A. Incoming Material Inspection
A. Incoming Material Inspection
Q-004
Aira Euro Automation Private Limited Rev. No. & Date 0 / 01.05.2014
Reviewed By MR
Quality Plan for Valves Approved By Head QA/QC
Inspection/Process Reference Acceptance Sampling Agency
Sr. Item / Process Sample Record Remarks
Parameter Criteria Criteria Acceptance S A C
A. INCOMING MATERIAL INSPECTION
Magnetic Particle Test * W-P-21-09 API 6D - A15 F-P-07-05 Reject ENR P R R/W
Magnetic Particle Test * W-P-21-09 API 6D - A13/A20 F-P-07-05 Reject ENR P R R/W
Lapping Material W-P-15-06 W-P-15-06 Max. 4 / Lot Reprocess --- --- P ---
6 Lapping Machine Speed W-P-15-06 W-P-15-06 Max. 4 / Lot Reprocess --- --- P ---
F-P-15-02 / F-
Operator W-P-15-06 W-P-15-06 Max. 4 / Lot Reprocess --- P ---
P-21-01
Surface Finish Roubert Chart Drawing Max. 4 / Lot Reprocess F-P-21-01 --- P ---
Supply Voltage W-P-21-12 Max. 12V F-P-07-05 / 10% Re-assembly F-P-21-01 --- P ---
Anti-Static Device
1
Test *
Resistance W-P-21-12 Max 10 F-P-07-05 / 10% Re-assembly F-P-21-01 --- P R/W
Water Chloride Content W-P-21-04 < 30ppm Once in a Year Add rust inhibitor SLC --- P ---
Hydro Back Seat Test R-P-21-02 /
4 Pressure R-P-21-02 100% Reject F-P-21-02 --- P R/W
(Gland Leakage) F-P-07-06
R-P-21-02 /
Pressure Holding Duration R-P-21-02 100% Reject F-P-21-02 --- P R/W
F-P-07-06
1 Cycle /
Pressure Test Cycle W-P-21-04 100% Reject F-P-21-02 --- P R/W
F-P-07-06
Material Brand Name Expiry Date 100% Reject F-P-15-04 --- P ---
1 Painting / Coating Humidity W-P-09-01 250C +100C Once in a Year Requalification F-P-16-01 --- P ---
Instrument - Object
W-P-09-01 6" - 8" Once in a Year Requalification F-P-16-01 --- P ---
Distance
Visual W-P-09-01 W-P-21-01 100% Reprocess F-P-15-04 --- P R/W
Coating Thickness * W-P-09-01 > 70micron 100% Reprocess F-P-15-04 --- P R/W
2 Name Plate Marking Visual W-P-21-01 Drawing 100% Re-marking F-P-21-03 --- P ---
Friction Lock or
3 Packing Visual Side Caps 100% Reprocess F-P-21-03 --- P ---
Bolting Type
E. SERVICING OF VALVES
1 INCOMING INSPECTION
1.1 Visual Inspection As per C2 W-P-21-01 W-P-21-01 100% Reject F-P-14-01 --- P ---
Dimensional
1.2 As per C3 W-P-21-03 Drawing 100% Reject F-P-14-01 --- P ---
Inspection
1.3 Pressure Testing As per C4, C5, C6