You are on page 1of 1

EBS SD Training Assignment

Text control

Question:

1. Configure text control:


- Create one text determination procedure for delivery header (L1)
- Create 4 Text type ID for delivery header (ZHLH, ZHLL, ZHLN, ZHLZ)
- Access sequence: 1 text ID copied from material sales text, 1 text ID copied from sales
orders, 1 text ID copied from customer material master.
- Test case: Create sales orders, create delivery
SO: 8281
DEL: 80002327
 Result: check text procedure is copied from above requirement.
2. Test function “Copied/reference” and text in obligatory

You might also like