Professional Documents
Culture Documents
Summary Part Urgent Desember
Summary Part Urgent Desember
SITE NO PART PN
1 Filter Ac 040604 -01018
2 hydroulic oil tank strainer 024102 - 05004
PST 3 Compresor oil separator 040203 - 02002
4 Gasket 040203 - 020461
5 Dust collector Diaphragm 088422 - 010330
1 High pressure filter hydrolik D59050800/D59050801
2 Return filter(Hydrolik) ERA52NCR/D-59050401A
3 V-Belt AC D-29040012
4 V-Belt alternator 3288475
GAM
5 Oil separator(compressor) D52040106
6 Air filter(AC) RB2200001
7 Motor bracket RB5220026B
8 Oil filter LF9009
1 Nedle Bearing Drifter ( AD161-0044)
2 WATER SPARATOR Everdigm R B 419-0003
VDTM
3 Oil Sparator Compresor ( D52040106 )
4 Rubber Dusthood/Dustcolector D-17081100
VENDOR JUMLAH HARGA TOTAL PO
PT AKAR 1 Rp 2,845,000.00 Rp 2,845,000.00 161
PT AKAR 2 Rp 4,268,500.00 Rp 8,537,000.00 161
PT AKAR 1 Rp 6,504,000.00 Rp 6,504,000.00 161
PT AKAR 1 Rp 813,000.00 Rp 813,000.00 161
PT AKAR 1 Rp 4,471,500.00 Rp 4,471,500.00 161
BERCA SMD 1 Rp 4,411,000.00 Rp 4,411,000.00 146
BERCA SMD 1 Rp 1,375,700.00 Rp 1,375,700.00 133
BERCA SMD 1 Rp 419,500.00 Rp 419,500.00 133
BERCA SMD 1 Rp 2,528,000.00 Rp 2,528,000.00 133
BERCA SMD 1 Rp 6,510,000.00 Rp 6,510,000.00 133
BERCA SMD 1 Rp 370,000.00 Rp 370,000.00 142
BERCA SMD 1 Rp 7,110,000.00 Rp 7,110,000.00 142
aneka filter 2 Rp 550,000.00 Rp 1,100,000.00 171
BERCA BJM 2 Rp 10,377,000.00 Rp 20,754,000.00 148
BERCA BJM 2 Rp 693,000.00 Rp 1,386,000.00 119
BERCA BJM 1 Rp 6,510,000.00 Rp 6,510,000.00 116
BERCA BJM 1 Rp 3,498,000.00 Rp 3,498,000.00 119
Rp 79,142,700.00
STATUS PART URGENSI
READY BALIKPAPAN URGENT SERVICE 1000HM
INDENT TURKI 7 HARI LAGI URGENT SERVICE 1000HM
READY BALIKPAPAN SEVICE 2000HM
READY BALIKPAPAN URGENT SERVICE 1000HM
READY BALIKPAPAN URGENT SERVICE 1000HM
READY SMD PM2000
proses tarik dr jkt PM1750
proses tarik dr jkt PM1750
proses tarik dr jkt PM1750
indent 1 bln PM2000
READY SMD PM2000
indent 1 bln
ready bpn HM2000
READY BJM JIKA TIDAK DIPAYMENT AKAN DIBATALKAN DAN DIBERIKAN PENAWARAM ULANG
READY BJM JIKA TIDAK DIPAYMENT AKAN DIBATALKAN DAN DIBERIKAN PENAWARAM ULANG
READY BJM JIKA TIDAK DIPAYMENT AKAN DIBATALKAN DAN DIBERIKAN PENAWARAM ULANG
READY BJM JIKA TIDAK DIPAYMENT AKAN DIBATALKAN DAN DIBERIKAN PENAWARAM ULANG
KETERANGAN