Raw Material Handling & Grinding

Limestone Clay

2 Crushers (Existing – impact, Polyssius 70 t/h + 50 t/h. Hazmag)

B.C. 250 t/h

H.G. Limestone

Sand pile Iron ore pile


Mix 20,000
ton

B.C. 150 / 200 t/h

455 m³ H.G. Limestone Sand Iron Ore

350 t Mix 150 t 150 t 150 ton

Feeder 150 t/h 50 t/h 10 t/h 10 t/h

B.C. 200 /250 t/h

100/150 t/h

V.R.M. LOESCHE

100 t/h (Existing)

100 / 150 t/h

To Raw Meal Silo


Raw Meal Storage & Clinker Production

From Raw Mill From Kiln & Raw Mill Filter


100/150 t/h 8.6 /12.9 t/h

108.6/162.9 t/h

CF silo 6000 ton

> 90/100 t/h

Preheater 4 stage with ILC precalciner

By-Pass way Kiln 3.6 x 46 m 1200 t/d

Polyssius Grate cooler 3 x15.5 m

50 tons 80 /120 t/h

80/120 t/h

80 /120 t/h

Emergency Hopper 500 tons clinker storage

10 m³ 20,000 tons

0-10 t/h

To Trucks 150 / 200 t/h

50 -60 t/h to trucks To Cement Mils


Cement Grinding
Gypsum Additive
500 ton 500 ton

Gypsum Additive

50 t/h 50 t/h
From Clinker silo Crusher 100 t/h

30/50 t/h
Clinker Hopper Gypsum Add.
200 t 100 t 100 t
By-Pass Dust
50 ton 150 t/h 10 t/h 10 t/h
By-Pass Bin 125/150 t/h
As per chemical Analysis
3 t/h C.M. 50t/h C.M. 70 t/h (Both Ball Mills)
50/60t/h 70/80 t/h Cement Produced

4 Cement Silos Each silo can receive CF Silo CF Silo CF Silo CF Silo
125 / 150 t/h 8000 t 8000 t 8000 t 8000 t

Bulk 80/100 t/h

Packer 80/100 t/h Palletizer Packer 80/100 t/h