You are on page 1of 2
COMPANY TECHNICAL STANDARDS TANK FOUNDATION IN CONCRETE 28824.ENG.CIv.0NG Rev. 00 December 2017 [AGSTRACT | The purpeuse ofthis document le provide a reference compen? 0 {4 coal | AD) Fwaccdan | beer EL viet” | taco [a rina pe Fast — [woe ENGINEERING COMPANY STANOARO SRA NS AY Ra eee a LEM DETECTION mT LEAK DETECTION Pmt CEOTEXTIE © DRAN PIPE HOPE PIPE 2) voy Mw GCENTER LINE OF DREWOFF SUMP MONITORING SUMP LEAK DETECTION P17 100 RENFORCEVENT CONCRETE, \REINFORCEMENT L Leak REINFORCEMENT LEM DETECTION >IT (REFER NOTE 4) DETECTION PIT at © AN PIPE OPE LEAK DETECTION PIT PLAN OF TANK FOUNDATION BITUMINOUS CONCRETE LAYER 100 THK EOTEXTILE GRAVEL HOPE LINER 2mm. THK: MINIMUM DRY DENSITY PROCTOR TEST (ASTM D1 RETE LAYER 100mm THK CENTER LINE OF TANK TANK Los LEAK [stope- 1.100) ETECTION {ENSION ARE IN VILLMETERS, UNLESS NOTED OTHERVISE 2, ANCHOR BOLTS AND STEEL INSé UNLESS OTHERWISE INDICATED, AS SHALL BE SUPPLIED BY CML si NTRACTOR 3. POSITION IN PLAN IS REFERRED TO NORTH REE ANGLE ROTATION, OF PLANT WITH 4 CLOCKWISE ‘a 4, THE MAxIMUM 4 -SUMPS PER PACING OF LEAK TANK, HOWEVER 2 TECTION PITS SHALL BE 15¥, UMPS MAY BE USED FOR TAN ViTH A MINIMUM OF LESS IN OIAMETER S 5m OR 5, THE MONITORING SUP CONNECTED WITH DROP-OFF SUMP SHELL BE USED ONLY 1 PER TANK 8, FOR CML COMPANY TECHN! WORKS UNING OF TANK FOUNDATIONS AND EARTH BUNDS SEE aL RO 27556.ENG.CIVOWG NOTE FOR DESIGNER THIS STANDARD SHALL BE VERIFIED AND CAI PROJECT SPECIFICATION AND APPLICABLE CO! LATED BY eS ° Lesx_conceete | STRUCTURAL FILL MATER ORY DENSITY CORRESPONDING H RUA Ft 5 SEE Eee ELIE | o's oF WOOT CPACTED 0's UNUM OMPACTED TO A MINNUM ROCTOR TEST (ASTW 01597) DENSITY CORRESPOND SECT TANK FOUNDATION: TYPE-B 5 PROVIDE 4 PROVIDE 4 SQUARE LIFTING Tal STEEL COVER ; ; 3g] PAVED AREA py ~| GRAVEL ins \r e | 50, + PROTECTION ~ 23] ey =| - Pi ||__HDPE WEMBRANE. 2" HOPE PIPE/ 2] DETAIL NONE ONE (3 DETA LL Oe ONE ‘eni spa 28824.2NG.CIV.DWG Rev, 0 - December 2017 Pag. 2 0f2 TANK FOUNDATION IN CONCRETE Ai

You might also like