You are on page 1of 2
MAINTAINENCE RECORD TRANSMITTAL, PROJECT ~ Zabel 1 DCP Date ~13.02.2023, CLIENT - M/s Empower Energy Solutions (CONSULTANT ~ Mis DC Pro Engineering MAIN CONTRACTOR ~ Mis AG ENGINEERING LLC KIND ATTENTION - Wr Marion Magdangan ‘SUBJECT ~ Submission of Maintenance check and activity records for Zabeel 1 DOP plant from January 2022 to August 2022 Dear Sk, Reference to the above-mentioned subject we have summarized all the mechanical Equipment’s maintenance records which have been undertaken by Mis AG engineering {rom September 2022 o January 2023. Please note the mainionance done fr all the mechanical equipment’ check ist, photographs and records has been subrnitted vile emails to Mis Empower PMO office. 1, Cooling tower-3 nos. Side stream fitaton -1 no Expansion Tank ~ 1 no, “Thermal Energy storage tank —2 nos. Primary ciled water pumps —4 nos. ‘Secondary chilled water pumps ~ 5 nos. Condenser water pumps ~4 nos, Suction difsers ~ 13 nos. Retigerant leak detection system — 1 system age 102 10 1" 12 18, 14, 19, 16. Fan col unit~28 nos. Air cooler unit~26 nos. Vertical Air Handling unit-9 nos. ‘Ar handling unit 2 nos. Fresh alr handling unit 1 no. Fans ~ 18 nos, PX unit 6 nos. Please signoff and acknowledge this letter asa token of acceptance for the ‘maintenance activity done by M/s Ag Engineering for al the Mechanical equipment’ as ted above Thi and Regards, ‘Acknowledged and Acceptance Name: TTR, RRARALA.C.NRORY™ Name- FOR AGENGINEERING LLC FOR EMPOWER ENERGY SOLUTION age 202

You might also like