You are on page 1of 48

DAWANLE维修车间

序号 工作内容 里程位置
1 2 3 4 5 6 7 8 9 10
完成数量
1 线路捣固
使用工时
Quantity
1 Tamping of line completed
Working time
完成数量
2 道岔维护
使用工时
Quantity
2 Maintenance of completed
switch Working time
完成数量 70 75 75 75 65 75 55 70 50
3 拨道
使用工时 50 50 50 50 50 50 50 50 50
Quantity
3 Dial completed
Working time
完成数量
4 方枕
使用工时
Quantity
4 Square pillow completed
Working time
完成数量
5 调整轨缝
使用工时
Quantity
Adjust the track completed
5
seam Working time
完成数量
6 整正轨底胶垫
使用工时
Quantity
Straight track completed
6
bottom pad Working time
完成数量 2 2 2 2 2 2 2 2 2
7 螺栓涂油
使用工时 110 110 110 110 110 110 110 110 110
Quantity
7 Oiled bolts completed
Working time
接头及扣件螺栓 完成数量 69 52 45 32 30
8
复紧 使用工时
Retightening of Quantity
8 joints & fastener completed
bolts Working time
完成数量
9 道砟清筛
使用工时
Quantity
9 Ballast cleaning completed
9 Ballast cleaning
Working time
完成数量
10 整理道床
使用工时
Quantity
Make the track completed
10
bed Working time
完成数量
11 倒运石砟
使用工时
Quantity
11 Bad luck ballast completed
Working time
完成数量
12 清理弃土
使用工时
Quantity
12 Clean up spoil completed
Working time
完成数量
13 路肩除草、砍树
使用工时
Road shoulder Quantity
13 weeding,tree completed
cutting Working time
完成数量
14 平交道口修整
使用工时
Quantity
14 Level crossing completed
repair Working time
完成数量
15 道心填碴
使用工时
Quantity
15 Road heart filling completed
Working time
完成数量 10
16 改道
使用工时 20
Quantity
16 Divert completed
Working time
完成数量
17 牲畜道口回填
使用工时
Quantity
Livestock completed
17
crossing backfill Working time
完成数量
18 补碴
使用工时
Quantity
18 Ballast completed
Working time
完成数量
19 清理水沟
使用工时
Quantity
19 Clean the gutters completed
19 Clean the gutters
Working time
完成数量
20 更换钢轨
使用工时
Quantity
20 Replace the rail completed
Working time
完成数量 62 80 65 50 50 110 60 50 40
21 垫片作业
使用工时 50 50 50 50 50 50 50 50 50
Quantity
21 Pads work completed
Working time
完成数量 73 307 5 2 2 2
22 补扣件
使用工时
Quantity
Make up completed
22
fastener Working time
完成数量
23 涵洞清淤
使用工时
Quantity
23 Culvert dredging completed
Working time
完成数量
24 修补护坡
使用工时
Quantity
24 Repair slope completed
Working time
完成数量
25 修补路肩
使用工时
Quantity
Repair the completed
25
shoulder Working time
完成数量
26 修补水沟
使用工时
Quantity
26 Repair gutters completed
Working time
完成数量
27 打磨肥边
使用工时
Quantity
Sanding fat completed
27
edges Working time
完成数量
28 倒运沙土
使用工时
Quantity
28 Dump sand completed
Working time
完成数量
29 修整便道
使用工时
Quantity
Repair the completed
29
sideditch
Repair the
29
sideditch Working time
完成数量
30 涵洞砍树
使用工时
Quantity
Culvert cut down completed
30
trees Working time

31 线路维护长度 完成数量 3 3 3 3 3 3 3 3 3 3

Line
Quantity
31 maintenance 3 3 3 3 3 3 3 3 3 3
completed
length

32 线路静态检查 完成数量

Quantity
32 Line static check
completed

33 警察配置 出勤人数 8 8 8 8 8 8 8 8 8 8

33 Police configurati No. of police 8 8 8 8 8 8 8 8 8 8


亚吉铁路中土埃塞段工务维护台帐
2022年 11月
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

60 75 75 75 80 80 75 70 80 80 70 75 50 70 80
50 50 50 50 50 50 50 50 50 50 50 50 50 50 50

2 2 2 2 2
110 110 110 110 110

45 35 55 20 35 40 45 50 65 45 65
800 900 700 800 800 900
20 20 20 20 20 20

20
20
46 60 45 45 45 60 80 50 40 40 40 40 75 55 50
50 50 50 50 50 50 50 50 50 50 50 50 50 50 50

85 9 7 17

2 1 1 1 2 1

2 3 3
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

4 8 4 8 8 4 4 8 8 8 4 4 4 8 8 8

4 8 4 8 8 4 4 8 8 8 4 4 4 8 8 8
记录人:相里煜明

小计 单位 备注
27 28 29 30 31

工时
19.6 Meter
9:40- workin
10:00 g hours

工时
Group
workin
g hours

工时
201 Meter
workin
8:30-11:30
g hours

工时
Meter
workin
g hours

工时
Meter
workin
g hours

工时
Piece
workin
g hours

工时
Meter
workin
g hours

工时
Meter
workin
g hours

工时
Meter
workin
g hours

工时
Meter
workin
g hours
立方米
工时
Cubic
meter
workin
g hours

工时
Meter
workin
g hours

工时
Meter
workin
g hours

工时
Meter
workin
g hours

工时
Meter
workin
g hours

工时
Meter
workin
g hours

工时
Locatio
n
workin
g hours

工时

workin
g hours

工时
Meter
workin
g hours

工时
Meter
workin
g hours

工时

workin
g hours

工时
Set
workin
g hours

工时
Hole
workin
g hours

工时
Locatio
n
workin
g hours

工时
Meter
workin
g hours

工时
Meter
workin
g hours

工时
Locatio
n
workin
g hours

工时

workin
g hours

工时
Locatio
n
workin
g hours

工时

workin
g hours
3 3 3 3 km

3 3 3 3 km

km

km

8 8 8 8 人次

8 8 8 8
Daily report of operat
次日工作计划
the next day work plan

序号sn.

日期 工区 作业内容 作业地点 作业时间


date workshop work content work location work time

2 line renovation k649+000 - k652+000 07:40 -14:30


01/12/22 Dewanle

3 oiling of bolts k631+000 -k633+000 8:10 -14:20

6 02/12/22 Dewanle line renovation k652+000 - k655+000 07:40 -14:30

7 oiling of bolts k629+000 -k631+000 8:10 -14:20

10 line renovation k655+000 - k658+000 08:20 -14:40


03/12/22 Dewanle
03/12/22 Dewanle

11 oiling of bolts k627+000 -k629+000 8:10 -14:30

12

13

14 line renovation k658+000 - k661+000 07:40 -14:20

04/12/22 Dewanle

15 oiling of bolts k625+000 -k627+000 8:20 -14:30

16

17

18 05/12/22 Dewanle line renovation k661+000 - k664+000 07:30 -14:20

19 oiling of bolts k623+000 -k625+000 8:20 -14:30

20

21

22 06/12/22 Dewanle line renovation k605+400 - k608+000 08:20 -14:20

23 oiling of bolts k621+000 -k623+000 8:00-14:30

25

26 line renovation on Aysha station track 3 08:00 -14:10

07/12/22 Dewanle
27 oiling of bolts Aysha station track 1 8:00-14:30

28
29

30 line renovation k611+000 - k614+000 08:40 -14:30


08/12/22 Dewanle

31 oiling of bolts k619+000 -k621+000 08:40 -14:30

32

33

34 line renovation k608+000 - k611+000 08:40 -14:20

09/12/22 Dewanle

35 oiling of bolts k617+000 - k619+000 08:50 -14:40

36

37

38 line renovation k621+000 - k623+000 08:10 -14:20

10/12/22 Dewanle
39 oiling of bolts k615+000 - k617+000 08:30 -14:10

40

41

42 line renovation k614+000 - k617+000 08:30 -14:20

11/12/22 Dewanle

43 oiling of bolts k613+000 - k615+000 08:50 -14:40


11/12/22 Dewanle

44

45

46 line renovation k617+000 - k620+000 08:40 -14:20

12/12/22 Dewanle

47 oiling of bolts k611+000 - k613+000 09:00 -14:40

48

49

50 line renovation k623+000 - k626+000 08:20 -14:20

13/12/22 Dewanle

51 oiling of bolts k609+000 - k611+000 09:00 -14:40

52

53
dewanle 101#, 103#,
105#,107#,102#,104#,106#108
54 line renovation #,110#, Regulation of 07:10 -14:30
turnout .dewanle station 1,2,3
14/12/22 Dewanle line remedation out side point
55 oiling of bolts k607+000 - k609+000 09:00 -14:40

56

57

58 line renovation k626+000 - k629+000 08:00 -14:50


15/12/22 Dewanle

59 oiling of bolts k605+400 - k607+000 09:00 -14:40


15/12/22 Dewanle

60

61

62 line renovation k629+000 - k632+000 07:50 -14:50

16/12/22 Dewanle

63 ditch repair k628+000 - k630+000 08:00 -14:50

64

65

66 line renovation k664+000 - k666+944 07:20 -14:50

17/12/22 Dewanle

67 ditch repair k628+000 - k630+000 08:10 -14:50

68

69

70 line renovation k661+000 - k664+000 07:20 -14:50

18/12/22 Dewanle

71 ditch repair k628+000 - k630+000 08:10 -14:50

72

73

74 line renovation k658+000 - k661+000 07:10 -14:30


19/12/22 Dewanle

75 ditch repair k628+000 - k630+000 08:10 -14:50


19/12/22 Dewanle

76

77

dewanle station
112#,116#,118#,120#,201#,202
78 line renovation 07:10 -14:20
#, turnout regulation out side
20/12/22 Dewanle dewanle lines 1, 3 regulation

79 shoulder weeding k610+000 -k613+000 08:50 -14:50

80

81

82 line renovation k655+000 - k658+000 07:50 -15:10


21/12/22 Dewanle

shoulder weeding and culvert


83 k613+000 -k616+000 08:40 -14:50
clearing

84

85

86 line renovation k652+000 - k655+000 07:50 -15:10

22/12/22 Dewanle
shoulder weeding and culvert
87 k616+000 - k619+500 08:40 -14:50
clearing

88

89

90 line renovation k650+000 - k652+000 08:40 -14:30


23/12/22 Dewanle
shoulder weeding and culvert
91 k619+000 - k621+500 08:40 -14:50
clearing
23/12/22 Dewanle

92

93

94 line renovation k647+000 - k650+000 08:00 -14:40

24/12/22 Dewanle
shoulder weeding and culvert
95 k623+000 - k626+000 08:30 -14:50
clearing

96

97

98 line renovation k645+000 - k647+000 08:10 -14:40

25/12/22 Dewanle
shoulder weeding and culvert
99 k626+000 - k629+000 08:30 -14:40
clearing

100

101

102 line renovation k642+000 - k645+000 08:10 -14:40

26/12/22 Dewanle
shoulder weeding and culvert
103 k629+000 - k632+000 08:10 -14:40
clearing

104

105

106

107
108

109

110

111

112

113

114

115

116

117

118

119

120

121

122

123
124

125

126

127

128
NAGAD维保中心Dire Dawa工务作业计划日报表
ly report of operation plan of Civil work of DD CMC of NAGAD(Dewanle station Infra - M
次日工作计划
next day work plan

带班人员及作业人数
计划工作量 Name of leader and 备注 日期
plan work amount remarks date
operators amount

local workers ;-
90m dial, 50pads ,20divert on the shoulder dewanle track maintance
20peoples
30/11/22
local workers;-
oiling of bolts dewanle track maintance
10peoples

local workers ;-
80m dial, 40pads ,10divert on the shoulder dewanle track maintance 01/12/22
20peoples

local workers;-
oiling of bolts dewanle track maintance
10peoples

local workers ;-
90m dial, 60pads ,10divert on the shoulder dewanle track maintance
20peoples
02/12/22
02/12/22
local workers;-
oiling of bolts dewanle track maintance
10peoples

with80m planned road way, 50pads ,10divert on local workers ;-


dewanle track maintance
the shoulder 20peoples
03/12/22
local workers;-
oiling of bolts dewanle track maintance
10peoples

with90m planned road way, 50pads ,10divert on local workers ;-


dewanle track maintance 04/12/22
the shoulder 20peoples

local workers;-
oiling of bolts dewanle track maintance
10peoples

with70m planned road way, 30pads ,10divert on local workers ;-


dewanle track maintance 05/12/22
the shoulder 20peoples

local workers;-
oiling of bolts dewanle track maintance
10peoples

local workers ;-
to remove fasteners on aysha Road 3 one by one dewanle track maintance
20peoples
06/12/22
local workers;-
oiling of bolts aysha station track 1 dewanle track maintance
10peoples
local workers ;-
with80mplanned road way,42pads and10divert dewanle track maintance
20peoples
07/12/22
local workers;-
oiling of bolts dewanle track maintance
10peoples

with70m planned road way, 40pads ,10divert on local workers ;-


dewanle track maintance
the shoulder 20peoples
08/12/22

local workers;-
oiling of bolts dewanle track maintance
10peoples

with50m planned road way, 30pads ,10divert on local workers ;-


dewanle track maintance
the shoulder 20peoples
09/12/22
local workers;-
oiling of bolts dewanle track maintance
10peoples

with70m planned road way, 30pads ,10divert on local workers ;-


dewanle track maintance
the shoulder 20peoples
10/12/22
local workers;-
oiling of bolts dewanle track maintance
10peoples
10/12/22

with60m planned road way, 40pads ,10divert on local workers ;-


dewanle track maintance
the shoulder 20peoples
11/12/22
local workers;-
oiling of bolts dewanle track maintance
10peoples

with70m planned road way, 50pads ,10divert on local workers ;-


dewanle track maintance
the shoulder 20peoples
12/12/22
local workers;-
oiling of bolts dewanle track maintance
10peoples

with60m planned road way, 30pads ,10divert on local workers ;-


dewanle track maintance
the shoulder 20peoples
13/12/22
local workers;-
oiling of bolts dewanle track maintance
10peoples

with80m planned road way, 30pads ,10divert on local workers ;-


dewanle track maintance
the shoulder 20peoples
14/12/22
local workers;-
oiling of bolts dewanle track maintance
10peoples
14/12/22

with90m planned road way, 40pads ,10divert on local workers ;-


dewanle track maintance
the shoulder 20peoples
15/12/22
local workers;-
repair ditches dewanle track maintance
10peoples

with100m planned road way, 50pads ,10divert local workers ;-


dewanle track maintance
on the shoulder 20peoples
16/12/22
local workers;-
repair ditches dewanle track maintance
10peoples

with80m planned road way, 60pads ,10divert on local workers ;-


dewanle track maintance
the shoulder 20peoples
17/12/22
local workers;-
repair ditches dewanle track maintance
10peoples

with70m planned road way, 40pads ,10divert on local workers ;-


dewanle track maintance
the shoulder 20peoples
18/12/22
local workers;-
repair ditches dewanle track maintance
10peoples
18/12/22

with60m planned road way, 30pads ,10divert on local workers ;-


dewanle track maintance
the shoulder 20peoples
19/12/22
local workers;-
shoulder weeding dewanle track maintance
10peoples

with90m planned road way, 50pads ,10divert on local workers ;-


dewanle track maintance
the shoulder 20peoples
20/12/22

local workers;-
shoulder weeding and culvert clearing dewanle track maintance
10peoples

with80m planned road way, 30pads ,10divert on local workers ;-


dewanle track maintance
the shoulder 20peoples
21/12/22
local workers;-
shoulder weeding and culvert clearing dewanle track maintance
10peoples

with90m planned road way, 40pads ,10divert on local workers ;-


dewanle track maintance
the shoulder 20peoples
22/12/22
local workers;-
shoulder weeding and culvert clearing dewanle track maintance
10peoples
22/12/22

with60m planned road way, 50pads ,10divert on local workers ;-


dewanle track maintance
the shoulder 20peoples
23/12/22
local workers;-
shoulder weeding and culvert clearing dewanle track maintance
10peoples

with70m planned road way, 40pads ,10divert on local workers ;-


dewanle track maintance
the shoulder 20peoples
24/12/22
local workers;-
shoulder weeding and culvert clearing dewanle track maintance
10peoples

with80m planned road way, 50pads ,10divert on local workers ;-


dewanle track maintance
the shoulder 20peoples
25/12/22
local workers;-
shoulder weeding and culvert clearing dewanle track maintance
10peoples
业计划日报表
anle station Infra - Maintance work shop Report)

当日完成工作
the day work finished

工区 作业内容 作业地点 作业时间


workshop work content work location work time

line renovation K646+000-K649+000 08:20-14:30

oiling of bolts K633+000-K635+000 08:10-14:35


Dewanle

Dewanle line renovation k649+000 - k652+000 07:50 -14:10

oiling of bolts k631+000 -k633+000 8:10 -14:30

k652+000 - k655+000 and


line renovation 07:40 -14:30
k656+000 -k657+000
Dewanle
Dewanle

oiling of bolts k629+000 -k631+000 8:10 -14:20

k655+000 -k658+000 and


line renovation 08:20 -14:40
k658+500-k660+200
Dewanle

oiling of bolts k627+000 -k629+000 8:10 -14:30

line renovation k658+000 - k661+000 07:20 -14:20

Dewanle oiling of bolts k625+000 -k627+000 8:20 -14:20

Dewanle line renovation k661+000 - k664+000 07:30 -14:20

oiling of bolts k623+000 -k625+000 8:20 -14:20

line renovation k605+400 - k608+000 08:40 -14:10

Dewanle
oiling of bolts k621+000 -k623+000 8:20-15:30
line renovation on Aysha Road 3 08:30 -14:00
Dewanle

oiling of bolts Aysha station 8:00-14:30

line renovation k611+000 - k614+000 08:40 -14:30

Dewanle

oiling of bolts k619+000 - k621+000 08:40 -14:30

line renovation k608+000 - k611+000 08:40 -14:20

Dewanle
oiling of bolts k617+000 - k619+000 08:50 -14:40

line renovation k621+000 - k623+000 09:20 -16:30

Dewanle

oiling of bolts k615+000 - k617+000 08:50 -14:40


Dewanle

line renovation k614+000 - k617+000 08:30 -14:20

Dewanle

oiling of bolts k613+000 - k615+000 08:50 -14:40

line renovation k617+000 - k620+000 08:40 -14:20

Dewanle

oiling of bolts k611+000 - k613+000 09:00 -14:40

line renovation k623+000 - k626+000 08:20 -14:20

Dewanle

oiling of bolts k609+000 - k611+000 09:00 -14:40

dewanle 101#, 103#,


105#,107#,102#,104#,106#108
line renovation #,110#, Regulation of 07:10 -14:50
turnout .dewanle station 1,2,3
Dewanle line remedation out side point
oiling of bolts k607+000 - k609+000 09:10 -15:00
Dewanle

line renovation k626+000 - k629+000 08:00 -14:50

Dewanle

oiling of bolts k605+400 - k607+000 09:00 -14:40

line renovation k629+000 -k632+000 08:20 -14:30

Dewanle

ditch repair k628+000 - k630+000 08:00 -14:50

line renovation k664+000 - k666+944 07:30 -14:50

Dewanle

ditch repair k628+000 - k630+000 08:10 -14:50

line renovation k661+000 - k664+000 07:20 -14:30


Dewanle

ditch repair k628+000 - k630+000 08:10 -14:50


Dewanle

line renovation k658+000 - k661+000 07:10 -14:30

19/12/22

ditch repair k628+000 - k630+000 08:10 -14:50

dewanle station
112#,116#,118#,120#,201#,202
line renovation 07:10 -14:20
#, turnout regulation out side
Dewanle dewanle lines 1, 3 regulation
shoulder weeding and culvert
k610+000 - k613+000 08:50 -14:50
cleaning

line renovation k655+000 - k658+000 07:50 -15:10

Dewanle
shoulder weeding and culvert
k613+000 - k616+000 08:50 -14:50
cleaning

line renovation k652+000 - k655+000 07:50 -15:10


Dewanle
shoulder weeding and culvert
k616+000 - k619+500 08:40 -14:50
clearing
Dewanle

line renovation k650+000 - k652+000 08:40 -14:30

Dewanle
shoulder weeding and culvert
k619+000 - k621+500 08:40 -14:50
clearing

line renovation k647+000 - k650+000 08:30 -14:30

Dewanle
shoulder weeding and culvert
k623+000 - k626+000 08:30 -14:40
clearing

line renovation k645+000 - k647+000 08:20 -14:30

Dewanle
shoulder weeding and culvert
k626+000 - k629+000 08:30 -14:30
clearing

nished

带班人员及作业人数
完成工作量 Name of leader and 备注
work finished amount remarks
operators amount

dial 70m , 85pads, divert 20m Local Workers: 20people dewanle track maintance

Local Workers: 10
oiling of bolts dewanle track maintance
peoples

local workers ;-
dial 70m , 62pads, divert 10m dewanle track maintance
20peoples

Local Workers: 10
oiling of bolts dewanle track maintance
peoples

dial 75m , 80pads, and 73 set of stolen local workers ;-


dewanle track maintance
fastneres 20peoples
Local Workers: 10
oiling of bolts dewanle track maintance
peoples

dial 75m , 65pads, and 307 set of stolen local workers ;-


dewanle track maintance
fastneres 20peoples

Local Workers: 10
oiling of bolts dewanle track maintance
peoples

local workers ;-
dial 75m , 50pads, 5 set of fasteners to stolen dewanle track maintance
20peoples

Local Workers: 10
oiling of bolts dewanle track maintance
peoples

dial 65m , 50pads, retightening of joints and local workers ;-


dewanle track maintance
fastener bolts 69 20peoples

Local Workers: 10
oiling of bolts and 2 set of fasteners dewanle track maintance
peoples

dial 75m , 110pads, retightening of joints and local workers ;-


dewanle track maintance
fastener bolts 52 20peoples

Local Workers: 10
oiling of bolts and 2 set of fasteners dewanle track maintance
peoples
local workers ;-
to remove 2496 fasteneres dewanle track maintance
20peoples

Local Workers: 10
oiling of bolts aysha station track 1 dewanle track maintance
peoples

dial 55m , 60pads, Retihtening of joints and local workers ;-


dewanle track maintance
fastener bolts 45. 20peoples

Local Workers: 10
oiling of bolts dewanle track maintance
peoples

dial 70m , 50pads, Retihtening of joints and local workers ;-


dewanle track maintance
fastener bolts 32 20peoples

Local Workers: 10
oiling of bolts dewanle track maintance
peoples

dial 50m , 40pads, Retihtening of joints and local workers ;-


dewanle track maintance
fastener bolts 30 20peoples

Local Workers: 10
oiling of bolts dewanle track maintance
peoples
dial 60m , 46pads, Retihtening of joints and local workers ;-
dewanle track maintance
fastener bolts 45 20peoples

Local Workers: 10
oiling of bolts dewanle track maintance
peoples

dial 75m , 60pads, Retihtening of joints and local workers ;-


dewanle track maintance
fastener bolts 35 20peoples

Local Workers: 10
oiling of bolts dewanle track maintance
peoples

dial 75m , 45pads, Retihtening of joints and local workers ;-


dewanle track maintance
fastener bolts 55 20peoples

Local Workers: 10
oiling of bolts dewanle track maintance
peoples

dial 75m , 45pads, Retihtening of joints and local workers ;-


dewanle track maintance
fastener bolts 20 20peoples

Local Workers: 10
oiling of bolts dewanle track maintance
peoples
local workers ;-
dial 80m , 45pads and 20diverts dewanle track maintance
20peoples

Local Workers: 10
oiling of bolts dewanle track maintance
peoples

local workers ;-
dial 80m , 60pads dewanle track maintance
20peoples

Local Workers: 10
reparing of ditches dewanle track maintance
peoples

dial 75m , 80pads, Retihtening of joints and local workers ;-


dewanle track maintance
fastener bolts 35 20peoples

Local Workers: 10
reparing of ditch 2. dewanle track maintance
peoples

dial 70m , 50pads, Retihtening of joints and local workers ;-


dewanle track maintance
fastener bolts 40 20peoples

Local Workers: 10
reparing of ditch 3. dewanle track maintance
peoples
local workers ;-
dial 80m , 40pads , set 85 fasteners to stolen. dewanle track maintance
20peoples

Local Workers: 10
reparing of ditch 3. dewanle track maintance
peoples

local workers ;-
dial 80m, 40 pads dewanle track maintance
20peoples

shoulder weeding 800m and culvert cleaning local workers;-


dewanle track maintance
2 places 10peoples

dial 70m , 40pads , set 9 fasteners and 45 local workers ;-


dewanle track maintance
pairs of tightening joint bolts 20peoples

shoulder weeding 900m and culvert cleaning local workers;-


dewanle track maintance
1 places 10peoples

dial 75m , 40pads , set 7 fasteners and 50pairs local workers ;-


dewanle track maintance
of tightening joint bolts 20peoples

shoulder weeding 700m and culvert cleaning local workers;-


dewanle track maintance
1 places 10peoples
dial 50m , 75pads , set 17 fasteners and 65 local workers ;-
dewanle track maintance
pairs of tightening joint bolts 20peoples

shoulder weeding 800m and culvert cleaning local workers;-


dewanle track maintance
1 places 10peoples

dial 70m , 55pads , 45 pairs of tightening local workers ;-


dewanle track maintance
joint bolts 20peoples

shoulder weeding 800m and culvert cleaning local workers;-


dewanle track maintance
2 places 10peoples

dial 80m , 50pads , 65 pairs of tightening local workers ;-


dewanle track maintance
joint bolts 20peoples

shoulder weeding 900m and culvert cleaning local workers;-


dewanle track maintance
1 places 10peoples

You might also like