Average 14.67 26.00 35.33
e. Consumtion Liter/Bcm
1) Effective 0.07 0.21 0.19
2) Average 0.08 0.20 0.18
3) Poor 0.08 0.27 0.25
6 Costing
a. OOC
1) Owning Cost $ 8.54 $ 13.79 $ 22.24
2) Operationg Cost $ 24.09 $ 35.89 $ 45.30
3) Fuel ($/hrs)
4) Maintenance $ 8.80 $ 8.80 $ 8.80
b. Rent Cost
1) Rent Cost ($/hrs) $ 13.75 $ 13.75 $ 26.00
2) Operationg Cost $ 19.04 $ 19.04 $ 45.30
3) Fuel ($/hrs)
4) Maintenance $ 19.04 $ 19.04 $ 45.30
c. Mining Contractor
1) Operationg ($/Bcm)
2) Rent cost ($/hrs)
3) Over haul distance ($/meter)
ID 15 16 1
ype Komatsu
D E No Parameter
PC 800-8 Cat 320 D2
1 Bucket Capacity
a. Easy
b. Average
c. Rather difficult
d. Difficult
2 Job efficiency
a. Good
b. Average
c. Rather Poor
d. Poor
3.1 1
3.41 1.1
3.1 1
2.48 0.8
2.17 0.7
32 25
6 7
6 6
3 3
6 5
5 4
384 158
349 144
279 115
244 101
318 131
262 108
187 77
142 58
318 131
142 58
227 94
37 51
47 64
67 94
50.33 69.67
0.21 0.71
0.21 0.68
0.26 0.87
ID
$ 39.87 $ 49.24
$ 57.23 $ 117.90 1120
$ 8.80 $ 7.63
$ 46.61 $ 57.55
$ 57.23 $ 119.33
$ 57.23 $ 119.33
2 3
Description Value
29000
25.8928571428571
Unit
No Description 1 2
HD 465-7R HD 785-7
1 Dimension (m)
a. Overall Length 9.355 10.29
b. Overall Weidth 5.395 5.53
c. Overall Height 4.4 5.05
2 Working range
a. Loading Height 3.6 4.25
b. Minimum turning radius 8.5 10.1
c. Maximum steering angle 39 41
3 Travel Peformance (Km/hrs) *'
a. F1 7.5 7.5
b. F2 12.5 12.5
b. F3 17.5 17.5
b. F4 25 25
b. F5 33.5 33.5
b. F6 44.5 44.5
b. F7 56 56
4 Cycle Time *'
a. Manuver Loading 48 48
b. Traveling
1) Front to Ramp 72 72
2) Ramp to Surf. Pit 108 108
3) Disposal to Front Dumping 72 72
4) Dumping, Spot, & Delay 198 198
d. Total cycle time (min) 8.3 8.3
5 Capacity
a. Struck (cu. meter) 25 40
b. Heaped (cu. meter) 34 60
c. Payload (Ton) 55 91
6 Fuel Consumption (liter/hour)
a. Low 41.9 55.9
b. Medium 55.9 74.5
c. High 69.9 93.1
d. Average 55.9 74.5
6 Costing
a. OOC
1) Owning Cost $ 33.14 $ 51.75
2) Operationg Cost $ 81.97 $ 98.71
3) Fuel ($/hrs)
4) Maintenance $ 8.08 $ 10.83
b. Rent Cost
1) Rent Cost ($/hrs) $ 38.74 $ 60.49
2) Operationg Cost $ 81.97 $ 98.71
3) Fuel ($/hrs)
4) Maintenance $ 8.08 $ 10.83
c. Mining Contractor
1) Operationg ($/Bcm)
2) Rent cost ($/hrs)
3) Over haul distance ($/meter)
4) Total ($/bcm)
ID 4 5
Note :
1. Travel peformance average
2. Cycle time no include loading time
3. Cycle time no include travel to disposal
Unit
3 4 5 6
FM 260JD Scania P380 Nissan CWB FM 320 Distance
Disposal
Front to Ramp to
Front to Front
Ramp Surf.
Dump
100 200 300 200
48 48 48 48
48 48 48 48
72 72 72 72
48 48 48 48
198 198 198 198
6.9 6.9 7 7
10 12 14 14
12 15 18.5 16.15
26 27 27 27
6 7 26 26
Exavator
No Cap. Buc. CT. Buc. Fuel Prod
ID Type
(m3) (second) (liter/hrs) (bcm/hrs)
1 C PC 400 LC-6 1.8 24 35 176
2 C PC 400 LC-6 1.8 24 35 176
3 C PC 400 LC-6 1.8 24 35 176
4 #N/A #N/A #N/A #N/A #N/A
5 #N/A #N/A #N/A #N/A #N/A
6 #N/A #N/A #N/A #N/A #N/A
7 #N/A #N/A #N/A #N/A #N/A
8 #N/A #N/A #N/A #N/A #N/A
9 #N/A #N/A #N/A #N/A #N/A
10 #N/A #N/A #N/A #N/A #N/A
11 #N/A #N/A #N/A #N/A #N/A
12 #N/A #N/A #N/A #N/A #N/A
13 #N/A #N/A #N/A #N/A #N/A
14 #N/A #N/A #N/A #N/A #N/A
15 #N/A #N/A #N/A #N/A #N/A
16 #N/A #N/A #N/A #N/A #N/A
17 #N/A #N/A #N/A #N/A #N/A
18 #N/A #N/A #N/A #N/A #N/A
19 #N/A #N/A #N/A #N/A #N/A
20 #N/A #N/A #N/A #N/A #N/A
21 #N/A #N/A #N/A #N/A #N/A
22 #N/A #N/A #N/A #N/A #N/A
23 #N/A #N/A #N/A #N/A #N/A
24 #N/A #N/A #N/A #N/A #N/A
25 #N/A #N/A #N/A #N/A #N/A
26 #N/A #N/A #N/A #N/A #N/A
27 #N/A #N/A #N/A #N/A #N/A
28 #N/A #N/A #N/A #N/A #N/A
29 #N/A #N/A #N/A #N/A #N/A
30 #N/A #N/A #N/A #N/A #N/A
31 #N/A #N/A #N/A #N/A #N/A
32 #N/A #N/A #N/A #N/A #N/A
33 #N/A #N/A #N/A #N/A #N/A
34 #N/A #N/A #N/A #N/A #N/A
35 #N/A #N/A #N/A #N/A #N/A
36 #N/A #N/A #N/A #N/A #N/A
37 #N/A #N/A #N/A #N/A #N/A
38 #N/A #N/A #N/A #N/A #N/A
39 #N/A #N/A #N/A #N/A #N/A
40 #N/A #N/A #N/A #N/A #N/A
41 #N/A #N/A #N/A #N/A #N/A
42 #N/A #N/A #N/A #N/A #N/A
43 #N/A #N/A #N/A #N/A #N/A
44 #N/A #N/A #N/A #N/A #N/A
45 #N/A #N/A #N/A #N/A #N/A
46 #N/A #N/A #N/A #N/A #N/A
47 #N/A #N/A #N/A #N/A #N/A
48 #N/A #N/A #N/A #N/A #N/A
49 #N/A #N/A #N/A #N/A #N/A
42 #N/A #N/A #N/A #N/A #N/A
Exavator
No Cap. Buc. CT. Buc. Fuel Prod
ID Type
(ton) (second) (liter/hrs) (ton/hrs)
1 A Cat 349 3.0 36 15 242
2 A Cat 349 3.0 36 15 242
4 B PC 300 LC-6 1.6 30 26 152
5 B PC 300 LC-6 1.6 30 26 152
Hauler
Cap. Ves. Fuel Avg. Speed Distance CT Front CT Loading
ID Type
(m3) (liter.hrs) (Km/hrs) (m) (min) (min)
4 Scania P380 15 19.4 17.5 900 6.9 3.2
5 Nissan CWB 19 19.4 17.5 900 6.9 4.1
6 Nissan CWB 19 19.4 17.5 900 6.9 4.1
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
Hauler
Cap. Ves. Fuel Avg. Speed Distance CT Front CT Loading
ID Type
(ton) (liter.hrs) (Km/hrs) (m) (min) (min)
3 FM 260JD 26 15.1 21.3 4,000 6.9 5.3
4 Scania P380 27 19.4 21.3 4,000 6.9 5.5
3 FM 260JD 26 15.1 21.3 4,000 6.9 8.3
4 Scania P380 27 19.4 21.3 4,000 6.9 8.7
Hauler
CT Travel Tot. CT Production Trip 1 unit Hauler Prod. Loss
(min) (min) Value Round Bcm/hrs Unit Bcm/hrs Bcm/hrs
3.1 13.2 4.54 4 58 4 198 22
3.1 14.1 4.26 4 74 3 189 13
3.1 14.1 4.26 4 74 3 189 13
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Hauler
CT Travel Tot. CT Production Trip 1 unit Hauler Prod. Loss
(min) (min) Value Round ton/hrs Unit ton/hrs ton/hrs
11.3 23.4 2.56 2 52 5 221 21
11.3 23.6 2.54 2 54 5 230 12
11.3 26.5 2.26 2 52 3 133 20
11.3 26.8 2.23 2 54 3 138 15
Fleet Simulation Target Fleet OB
Prod Fuel Prod. (bcm) Logic. ID
FR Total
Bcm/hrs (Liter) Daily Weekly Mothly Logic. Match
176 113 0.64 2,286 16,001 59,433 2 Match 1
176 94 0.53 2,286 16,001 59,433 2 Match 2
176 94 0.53 2,286 16,001 59,433 2 Match 3
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
#N/A #N/A #N/A #N/A #N/A #N/A - - -
Fleet Matching
No ID
Excavator Hauler Prod
Type Type Unit (bcm/hrs) (bcm/fleet)
1 1 PC 400 LC-6 Scania P380 4 176 68,577
2 2 PC 400 LC-6 Nissan CWB 3 176 68,577
3 - - - - -
4 - - - - -
5 - - - - -
6 - - - - -
7 - - - - -
8 - - - - -
9 - - - - -
10 - - - - -
Fleet Matching
No ID Excavator Hauler Prod
Type Type Unit (ton/hrs) (ton/fleet)
1 - - - - -
2 - - - - -
3 - - - - -
4 - - - - -
5 - - - - -
6 - - - - -
7 - - - - -
8 - - - - -
9 - - - - -
10 - - - - -
Kurs Rp 12,500
Fleet Sim. $ 0.88
Solar
Rp 11,000
Day
30
Cost
Excavator Hauler
Fuel Database
Owning Rent Owning Rent
(liter/hrs) FR $ ($/hrs) ($/hrs) ($/hrs) ($/hrs)
113 $ 0.64 $ 99.42 $ 31.05 $ 34.81 $ 76.05 $ 82.95
94 $ 0.53 $ 82.34 $ 31.05 $ 34.81 $ 47.15 $ 67.67
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
Fleet Sim.
Total
Day
(fleet)
Cost
Fuel
(liter/hrs) FR $ (ton/hrs)
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
Cost
Total Exclude Fuel Total Include Fuel
Owning Rent OOC Rent + Operating
($/hrs) ($/Bcm) ($/hrs) ($/Bcm) ($/hrs) ($/Bcm) ($/hrs)
$ 107.10 $ 0.61 $ 117.75 $ 0.67 $ 206.52 $ 1.17 $ 217.18
$ 78.20 $ 0.44 $ 102.48 $ 0.58 $ 160.54 $ 0.91 $ 184.82
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
Fuel
Rent + Operating
($/Bcm)
$ 1.24
$ 1.05
-
-
-
-
-
-
-
-
Fleet Matching
No ID
Excavator Hauler Prod
Type Type Unit (bcm/hrs) (bcm/fleet)
1 1 PC 400 LC-6 Scania P380 4 176 68,577
2 2 PC 400 LC-6 Nissan CWB 3 176 68,577
3 3 PC 400 LC-6 Nissan CWB 3 176 68,577
4 - - - - -
5 - - - - -
6 - - - - -
7 - - - - -
8 - - - - -
9 - - - - -
10 - - - - -
11 - - - - -
12 - - - - -
13 - - - - -
14 - - - - -
15 - - - - -
16 - - - - -
17 - - - - -
18 - - - - -
19 - - - - -
20 - - - - -
21 - - - - -
22 - - - - -
23 - - - - -
24 - - - - -
25 - - - - -
26 - - - - -
27 - - - - -
28 - - - - -
29 - - - - -
30 - - - - -
31 - - - - -
32 - - - - -
33 - - - - -
HD 465-7R #VALUE!
HD 785-7 #VALUE!
FM 260 JD #VALUE!
Scania #VALUE!
Cat 740 #VALUE!
Cost
Excavator Hauler Total Exclude F
Fuel Database
Owning Rent Owning Rent Owning
(liter/hrs) FR $ ($/hrs) ($/hrs) ($/hrs) ($/hrs) ($/hrs)
113 0.64 $ 99.42 $ 31.05 $ 34.81 $ 76.05 $ 82.95 $ 107.10
94 0.53 $ 82.34 $ 31.05 $ 34.81 $ 47.15 $ 67.67 $ 78.20
94 0.53 $ 82.34 $ 31.05 $ 34.81 $ 47.15 $ 67.67 $ 78.20
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
Cost
Total Exclude Fuel Total Include Fuel
Distance
Owning Rent OOC Rent + Operating
($/Bcm) ($/hrs) ($/Bcm) ($/hrs) ($/Bcm) ($/hrs) ($/Bcm)
$ 0.61 $ 117.75 $ 0.67 $ 206.52 $ 1.17 $ 217.18 $ 1.24
$ 0.44 $ 102.48 $ 0.58 $ 160.54 $ 0.91 $ 184.82 $ 1.05
$ 0.44 $ 102.48 $ 0.58 $ 160.54 $ 0.91 $ 184.82 $ 1.05
- - - - - - -
- - - - - - - 1,000
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
2,500
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
4,000
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
OFR September 2014
Fle
Activity Target Exavator
Loc. Fleet (n)
Type
Waste Removal
1. Unload Toposil Lcm -
2. Mud Remove Lcm -
3. OB Removal 68,577 Bcm F1 1 PC 400 LC-6
18,468 Bcm 1 PC 400 LC-6
Coal Getting
1. Coal Getting Ton 1 -
Total
Overbudren 87,044 Bcm Produtivity
Mud 0 Lcm OB 352
Coal 0 Ton Mud 0
SR Non Mud #DIV/0! Coal #VALUE!
SR Include Mud #DIV/0! Fleet 3
Productivity
Activity Unit
PA Eff. Unit Prod
General Working
1. Cleaning Coal PC 200 85% 55%
2. Reshaping Slope - 85% 55%
3. Topsoil Rehandle - 85% 55%
4. Front Support D375-5 85% 55%
5. Dumping Support D375-5 85% 55%
D375-5 85% 55%
Support
1. Grader GD705-A4 85% 55%
2. Tower Lamp Tower Lamp 85% 55%
3. Water Pumping SYKESS-HH160i SS 55%
4. Compact -
5. Fuel Truck Fuel Truck 85% 55%
6. Lube Truck Lube Truck 85% 55%
Total Support Cost
Mining Operation (Exlude Man Power) Over Hauling Distance Average (A)
Exclude Fuel Price Var Price
1. Owning Cost A $ 2.33
a. Operation $ 156.41 B #VALUE!
b. Support $ 152.12
c. Blasting $ 0.44 Cost
d. Total $ 308.97
e. Cost $/Bcm $ 1.32
2. RentCost Over Hauling Distance Average (B)
a. Operation $ 204.96 Var Price
b. Support $ 189.49 A $ 2.33
c. Blasting $ 0.44 B #VALUE!
d. Total $ 394.89
e. Cost $/Bcm $ 1.57
Include Fuel
1. Owning Cost
a. Operation $ 321.09
b. Support $ 340.03
c. Blasting $ 0.44
d. Total $ 661.57
e. Cost $/Bcm $ 2.33
2. RentCost
a. Operation $ 369.64
b. Support $ 377.40
c. Blasting $ 0.44
d. Total $ 747.49
e. Cost $/Bcm $ 2.57
Fleet Setting Costing ($/hrs)
Hauler Distance Prod No. ID Excluce Fuel
Type Unit (meter) (Bcm/hrs) (Bcm/fleet) Owning
- - 1,000 - - -
- - 1,000 - - -
Nissan CWB 3 1,000 176 68,577 2 $ 78.20
Nissan CWB 3 1,000 176 68,577 2 $ 78.20
- - 4,000 - - 18 -
Costing ($/hrs)
ID Excluce Fuel Incluce Fuel
Owning Rent & Opr. Owning Rent & Opr.
#VALUE!
Distance Average (B)
Distance Over_Dist Unit Measure
1000
0 100
1000
OFR Oktober-Desember 2014
Costing ($/hrs)
Eff. Work
Excluce Fuel Incluce Fuel Eff. Prod. Activity
(%)
Rent & Opr. Owning Rent & Opr.
Waste Removal
- - - #VALUE! #VALUE!
- - - #VALUE! #VALUE!
$ 102.48 $ 160.54 $ 184.82 100% 176
$ 102.48 $ 160.54 $ 184.82 27% 47
Coal Getting
- - - #VALUE! #VALUE!
Total
$ 204.96 $ 321.09 $ 369.64
- - -
Estimate
- - -
$ 204.96 $ 321.09 $ 369.64
Activity
General Working
Support
Include Fuel
1. Owning Cost
2. RentCost
OFR Oktober-Desember 2014
Fleet Setting
Activity Target Exavator Hauler
Loc. Fleet (n)
Type Type
Waste Removal
1. Unload Toposil 0 Lcm - -
2. Mud Remove 30,948 Lcm F1 1 - -
3. OB Removal 137,153 Bcm F2, F3 2 - -
36,936 Bcm F4, F5 2 - -
Coal Getting
1. Coal Getting 50,000 Ton C1 1 - -
Total
Overbudren 174,089 Bcm Produtivity
Mud 30,948 Lcm OB 0 Bcm/hrs
Coal 50,000 Ton Mud #VALUE! Lcm/hrs
SR Non Mud 3.48 Coal #VALUE! Ton/hrs
SR Include Mud 4.10 Fleet 6 Fleet
Productivity
Activity Unit ID
PA Eff. Unit Prod
General Working
1. Cleaning Coal PC 200 85% 55% 15
2. Reshaping Slope - 85% 55%
3. Topsoil Rehandle - 85% 55%
4. Front Support D375-5 85% 55% 21
5. Dumping Support D375-5 85% 55% 21
D375-5 85% 55% 21
Support
1. Grader GD705-A4 85% 55% 20
2. Tower Lamp Tower Lamp 85% 55% 19
3. Water Pumping SYKESS-HH160i SS 55% 25
4. Compact -
5. Fuel Truck Fuel Truck 85% 55% 22
6. Lube Truck Lube Truck 85% 55% 23
Total Support Cost
- - - - - -
- 2,500 - - 15 - -
- 2,500 - - 13 - -
- 2,500 - - 11 - -
- 4,000 - - 21 - -
Total Cost OB $ - $ -
Total Cost Mud - -
Total Cost Coal - -
Total Opr. Cost $ - $ -
Costing ($/hrs)
Excluce Fuel Incluce Fuel
Owning Rent & Opr. Owning Rent & Opr.
- - - -
- - #VALUE! #VALUE!
- - #VALUE! #VALUE!
- - #VALUE! #VALUE!
- - #VALUE! #VALUE!
$ - $ -
- -
Estimate
- -
$ - $ -
Ops. 1
2014
Material
August September October November
Topsoil - 28,000
Overburden - 275,000 550,000 550,000
Mud - 30,948 30,948 30,948
Coal - 25,000 50,000 50,000
SR - 13.36 11.50 11.50
SR Non Mud - 11.00 11.00 11.00
Total
December
550,000 1,650,000
30,948 123,792
50,000 175,000
11.50 9.99
11.00 9.43
PARAMETER COST
Net Depretiations Depretiations Depretiati Interest, Total Fuel by Transmiss Final Drive Hydroulic
ID EQUIPMENT Price PPN 10% WH/Years r factor tax, Owning Engine Oil Grease Filters Tyre
Value Time on Cost actual ion Oil Oil Oil
insurance Cost
1 HM 400 $ 371,000.00 $ 37,100.00 $ 333,900.00 4,056 20,280 $ 16.46 0.10 0.64 $ 7.90 $ 24.37 $ 38.65 $ 0.22 $ 0.21 $ 0.14 $ 0.09 $ 0.04 $ 0.33 $ 0.73
2 HD465 $ 504,538.00 $ 50,453.80 $ 454,084.20 4,056 20,280 $ 22.39 0.10 0.64 $ 10.75 $ 33.14 $ 73.89 $ 0.22 $ 0.21 $ 0.14 $ 0.09 $ 0.04 $ 0.33 $ 0.73
3 D375-5 $ 658,180.00 $ 65,818.00 $ 592,362.00 4,056 20,280 $ 29.21 0.10 0.64 $ 14.02 $ 43.23 $ 83.79 $ 0.24 $ 0.27 $ 0.13 $ 0.11 $ 0.09 $ 0.37
4 PC 1250-7 $ 749,654.00 $ 74,965.40 $ 674,688.60 4,056 20,280 $ 33.27 0.10 0.64 $ 15.97 $ 49.24 $ 110.27 $ 0.24 $ 0.09 $ 0.04 $ 0.25 $ 0.40 $ 0.31
5 PC2000-1 $ 1,589,209.00 $ 158,920.90 $ 1,430,288.10 4,056 20,280 $ 70.53 0.10 0.64 $ 33.85 $ 104.38 $ 80.49 $ 0.48 $ 0.11 $ 0.15 $ 0.47 $ 0.18 $ 0.60
6 GD705-5 $ 272,674.00 $ 27,267.40 $ 245,406.60 4,056 20,280 $ 12.10 0.10 0.64 $ 5.81 $ 17.91 $ 23.65 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 1.45
7 GD825 $ 453,244.00 $ 45,324.40 $ 407,919.60 4,056 20,280 $ 20.11 0.10 0.64 $ 9.65 $ 29.77 $ 35.24 $ 0.32 $ 0.07 $ 0.23 $ 0.16 $ 0.09 $ 0.39 $ 1.45
8 HD785 $ 787,861.00 $ 78,786.10 $ 709,074.90 4,056 20,280 $ 34.96 0.10 0.64 $ 16.78 $ 51.75 $ 87.88 $ 0.52 $ 0.38 $ 0.23 $ 0.14 $ 0.07 $ 0.64 $ 2.55
9 Fuel Truck $ 186,500.00 $ 18,650.00 $ 167,850.00 4,056 20,280 $ 8.28 0.10 0.64 $ 3.97 $ 12.25 $ 17.05 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
10 Crane Truck $ 185,895.35 $ 18,589.53 $ 167,305.81 4,056 20,280 $ 8.25 0.10 0.64 $ 3.96 $ 12.21 $ 17.05 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
11 Lube Truck $ 234,100.00 $ 23,410.00 $ 210,690.00 4,056 20,280 $ 10.39 0.10 0.64 $ 4.99 $ 15.38 $ 17.05 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
12 Drilling $ 765,000.00 $ 76,500.00 $ 688,500.00 4,056 20,280 $ 33.95 0.10 0.64 $ 16.30 $ 50.25 $ 45.47 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
13 Tower Lamp $ 20,540.00 $ 2,054.00 $ 18,486.00 4,056 20,280 $ 0.91 0.10 0.64 $ 0.44 $ 1.35 $ 2.00 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
14 Forklift 3 ton $ 52,275.00 $ 5,227.50 $ 47,047.50 4,056 20,280 $ 2.32 0.10 0.64 $ 1.11 $ 3.43 $ 2.27 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
15 Forklift 5 ton $ 65,915.13 $ 6,591.51 $ 59,323.62 4,056 20,280 $ 2.93 0.10 0.64 $ 1.40 $ 4.33 $ 3.41 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
16 Genset PL 380 $ 42,000.00 $ 4,200.00 $ 37,800.00 4,056 20,280 $ 1.86 0.10 0.64 $ 0.89 $ 2.76 $ 10.23 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
17 Genset PL 30 $ 10,500.00 $ 1,050.00 $ 9,450.00 4,056 20,280 $ 0.47 0.10 0.64 $ 0.22 $ 0.69 $ 9.09 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
18 MF290 $ 134,651.08 $ 13,465.11 $ 121,185.97 4,056 20,280 $ 5.98 0.10 0.64 $ 2.87 $ 8.84 $ 9.09 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
19 SCANIA P380 $ 155,418.42 $ 15,541.84 $ 139,876.58 4,056 20,280 $ 6.90 0.10 0.64 $ 3.31 $ 10.21 $ 13.64 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
20 PC800 $ 607,087.96 $ 60,708.80 $ 546,379.17 4,056 20,280 $ 26.94 0.10 0.64 $ 12.93 $ 39.87 $ 48.43 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
21 Hino FM260JD $ 99,473.68 $ 9,947.37 $ 89,526.32 4,056 20,280 $ 4.41 0.10 0.64 $ 2.12 $ 6.53 $ 11.37 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
22 WA500-3 $ 913,000.00 $ 91,300.00 $ 821,700.00 4,056 20,280 $ 40.52 0.10 0.64 $ 19.45 $ 59.97 $ 33.31 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
23 EX-CAT349DL $ 433,064.21 $ 43,306.42 $ 389,757.79 4,056 20,280 $ 19.22 0.10 0.64 $ 9.23 $ 28.44 $ 37.52 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
24 GS-CUMMINS S38G7 $ 16,500.00 $ 1,650.00 $ 14,850.00 4,056 20,280 $ 0.73 0.10 0.64 $ 0.35 $ 1.08 $ 10.23 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
25 SYKESS-HH160i SS $ 179,126.32 $ 17,912.63 $ 161,213.68 4,056 20,280 $ 7.95 0.10 0.64 $ 3.82 $ 11.77 $ 10.23 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
26 PC400LCSE-7 $ 338,684.21 $ 33,868.42 $ 304,815.79 4,056 20,280 $ 15.03 0.10 0.64 $ 7.21 $ 22.24 $ 36.49 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
27 GD705-A4 $ 376,894.74 $ 37,689.47 $ 339,205.26 4,056 20,280 $ 16.73 0.10 0.64 $ 8.03 $ 24.75 $ 28.42 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
28 Bomag BW 211D-40 $ 80,995.05 $ 8,099.51 $ 72,895.55 4,056 20,280 $ 3.59 0.10 0.64 $ 1.73 $ 5.32 $ 17.05 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
29 Tower Lamp $ 13,275.81 $ 1,327.58 $ 11,948.23 4,056 20,280 $ 0.59 0.10 0.64 $ 0.28 $ 0.87 $ 2.27 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
30 NISSAN CWB $ 105,263.16 $ 10,526.32 $ 94,736.84 4,056 20,280 $ 4.67 0.10 0.64 $ 2.24 $ 6.91 $ 11.37 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
31 Articulate CAT 740 $ 420,000.00 $ 42,000.00 $ 378,000.00 4,056 20,280 $ 18.64 0.10 0.64 $ 8.95 $ 27.59 $ 33.96 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
32 PC 200 $ 130,000.00 $ 13,000.00 $ 117,000.00 4,056 20,280 $ 5.77 0.10 0.64 $ 2.77 $ 8.54 $ 15.28 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
33 PC 300 $ 210,000.00 $ 21,000.00 $ 189,000.00 4,056 20,280 $ 9.32 0.10 0.64 $ 4.47 $ 13.79 $ 27.08 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
ID Unit Owning Cost Total Operating Maintenace Own Operating Total All Prod.
Cost
26 1 PC400LCSE-7 $ 22.24 $ 45.30 $ 8.80 Scania $ 10.21 $ 22.45 $ 32.65 $ 97.96
20 2 PC800 $ 39.87 $ 57.23 $ 8.80 HD 785 $ 51.75 $ 98.71 $ 150.45 $ 451.36
4 3 PC 1250-7 $ 49.24 $ 117.90 $ 7.63 PC 400 $ 22.24 $ 45.30 $ 67.54 $ 67.54
2 4 HD465 $ 33.14 $ 81.97 $ 8.08 Total $ 518.91 180 $ 2.88
8 5 HD785 $ 51.75 $ 98.71 $ 10.83
21 6 Hino FM260JD $ 6.53 $ 20.17 $ 8.80
19 7 SCANIA P380 $ 10.21 $ 22.45 $ 8.80
3 8 D375-5 $ 43.23 $ 91.29 $ 7.50
27 9 GD705-A4 $ 24.75 $ 37.23 $ 8.80
6 10 GD705-5 $ 17.91 $ 32.64 $ 8.99
7 11 GD825 $ 29.77 $ 44.26 $ 9.02
29 12 Tower Lamp $ 0.87 $ 11.08 $ 8.80
9 13 Fuel Truck $ 12.25 $ 24.86 $ 7.80
25 14 SYKESS-HH160i SS $ 11.77 $ 19.04 $ 8.80
32 15 PC 200 $ 8.54 $ 24.09 $ 8.80
33 16 PC 300 $ 13.79 $ 35.89 $ 8.80
31 17 Articulate CAT 740 $ 27.59 $ 42.76 $ 8.80
18 - - - -
29 19 Tower Lamp $ 0.87 $ 11.08 $ 8.80
27 20 GD705-A4 $ 24.75 $ 37.23 $ 8.80
3 21 D375-5 $ 43.23 $ 91.29 $ 7.50
9 22 Fuel Truck $ 12.25 $ 24.86 $ 7.80
11 23 Lube Truck $ 15.38 $ 24.86 $ 7.80
16 24 Genset PL 380 $ 2.76 $ 20.04 $ 9.80
25 25 SYKESS-HH160i SS $ 11.77 $ 19.04 $ 8.80
30 26 NISSAN CWB $ 6.91 $ 20.17 $ 8.80
27 - - - -
28 - - - -
29 - - - -
30 - - - -
31 - - - -
32 - - - -
33 - - - -
34 - - - -
35 - - - -
36 - - - -
37 - - - -
38 - - - -
39 - - - -
40 - - - -
41 - - - -
42 - - - -
43 - - - -
44 - - - -
Operator Repair Tot Total RATE
GET Operating O & O Cost EXCLUDED
Wage Cost Maintenance
Cost FUEL
Net Depretiations Depretiations Depretiati Interest, Total Owning Engine Transmiss Final Drive Hydroulic
ID EQUIPMENT Price PPN 10% WH/Years r factor tax, Fuel Grease Filters Tyre
Value Time on Cost insurance Cost Oil ion Oil Oil Oil
1 HM 400 $ 371,000.00 $ 37,100.00 $ 333,900.00 4,056 16,224 $ 20.58 0.10 0.64 $ 7.90 $ 28.48 $ 38.65 $ 0.22 $ 0.21 $ 0.14 $ 0.09 $ 0.04 $ 0.33 $ 0.73
2 HD465 $ 504,538.00 $ 50,453.80 $ 454,084.20 4,056 16,224 $ 27.99 0.10 0.64 $ 10.75 $ 38.74 $ 73.89 $ 0.22 $ 0.21 $ 0.14 $ 0.09 $ 0.04 $ 0.33 $ 0.73
3 D375-5 $ 658,180.00 $ 65,818.00 $ 592,362.00 4,056 16,224 $ 36.51 0.10 0.64 $ 14.02 $ 50.53 $ 83.79 $ 0.24 $ 0.27 $ 0.13 $ 0.11 $ 0.09 $ 0.37
4 PC 1250-7 $ 749,654.00 $ 74,965.40 $ 674,688.60 4,056 16,224 $ 41.59 0.10 0.64 $ 15.97 $ 57.55 $ 110.27 $ 0.24 $ 0.09 $ 0.04 $ 0.25 $ 0.40 $ 0.31
5 PC2000-1 $ 1,589,209.00 $ 158,920.90 $ 1,430,288.10 4,056 16,224 $ 88.16 0.10 0.64 $ 33.85 $ 122.01 $ 80.49 $ 0.48 $ 0.11 $ 0.15 $ 0.47 $ 0.18 $ 0.60
6 GD705-5 $ 272,674.00 $ 27,267.40 $ 245,406.60 4,056 16,224 $ 15.13 0.10 0.64 $ 5.81 $ 20.93 $ 23.65 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 1.45
7 GD825 $ 453,244.00 $ 45,324.40 $ 407,919.60 4,056 16,224 $ 25.14 0.10 0.64 $ 9.65 $ 34.80 $ 35.24 $ 0.32 $ 0.07 $ 0.23 $ 0.16 $ 0.09 $ 0.39 $ 1.45
8 HD785 $ 787,861.00 $ 78,786.10 $ 709,074.90 4,056 16,224 $ 43.71 0.10 0.64 $ 16.78 $ 60.49 $ 87.88 $ 0.52 $ 0.38 $ 0.23 $ 0.14 $ 0.07 $ 0.64 $ 2.55
9 Fuel Truck $ 186,500.00 $ 18,650.00 $ 167,850.00 4,056 16,224 $ 10.35 0.10 0.64 $ 3.97 $ 14.32 $ 17.05 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
10 Crane Truck $ 185,895.35 $ 18,589.53 $ 167,305.81 4,056 16,224 $ 10.31 0.10 0.64 $ 3.96 $ 14.27 $ 17.05 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
11 Lube Truck $ 234,100.00 $ 23,410.00 $ 210,690.00 4,056 16,224 $ 12.99 0.10 0.64 $ 4.99 $ 17.97 $ 17.05 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
12 Drilling $ 765,000.00 $ 76,500.00 $ 688,500.00 4,056 16,224 $ 42.44 0.10 0.64 $ 16.30 $ 58.73 $ 45.47 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
13 Tower Lamp $ 20,540.00 $ 2,054.00 $ 18,486.00 4,056 16,224 $ 1.14 0.10 0.64 $ 0.44 $ 1.58 $ 2.00 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
14 Forklift 3 ton $ 52,275.00 $ 5,227.50 $ 47,047.50 4,056 16,224 $ 2.90 0.10 0.64 $ 1.11 $ 4.01 $ 2.27 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
15 Forklift 5 ton $ 65,915.13 $ 6,591.51 $ 59,323.62 4,056 16,224 $ 3.66 0.10 0.64 $ 1.40 $ 5.06 $ 3.41 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
16 Genset PL 380 $ 42,000.00 $ 4,200.00 $ 37,800.00 4,056 16,224 $ 2.33 0.10 0.64 $ 0.89 $ 3.22 $ 10.23 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
17 Genset PL 30 $ 10,500.00 $ 1,050.00 $ 9,450.00 4,056 16,224 $ 0.58 0.10 0.64 $ 0.22 $ 0.81 $ 9.09 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
18 MF290 $ 134,651.08 $ 13,465.11 $ 121,185.97 4,056 16,224 $ 7.47 0.10 0.64 $ 2.87 $ 10.34 $ 9.09 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
19 SCANIA P380 $ 155,418.42 $ 15,541.84 $ 139,876.58 4,056 16,224 $ 8.62 0.10 0.64 $ 3.31 $ 11.93 $ 13.64 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
20 PC800 $ 607,087.96 $ 60,708.80 $ 546,379.17 4,056 16,224 $ 33.68 0.10 0.64 $ 12.93 $ 46.61 $ 48.43 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
21 Hino FM260JD $ 99,473.68 $ 9,947.37 $ 89,526.32 4,056 16,224 $ 5.52 0.10 0.64 $ 2.12 $ 7.64 $ 11.37 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
22 WA500-3 $ 913,000.00 $ 91,300.00 $ 821,700.00 4,056 16,224 $ 50.65 0.10 0.64 $ 19.45 $ 70.10 $ 33.31 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
23 EX-CAT349DL $ 433,064.21 $ 43,306.42 $ 389,757.79 4,056 16,224 $ 24.02 0.10 0.64 $ 9.23 $ 33.25 $ 37.52 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
24 GS-CUMMINS S38G7 $ 16,500.00 $ 1,650.00 $ 14,850.00 4,056 16,224 $ 0.92 0.10 0.64 $ 0.35 $ 1.27 $ 10.23 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
25 SYKESS-HH160i SS $ 179,126.32 $ 17,912.63 $ 161,213.68 4,056 16,224 $ 9.94 0.10 0.64 $ 3.82 $ 13.75 $ 10.23 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
26 PC400LCSE-7 $ 338,684.21 $ 33,868.42 $ 304,815.79 4,056 16,224 $ 18.79 0.10 0.64 $ 7.21 $ 26.00 $ 36.49 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
27 GD705-A4 $ 376,894.74 $ 37,689.47 $ 339,205.26 4,056 16,224 $ 20.91 0.10 0.64 $ 8.03 $ 28.94 $ 28.42 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
28 Bomag BW 211D-40 $ 80,995.05 $ 8,099.51 $ 72,895.55 4,056 16,224 $ 4.49 0.10 0.64 $ 1.73 $ 6.22 $ 17.05 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
29 Tower Lamp $ 13,275.81 $ 1,327.58 $ 11,948.23 4,056 16,224 $ 0.74 0.10 0.64 $ 0.28 $ 1.02 $ 2.27 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
30 NISSAN CWB $ 105,263.16 $ 10,526.32 $ 94,736.84 4,056 16,224 $ 5.84 0.10 0.64 $ 2.24 $ 8.08 $ 11.37 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
31 Articulate CAT 740 $ 420,000.00 $ 42,000.00 $ 378,000.00 4,056 16,224 $ 23.30 0.10 0.64 $ 8.95 $ 32.25 $ 33.96 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
32 PC 200 $ 130,000.00 $ 13,000.00 $ 117,000.00 4,056 16,224 $ 7.21 0.10 0.64 $ 2.77 $ 9.98 $ 15.28 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
33 PC 300 $ 210,000.00 $ 21,000.00 $ 189,000.00 4,056 16,224 $ 11.65 0.10 0.64 $ 4.47 $ 16.12 $ 27.08 $ 0.32 $ 0.07 $ 0.23 $ 0.14 $ 0.09 $ 0.38 $ 0.26
3 SERVICE BLASTING
JASA PELEDAKAN
SEWA MMU
4 SERVICE DRILLING
BIAYA METER DRILLING
RENCANA BIAYA DIVISI DRILLING & B
SATUAN HARGA
JANUARY FEBRUARY MARCH APRIL
KG $ 0.70 91,904 91,904 91,904 91,904
KG $ 3.62 1,778 1,778 1,778 1,778
PCS $ 1.55 35 35 35 35
PCS $ 4.43 3,556 3,556 3,556 3,556
PCS $ 4.49 0 0 0 0
PCS $ 4.15 1,422 1,422 1,422 1,422
PCS $ 4.83 0 0 0 0
PCS $ 4.15 1,067 1,067 1,067 1,067
PCS $ 4.83 0 0 0 0
PCS $ 4.15 711 711 711 711
PCS $ 4.83 0 0 0 0
PCS $ 4.15 356 356 356 356
PCS $ 4.83 0 0 0 0
ROLL Rp 560,000.00 53 53 53 53
Rupiah
Dolar
Cost/Bcm
TOTAL BIAYA
$ 771,993.60 Bulan 12
$ 77,226.67 Kurs $ Rp 12,000.00
$ 641.70 PF 0.21 kg/m³
$ 189,013.33 Burden 4.5 m
$ - Spasi 5.5 m
$ 70,826.67 Depth Hole 5m
$ - Steaming 2.1 m
$ 53,120.00 Charging 2.4 m
$ -
$ 35,413.33
$ -
$ 17,706.67
$ -
$ 29,866.67
Rp 14,949,703,600.00
Rp 714,645,504.00
Rp 89,100,000.00
Rp 1,872,000,000.00
Rp 64,800,000.00
Rp 2,740,545,504.00
Rp 1,076,400,000.00
Rp 240,000,000.00
Rp 1,316,400,000.00
Rp 9,139,200,000.00
Rp 9,139,200,000.00
Rp 28,145,849,104.00
$ 2,345,487.43
$ 0.44
Kekurangan
1. OHDA Price per jarak 100 m
2. Working hour masih tinggi
3. Harga fuel belum aktual
4. Perhitungan unit support belum menyesuaikan actual
5. Perhitungan solar di unit support