You are on page 1of 2

08/04/2021

JST 09AUG2021

VERIFY VERIFY
REFER TO SY2
COMMENTS
L1CB-171
SEE SITE GRADING
PLAN AND
L1CB-171 DRIVEWAY J
SHOPDRAWING
FOR REFERENCE

10
120

see attachment TYPE A STIRRUPS


below

REFER TO THIS FRAMING PLAN

SY2 NOTES:
-VERIFY LENGTH OF REBARS BASED ON OUR COMMENTS/CORRECTIONS
PRIOR TO FABRICATION AND INSTALLATION
-VERIFY QUANTITY OF STIRRUPS BASED ON REQUIRED SPACING
-VERIFY Ldh, HOOK, ANCHORAGE AND SPLICE LENGTH BASED ON SY2 PARAMETERS
-VERIFY CAMBER REQUIREMENTS
-ALL STIRRUPS ALONG SPLICE SHALL BE SPACED @ 100mm O.C.
-VERIFY AR PLANS FOR AR ELEVATIONS AND STRUCTURAL FLOOR LEVEL
-ALWAYS REFER TO UPDATED STRUCTURAL PLANS

TYPE A STIRRUPS
C-11 C-20

C-18

C-10

B3PC1
B2PC1

SSL +0.50
SSL +0.19
SSL +0.50
0 L1PC-4
-24
L 1G SSL +0.15
L1 L1 SSL +0.50
B-2 B-1
06 RM 94
PB
13 -10
L1 1B-3
B-2 L
SSL +0.49 06 SSL +0.15
L1
B-2
SSL +0.26 07
87 L1
B-2 B-1 SSL +0.50
L1 95
SSL +0.20 L1 SSL -0.27
B-2
07 RM SSL +0.50
PB
SSL -0.03 -9

L1
B-2 L1B-197
08 SSL -2.21 RMPB-17
SSL -0.64 SSL -1.87
SSL -2.22 L1B-198
SSL +0.20

RMPB-8 RMPB-18
SSL -1.28
2
29 L1B-209
B- SSL -1.83
L1
SSL -1.85
SSL -2.40 SSL +0.20
B3PC1 SSL -2.08 SSL +0.20
SSL -0.50 SSL -2.97