Professional Documents
Culture Documents
CRT SFD CVL STR Cal FRM 063 064
CRT SFD CVL STR Cal FRM 063 064
2 3 FOLD 5
4 5 FOLD 5
6
Authority
TA
TA
UR
TA
TA
TA
TA
TA
TA
UR
UR
UR
UR
UR
UR
UR
FC
FC
03
FC
FC
FC
FC
FC
FC
0 4
03
03
03
03
03
03
A1
TA-B08 (350 x 900) U/S
TA-B07 (300 x 700) TA-B07 (300 x 700)
+169.955 (T.O.C)
3850
TA
UR
FC
TA-CB10 (250 x 900) U/S
TA
04
UR
A2
FC
TA
TA
TA
03
TA
UR
UR
UR
UR
FC
FC
FC
TA
FC
01
01
01
UR
03
F C0
3
TA
TA
7800
+169.405 SSL
UR
UR
350 THICK RC
TA
FC
FC
TA
UR
0
1
SLAB
UR
FC
BOOSTER PUMP
FC
03
03
TA
UR
TA
FC
UR
REFER DETAIL-5
BMU PEDESTAL
01
FC
02
TA-B5 (400 x 900) TA-CB6 (400 x 900)
A3
TA-CB5 (400 x 900) TA-B06 (400 x 900) TA
UR
FC
Site Key Plan
TA
03
UR
FC
0 3
TA-03-119-00
TA
TA
TA
UR
7
UR
UR
FAHU
FC0
7800
FC
FC
1
02
02
TA
TA
UR
UR
410 THK DP
410 THK DP
FC
FC
03
03
WATER HT : 3.70m
GRP WATER TANK
WATER HT : 3.70m
GRP WATER TANK
TA
UR
350 THICK RC
+169.405 SSL
FC
04
SLAB
A4
TA
UR
TA
FC
UR
04
FC
TA
04
UR
4200
FC
0 4
TOWER-C
A5
TA TA
TA
TA
TA
TA
TA
UR UR
UR
UR
UR
UR
UR
FC FC
FC
FC
FC
FC
FC
03 01
03
03
01
01
01
3050
DN
N
TA-LB01 (350 x 915)
ELE.ROOM
TA
UR
A6
F
C0
TA
TA
1
UR
UR
Q
FC
2600
03
0 1
TA
A7
UR
TA
FC
UR
TA TA
0
TA-CB1 (300 x 900)
FC
TA
TA
UR UR
03
UR
UR
FC FC
FC
FC
03 01
0
1
1
Key Plan : NTS
5800
A7'
c c
TA
TA
UR
UR
TA
TA
FC
FC
UR
UR
03
03
FC
FC
GENERAL NOTES:
04
04
TA
UR
A8
FC
TA
03
1550
UR
FC
TA-CB4 (300 x 900) TA-CB3 (300 x 900)
0
TA-B04 (500 x 800)
A9
SB01
1. THE STABILITY OF THE STRUCTURE DURING ERECTION AND USE IS THE
TA
U
TA
UR RESPONSIBILITY OF THE SITE.
A-D
A-C
A-A
A-B
A-E
RF
A-F
FC
3450
C0 03
3
A10
TA
TA UR
UR FC
THE FORMWORK.
TA
TA
FC
+169.405 SSL
350 THICK RC
03
UR
UR
04
FC
FC
SLAB
03
A10'
3850
3. ENSURE THE FOUNDATION ARE ADEQUATE TO TRANSMIT THE LOADS APPLIED.
A11
TA
UR
TA
FC
4. THE GIVEN CONCRETE PRESSURE SHOULD NOT BE EXCEEDED.
UR
03
FC
TA
AS PER FACADE DETAILS
SUPPORTING ELEMENTS
03
UR
FC
TA
FC
FAHU
03
5.18MM THICKNESS OF PLYWOOD HAS TO BE USED OTHERWISE IT MIGHT CAUSE
DN
TA
TA
UR
ADDITIONAL DEFLECTION.
UR
FC
FC
9004
03
0 3
Allowable Stresses :
TA
TA
Fb= 13.99 N/mm2 , Fv= 4.83 N/mm2
UR
UR
FC
FC
0 3
03
TA
TA
TA
Fc = 3100 N/mm2, δ = L/ 270 ( As per BS )
TA
UR
UR
UR
UR
FC
FC
FC
FC
03
0
0
3
03
A12
TA TA TA TA
6. THE SHOWN STRUCTURAL DIMENSIONS ARE TAKEN FROM STRUCTURAL OR
TA
UR UR UR UR
UR
A
FC FC FC FC
ARCHITECTURAL DRAWINGS.
TA
FC
03 03 03 03
UR
03
FC
03
3275 6900 1850 6900 4175
1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2
A-D
A-C
A-E
A-B
A-A
A-F
OTHERWISE STATED.
TA
8. THIS DRAWINGS SHOULD BE READ IN CONJUNCTION WITH RELEVANT
TA
ARCHITECTURAL AND STRUCTURAL DRAWINGS.
UR
TA
TA1.0
TA1.0
TA
TA1.0
TA1.0
SITE KEY PLAN 9. THE WRITTEN DIMENSIONS TO BE CONSIDERED.
U1.0
1.0
1.0 F
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
10. TIE ROD POSITION ARE ONLY PROPOSAL , THEY HAVE TO BE ADJUSTED ON SITE.
RF
UR
UR
UR
UR
UR
UR
FC
11. MAX. HORIZONTAL TIE ROD DISTANCE = 1.2M , UNLESS OTHERWISE MENTIONED.
C0
12. MAX ALLOWABLE LOAD ON TIE ROD = 70KN.
F
F
1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2
03
C0
C0
C0
C0
C0
C0
13. MAX ALLOWABLE SPACING OF PUSH PULL PROPS =1.3M :
4
PERMISSIBLE LOAD = 150KG/M2
FOLD 6
14. PROPS/ SHORING MUST BE INSTALLED VERTICALLY,AVOID ANY INCLINATIONS AND
3
3
3
SHOULD SUPPORT ON THE FIRMED SURFACE.
A
15.MAX ALLOWABLE LOAD ON VERTICAL SUPPORT:
TA-B07 (300 x 700) TA-B07 (300 x 700) ALL MEASUREMENTS OF THE STRUCTURE HAVE
+169.955 (T.O.C)
+169.955 (T.O.C)
TA
TA
UR
UR
T3A-450x330
F
FC
C0
03
3
TA
UR
FC
TA-CB10 (250 x 900) U/S
TA
04
a ...Prop spacing(from drawing)
UR
b ...Primary beam spacing(from drawing)
c ...Secondary beam spacing(from drawing)
FC
TA
TA
TA
03
UR
UR
UR
B B
FC
FC
FC
01
01
01
A-D
A-C
A-A
A-B
A-E
A-F
1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Detail For Overlapping Doka Beam
TA
TA
UR
TA
TA1.0
TA1.0
TA
TA1.0
TA1.0
!
U1.0
1.0
1.0 F
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
RF
UR
UR
UR
UR
UR
UR
FC
C0
200 200 200 200
F
F
FC
1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2450 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2
03
150 150
C0
C0
C0
C0
C0
225 1000 1000 450 225
4
1000 875 875 1000
03
3
3
A
450
450
TA-B08 (350 x 900) U/S
FOLD 7
740 1200 1200 1200 TA-B07
1200 (3001200x 700) 1200 1200 1200 385 385 1200 1200 TA-B07
1200 (300
1200 x 700)1200 1200 1200 1200 740
TA-B08 (350 x 900) U/S
1200
1200
190 190
+169.955 (T.O.C)
+169.955 (T.O.C)
TA
TA
UR
UR
T3A-450x330
FC
FC
03
03
TA
2250
2250
RISK OF FORMWORK BEAM
! TIPPING OVER!
UR
BEAMS.
U RF !
RISK OF BREAKING THE
FORMWORK SHEETS!
For Approval
TA
TA
TA
UR
UR
3 LEGEND :
FC
FC
FC
01
01
TABLE HEAD 20
0 ISSUED FOR Approval 08/04/2023
Rev Description Date By
TABLE HEAD 30 Client
Sobha Sapphire, 13th Floor, Al Khail Road,
DOKA FLOOR PROP Business Bay, Dubai, UAE. P.O.Box 125250
T e l N u m b e r : + 9 7 1 (4) 4 2 3 8 0 6 4
investments F a x N u m b e r : + 9 7 1 (4) 4 2 1 5 9 0 8
www. sobha-me.com
4-WAY HEAD H20
Consultant
SUPPORTING HEAD H20 DF Sobha Sapphire, 13th Floor, Al Khail Road,
Business Bay, Dubai, UAE. P.O.Box 122960
T e l N u m b e r : + 9 7 1 (4) 4 2 3 8 0 5 4
REMOVABLE FOLDING TRIPOD F a x N u m b e r : + 9 7 1 (4) 4 2 1 5 9 0 8
architects www. p n c a r c h i t e c t s.com
Project
NOTES : PROPOSED B+G+5P+41+SERVICE FLOOR+ROOF
SECONDARY H20 BEAM SPACING COMMERCIAL RETAIL + RESIDENTIAL
BIM 360://HO-01/20005-ST-HO-01-Main.rvt
1400mm~1800mm = 300mm
PRIMARY H20 BEAMxPROP SPACING STAGE DRAWN CHECKED APPROVED SCALE SHEET
A-C
A-D
A-A
A-E
A-B
A-F
TA
TA
UR
TA
TA
TA
TA
TA
TA
UR
UR
UR
UR
UR
UR
UR
FC
FC
03
FC
FC
FC
FC
FC
FC
0 4
03
03
03
03
03
03
A1
TA-B08 (350 x 900) U/S
TA-B07 (300 x 700) TA-B07 (300 x 700)
+169.955 (T.O.C)
3850
TA
UR
FC
TA-CB10 (250 x 900) U/S
TA
04
UR
A2
FC
TA
TA
TA
03
TA
UR
UR
UR
2350
UR
FC
FC
FC
TA
FC
01
01
01
UR
03
F C0
3
TA
TA
7800
+169.405 SSL
UR
UR
350 THICK RC
TA
FC
FC
TA
UR
0
1
SLAB
UR
FC
BOOSTER PUMP
FC
03
03
250 250
TA
UR
TA
FC
UR
REFER DETAIL-5
BMU PEDESTAL
01
1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200
FC
02
TA-B5 (400 x 900) TA-CB6 (400 x 900)
A3
TA-CB5 (400 x 900) TA-B06 (400 x 900) TA
UR
FC
Site Key Plan
TA
03
UR
FC
0 3
TA-03-119-00
TA
TA
TA
UR
7
UR
UR
FAHU
FC0
7800
FC
FC
1
02
02
TA
TA
UR
UR
410 THK DP
410 THK DP
FC
FC
03
03
WATER HT : 3.70m
GRP WATER TANK
WATER HT : 3.70m
GRP WATER TANK
TA
UR
350 THICK RC
+169.405 SSL
FC
04
SLAB
A4
TA
UR
TA
FC
UR
04
FC
TA
04
UR
4200
FC
0 4
TOWER-C
A5
TA TA
TA
TA
TA
TA
TA
UR UR
UR
UR
UR
UR
UR
FC FC
FC
FC
FC
FC
FC
03 01
03
03
01
01
01
3050
DN
N
ELE.ROOM
TA
UR
A6
TA-B07 (300 x 700) TA-B07 (300 x 700)
F
C0
150 150
TA
TA
1
UR
UR
Q
FC
225 225
2600
03
0
450 1000 1000 450
1
1000 875 875 1000
TA
A7
UR
TA
FC
UR
TA TA
0
TA-CB1 (300 x 900)
FC
TA
TA
UR UR
03
UR
UR
FC FC
FC
FC
03 01
0
1
1
Key Plan : NTS
5800
A7'
c c
TA
TA
UR
UR
TA
TA
450
450
FC
FC
UR
UR
03
03
FC
FC
GENERAL NOTES:
04
04
TA
UR
A8
FC
TA
03
1550
UR
FC
TA-CB4 (300 x 900) TA-CB3 (300 x 900)
0
TA-B04 (500 x 800)
A9
SB01
1. THE STABILITY OF THE STRUCTURE DURING ERECTION AND USE IS THE
TA
URF
TA
UR
FC
RESPONSIBILITY OF THE SITE.
3450
C0 03
3
A10
740 1200 1200 1200 1200 1200 1200 1200 1200 385 385 1200 1200 1200 1200 1200 1200 1200 1200 740 TA
UR
TA
UR
FC
THE FORMWORK.
TA
TA
FC
+169.405 SSL
350 THICK RC
03
UR
UR
04
TA
TA
TA
TA
FC
FC
SLAB
03
A10'
3850
3. ENSURE THE FOUNDATION ARE ADEQUATE TO TRANSMIT THE LOADS APPLIED.
1200
1200
TA-B08 (250 x 600) TA-CB10 (250 x 600)
A11
TA-B08 (250 x 600) TA-CB10 (250 x 600)
TA
UR
W
W
TA
FC
4. THE GIVEN CONCRETE PRESSURE SHOULD NOT BE EXCEEDED.
UR
190 190
03
FC
TA
AS PER FACADE DETAILS
SUPPORTING ELEMENTS
03
UR
FC
TA
FC
FAHU
03
5.18MM THICKNESS OF PLYWOOD HAS TO BE USED OTHERWISE IT MIGHT CAUSE
5A
5B
5A
5B
DN
TA
TA
UR
ADDITIONAL DEFLECTION.
UR
FC
FC
9004
03
0 3
Allowable Stresses :
TA
TA
Fb= 13.99 N/mm2 , Fv= 4.83 N/mm2
UR
UR
FC
FC
0 3
03
TA
TA
TA
Fc = 3100 N/mm2, δ = L/ 270 ( As per BS )
TA
UR
UR
UR
UR
FC
FC
FC
FC
03
0
0
3
03
A12
TA TA TA TA
6. THE SHOWN STRUCTURAL DIMENSIONS ARE TAKEN FROM STRUCTURAL OR
TA
UR UR UR UR
UR
FC FC FC FC
ARCHITECTURAL DRAWINGS.
TA
FC
03 03 03 03
UR
03
FC
03
3275 6900 1850 6900 4175
A-D
A-C
A-E
A-B
A-A
A-F
OTHERWISE STATED.
10. TIE ROD POSITION ARE ONLY PROPOSAL , THEY HAVE TO BE ADJUSTED ON SITE.
2250
2250
11. MAX. HORIZONTAL TIE ROD DISTANCE = 1.2M , UNLESS OTHERWISE MENTIONED.
FOLD 6
14. PROPS/ SHORING MUST BE INSTALLED VERTICALLY,AVOID ANY INCLINATIONS AND
SHOULD SUPPORT ON THE FIRMED SURFACE.
TA
TA
TA
I BEAM & BOXOUT LAYOUT AT LEVEL 46
W
W
W
12
10
6
8
Handrail Clamp S
576 +169.405 SSL a ...Prop spacing(from drawing)
b ...Primary beam spacing(from drawing)
Level 47 c ...Secondary beam spacing(from drawing)
d ...max 50cm or half of prop spacing
350
e ...max 50cm
B B
266
Scaffolding Tied
3500
!
2950
to Shear wall
2732
Casted
FOLD 7
Shear wall
Inverted U Head
266
250
+165.905 SSL
Level 46 RISK OF FORMWORK BEAM
! TIPPING OVER!
A
existing Slab DOKA TIMBER BEAM H20 ECO N
TABLE HEAD 20
A
SECTION- A-A DOKA FLOOR PROP Business Bay, Dubai, UAE. P.O.Box 125250
T e l N u m b e r : + 9 7 1 (4) 4 2 3 8 0 6 4
investments F a x N u m b e r : + 9 7 1 (4) 4 2 1 5 9 0 8
www. sobha-me.com
4-WAY HEAD H20
Consultant
SUPPORTING HEAD H20 DF Sobha Sapphire, 13th Floor, Al Khail Road,
Business Bay, Dubai, UAE. P.O.Box 122960
T e l N u m b e r : + 9 7 1 (4) 4 2 3 8 0 5 4
REMOVABLE FOLDING TRIPOD F a x N u m b e r : + 9 7 1 (4) 4 2 1 5 9 0 8
architects www. p n c a r c h i t e c t s.com
Project
NOTES : PROPOSED B+G+5P+41+SERVICE FLOOR+ROOF
SECONDARY H20 BEAM SPACING COMMERCIAL RETAIL + RESIDENTIAL
BIM 360://HO-01/20005-ST-HO-01-Main.rvt