© JUMEIRAH EGYPT NAIA BAY RAS EL HEKMA INFRASTRUCTURE WORKS: = This report covers the basic guidelines for plumbing components to be Implemented ane wil consider the inputs and requirements af the end.user ane devalaper ofthe project. ~The diferent components taken into consideration will cover domestic water supply, sewage and storm system and irgation systems. = The folowing codes wil be used inthe desig ofthe plumbing systems: + AWWA (American Water Works Association). + Egyptian Code for design and implementation ‘of water and drainage networks (was issued under the Ministerial Decree No. 197 + Egyptian Civil Defense Authoriias Regulations + Egyptian Plumbing Regulations, + UPC: Uniform Plumbing code + UBC: Uniform Builing code + National Plumbing Code Handbook + ASTM: American Sacety for Testing Materials + BS: Britsh Standards + ANSUASHRAEIUSGBCIES Standard 189.1 3) WATER SUPPLY SYSTEM: General = The combined water supply and frfighng system proposed for Nala ba compaund new development shall be fed fram a proposed desalination plant fang via dedicated water and fefighting storage tanks = This system ie proposed as this is considered the mast optimum solution and ‘accepted from local authortes by tis system 1+ Network fs uted for both services. Pressure could be achieved forall units as domestic wate supaly| 34 32 AAtths arty doign stage, Its assumed thatthe proposed desatination plant shall bs supplied with raw water via dirt sll intake, This however fs yet to be further coordinated with the Client and the geotechnical designer Tanks wil be cenvaized as to provide one single pont of water feed from ‘municipalty and localization of maintenance across the ste Scope of Work ‘The scope of work ofthe domestic waler and firefighting system isto cover the domestic and firefighting requirements of the varias residential types, commercial and adminisvaton bulding inside tho resort trough the following Design and construct new main loop surrounding the residential types. Provide gate, ai operation and washout valves necessary for network proper Provide above ground fre nyarants Provide dedicated water supply and fefighting tanks Design Guidelines ‘Tho Design ofthe domestic walar and freighing system will generally follow the Egyptian codes for water and sanitary systems, 3 Pressure could be achieved athe stret fre hydrants @(MIRIMUMINMEP 4-5 bar instead of 1S bar MEP Schematic Design Repor (Rev 00) Naa Bay Page 24 032 November, 2022 S ( JUMEIRAH EGYPT NAIA BAY RAS EL HEKMA 3.3 Design Criteria 33.1 Water Consumption and Design Assumptions 336 Fire Hydrants Can you neglect installation ofthis FHC? = Te folowing daign ce wl be uted o cover the wale requemens for ~The fre hycranis shall be ofthe pla yge (aboveground) wih 265 thevarove feces win the projet ste Duet mosses ard 40100 pumped ot = Resins 270 W Hay (acoring o Egyptian it this distance willbe ose) - Se ANCERARSSHENTSLSTERSNTO, approved by civil defense, we an proceed, Kindly confirm 22.2 Peak Factor 33.7 Fire Flow Sie pone Based onthe Egyptian code, average peak actos areas olows = According Esyptan code for dain and condtons of walt ad sewer networks, fretting requrements vary accdng fo popuaion seed = Average daly 10 folowing ie boom bl = Peak ment stots Table 3 Fe fow requirements = Peak day 12018 cae = ro Flow = Peak Hour 2asie2s Population er Duration (tours) 2.3. Hydra Design RenoieAreas | 15 2 ~The popes sling and the water supply network wil be designed using a ener simulaton computer program based on SEGRSRGSMGRD Hazen williams Formula rans Fem (WaterCat) Th proposed water supply and fefgning Be nor al Forma Water ‘cua 000 2 2 3.34 pe Materia, Cover ‘a00%6 25000 | 25 2 = A pipes wil be of HOPE. A minimum of 1.20 m ppe cover shal be 2.00016 50000 | 90 3 Centilred ‘Vinee, ppes are shallone or exposed to heavy ate Greuaton or crossing rads coneree protection tobe provided. 398 Vates = Based onthe above table, flow of 20 sc wl be considered athe ast fomae fe hyrat in Nala bal aio, For2 is he duralon a ddcaod = Gate ves shal be provided at each ode and at reasonable distances ax Storage BOER wl ne roqed forthe use suing fro overs ony Gate vas ecodng. (ort None! Neaghing equroments" dcusted under Imechana! secon Nie report storage Torna and extemal = Divety burs gato valves wih water poofng raping Lo pote against fretgnings 40019.” - fsiniy shal bene for sizes Up to 2Sorm dameorVaves of dasa ‘Yolume for internal network = 50mm ardarger sabe a he buterty type andes chamber 202 = Aa nt 10 m3, Kindy = Airvalvos sal be provide a igh point and washout vahios a ow pons Volume for external network te dicated by ste grading and condone Yalume for external neiyor es a THE soma Deg Ropor (R00) Total Volame= 1444227 = 371 m3 ~ 70.m3 Naa Bay Page 25 0f 32 November, 2022 NAIA BAY RAS EL HEKMA 3.3.8 Estimated Domestic Flows = Beach (public) swimming Pools & lagoon wil be consideration these ‘consumption fram main water ark, Kindly take private pools = The estimated domestic flows will be based on the domestic water Ira ee iration consumptons, firefighing requirements and pool make up water for =Total daly water requirement is 2400 msiday.™¥" ‘Swimming pools and lagoon = Frfightng storage requirement for extemal and internal fretighting 's 400 = The fllowing population estimates have been considered fr both part 1 and m3 phase 1 ~The water tank volume is require to be 2800 m3 based on one day storage. ‘Table: Population fgures for part 1 Building Type | No. Of Units | Capita/Unit | Populationstafivisitor 34 Proposed System Type A 16 5 m Type B 23 5 250 ~ As proviousy outined, the proposed water supply systom wilful the wator Tye C. 19 5: 164. demands of all bulings in acdtion to extemal and intemal freghting eee te = Te requirements of various vilasichalets Type E (5 unit 4 5 iz = Each building will be provided with a pressure reducing valve at potable Type E (6 unit) 2 5 104 water inlet reduce the network pressure suit the intemal plumbing Type E (7 unit) $ 5 362 normal operation pressures range as necessary. Type F 9 5. 485 = The present concept is based on providing a combined water supply and Type G 2 5 207 frefigntng network supplied from @ combined tank and a set of pumps Tye G* 2 5 172, serving both water supply and oxtmal fre hydranUintomal fretghting system in case offre event. However, the other below two options could be Hotel 4 2 En ‘applied ang would need fo be further ciseussed with the Client to agree Branded res dences 1 2 80 ‘oUt the prefered option: Cabs 1 2 23 angus wih boa t 3 2 Kindly remove these points Boutique hotel 1 2 45, + Provide a separate frefghting network and tank for intemal Commercial frefighting system only for buikings that need intemal firefighting ulings +900 system, while the extemal fr hycrant wil sil be supplied from the Tamiistaton combined water supply network and tank. building 84 + Provide a completly separate frefighting network and tank to serve ‘Seiviee bulking a2 both the intomal and extemal frefighting use. This network will be Treatment stafons a ‘extended fo the whole project areas to ensure a fll coverage of a > ‘external fr hydrants =Total population is expecte to be 6021 capita = Total domostic water roquirement is 1600 maiday MEP Schematic Design Repor (Rev 00) Naa Bay Page 26 032 November, 2022 © JUMEIRAH EGYPT NAIA BAY RAS EL HEKMA 5) SEWAGE WATER SYSTEM: 4) IRRIGATION SYSTEM: Generar General ~The Proposed system will comprse gravy sewers discharging via pump = The irigation water source to Nala bal compound shal be from a separate stations and force mains towards a proposed STP. The scope of work shal inigation water network ed trom the TSE (Treated Sewage Eftuent) water be as detailed below generated from the proposed STP within the project area, The proposed main irigation network will be suppled via @ direct connectan from the = Provide postive crainage system for new main and seconcary roads iigation tank. The inigaion network wil be designed in a closed loop Configuration to provige the required rosicual pressure at any point inthe = Provide postive drainage system for the parking areas adjacent to the Inigation network buldings! 4.4 Scope of Work ~ Provide free sischarge outlets fr roof crainage of varius builings over the gardens and open spaces which willbe percolated ito the soll and wil be = The irigation system scope of works wil be limited to the provision of Considered in the aysters irigation demands to all proposed thin the resort The scope of work for the igation network wil be limited to the main = Connect building sewage inspection chambers — where applicable - to itgatonnework up to tapping pts dda forthe secondary tigation combined system. For Bulnge discharging from all sides, the inspection system which wil be provides by ober. ‘hampers will be connected together and tie to the combined. system "You can get the fandscape area from our arch, team rarnane vs 42 Design Criteria 4.2.4 Water Demand 54 Design Criteria = At tis eaty sage and unil the design of th external sof landscaping i fnalzed, an approximate rigation SGEMEMARAISTARIAIAIA) chal be onsdered. To be 18 LimZiday and must mention the water demand for trees, also we can calculate the water demand for our landscape after | ~ 4.3 Design Assumptions area calculation ‘The irigation syetem design wil be based on the falling assumption: = The system wil incorporate isolation, quick couplers, air and washout valves as wel asa dedicated inigaion tans. = The main pipes shall be HOPE, 5.44 Codes and Regulations Tho design of crainage system shall be based on Egyptian Code design entera ane regulations. = Pipes wile sized 80 that velocities @OHREEREEIBAISD Shall be 1.Sm/s with a maximum of 3.0mis. MEP Schematic Design Repor (Rev 00) Naa Bay Page 27 of 32 November, 2022 © JUMEIRAH EGYPT. NAIA BAY RAS EL HEKMA ‘2. Manning Formula The manning equation with the modified cosficient is used for the caleulation of flow in chanel: a (in x (A) (R20) «(5 ¥0) where oo a> Roughness costcient = Area of tow (m2) Hydraulic radius () = Longitudinal slope (%) Rate of discharge (maisec) Table 5: Manning Roughness Coefficient Type of channel Manning's Asohal surece 0015 PVC bipe 0013 5.4.2 Hydraulics The Design of storm sewers will be based on Colebrooke-White Equation. ‘The value of roughness coetficent Ks shall be 1.5 mm. For gravity pipes, minimum self Air conditioning of Bed Rooms, Dining Room, Receptions, and Kitchen shall be carried out by split high wall (HSRAC) indoor units installed on the walls > DXSplit Units will consist of the following: ‘*Cleanable air Filter. + Three speed motor. + Cooling Coil «Heat Pump. TYPE (ll) EXHAUST SYSTEM: = Alltoiets will be exhausted (negative pressure) by exhaust fans. Smal kitchens will be exhausted by exhaust fans. ©. SMOKE AND VENTILATION FOR PARKING AREA: = Car Parks and Basement areas require an extract ductwork system suitable for clearing smoke and fumes. This is a situation where fire resisting ductwork is a perfect solution. = Mechanical ventilation must provide 6 ACH (Air Changes per Hour) under normal conditions. In the event of fire this rises to 8 ACH (Egyptian code), so two- ‘speed or inverter-controlled fans (variable speed) need to be installed, ~ Extract points must be arranged so that at least 65% are at high level and 35% at law level (80cm) = Make up air is permitted to be provided at a minimum rate of 85% of extract air via fresh air fans ~ Make up air shall be drawn directly from the extemal and its intake shall not be less than 5 M from any exhaust discharge pining, Requirements for system components: > smoke exhaust fans with sprinkler system: 200°C/h, > smoke exhaust fans without sprinklers: 300°C/h, > exhaust ducts: 200°C/1h, > Fresh air fan This system willbe for hotels and mall only, Kindly mention that MEP Schematte Design Report Naa Bay Page 38 32 November, 2022

You might also like