VOLUMEN DE EXCAVACION CANAL

Aignment: Canal
Sample Line Group: SL Collection - 13
Start Sta: 0+000.00
End Sta: 1+183.78
Station Area de corte Volumen de corte Total corte
0+000.00 27.1 0 0
0+020.00 29.32 564.15 564.15
0+040.00 32.43 617.48 1,181.63
0+060.00 35.6 680.33 1,861.96
0+080.00 36.91 725.15 2,587.11
0+100.00 34.58 714.99 3,302.10
0+120.00 34.19 687.78 3,989.88
0+140.00 38.39 725.79 4,715.67
0+160.00 35.7 740.82 5,456.49
0+180.00 34.19 698.87 6,155.36
0+200.00 33.87 680.61 6,835.97
0+220.00 30.13 640.04 7,476.00
0+240.00 41.31 714.84 8,190.84
0+260.00 42.9 842.04 9,032.88
0+280.00 30.93 737.95 9,770.83
0+300.00 25.82 567.4 10,338.23
0+320.00 25.19 510.14 10,848.36
0+340.00 32.54 577.59 11,425.95
0+360.00 39.08 716.99 12,142.94
0+380.00 38.79 779.77 12,922.71
0+400.00 38.38 772.59 13,695.29
0+420.00 35.48 739.21 14,434.51
0+440.00 36.4 718.96 15,153.47
0+460.00 34.74 711.33 15,864.80
0+480.00 34.38 691.11 16,555.90
0+500.00 32.91 672.88 17,228.79
0+520.00 30.49 633.94 17,862.72
0+540.00 32.43 629.16 18,491.88
0+560.00 36.84 692.66 19,184.54
0+580.00 39.53 763.17 19,947.71
0+600.00 44.56 840.44 20,788.15
0+620.00 44.23 887.81 21,675.97
0+640.00 33.81 779.9 22,455.86
0+660.00 30.83 646.36 23,102.23
0+680.00 36.95 677.76 23,779.99
0+700.00 35.63 725.79 24,505.78
0+720.00 29.3 649.34 25,155.12
0+740.00 27.38 566.81 25,721.92
0+760.00 28.37 557.43 26,279.36
0+780.00 30.38 587.5 26,866.85
0+800.00 30.74 611.25 27,478.10

VOLUMEN DE EXCAVACION PROTECCION


DIRECTA

Aignment: Proteccion directa


Sample Line Group: SL Collection - 1
Start Sta: 0+000.00
End Sta: 0+300
Station Area de corte Volumen de corte Total corte
0+000.00 0 0 0
0+020.00 0 0 0
0+040.00 7.97 108.74 108.74
0+060.00 9.66 162.27 271.01
0+080.00 9.15 188.12 459.13
0+100.00 0 91.52 550.65
0+120.00 9.7 133.18 683.83
0+140.00 8.95 186.55 870.38
0+150.00 4.72 54.15 924.53
0+160.00 5.72 52.21 976.74
0+180.00 5.85 107.06 1,083.80
0+200.00 0 58.49 1,142.29
0+220.00 3.73 37.26 1,179.55
0+240.00 3.46 71.86 1,251.41
0+260.00 5.1 85.63 1,337.04
0+280.00 4.02 107.85 1,444.90
0+300.00 0 40.24 1,485.14

VOLUMEN DE EXCAVACION JARILLON

Aignment: Jarillon
Sample Line Group: SL Collection - 1
Start Sta: 0+300.00
End Sta: 1+050.07
Station Area de corte Volumen de corte Total corte
0+300.00 0 40.24 1,485.14
0+320.00 7.98 79.84 1,564.97
0+340.00 7.98 161.79 1,726.76
0+360.00 7.27 154.29 1,881.05
0+380.00 8.34 156.12 2,037.17
0+400.00 0 83.37 2,120.54
0+420.00 9.11 91.12 2,211.67
0+440.00 8.64 177.5 2,389.17
0+460.00 10.43 192.48 2,581.65
0+480.00 10.91 215.44 2,797.09
0+500.00 0 110.16 2,907.25
0+520.00 9.95 100.44 3,007.70
0+540.00 9.19 193.22 3,200.92
0+560.00 9.84 190.3 3,391.22
0+580.00 8.34 181.75 3,572.97
0+600.00 0 83.37 3,656.34
0+620.00 10.76 107.62 3,763.96
0+640.00 10.48 212.42 3,976.38
0+660.00 10.21 206.92 4,183.30
0+680.00 9.53 197.42 4,380.72
0+700.00 0 95.31 4,476.03
0+720.00 10.55 105.47 4,581.49
0+740.00 8.33 188.75 4,770.24
0+760.00 7.28 156.03 4,926.27
0+780.00 8.34 156.13 5,082.40
0+800.00 0 83.37 5,165.77
0+820.00 10.76 107.62 5,273.38
0+840.00 9.63 203.91 5,477.30
0+860.00 8.98 186.07 5,663.37
0+880.00 14.37 233.47 5,896.84
0+900.00 0 143.7 6,040.54
0+920.00 15.54 155.41 6,195.95
0+940.00 15.96 315.03 6,510.98
0+960.00 17.56 335.22 6,846.19
0+980.00 6.84 243.95 7,090.14
1+000.00 0 68.36 7,158.49
1+020.00 14.45 144.46 7,302.96
1+040.00 16.04 304.84 7,607.80
1+050.00 16.81 164.24 7,772.04
Total: 6,287.04

VOLUMEN DE EXCAVACION ESPOLON 1

Aignment: SP1
Sample Line Group: SL Collection - 2
Start Sta: 0+000.00
End Sta: 0+050.00
Station Area de corte Volumen de corte Total excavacion
0+005.00 175.44 0 0
0+009.00 153.11 657.1 657.1
0+014.00 140.24 733.38 1,390.48
0+019.00 128.75 672.47 2,062.95
0+024.00 116.99 614.35 2,677.30
0+029.00 100.67 544.16 3,221.46
0+034.00 83.22 459.74 3,681.20
0+039.00 64.22 368.61 4,049.80

VOLUMEN DE EXCAVACION ESPOLON 2

Aignment: SP2
Sample Line Group: SL Collection - 3
Start Sta: 0+000.00
End Sta: 0+050.02
Station Area de corte Volumen de corte Total de corte
0+004.00 93.86 0 0
0+009.00 96.87 476.83 476.83
0+014.00 101.53 496 972.83
0+019.00 100.11 504.09 1,476.93
0+024.00 95.61 489.28 1,966.21
0+029.00 83.24 447.11 2,413.32
0+034.00 69.53 381.92 2,795.24
0+039.00 55.35 312.21 3,107.45

VOLUMEN DE EXCAVACION ESPOLON 3

Aignment: SP3
Sample Line Group: SL Collection - 4
Start Sta: 0+000.00
End Sta: 0+050.00
Station Area de corte Volumen de corte Total corte
0+003.00 149.28 0 0
0+008.00 79.39 571.68 571.68
0+013.00 74.02 383.52 955.2
0+018.00 76.97 377.46 1,332.66
0+023.00 79.75 391.79 1,724.45
0+028.00 76.64 390.96 2,115.41
0+033.00 69.44 365.19 2,480.60
0+038.00 58.24 319.19 2,799.78
VOLUMEN DE EXCAVACION ESPOLON 4

Aignment: SP4
Sample Line Group: SL Collection - 5
Start Sta: 0+000.00
End Sta: 0+050.00
Station Area de corte Volumen de corte Total corte
0+003.00 93.23 0 0
0+008.00 75.67 422.26 422.26
0+013.00 60.77 341.11 763.37
0+018.00 56.94 294.27 1,057.64
0+023.00 54.31 278.13 1,335.77
0+028.00 54.17 271.21 1,606.97
0+033.00 52.89 267.64 1,874.61
0+038.00 49.36 255.62 2,130.23

VOLUMEN DE EXCAVACION ESPOLON 5

Aignment: SP5
Sample Line Group: SL Collection - 6
Start Sta: 0+000.00
End Sta: 0+050.00
Station Area de corte Volumen de corte Total corte
0+003.00 77.01 0 0
0+008.00 76.56 383.91 383.91
0+013.00 77.08 384.09 767.99
0+018.00 79.45 391.32 1,159.32
0+023.00 78.4 394.62 1,553.93
0+028.00 73.15 378.86 1,932.79
0+033.00 62.57 339.28 2,272.08
0+038.00 48.47 277.58 2,549.66

VOLUMEN DE EXCAVACION ESPOLON 6

Aignment: SP6
Sample Line Group: SL Collection - 6
Start Sta: 0+000.00
End Sta: 0+050.00
Station Area de corte Volumen de corte Total corte
0+003.00 90.28 0 0
0+008.00 87.1 443.44 443.44
0+013.00 79.83 417.33 860.77
0+018.00 79.15 397.45 1,258.22
0+023.00 78.67 394.54 1,652.76
0+028.00 76.31 387.44 2,040.20
0+033.00 72.9 373.01 2,413.21
0+038.00 66.89 349.47 2,762.68

VOLUMEN DE EXCAVACION ESPOLON 7

Aignment: SP7
Sample Line Group: SL Collection - 9
Start Sta: 0+000.00
End Sta: 0+050.16
Station Area de corte Volumen de corte Total corte
0+003.00 79.52 0 0
0+008.00 80.1 399.04 399.04
0+013.00 81.43 403.82 802.86
0+018.00 82.81 410.59 1,213.45
0+023.00 83.65 416.15 1,629.60
0+028.00 81.63 413.2 2,042.80
0+033.00 76.96 396.47 2,439.28
0+038.00 69.71 366.68 2,805.96

VOLUMEN DE EXCAVACION ESPOLON 8

Aignment: SP8
Sample Line Group: SL Collection - 8
Start Sta: 0+000.00
End Sta: 0+050.00
Station Area de corte Volumen de corte Total corte
0+003.00 81.33 0 0
0+008.00 79.64 402.42 402.42
0+013.00 78.27 394.77 797.19
0+018.00 71.93 375.51 1,172.69
0+023.00 66.89 347.06 1,519.75
0+028.00 63.49 325.95 1,845.70
0+033.00 63.96 318.61 2,164.31
0+038.00 74.59 346.38 2,510.69
VOLUMEN DE EXCAVACION ESPOLON 9

Aignment: SP9
Sample Line Group: SL Collection - 10
Start Sta: 0+000.00
End Sta: 0+049.68
Station Area de corte Volumen de corte Total corte
0+003.00 85.13 0 0
0+008.00 81.67 417.01 417.01
0+013.00 79.52 402.97 819.98
0+018.00 79.39 397.26 1,217.24
0+023.00 76.87 390.64 1,607.89
0+028.00 70.38 368.12 1,976.01
0+033.00 72.78 357.89 2,333.90
0+038.00 75.6 370.96 2,704.86