ae Introduction
Introduction = — 7
Chemical_engineer needs. knowledge of. Science rthermodynarnics skinetics
_ond_computer ip. mak ing-these applications engineer must. recagnis;
_—..mical_aspects_whic! bLinvolves profit measuring.and processes
|__-chemital engineers design new plants.and_expland.and_bevi
1g) Development of dato. far-final design —
_A) Final economic xevalution ——__———
_ _5) Detailed engineering design —.
16) Pocurement— 7
| Design Engineers. - — = — =
__|- chemical engineet-many times 1eferred.as design engines" becaus cof.
__smany design duties like ‘making. econoenie evaluation of new procksses..desig-
_ ining individual pieces of .equipment.ct.developtng-plant layout for-coordi~
_______- nation _pf_averalll-opetat lon .
Cost £ngineers ——— ____
A _chemical_eng, ineer Specializing ineconarnic aspects of the design.is_
reffered as * cos enginett! ——
i Process Enginetes §
_Works for ecanomic evaluat on.4-general. ¢conami. SoS¥ Estimation a
a There 15 no design project Should procecd Lo the final Slages 4,
~ co we Conside and cost estimation Should be rade throughoy.
: a € carly stages af the design when complete Specifications are ob
{ ‘available
i | Evaluation of cost th the Preliminary design phases is Sometirnes
ih sCathed ‘gquesstimation’ but more commonly ‘predesign cost est tmation'
~sTHIS provides basis_for Company menag ement
——.. {Factors Affecting profitability Of investment
2 Money _ -
~ Money or any other Negotiable type of capital has tirne value when
— jo. manufacturing enterprise invest Money rit expects to receive a return
~ during time of money used: The amount of te burn demanded usually de~
ipends on degree Of Fisk assumed. Risks differ between projects and
| process. used
6 Since for incorpotatin
g different levels Of FISk Into Profitability »
{the most_common methods
are to kaise miniraum acceptable ‘rate of
;Feturn! for the Fiskiet projects
Interest
Time value of money_has been integrated into tnvestment~ evalua-
_- fbion Systems by.means of compound_interest relat lonships
Tor any
assumed tnterest_value Of Money.ra.known arnount at any
One time
~ an be converted to.an_equivalent but different amount at a different_lessential that chemicalengineet be conversant with turdarm gral Yas =
ation. = a - a
€-g~ Income tax_apply_differently to projects with.diff erent _pro part ions
Of fred ov, swarking capitals . Profitability Therefore should be based.an
Lancome after taxes. ___———
_.4) Depreciations -_—. a
All physitalassets of on industrial focility.d ecrease thvaiue.t
___ageit15 normal practice to.make-
___ to distui bute first cost of focility over its expected service li
___|'Depreciations’
Ee (additional funds correspon
|___l recovery" 1o_partial_begeneration off
ding to depreciation. expense ts‘capttal
nest _coSt of physicel assets —————--
____|15) Income -tax Laws — .
This. peemits becavery_of funds bg two.diggerent accelerated deprecia=
aight=1 ine method since Cash flow ttmiirg.-
nmethod_afjects profitability significa
| | ion_shedules.a5 wells by St
| is affected choice of depreciadio
— _ - at
_—Thou.g! b-cash casts and sales_values may be-equal_antuio-pr syectso
me forto% purpose may bedig-erent a =
| theie reported net inca:
____.Optimum_Design-
_In every tase encountered -by-chemnical
___aiternative methods which can be used forgiven _pro
|______Fach of these process contain 5_many_possible.alternatives. inyalving
Vd biables Such a5 gos _=mixtw-e _compasition . temperature .pressuke—
sand choice of Catalyst. Tt is the responsibility of chemical_engg-4s.chanse
- { he best process_and to inca patate into design the. equipment and — =
— methods which will give best besubt @
9: Formaldehyde can be produced by-tata yst dehydrogenct-iap of ——
Lengg.there are Sévercl ok —
cess oF operation »_‘ eect $2
Joby Comtiolted oxidation of natural gets. oF by direct reactid
bet
Optimum Economic design
Total cost
wah =| Af there ake two ok more methods for obtaining exactly eqal equi'-
|Malent ffnal vesults the prefered method would bethe one Invol ving
east total cost-This.is basis of.an ‘optimurn econamic design’
one of the typical example of this is determing Optimum econamic.
ipediato use when_pumping a.givenamount of fluid from one point —
to another — _ =
AS. Shown is above {1g:The pumping cast increases with decreased
Rost Size.of pipe diameter because. of frictional effects while the
fixed charges for the pipeline becomes lower than_when Smaller pipe
diameters are used: because of reduced capital investment: The ‘
iChemical engineer often Selects_afinal_design onthe basis, of conditions
SHiving-the least total_cost.
1» oF Ha.tinder Special condition of catalyst rternp § pressus,yrild determining
7 | : 7 7 Peaietest 7
ypild determ\ping
ee bby equilibs ole [
— \ =e
wa |
Zonverter kemperature CO —> ;
igure dioaide converter
i.prg: Determination of optimum tempernture tn.
2). $03 +H20 ———+ Ha S207 — —
_Practical considerations indesign
}____ Standard sire
| ___1t may b¢ possible tadetermine_an exact time. pipe_drameter-for an
__optimum _econamic design-but this does_nat_ mean that this exoct size
{must be used in final size des fgg
j———_____5) uppose the optimum dimeter were 5-+5 inch (8-Lem).Tt wauld_beim=—
| pyacticle tn havea Special pipe fabricated with ontnside diametesof _
| nes in sTstend -the engine! would choase.a standard pipe sitembichbe purchased at requlat market price and the Fecommended pipe size
f would probably be std. 3.1/2 inch diameter pipe having ah inside diamete
of 3:55 Inch (9-02¢m)
In developing the plant layout , contial valves.must be placed where __
A aycontiol valves =e
ve
“they are easily accessible to_operators - Sufficient space must.be . —
E
available -formainteinance personnel tocheck take apart and_-epair___
£quipment: - ner sL Sees -
‘Design approch = oe -
Plants are designed around computers They are.used to.determine.
design data_and are used as models far optrmixatian once.a design is
Stablish.-They are also used to maintain operating. plants on the
——— - |desired operating conditions.
~~ —-~|]~In plant design we requires. physical Propestres and also requires
~ =. —llapproximation of values which requires design calculations also engi-
—-{Neeks are going for assumptions -because no absolutely accurate values.
HOF methods af Calculations aredvailables
- Another. important factor. inthe approchto.any design aoe tovalves |
\economic conditions. and limitations - An engineer prefer to accept errors
= |kather than-to spend time determining coefficients or factors
ae