Background of Jimma university
2
Background of previous FSRE projects
Financer (Euro)
ICCO-Cooperation contribution: 40052.70
Own contribution: 40033.36
Out growers contribution: 17777.97
Project total Budget: 80066.72
3
Background of previous FSRE projects
7
Background of previous FSRE projects
8
Background of previous FSRE projects
9
Background of previous FSRE projects
10
Background of previous FSRE projects
11
Background of previous FSRE projects
14
Background of previous FSRE projects
15
Background of previous FSRE projects
16
Cost- benefit Analysis
A. Chicken production (layers)
Fixed Items Cost/year
I. Input cost
Poultry house 500
Feederer and waterer 100
Chicken 1920
Variable Items
Feed cost (13 quintal/year) 11700
Labour 5400
II. Out put Total annual cost 19620
No Hen Average egg/year One egg price Annual return
1 250 3 750
40 10000 3 30,000
Profit /year Annual return-Total annual cost
=30,000-19620
=10,380 17
Cost- benefit Analysis
A. Chicken production (layers)
I. Input cost
Fixed Items Cost/year
Pond construction 1500
2 2kg 50 100
400 200kg 50 10000
Profit /year
Annual return-Total annual cost =10,000-2500 =7500
19
Background of previous FSRE projects
Lesson learned
‘‘prevention is better than control’’ especially for poultry
disease
The college had encountered
50% losses of pullet from outbreak of disease in the hatchery
house, that contributed to limit the number of pullet distributed
in phase I
Hatchery ponds in JUCAVM chicken –fish integrated
farm should be constructed and started the construction
20
Description of the up scaling project
21
22
Description of the up scaling project
23
Description of the up scaling project
24
Description of the up scaling project
25
Previous and current FSRE Projects link
26
Risks and Mitigation Strategies
Risks
Disease outbreak among the crossbred poultry birds being
distributed
The safety issue around ponds to safe grand the children
and animals
Mitigation strategies
Vaccination at day old stages
Construction of fences around the ponds
27
Sustainability of the up-scaling project
28
Other required service and inputs
29
Gender strategies
30