MAINTAINENCE RECORD TRANSMITTAL,
PROJECT ~ Zabel 1 DCP Date ~13.02.2023,
CLIENT - M/s Empower Energy Solutions
(CONSULTANT ~ Mis DC Pro Engineering
MAIN CONTRACTOR ~ Mis AG ENGINEERING LLC
KIND ATTENTION - Wr Marion Magdangan
‘SUBJECT ~ Submission of Maintenance check and activity records for Zabeel 1 DOP
plant from January 2022 to August 2022
Dear Sk,
Reference to the above-mentioned subject we have summarized all the mechanical
Equipment’s maintenance records which have been undertaken by Mis AG engineering
{rom September 2022 o January 2023.
Please note the mainionance done fr all the mechanical equipment’ check ist,
photographs and records has been subrnitted vile emails to Mis Empower PMO office.
1, Cooling tower-3 nos.
Side stream fitaton -1 no
Expansion Tank ~ 1 no,
“Thermal Energy storage tank —2 nos.
Primary ciled water pumps —4 nos.
‘Secondary chilled water pumps ~ 5 nos.
Condenser water pumps ~4 nos,
Suction difsers ~ 13 nos.
Retigerant leak detection system — 1 system
age 10210
1"
12
18,
14,
19,
16.
Fan col unit~28 nos.
Air cooler unit~26 nos.
Vertical Air Handling unit-9 nos.
‘Ar handling unit 2 nos.
Fresh alr handling unit 1 no.
Fans ~ 18 nos,
PX unit 6 nos.
Please signoff and acknowledge this letter asa token of acceptance for the
‘maintenance activity done by M/s Ag Engineering for al the Mechanical equipment’ as
ted above