Change preparation 8 Use a new gage/instrument, or change □ Acceptance report □ Calibration report □ MSA □ Other ( )
Materials and Batch number Material disposal Responsible Planned entry and export details (date/quantity)
Actual 9 Replacement material or finished packaging material manufacturer □ Material Certificate □ Full Size □ Function □ Package Verification □ Others ( )
Part No Quantity Rubber production process, raw materials, formulations, specifications, material
delivery plans or order number plan department completion 10 □ Material Certificate □ Full size □ Function □ Other ( )
grades, etc.
Material or semi-
11 Parts supplier production process, raw materials, formula, specifications (size
finished products □ Material Certificate □ Full size □ Function □ Other ( )
or function), production site changes, etc.
have been ordered
Material or semi-
12 Overhaul or replacement of key equipment of parts supplier, change of
finished product □ full size □ function □ package verification □ other ( )
packaging plan
inventory
Finished product
quantity 13 Process or important process parameters have changed □Size □Function □Capacity analysis □Others ( )
Number of
uncompleted orders 14 Packaging plan change □Package verification □Others ( )
Quantity of
preparation 15 Cleaning agent, lubricant, etc. □ Material Certificate □ Other ( )
Number of packaging
materials 16 Inspection method, reference replacement □MSA □Other ( )
Number of orders
without work orders
17 Production site change, production line change, internal change □Size □Function □Capacity analysis □Acceptance report □CMK □Other ( )
18 Customer design changes, part changes □DFM □Modification mode □Appearance □Full size □Function □Others ( )
EC pre-delivery plan
deadline 19 Customer requested materials □ Material Certificate □ Other ( )
PFC 21 Customer product information, shipping location change □PI □label □Other ( )
Product or mold file 22 Other changes □Other ( )
FMEA
CP
MI
File OI
II
PI
Experience database
Product history
Other
Mold processing
Rack Processing
Tool handling
Sample processing
System data processing
Do you need to apply for customer
approval before EC?
EC implementation time
Customer special requirements
Material identification time
Other
Environmental substance testing
Operator training
Internal Customer
EC implementation approval approval