You are on page 1of 1

SOFTWARE DEVELOPMENT LIFE CYCLE

Phase Activities Deliverables


The main goal of the
grading system is to
 Define the system to be
develop an online web-
developed.
Planning based system by which
 Set the project scope.
the institution may
 Develop the project plan. disseminate grades in a
systematic manner.
Gather requirements
students, teachers, and
administrators. Analyze
 Gather business
Analysis any existing systems or
requirements.
processes related to
grade management and
communication.
The desired features of
 Design the technical
the grading system have
Design architecture. a login functionality and
 Design system models. grade display.
The students’ grading
 Build technical architecture. system is implemented
Development  Build databases and using HTML, CSS,
programs. JavaScript, PHP and
MySQL.
Testing the system to
 Write test conditions.
Testing validate if it meets the
 Perform testing.
specified requirements.
Deploy the system in the
institutions web server
and provide
documentation and
 Write user documentation.
Implementation training materials to
 Provide training.
students, and
administrators on how to
use the system
effectively.
Monitor the performance
of the online grades
viewer and address any
 Build a help desk. reported issues or bugs.
Maintenance
 Support system changes. Perform regular
maintenance activities,
such as applying
updates.

You might also like