Wa0020.
04. Mounting Nut is fouling on assy during fitment on 100%stores have been rectified by
fixture usingmock up fixture &there is no
fouling of nut observed.
05. Poor Workmanship Observed on Fitment of Rivet Rivetting quality have been
improved by using Rivetting
Machine &100% checking have
06. been done
Curvature &holes of strip to Drg. No.575-47-117 is
Rectification have been done byY
not matching with template/mating assy.
07.
07. Dimensions of Trough to Drg.No. 675-47-99 found using Mock Up Fixture,
95 to 98 as against 90mm
100% Troughwhich has been usedin
assy, have been properly cut &
deburred to maintain height of
03. 90mm.
Dimensions of Trough to Drg.No. 675-47-101 found 100% Trough which
104 to 107 as against 95mm has been used in
assy. have been properly cut&
deburred to maintain height of
09 Dimensions of sub assy 675-47-sb127 found 95mm.
100%Sub assy.(675-47-sb127) which
9.77mm as against 6mm has been used in assy. have been
properly taRred &welded In welding
fixture to maintain dimension 5nmm
10. Dimensions of sub assy 675-47-sb126found to6mm.
100% Sub assy.(675-47-sb126 which
3.83mmas against 6mm hasbeen used In assy. have been
properly tagged &welded in welding
fixture to maintain dimension 5mm
to6mm