You are on page 1of 2
Name of Work: Bill of Quantity Construction of Hall and Improvement! Renovation of Second Floor Shed. Construction of Hall Improvement! Renovation of Second floor fabricated shed Lying of tuff tiles in the lawn wv Installation of weight lift (Winch local) Estimated Cost in Rs:- Earnest Money Rs:- ‘Completion Period: 5.272 105450!- Million ‘As Por Work Order S#| tot amean [om of work unit | Rate | aty: | Amount T | 08:25:-6 _ |Excavation in foundation of building bridges | 100ck | easa0s | O84 | 7474 Jetc complete in ordinary soil Z| 03-25- [Dismantiing brick work intima oreament | 1000en| 4253 | 4.21 | sti7 mortar 3 | 06-07-8038 _|RCC in roof slab, beam, column & other Took | 4140533 | 256 | 106264 structuralmembers, insitu or precast (1:2:4) 4 | 0603-6 [Cement concrete ( brickistone ballast i5"to | T00eR | 2343358 | 3914 | 917103 12" linullah shingle well graded and cleaned) in foundation_& plinth (ratio 1:4:8) © | 07-04-2058 [Pucca brick work in foundation:& plinth in | 10OcR | S67ea69 | 869 | 326736 lcement, sand motor (1:6) © | 0626-02 [Damp proof course of cem. conc. 1:24 Tosh | toera | 179 | 13197 including bitumen coat, 1 layer polythene & 1 coat bitumen (2" thick) 7 | 07-05-8-05 |Pucca brick work in ground floor cement, | 100m | 3020288 | 1095 | 420125 jsand motor (1:6) @ | 07-06-08 [Pucca brick workin ground floor cementsand| 700 eR | 4070541 | 1.71 | 69759 +07-08 __|motor (1:6) add extra @| 09-45 PIF Burnt Brick Tile Roofing over Teeron | 100s | 7aaa7.73 | 13.62 | 1013078 land Steel Girder, in 1:6 cls mortar (12' max span 70] 2545-2 {Supplying and fixing 18 SWG MS Sheet door | Tsft | 627.52 | 160.00 | 132403 lwith angle iron frame ( 1.5" x1.°x1V/8") bot hinges, paint ete complete. TT] 08-06 |Single layer of ties 12°x6"x2" laid over 4” | T0Osh | 1600875 | 150 | 22641 learth and 1" mud plaster on top of RC roof slab or Plain Gament Conerele including placing, | 700m | 3600222 | 661 | 202407 06-05-F compacting, finishing and curing (Ratio 12:4) 73] 11-18 [Cement pointing struck joints, on walls, upto | 00st | 38057 | 14.98 |” 68349 20 feet height Ratio (1:3 74] 17-09: [Cement plaster 1:4 upto 20 ft height 172" Oost | 377334 | 1680 | 63380 thick. 75 |_17-23-8.03_|White washing: New surface Three coats, | T00sk | 622.58 | 1124 [$872 16| 25-588 _ [PIF of Parking Sheed consisting of CGI, Tsft | 653.09 | 1111.00] 726583 |Sheet, Tublar Pipe 17[ 1550 ]Wiing of ights/fan/cai-bell pontin 30.029 [No | 1575.83 | 8.00 | 12607 PVC insulated bare cable in PVC pipe recessed, 78| 1610-6 [Providing and Erection Plastic board No | 174as_} 200 | 349 | 10x12)" 70] 1610-6 [Providing and Erection Plastic board (7xay" | No | 19041 [200 |” 261 20 |_16-81 | Supply and fixing 20 Amp power plug No_| 272.88 | 200 | 545 — 21] 16-11-b-02 [Supply and Erection of iron/aluminium clad, | No | 1230.3 | 2.00 | 2461 1500 V main switch Triple pole with neutral link: 30/35 Amp. = 2a] 06-08-¢ | Supply & fabricate M.S. reinforcement for Tonne | 242,000.00 0.25 | 60580 Icement concrete (Hot rolled deformed bars Grade 40) zl Za} 10-451 Providing and Fixing Precast Concrete 5000 | 100SR |~8670.72 | 63.00 | 546255 psi TUFF Tiles GOmm thick over bed of 2" thick sand aa Sa] NST |Suppy and thang of Coustorised winch pe Elevator | US | 50000 | 1.00 | 550000 loot tone load capacity from Grouund Float o 2nd Floor (3 Stop Gr'+2) Speed 025m/Sec, Size Width |aFtx Depth GFt indicators: Digital Indication in all Landings including drectonal arrows Doors: Collopsibie doors with safaty and power break ldown arrangment Total Rs.| 5272464 In Milion Rs.| 6.272 Note Try other Nem of work erop out during execution will be paid on M.R.S 2022 (2nd Bi Contractor Premium. ‘Annual). The Quantities are liable to be increased or decreased during execution. % Above | Below Contractor Signature @

You might also like