You are on page 1of 2

1 FOLD 2

2 3 FOLD 5
4 5 FOLD 5
6
Authority

© COPYRIGHT PNC ARCHITECTS


Stamp

TA

TA
UR
TA

TA

TA

TA

TA

TA
UR
UR

UR

UR

UR
UR

UR

FC

FC
03
FC

FC

FC

FC
FC

FC

0 4
03

03

03

03
03

03

A1
TA-B08 (350 x 900) U/S
TA-B07 (300 x 700) TA-B07 (300 x 700)

TA-B08 (350 x 900) U/S


+169.955 (T.O.C)

+169.955 (T.O.C)

3850
TA
UR
FC
TA-CB10 (250 x 900) U/S

TA-CB10 (250 x 900) U/S

TA
04

UR

A2
FC
TA

TA

TA

03
TA

UR

UR

UR
UR

FC

FC

FC

TA
FC

01

01

01

UR
03

F C0
3
TA

TA

7800
+169.405 SSL
UR

UR

350 THICK RC
TA

FC

FC

TA
UR

0
1

SLAB

UR
FC

BOOSTER PUMP

FC
03

03
TA
UR

TA
FC

UR

REFER DETAIL-5
BMU PEDESTAL
01

FC
02
TA-B5 (400 x 900) TA-CB6 (400 x 900)

A3
TA-CB5 (400 x 900) TA-B06 (400 x 900) TA
UR
FC
Site Key Plan

TA
03

UR
FC
0 3
TA-03-119-00
TA
TA

TA

UR

7
UR

UR

FAHU
FC0

7800
FC

FC

1
02

02
TA

TA
UR

UR
410 THK DP

410 THK DP
FC

FC
03

03
WATER HT : 3.70m
GRP WATER TANK
WATER HT : 3.70m
GRP WATER TANK
TA
UR

350 THICK RC
+169.405 SSL
FC
04

SLAB

A4
TA
UR
TA

FC
UR

04
FC

TA
04

UR

4200
FC
0 4
TOWER-C

A5
TA TA

TA

TA
TA

TA

TA
UR UR

UR
UR
UR

UR

UR
FC FC

FC
FC
FC

FC

FC
03 01

03
03
01

01

01

3050
DN
N
TA-LB01 (350 x 915)

ELE.ROOM

TA
UR

A6
F
C0
TA

TA

1
UR

UR
Q

TA-LB02 (500 x 915)


FC

FC

2600
03

0 1

TA

A7
UR

TA
FC

UR
TA TA

0
TA-CB1 (300 x 900)

FC
TA

TA
UR UR

03
UR

UR
FC FC

FC

FC
03 01

0
1

1
Key Plan : NTS

5800

A7'
c c

TA

TA
UR

UR
TA

TA

FC

FC
UR

UR

03

03
FC

FC
GENERAL NOTES:

04

04
TA
UR

A8
FC

TA
03

DRG NO: APT-0-102-01


REFERE STANDARD DETAILS
FOR SHAFT UPSTAND DETAILS

1550
UR
FC
TA-CB4 (300 x 900) TA-CB3 (300 x 900)

0
TA-B04 (500 x 800)

TA-B03 (500 x 800)

A9
SB01
1. THE STABILITY OF THE STRUCTURE DURING ERECTION AND USE IS THE
TA
U
TA
UR RESPONSIBILITY OF THE SITE.

A-D

A-C

A-A
A-B
A-E
RF
A-F

FC

3450
C0 03
3

TA-CB11 (400 x 1000) TA-CB11 (400 x 1000)


2. ENSURE THE STRUCTURE IS ADEQUATE TO TRANSMIT THE LOADS APPLIED FROM

A10
TA
TA UR
UR FC
THE FORMWORK.

TA

TA
FC

+169.405 SSL

350 THICK RC
03

UR

UR
04

FC

FC

SLAB

200 THK RC UPSTAND


03

03

A10'
3850
3. ENSURE THE FOUNDATION ARE ADEQUATE TO TRANSMIT THE LOADS APPLIED.

A11
TA
UR

TA
FC
4. THE GIVEN CONCRETE PRESSURE SHOULD NOT BE EXCEEDED.

UR
03

FC
TA
AS PER FACADE DETAILS

SUPPORTING ELEMENTS

200 THK RC UPSTAND

03
UR
FC
TA

200 THK RC UPSTAND


03
UR
FOR CLADDING

FC

FAHU
03
5.18MM THICKNESS OF PLYWOOD HAS TO BE USED OTHERWISE IT MIGHT CAUSE

DN

TA
TA

UR
ADDITIONAL DEFLECTION.

UR

FC
FC

9004
03
0 3
Allowable Stresses :

TA
TA
Fb= 13.99 N/mm2 , Fv= 4.83 N/mm2

UR
UR

FC
FC

0 3
03

TA
TA

TA
Fc = 3100 N/mm2, δ = L/ 270 ( As per BS )

TA
UR
UR

UR

UR
FC
FC

FC

FC
03
0

0
3

03

A12
TA TA TA TA
6. THE SHOWN STRUCTURAL DIMENSIONS ARE TAKEN FROM STRUCTURAL OR

TA
UR UR UR UR

UR
A
FC FC FC FC
ARCHITECTURAL DRAWINGS.

TA
FC
03 03 03 03

UR
03

FC
03
3275 6900 1850 6900 4175

7. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS

1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2

A-D

A-C
A-E

A-B

A-A
A-F
OTHERWISE STATED.

TA
8. THIS DRAWINGS SHOULD BE READ IN CONJUNCTION WITH RELEVANT

TA
ARCHITECTURAL AND STRUCTURAL DRAWINGS.

UR
TA

TA1.0

TA1.0

TA

TA1.0

TA1.0
SITE KEY PLAN 9. THE WRITTEN DIMENSIONS TO BE CONSIDERED.

U1.0
1.0

1.0 F

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0
10. TIE ROD POSITION ARE ONLY PROPOSAL , THEY HAVE TO BE ADJUSTED ON SITE.

RF
UR

UR

UR

UR

UR
UR
FC
11. MAX. HORIZONTAL TIE ROD DISTANCE = 1.2M , UNLESS OTHERWISE MENTIONED.

C0
12. MAX ALLOWABLE LOAD ON TIE ROD = 70KN.

F
F
1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2

03
C0

C0

C0

C0

C0
C0
13. MAX ALLOWABLE SPACING OF PUSH PULL PROPS =1.3M :

4
PERMISSIBLE LOAD = 150KG/M2

FOLD 6
14. PROPS/ SHORING MUST BE INSTALLED VERTICALLY,AVOID ANY INCLINATIONS AND
3

3
3
SHOULD SUPPORT ON THE FIRMED SURFACE.

A
15.MAX ALLOWABLE LOAD ON VERTICAL SUPPORT:

TA-B08 (350 x 900) U/S


PROPS (FLEX SYSTEM) = 20KN

Safety Advice PROPS (TABLE SYSTEM)


STANDARD FOR SCAFFOLDING
= 28KN
= 32KN

TA-B07 (300 x 700) TA-B07 (300 x 700) ALL MEASUREMENTS OF THE STRUCTURE HAVE

TA-B08 (350 x 900) U/S


TO BE CHECKED!
ALL MEASUREMENTS IN MM!

+169.955 (T.O.C)

+169.955 (T.O.C)
TA

TA
UR
UR

T3A-450x330

F
FC

T1-390x330 T3-450x330 T3-450x330 T3-450x330 T3A-450x330

C0
03

3
TA
UR
FC
TA-CB10 (250 x 900) U/S

TA-CB10 (250 x 900) U/S

TA
04
a ...Prop spacing(from drawing)

UR
b ...Primary beam spacing(from drawing)
c ...Secondary beam spacing(from drawing)

FC
TA

TA

TA

d ...max 50cm or half of prop spacing


TOWER A-CANTILEVER SLAB AT LEVEL 47 - GENERAL ARRANGEMENT LAYOUT e ...max 50cm

03
UR

UR
UR

B B
FC

FC
FC
01

01
01

A-D

A-C

A-A
A-B
A-E
A-F

f ...min 40cm (total 80cm) primary beam


overlap(measured from the prop axis)
g ...min 30cm (total 60cm) secondary beam
1200 1200 1200 1200 1200 1200 1200 1200 1200 275 2400 275 1200 1200 1200 1200 1200 1200 1200 1200 1200 overlap(measured from the prop axis)
A

1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Detail For Overlapping Doka Beam
TA

TA
UR
TA

TA1.0

TA1.0

TA

TA1.0

TA1.0
!

U1.0
1.0

1.0 F

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0
RF
UR

UR

UR

UR

UR
UR
FC

200 200 200 200

C0
200 200 200 200
F

F
FC
1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2450 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2
03

150 150
C0

C0

C0

C0

C0
225 1000 1000 450 225

4
1000 875 875 1000

03
3

3
A
450

450
TA-B08 (350 x 900) U/S

FOLD 7
740 1200 1200 1200 TA-B07
1200 (3001200x 700) 1200 1200 1200 385 385 1200 1200 TA-B07
1200 (300
1200 x 700)1200 1200 1200 1200 740
TA-B08 (350 x 900) U/S
1200

1200
190 190
+169.955 (T.O.C)

+169.955 (T.O.C)
TA

TA
UR
UR

T3A-450x330

FC
FC

T1-390x330 T3-450x330 T3-450x330 T3-450x330 T3A-450x330

03
03

TA
2250

2250
RISK OF FORMWORK BEAM
! TIPPING OVER!
UR

ONLY ATTACH THE HANDRAIL CLAMP-S TO


FORMWORK BEAMS IF THESE CANNOT TIP OVER.
FC

NEVER MOUNT GUARD-RAIL BOARDS IN THE


TA-CB10 (250 x 900) U/S

TA-CB10 (250 x 900) U/S

TA LONGITUDINAL DIRECTION OF THE FORMWORK


04

BEAMS.

U RF !
RISK OF BREAKING THE
FORMWORK SHEETS!
For Approval
TA

TA

TA

IT IS FORBIDDEN TO FASTEN THE CLAMP-S TO THE


TOWER A-CANTILEVER SLAB AT LEVEL 47 - GENERAL ARRANGEMENT LAYOUT C0 FORMWORK SHEETING ONLY.
UR

UR
UR

3 LEGEND :
FC

FC
FC

A DOKA TIMBER BEAM H20 ECO N A


01

01
01

TABLE HEAD 20
0 ISSUED FOR Approval 08/04/2023
Rev Description Date By
TABLE HEAD 30 Client
Sobha Sapphire, 13th Floor, Al Khail Road,
DOKA FLOOR PROP Business Bay, Dubai, UAE. P.O.Box 125250
T e l N u m b e r : + 9 7 1 (4) 4 2 3 8 0 6 4
investments F a x N u m b e r : + 9 7 1 (4) 4 2 1 5 9 0 8
www. sobha-me.com
4-WAY HEAD H20

Consultant
SUPPORTING HEAD H20 DF Sobha Sapphire, 13th Floor, Al Khail Road,
Business Bay, Dubai, UAE. P.O.Box 122960
T e l N u m b e r : + 9 7 1 (4) 4 2 3 8 0 5 4
REMOVABLE FOLDING TRIPOD F a x N u m b e r : + 9 7 1 (4) 4 2 1 5 9 0 8
architects www. p n c a r c h i t e c t s.com

Project
NOTES : PROPOSED B+G+5P+41+SERVICE FLOOR+ROOF
SECONDARY H20 BEAM SPACING COMMERCIAL RETAIL + RESIDENTIAL
BIM 360://HO-01/20005-ST-HO-01-Main.rvt

SLAB THICKNESS: Max. spacing c/c


DEVELOPMENT ON PLOT NO. 347-0383 AT SOBHA
HARTLAND, AL MERKADH, DUBAI, U.A.E
200mm~300mm = 488mm
DROP BEAM: Max. spacing c/c Title

400mm~1000mm = 406mm TOWER A-CANTILEVER SLAB AT


1000mm~1400mm = 350mm LEVEL 47
09/03/2021 17:13:54

1400mm~1800mm = 300mm

PRIMARY H20 BEAMxPROP SPACING STAGE DRAWN CHECKED APPROVED SCALE SHEET

APPROVAL Kirubhakaran Syed Zubair A0


SLAB THICKNESS: Max. Grid c/c
Drawing Number DM Number Rev
200mm~300mm = 1.65m x1.1m
CRT-SFD-CVL-STR-SB-FRM-063 0
FOLD 2 FOLD 1 FOLD 5 FOLD 3 FOLD 4
1 2 3 4 5 6
1 FOLD 2
2 3 FOLD 5
4 5 FOLD 5
6
Authority

© COPYRIGHT PNC ARCHITECTS


Stamp

A-C
A-D

A-A
A-E

A-B
A-F

TA

TA
UR
TA

TA

TA

TA

TA

TA
UR
UR

UR

UR

UR
UR

UR

FC

FC
03
FC

FC

FC

FC
FC

FC

0 4
03

03

03

03
03

03

A1
TA-B08 (350 x 900) U/S
TA-B07 (300 x 700) TA-B07 (300 x 700)

TA-B08 (350 x 900) U/S


+169.955 (T.O.C)

+169.955 (T.O.C)

3850
TA
UR
FC
TA-CB10 (250 x 900) U/S

TA-CB10 (250 x 900) U/S

TA
04

UR

A2
FC
TA

TA

TA

03
TA

UR

UR

UR
2350
UR

FC

FC

FC

TA
FC

01

01

01

UR
03

F C0
3
TA

TA

7800
+169.405 SSL
UR

UR

350 THICK RC
TA

FC

FC

TA
UR

0
1

SLAB

UR
FC

BOOSTER PUMP

FC
03

03
250 250

TA
UR

TA
FC

UR

REFER DETAIL-5
BMU PEDESTAL
01
1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200

FC
02
TA-B5 (400 x 900) TA-CB6 (400 x 900)

A3
TA-CB5 (400 x 900) TA-B06 (400 x 900) TA
UR
FC
Site Key Plan

TA
03

UR
FC
0 3
TA-03-119-00
TA
TA

TA

UR

7
UR

UR

FAHU
FC0

7800
FC

FC

1
02

02
TA

TA
UR

UR
410 THK DP

410 THK DP
FC

FC
03

03
WATER HT : 3.70m
GRP WATER TANK
WATER HT : 3.70m
GRP WATER TANK
TA
UR

350 THICK RC
+169.405 SSL
FC
04

SLAB

A4
TA
UR
TA

FC
UR

04
FC

TA
04

UR

4200
FC
0 4
TOWER-C

200 200 200 200

A5
TA TA

TA

TA
TA

TA

TA
UR UR

UR
UR
UR

UR

UR
FC FC

FC
FC
FC

FC

FC
03 01

03
03
01

01

01

3050
DN
N

200 200 200 200


TA-LB01 (350 x 915)

ELE.ROOM

TA
UR

A6
TA-B07 (300 x 700) TA-B07 (300 x 700)

F
C0
150 150

TA

TA

1
UR

UR
Q

TA-LB02 (500 x 915)


FC

FC
225 225

2600
03

0
450 1000 1000 450

1
1000 875 875 1000

TA

A7
UR

TA
FC

UR
TA TA

0
TA-CB1 (300 x 900)

FC
TA

TA
UR UR

03
UR

UR
FC FC

FC

FC
03 01

0
1

1
Key Plan : NTS

5800

A7'
c c

TA

TA
UR

UR
TA

TA
450

450

FC

FC
UR

UR

03

03
FC

FC
GENERAL NOTES:

04

04
TA
UR

A8
FC

TA
03

DRG NO: APT-0-102-01


REFERE STANDARD DETAILS
FOR SHAFT UPSTAND DETAILS

1550
UR
FC
TA-CB4 (300 x 900) TA-CB3 (300 x 900)

0
TA-B04 (500 x 800)

TA-B03 (500 x 800)

A9
SB01
1. THE STABILITY OF THE STRUCTURE DURING ERECTION AND USE IS THE
TA
URF
TA
UR
FC
RESPONSIBILITY OF THE SITE.

3450
C0 03
3

TA-CB11 (400 x 1000) TA-CB11 (400 x 1000)


2. ENSURE THE STRUCTURE IS ADEQUATE TO TRANSMIT THE LOADS APPLIED FROM

A10
740 1200 1200 1200 1200 1200 1200 1200 1200 385 385 1200 1200 1200 1200 1200 1200 1200 1200 740 TA
UR
TA
UR
FC
THE FORMWORK.

TA

TA
FC

+169.405 SSL

350 THICK RC
03

UR

UR
04

TA

TA

TA

TA

FC

FC

SLAB

200 THK RC UPSTAND


03

03

A10'
3850
3. ENSURE THE FOUNDATION ARE ADEQUATE TO TRANSMIT THE LOADS APPLIED.

1200

1200
TA-B08 (250 x 600) TA-CB10 (250 x 600)

A11
TA-B08 (250 x 600) TA-CB10 (250 x 600)
TA
UR

W
W

TA
FC
4. THE GIVEN CONCRETE PRESSURE SHOULD NOT BE EXCEEDED.

UR
190 190
03

FC
TA
AS PER FACADE DETAILS

SUPPORTING ELEMENTS

200 THK RC UPSTAND

03
UR
FC
TA

200 THK RC UPSTAND


03
UR
FOR CLADDING

FC

FAHU
03
5.18MM THICKNESS OF PLYWOOD HAS TO BE USED OTHERWISE IT MIGHT CAUSE

5A

5B

5A
5B

DN

TA
TA

UR
ADDITIONAL DEFLECTION.

UR

FC
FC

9004
03
0 3
Allowable Stresses :

TA
TA
Fb= 13.99 N/mm2 , Fv= 4.83 N/mm2

UR
UR

FC
FC

0 3
03

TA
TA

TA
Fc = 3100 N/mm2, δ = L/ 270 ( As per BS )

TA
UR
UR

UR

UR
FC
FC

FC

FC
03
0

0
3

03

A12
TA TA TA TA
6. THE SHOWN STRUCTURAL DIMENSIONS ARE TAKEN FROM STRUCTURAL OR

TA
UR UR UR UR

UR
FC FC FC FC
ARCHITECTURAL DRAWINGS.

TA
FC
03 03 03 03

UR
03

FC
03
3275 6900 1850 6900 4175

7. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS

A-D

A-C
A-E

A-B

A-A
A-F
OTHERWISE STATED.

8. THIS DRAWINGS SHOULD BE READ IN CONJUNCTION WITH RELEVANT


ARCHITECTURAL AND STRUCTURAL DRAWINGS.

SITE KEY PLAN 9. THE WRITTEN DIMENSIONS TO BE CONSIDERED.

10. TIE ROD POSITION ARE ONLY PROPOSAL , THEY HAVE TO BE ADJUSTED ON SITE.
2250

2250
11. MAX. HORIZONTAL TIE ROD DISTANCE = 1.2M , UNLESS OTHERWISE MENTIONED.

12. MAX ALLOWABLE LOAD ON TIE ROD = 70KN.

13. MAX ALLOWABLE SPACING OF PUSH PULL PROPS =1.3M :


PERMISSIBLE LOAD = 150KG/M2

FOLD 6
14. PROPS/ SHORING MUST BE INSTALLED VERTICALLY,AVOID ANY INCLINATIONS AND
SHOULD SUPPORT ON THE FIRMED SURFACE.

15.MAX ALLOWABLE LOAD ON VERTICAL SUPPORT:


PROPS (FLEX SYSTEM) = 20KN

Safety Advice PROPS (TABLE SYSTEM)


STANDARD FOR SCAFFOLDING
= 28KN
= 32KN

ALL MEASUREMENTS OF THE STRUCTURE HAVE


TO BE CHECKED!
ALL MEASUREMENTS IN MM!
TA

TA

TA

TA
I BEAM & BOXOUT LAYOUT AT LEVEL 46
W

W
W
12

10

6
8
Handrail Clamp S
576 +169.405 SSL a ...Prop spacing(from drawing)
b ...Primary beam spacing(from drawing)
Level 47 c ...Secondary beam spacing(from drawing)
d ...max 50cm or half of prop spacing
350

e ...max 50cm
B B
266

Scaffolding U head f ...min 40cm (total 80cm) primary beam


overlap(measured from the prop axis)
g ...min 30cm (total 60cm) secondary beam
overlap(measured from the prop axis)
Standard 2.00 m

Detail For Overlapping Doka Beam

Scaffolding Tied
3500

!
2950

to Shear wall
2732

Casted

FOLD 7
Shear wall
Inverted U Head
266
250

+165.905 SSL
Level 46 RISK OF FORMWORK BEAM
! TIPPING OVER!

ONLY ATTACH THE HANDRAIL CLAMP-S TO

IPE 200 5.0 m Length 1000 265


FORMWORK BEAMS IF THESE CANNOT TIP OVER.
NEVER MOUNT GUARD-RAIL BOARDS IN THE
LONGITUDINAL DIRECTION OF THE FORMWORK
BEAMS.

RISK OF BREAKING THE


! FORMWORK SHEETS!

1350 50 IT IS FORBIDDEN TO FASTEN THE CLAMP-S TO THE For Approval


Tie rod anchored to LEGEND :
FORMWORK SHEETING ONLY.

A
existing Slab DOKA TIMBER BEAM H20 ECO N

TABLE HEAD 20
A

0 ISSUED FOR Approval 08/04/2023


Rev Description Date By
TABLE HEAD 30 Client
Sobha Sapphire, 13th Floor, Al Khail Road,

SECTION- A-A DOKA FLOOR PROP Business Bay, Dubai, UAE. P.O.Box 125250
T e l N u m b e r : + 9 7 1 (4) 4 2 3 8 0 6 4
investments F a x N u m b e r : + 9 7 1 (4) 4 2 1 5 9 0 8
www. sobha-me.com
4-WAY HEAD H20

Consultant
SUPPORTING HEAD H20 DF Sobha Sapphire, 13th Floor, Al Khail Road,
Business Bay, Dubai, UAE. P.O.Box 122960
T e l N u m b e r : + 9 7 1 (4) 4 2 3 8 0 5 4
REMOVABLE FOLDING TRIPOD F a x N u m b e r : + 9 7 1 (4) 4 2 1 5 9 0 8
architects www. p n c a r c h i t e c t s.com

Project
NOTES : PROPOSED B+G+5P+41+SERVICE FLOOR+ROOF
SECONDARY H20 BEAM SPACING COMMERCIAL RETAIL + RESIDENTIAL
BIM 360://HO-01/20005-ST-HO-01-Main.rvt

SLAB THICKNESS: Max. spacing c/c


DEVELOPMENT ON PLOT NO. 347-0383 AT SOBHA
HARTLAND, AL MERKADH, DUBAI, U.A.E
200mm~300mm = 488mm
DROP BEAM: Max. spacing c/c Title

400mm~1000mm = 406mm TOWER A-CANTILEVER SLAB AT


1000mm~1400mm = 350mm LEVEL 47-I BEAM LAYOUT &
09/03/2021 17:13:54

1400mm~1800mm = 300mm SECTION DETAILS


PRIMARY H20 BEAMxPROP SPACING STAGE DRAWN CHECKED APPROVED SCALE SHEET

APPROVAL Kirubhakaran Syed Zubair A0


SLAB THICKNESS: Max. Grid c/c
Drawing Number DM Number Rev
200mm~300mm = 1.65m x1.1m
CRT-SFD-CVL-STR-SB-FRM-064 0
FOLD 2 FOLD 1 FOLD 5 FOLD 3 FOLD 4
1 2 3 4 5 6