81.2%
OEE DATA
Shift Length (Minutes) : 480
Number of Shift(s) : 3
Short Breaks per Shift (Minutes) : Each (Minutes) : 10 Nb : 2 Total : 20
Meal Break per Shift (Minutes) : Each (Minutes) : 30 Nb : 1 Total : 30
Down Time (Minutes) : 30
Ideal Rate : (Pieces/Hour) : 1500 (Pieces/Minute) : 25
Total Pieces Produced per Shift : 9000
Rejected Pieces per Shift : 270

OEE VARIABLES CALCULATION


Planned Production Time (Minutes) : 1290
Operating Time (Minutes) : 1200
Good Pieces per Shift : 8730

OEE FACTORS CALCULATION


Availability 93.0% 90.0%
Performance 90.0% 95.0%
Quality 97.0% 99.9%
Overall OEE 81.2% 85.4%

120%
Calculated Factor World Class

100%

80%

60%

40%

20%

0%
Availability Performance Quality Overall OEE
Rate
000000File : 667148148.xls
Copyright © 2004-2008 - Philippe Magnier# 08000SRF - General [Internal Use] - This mail, document is for general internal useForm
0 in SRF Release : 1.10 US
20%

0%
Availability Performance Quality Overall OEE
Rate

000000File : 667148148.xls
Copyright © 2004-2008 - Philippe Magnier# 08000SRF - General [Internal Use] - This mail, document is for general internal useForm
0 in SRF Release : 1.10 US

You might also like