FEED PLANT 1 TODAY MTD YTD FEED PLANT 2 TODAY MTD YTD FEED PLANT 6 TODAY MTD YTD
CPKO (MT) - 12,315.180 105,569.332 SWEET WATER (MT) 53.630 3,763.087 40,421.346 FEED OIL -SPKFA (MT) 598.248 12,943.229 98,209.124
RBDPKO (MT) - - 9,017.218 TREATED SW (MT) 50.949 3,574.935 38,323.998 FEED OIL -SPKRFA (MT) - 721.096 6,693.966
CPKOLEIN (MT) - - - FEED TO P6 (MT) 598.248 13,664.325 104,903.090
SPKFA (MT) - 11,711.280 99,889.194 PLANT 3 RESIDU (MT) 41.820 846.824 6,404.662
SRBDPKFA (MT) - - 7,853.172 FEED PLANT 3 TODAY MTD YTD L.END (MT) 20.095 484.390 4,037.006
SPKOLEOIN (MT) - - - TREATED SW (MT) 91.621 3,626.867 38,555.598 L.END RESIDUE (MT) - 17.844 262.471
SPKRFA (MT) - 701.976 6,601.337 CRUDE GLYCERINE (MT) 24.384 1,806.661 16,461.686 PITCH (MT) - 95.989 760.852
FATTY ACID PRODUCE (MT) - 12,413.256 114,343.703 CG YIELD (%) #DIV/0! 13.76% 13.60% DPKFA + L.END Yield (%) 93.765% 93.091% 92.647%
SKFA / SRBDPKO / SPKOLEOIN / SPKRFA YIELD (%) #DIV/0! 94.545% 94.448% FA + CG YIELD (%) #DIV/0! 108.31% 108.05% PITCH + L.END RESIDUE Yield (%) 0.000% 0.833% 0.975%
SWEET WATER (MT) - 3,720.339 40,339.693 RESIDU Yield (%) 6.990% 6.197% 6.105%
SW YIELD(%) #DIV/0! 28.336% 33.321%
2. QUALITY RAW MATERIAL FATTY ACID SWEET WATER TREATED SW CG DPKFA RESIDUE
FFA (%) 4.01
PH 7.22 9.92
TDS (ppm) 210.00
(Kg /mt Raw Material) #DIV/0! 267.57 206.94 (Kg /mt SW) - 0.66 0.47 (Kg /mt SPKFA) 33.43 37.69 48.42
ELECTRICITY (kWh) 705.00 123,362.000 1,046,229.00 SODA ASH (Kg) - 2,405.000 22,756.00 ELECTRICITY (kWh) 8,000.00 207,100.000 1,740,382.00
(kWh / mt Raw Material) #DIV/0! 9.40 8.64 (Kg/mt SW) - 0.64 0.56 (kWh / mt SPKFA) 13.37 15.16 16.59
HP BOILER - SOLAR (L) - - - Magnafloc (Gram) - 26,000.800 298,200.80 NG TOH (M³) 9,086.83 214,123.070 1,714,991.32
(L / mt Raw Material) #DIV/0! - - (Gram/mt SW) - 6.91 7.38 (M³ / mt SPKFA) 15.19 15.67 16.35
NATURAL GAS (M³) - 99,805.990 939,213.69 Sodium Aluminate - 134.000 1,501.00 BWRO CT 50.00 1,344.000 11,238.00
(M³ / mt Raw Material) #DIV/0! 7.60 7.76 (Kg / mt SW) - 0.04 0.04 (M³ / mt SPKFA) 0.08 0.10 0.11
BWRO (M³) 174.00 4,986.000 278,207.00 PLANT 3 DEMIN WATER (M³) 92.00 2,066.000 17,228.00
(M³/mt Raw Material) #DIV/0! 0.38 2.30 TODAY MTD YTD (M³ / mt SPKFA) 0.15 0.15 0.16
DEMIN WATER (M³) 9.00 1,637.000 13,466.00 NaOH (kg) 27.00 1,849.300 15,916.70
(M³/mt Raw Material) #DIV/0! 0.13 0.11 (Kg/mt CG) 0.30 0.51 0.41
4. REMARKS
*/ Plant 1 Downtime 16.5 hours due to HPBO Under Maintenance
*/ P3 Low Flowrate due to Low Raw material Stock
*/ P6 Downtime In Normal Operation
5. STOCK AND SHIPMENT RAW MATERIAL SPKFA SPKRFA SRBDPKFA SW TSW CG DPKFA RDPKFA L.END RESIDUE PITCH
O/P STOCK OF THE MONTH (MT) 6,115.107 3,255.979 327.114 - 98.000 100.406 795.585 5,799.977 258.454 292.254 129.557
YESTERDAY STOCK (MT) 4,304.102 2,622.278 307.994 - 108.882 89.146 637.974 2,159.715 249.175 239.508 67.030
PRODUCED (MT) - - - - - 50.949 24.384 560.947 41.820 - -
7. LOCAL DESPATCHES / SHIPMENT TODAY MTD TODAY MTD TODAY MTD TODAY MTD
SHIPMENT/MTD - - - 1,939.888 - 15,799.638 - 229.106
SHIPMENT/YTD 15,899.532 16,384.426 90,287.497 767.316
8. OUTSTANDING COMMITMENT
SHIPMENT/MTD - 0.112 0.362 -
OIL PROCESS TODAY MTD TODAY MTD TODAY MTD TODAY MTD