Professional Documents
Culture Documents
CertifHy - Presentation - Electricity Grid Cases
CertifHy - Presentation - Electricity Grid Cases
a European guarantee
of origin scheme for
green hydrogen
Definition of Green
Project co-finance by the FCH JU
Hydrogen
under FP7:
Frederic Barth
Hinicio
Agenda
2
“GHG emissions need to be considered”:
“Low carbon" = at least 60% less emissions than BAT
benchmark
Non-
Not Low-carbon
Renewable Benchmark emissions
Renewable
& Not Low- intensity threshold
Carbon & Not Low-
(= 91 g CO2 eq/MJH2)*
H2 Carbon
H2
- 60%**
Low-carbon threshold
Renewable Non- (= 36.4 g CO2 eq/MJH2 )
carbon
Carbon H2 Low-Carbon
H2
* Best Available Technology = Natural gas steam methane reforming >95% of hydrogen market 3
** cfr RED reduction requirement for biofuels in 2018
“Both Renewables and GHG Emission targets of
hydrogen users need to be addressed”
Not Low-carbon
Benchmark emissions
Grey H2 intensity threshold
(= 91 g CO2 eq/MJH2)*
- 60%**
Low-carbon threshold
CertifHy CertifHy (= 36.4 g CO2 eq/MJH2 )
carbon
Low-
* Best Available Technology = Natural gas steam methane reforming >95% of hydrogen market 4
** cfr RED reduction requirement for biofuels in 2018
The low carbon benchmark has been set at an
ambitious level
Eligible
pathways
5
A CO2 audit will tell you what's low carbon and what's
not
6
« No GOs should be allowed for biomass co-fired coal
power plants »
90 %
10 %
10 %
8
Need to define the amount of Renewable Hydrogen
produced by a process using multiple energy inputs
Not Low-carbon
Benchmark emissions
Grey H2 intensity threshold
(= 91 g CO2 eq/MJH2)*
- 60%**
Low-carbon threshold
CertifHy CertifHy (= 36.4 g CO2 eq/MJH2 )
carbon
Low-
* Best Available Technology = Natural gas steam methane reforming >95% of hydrogen market 9
** cfr RED reduction requirement for biofuels in 2018
Renewable hydrogen will be as green as the
energy used for its production
Non-renewable
H2
Total energy input : 30 GJ 23%
Non-renewable:
7 GJ Renewable H2
23%
77%
Renewable: 23 GJ
77%
11
Renewable hydrogen will be as green as the energy
used for its production – example Steam Methane
Reforming
Biogas from bio-waste with non-renewable Bio-methane from biowaste and Natural Gas
heat
Bio-waste to biogas
Bio-methane from bio waste Natural gas
12
Agenda
13
1- Benchmark threshold applied to
Past Production of the Hydrogen Plant
H2 with
Grey H2 Green GO 1 - Average GHG intensity since t2-12 months of
Non-CertifHy H2
< 91 H2 with
LC GO must not exceed 91 gCO2/MJH2
gCO2/MJH2 ?
H2 Production
12 months
Past Production
t2 – 12 months t1 t2 Time
14
2 - Low Carbon threshold applied to Production Batch
H2 with
Grey H2 Green GO 1 - Average GHG intensity since t2-12 months of
Non-CertifHy H2
H2 with
< 91 must not exceed 91 gCO2/MJH2
LC GO
gCO2/MJH2 ?
H2 Production
12 months
Past Production
Production
Batch
t2 – 12 mths t1 t2 Time
CertifHy CertifHy
Low Carbon H2 GOs Green H2 GOs
19
Decision tree presenting the criteria for producing Low-
Carbon and CertifHy Green H2
No Yes
No Yes
16
Agenda
17
Electrolysis with mixed electricity input (1/3)
60%
No Yes
50%
No Yes
19
* GHG content as reflected by electricity supplier’s mix
CertifHy Green hydrogen process example -
electrolysis (3/3)
30%
(benchmark)?
hydraulic
mix * nuclear
fossil fuels
Electrolyser
other renewables
No Yes 76%
No Yes
20
* GHG content as reflected by electricity supplier’s mix
Electrolysis with different energy mixes as energy
input (4/5)
100% French
electricity
mix *
7% 11%
6%
hydraulic
nuclear
Average emissions of past fossil fuels
(benchmark)? Electrolyser
No Yes
No Yes
21
* GHG content as reflected by electricity supplier’s mix
Electrolysis with different energy mixes as energy
input (5/5)
70% French
electricity
mix * 7% 11%
6%
hydraulic
nuclear
fossil fuels
other renewables
No Yes
22
* GHG content as reflected by electricity supplier’s mix
Central Steam Methane Reforming (1/2) – using
biomethane
25% bio-
methane from
bio-waste
No Yes
No Yes
23
* GHG content as disclosed by electricity supplier’s mix
Central Steam Methane Reforming (2/3)
25% bio-
methane
from corn
No Yes
No Yes
24
* GHG content as reflected by electricity supplier’s mix
Central Steam Methane Reforming (2/2) – with CCS
No Yes
25
* GHG content as reflected by electricity supplier’s mix
On-site SMR (1/2) with bio-gas from bio-waste and
non-renewable heat
81%
No Yes Non-renewable
Renewable energy input heat
Production unit NOT
ELIGIBLE into batch?
No Yes
26
* GHG content as reflected by electricity supplier’s mix
On-site SMR (2/2) with bio-gas from corn and non-
renewable heat
80%
No Yes Non-renewable
Renewable energy input heat
Production unit NOT
ELIGIBLE into batch?
No Yes
27
* GHG content as reflected by electricity supplier’s mix
Definition of green hydrogen
Q&A
28
Buying H2 without associated CertifHy Green GO leaves the
buyer of the molecule with the RESIDUAL MIX
29