Professional Documents
Culture Documents
P CV HL 83 Relleno Estructural 51 c5 1
P CV HL 83 Relleno Estructural 51 c5 1
3
-0.0
5
7
4
0 .3
2
3
13
4
-0.0
4
20
-0.0
12
21
-0.0
-0.0
4639500.0
4639500.0
1
6
0.7
2
19
0.3
1
11
2
0 .6
1
14
3
0.6
0.4
22
6
0 .0
1
27
-0.0
12.9
1
28
-0.0
1
0
0 .7
7
7
4
18
2
1
10
2
0.3
0 .4
0.7
23
9
5
15
26
9
0 .4
0.4
0 .1
29
1
0.1
2
32
-0.0
1
16
0.4
4
17
2
24
1
0 .5
25
3
0 .7
9
0.2
0.6
1
1
0.5
8
0.7
30
5
0.4
31
9
0.2
33
4
0.0
51.0
PERFIL 1 - 1
220.0 220.0
SE Subrasante Teorica PAD
CT 218.0 218.0
SEC OR Capa Estructural Protocolo Actual
TOR 4 Base de Asiento Capa Estructural Protocolos anteriores
5 216.0 216.0
214.0 214.0
SE
SE CT
CT OR 212.0 212.0
OR
6 3 Progr. 0+000 0+010 0+020 0+030 0+040 0+050 0+053
4639500.0
OR
8
Elevación Media: 214.97m
12.9
SECTOR 1
Esp. Medio: 0.41m
4639250.0
REFERENCIAS PLANIMETRICAS NOTAS Responsable: Firma Conforme Contratista: Sandin Hnos N°Contrato :
1. Ortomosaico del 27/11/2022 proporcionado Grupo Sit. Realizó: Gisella B. Trigo Caballero Revisó: Jhon Siles
Curvas de Nivel Princ. Capa Relleno (Equidistancia 0.50m) Of. Tecnica Sandin:
Frente de Obra: Ampliación PAD Lixiviación
2. Medidas expresadas en metros.
Curvas de Nivel Sec. Capa Relleno (Equidistancia 0.10m)
3. Elevaciones referidas al n.m.m QC Sandin: Sistema de Referencia: Gauss Krüger (Faja 2). Datum CAI'69.
Fase 1 de Expansión Pila Lixiviación
Documento de Referencia:
Fase 2 de Expansión Pila Lixiviación Nº de Protocolo: Rev: Descripción: Lámina:
QA Anndes: CV2002- HEAP EXPANSIÓN PREPARED SUBGRADE-rev A
P-CV-HL-83 1
Capa Relleno Estructural Relevada
Escala Planta Detalle 1/250 Escala Planta General: 1/5000
Relleno estructural-51 1 de 1