Professional Documents
Culture Documents
Sub Station-1
Sub Station-1
PB-2
PB-2
PB-2
ON IT.
A B E F
450 2. THE STRUCTURE IS DESIGNED AS PER RELEVANT I.S CODE AND
PB-3 PB-3 PB-2 PB-2 PB-2 FOR FOLLOWING ENVIRONMENT CONDITIONS:
4
(a) SEISMIC ZONE: IV
450
PB-2
PB-1
PB-4
(b) BASIC WIND SPEED (Vb): 55M/SEC
PB-5
PB-2
PB-2
3. PROPER COVER SHALL BE MAINTAINED FOR ALL RCC MEMBERS BY
PB-5 PB-5 ATTACHING SUITABLE COVER BLOCKS TO REINFORCEMENT
3 PB-5 PB-7
BARS.THE CLEAR COVER FOR PROTECTION OF MAIN
REINFORCEMENT FOR DIFFERENT MEMBERS SHALL BE FOLLOWS:
PB-5
PB-1
(a) RAFT/FOOTING: 50 MM
PB-2
LONGITUDINAL 4#20
PB-2
(b) COLUMN: 45 MM
REINFORCEMENT
4#16
PB-1
(NOS-mmØ) (c) LINTELS,STAIR ETC: 45 MM
PB-5 PB-5 TRANSVERSE REINFORCEMENT #10@ 95 c/c NEAR ENDS (d) BEAM: 45 MM
2 WITHIN CONFINING REIN (L0)
(e) SLAB: 45 MM
TRANSVERSE REINFORCEMENT #8 @200c/c BALANCE
PB-1 PB-1 BALANCE PORTION (L1)
PB-1
PB-4
PB-5
4. DESIGN DATA
PB-2
450 (a) GRADE OF RCC: M 30 (DESIGN MIX)
PB-6
(b) GRADE OF REINFORCEMENT: TMT BARS OF GRADE FE-500D
PB-5 PB-5 PB-5 IN ABSENCE OF SOIL INVESTIGATION
}
(c) TYPE OF SOIL:
1
450
REPORT STR DES HAS BEEN CARRIED
(d) SBC -
PB-2
OUT ASSUMING MEDIUM SOIL.
(e) DEPTH OF FOUNDATION HAS BEEN DESIGNED
PB-1 REINFORCEMENT FOUNDATION- FOR SBC OF 150 KN/M2 AT 1.50 M
4#20 BELOW MGL. GE TO VERIFY THE DATA
PLINTH BEAM LAYOUT PLAN ARRANGMENT
WITH SOIL INVESTIGATION REPORT
FOOTING TO PLINTH
BEFORE EXECUTION. (ALL FOOTINGS
HAVE BEEN ASSUMED TO REST ON ONE
BEAM LEVEL
LEVEL)
C1 C1 C1 C1 C1
3
SNO. DATE DESCRIPTION INITIAL
REVISIONS
PROVN OF FIRE STN TO INCL GARAGE FOR TFF AND LIVING ACCN FOR
FIRE CREW WITH ALLIED INFRA INSIDE AREA OF 41 FAD
1
C1 C1