(Q 5 Trisha
“a” [Projects
OFFER FOR DUCTION AND INSULATION WORK..JINDALSTEEL PLANT ANGUL_
= Tage 1 ae = ae
7 [tine.shitting instalation of Factory Fabricated | 450000 yeo0e a
Duct of UPTO
7 [titing.shittinginstalation of Factory Fabricated | 3,500.00 =. oso a
Duct of 751-
7 [iting shitting instalation of Factory Fabricated | 150000 — =
loucr of 1501-
3 [ttine. shitting instalation of Factory Fabricated | 100000 = aaa
louct of Above
] [tine shitting instalation of Henble 2500] ey =a
lconnections constructe
9 [tiine.cniting instalation of Gil Volume co) a
|controt dampers with
Jo [ttn shining. instalation of opposed blade GI co aa
\colse dampers
a _ [Uitine.shiting instalation of powder coated oo oe
lextrued Al grille
qa __|titin.shiting installation of powder coated 00, a
lextruded Al grille
TS [inst powder coated exuded Alaiffuser 5.00] eA pason09|
yg [Mtine.shiting instalation of powder coated seo) peared us
lextruced Al difus
7s _ [tttine hitting instalation of Fusibie Unk type 500] |
Ince dampers #
ye _ [Uiting. shitting installation of Fresh air oxeel ren =z
larrangement with bird
7 insty of 10 mm thick & 140 to 160Kg/m3 Pc Tamm
ye [Mtine. shitting instalation of Insulation of 13 3,500.00] =, 05.00 =
lmm thickness w
qo _ [Uiiseshiting instalation of Insulation of 1S 350000], aa =a
|mm thickness wi
Trea 3,670,500.00
antec e naa peor aie Retr)
G House 6LH-42 Housing Board Mobile: +91-9755096790
Address: H sale.
FP eT cs eee Le GSTIN » lJODMHPS2475D128
LI
Colony, PS E
‘Scanned with CamScanner