G AC 220 V AC 220 V
SOURCE LIGHTING SOURCE CIRCUITS
EMERGENCY
GENERATOR
99 KW 440V/3ø
60 HZ
3 WIRE 0.8 PF
SHORE SUPPLY
220V/3ø 60 HZ 3 WIRE
440V FEEDER
440V FEEDER
Interlock
No.1
No.2
NO.1 NO. 2
TRANSFORMER TRANSFORMER
440/230 V/3ø 440/220 V/3ø
60 HZ 60 HZ
60 KVA 60 KVA
PLC
440V/3ø 60 HZ 3 WIRE
BC 1
BUS COUPLER
PPU
G G
NO. 1
M M NO. 4
GENERATOR G G GENERATOR
425 KW 440V/3ø BOW THRUSTER 1 BOW THRUSTER 2 425 KW 440V/3ø
60 HZ 500 KW 440V/3ø 500 KW 440V/3ø NO. 3 60 HZ
3 WIRE 0.8 PF NO. 2 GENERATOR 3 WIRE 0.8 PF
60 HZ 60 HZ
GENERATOR 425 KW 440V/3ø
3 WIRE 0.8 PF 3 WIRE 0.8 PF
425 KW 440V/3ø 60 HZ
60 HZ
G
3 WIRE 0.8 PF
3 WIRE 0.8 PF
NO.5
M GENERATOR
650 KW 440V/3ø
60 HZ
STERN 3 WIRE 0.8 PF
THRUSTER
500 KW 440V/3ø
60 HZ
Note:
red line is additional requirements
Thruster and Main Propulsion Control Overview
BOW
THRUSTER 1
BT1 – 500 KW
BOW
THRUSTER 2
BT2 – 500 KW
STERN 2 x MAIN
THRUSTER ENGINES
ST1 – 500 KW
2 x CPP MAIN
PROPULSION
2 x HIGH LIFT
FLAP
RUDDERS
1 Thruster System
1 Bow Thruster Unit -1 (existing) 500 1 70 350 1) Considered the 70 350
2 Bow Thruster Servo Pump 5 1 100 5 thrusters are running in 100 5
3 Stern Thruster Unit 500 1 70 350 70 % of full load in DP in 70 350
4 Stern Thruster Servo Pump 5 1 100 5 the previous load analysis 100 5
5 Bow Thruster Unit -2( New ) 500 1 70 350 the Load factor 70 350
6 Bow Thruster Servo Pump 5 1 100 5 considered as 100 % 100 5
Total Load in KW 1065 1065
4 Domestic Equipment
Total Load in KW 27.68 27.68
5 Galley Equipment
Total Load in KW 10.4 2.4 10.4 2.4
6 Laundry
Total Load in KW 10.4 10.4
8 Vent Fans / AC
Total Load in KW 79.94 0.71 80.69 0.71