Ø D13 - 200 (10)

3
1 Ø D10 - 150 (4)
2
MIN 15 CM
di sesuaikan dilapangan
BESI ANGKER Ø 22
dengan serandang (disesuaikan dengan serandang)
PIPA PVC Ø 1"
BETON COR BERTULANG
K-225

50
URUGAN TANAH KEMBALI

40
LANTAI KERJA K-100 T = 5 CM
BATU KOSONG T = 20 CM
URUGAN PASIR T = 15 CM

40
Ø D16 - (6)
STROSSE
300

Ø 40 cm STROSSE
Ø 40 cm
Ø 8-150
Ø D16 - (6) Ø 8-150
40 80 40
40 80 40 160 POTONGAN B - B
160
POTONGAN A - A TABEL TULANGAN
300 300
JUMLAH TULANGAN UNTUK I SET PONDASI ( CT )
PANJ BERAT PER UNIT JUMLAH
KODE DIA JML BENTUK CM
POT (M') (KG/M') (KG) BERAT(KG)
1 10 12 2,98 0,620 1,85 22,17

72
72
2 D 13 150

30
54 3,70 1,042 3,86 208,19
70
Ø D13 - 200

40

78
3 D 13 24 2,66 1,042 2,77 83,15
20 20
VOLUME BESI BETON 313,51

160
80
VOLUME BETON (M3) 4,03

Ø D13 - 200
BESI ANGKER Ø 22

40
PONDASI - CT
DIGAMBAR DIPERIKSA DIKETAHUI
Enjinering UIT
LEMBAR = 1 / 1 TGL. GBR. NO.