JIRONES ALTO LARGO ANCHO VOL.

CONCRETO
CA. AMAUTA 0.39 7.62 0.4 1.19
0.74 7.62 0.4 2.26
0.23 7.62 0.4 0.70
0.41 7.62 0.4 1.25
0.51 7.62 0.4 1.55
0.46 7.62 0.4 1.40
0.74 7.62 0.4 2.26
0.84 7.62 0.4 2.56
jr. Salaverry 0.53 7.62 0.4 1.62
0.37 7.62 0.4 1.13
0.24 7.62 0.4 0.73
0.61 7.62 0.4 1.86
0.29 7.62 0.4 0.88
0.12 7.62 0.4 0.37
macchu picchu 0.34 7.62 0.4 1.04
0.40 7.62 0.4 1.22
0.59 7.62 0.4 1.80
0.75 7.62 0.4 2.29
0.46 7.62 0.4 1.40
0.67 7.62 0.4 2.04
0.88 7.62 0.4 2.68
0.30 7.62 0.4 0.91
capilla 0.10 7.62 0.4 0.30
0.10 7.62 0.4 0.30
0.10 7.62 0.4 0.30
dados de concreto 0.60 0.30 0.3 0.49

TOTAL 34.53
M3
ENCOFRADO
6.26
11.87
3.69
6.58
8.18
7.38
11.87
13.47
8.50
5.93
3.85
9.78
4.65
1.92
5.45
6.42
9.46
12.03
7.38
10.75
14.12
4.81
1.60
1.60
1.60

179.17
M2