You are on page 1of 1

Sawah

Timbunan Pilihan
CL

2% 2%

Sawah

ELEVASI PERSAMAAN
STASION 0+300
JARAK (M) 0.50 2.15 2.15

ELEVASI EXISTING (M)

ELEVASI TERPASANG (M)

332.21 333.29
332.21 333.09
332.25 332.09
332.21 331.94
Skala 1 : 100

CROSS SECTION
Sawah

Sawah Timbunan Pilihan


CL

2% 2%

ELEVASI PERSAMAAN
STASION 0+350
JARAK (M) 2.25 2.25

ELEVASI EXISTING (M)

ELEVASI TERPASANG (M)

333.64 333.84
333.68 333.36
333.64 334.26

Skala 1 : 100

You might also like