You are on page 1of 15

J-028 NACIN CRICKET PAVILION MATERIAL REQUIREMENT (E350 GR)

Length Width Quantity(NOS) Material(MM)


10600 1510 5 8
5000 1510 1 10
12000 1510 1 12
6500 1510 2 16
5000 1510 1 24
6000 - 4 125NBX4.85
TOTAL.: 14
L REQUIREMENT (E350 GR)
Weight(Kgs) Remarks
5025.884 MRR NOT RECEIVED
592.675 MRR NOT RECEIVED
1706.904 MRR NOT RECEIVED
2465.528 MRR NOT RECEIVED
1422.42 MRR NOT RECEIVED
388.8 MRR NOT RECEIVED
11602.211
J-028 NACIN INDOOR PH 86 & 81 RAW MATERIAL REQUIREMENT (E350 GRADE)
Length Width Quantity (NOS) Material (MM) Weight(kgs) Total Weight(kgs) Remarks Received Qty Received wt Balance qty Balance wt
12000 1510 19 6 16215.588 MRR 18 15362.136 1 853.452
19098.108
10200 1500 4 6 2882.52 MRR 0 0 4 2882.52
5050 1500 18 8 8562.78 MRR 18 8562.78 0 0
17125.56
5050 1500 18 8 8562.78 MRR 18 8562.78 0 0
12000 1510 5 10 7112.1 MRR 5 7112.1 0 0
14224.2
10000 1510 6 10 7112.1 MRR 6 7112.1 0 0
10000 1510 5 14 8297.45 8297.45 MRR 4 6637.96 1 1659.49
11000 2000 6 16 16579.2 16579.2 MRR 5 13816 1 2763.2
12500 10000 1510 1 20 2370.7 2370.7 MRR 1 2943.75 0 0
TOTAL.: 82 77695.218 75 70109.606 7 8158.662
Nacin Mock Airport PH 1 Raw Material Requirement (E350gr)
Length Width Quantity Material Weight (kgs) Remarks Received Qty Received wt Balance qty Balance wt
6000 1800 7 6 3560.76 7 3560.76 0 0
6000 1500 3 8 1695.6 3 1695.6 0 0
6000 1500 3 10 2119.5 3 2119.5 0 0
6000 1500 6 14 5934.6 6 5934.6 0 0
Total.: 19 13310.46 19 13310.46 0 0
J-028 NACIN MOCK AIRPORT PH2 MATERIAL REQUIREMENT (E350GR)
Length Width Quantity Material Weight(kgs) Remarks Received Qty Received wt Balance qty Balance wt
6300 1510 1 6 448.0623 MRR 1 448.0623 0 0
6300 1510 1 12 896.1246 MRR 1 896.1246 0 0
6000 0 21 100NB 1524.6 MRR 0 0 21 1524.6
TOTAL.: 23 2868.7869 2 1344.1869 21 1524.6
J-028 NACIN OUTDOOR PH 2 RAW MATERIAL REQUIREMENT (E350 GRADE)
Length Width Quantity Material Weight (kgs) Total Weight (kgs) Remarks Received Qty Received wt Balance qty Balance wt
10100 1510 4 6 2873.2884 MRR 4 2873.2884 0 0
6128.8404
4800 1800 8 6 3255.552 MRR 8 3255.552 0 0
5400 1500 8 8 4069.44 4069.44 MRR 8 4069.44 0 0
6400 1510 12 10 9103.488 9103.488 MRR 12 9103.488 0 0
10500 1510 5 14 8712.3225 8712.3225 MRR 5 8712.3225 0 0
8300 2000 3 16 6254.88 6254.88 MRR 3 6254.88 0 0
12000 2500 1 28 6594 6594 MRR 1 6594 0 0
6000 0 19 125NBX4.85 (MEDIUM) 1846.8 1846.8 MRR 17 1652.4 2 194.4
TOTAL: 60 42709.7709 58 42515.371 2 194.4
J-028 NACIN PARADE GROUND PH2 RAW MATERIAL REQUIREMENT (E350 GRADE)
Length Width Quantity Material Weight (kgs) Total Weight(kgs) Remarks Received Qty Received wt Balance qty Balance wt
10000 1500 10 8 9420 MRR 8 7536 2 1884
6100 1500 10 8 5746.2 19292.16 MRR 0 0 10 5746.2
7300 1500 6 8 4125.96 MRR 0 0 6 4125.96
8100 1500 5 10 4768.875 MRR 5 4768.875 0 0
14345.875
6100 2000 10 10 9577 MRR 0 0 10 9577
6000 1500 1 12 847.8 847.8 MRR 1 847.8 0 0
10000 1500 5 14 8242.5 8242.5 MRR 5 8242.5 0 0
12000 1500 1 16 2260.8 2260.8 MRR 1 2260.8 0 0
12000 2500 2 20 9420 9420 MRR 2 9420 0 0
6000 2450 1 28 3231.06 3231.06 MRR 1 3231.06 0 0
6000 2450 1 32 3692.64 3692.64 MRR 1 3692.64 0 0
6000 0 22 100NB 1597.2 1597.2 MRR 0 0 22 1597.2
TOTAL.: 74 62930.035 24 39999.675 50 22930.36
J-033 BHAVANI TIMBERS TOTAL MATERIAL REQUIREMENT
Length Width Quantity(NOS) Material(MM) Weight (KGS) Total Wt (KGS) Grade Remarks Received Qty Received wt Balance qty Balance wt
12000 1510 28 5 19913.88 MRR 28 19913.88 0 0
22758.72 E350
8000 1510 6 5 2844.84 MRR 0 0 6 2844.84
12000 1510 7 6 5974.164 5974.164 E350 MRR 7 5974.164 0 0
12000 1510 20 8 22758.72 22758.72 E350 MRR 18 20482.848 2 2275.872
12000 1510 7 10 9956.94 MRR 7 9956.94 0 0
12944.022 E350
6300 1510 4 10 2987.082 MRR 3 2240.311 1 746.771
12000 1510 5 12 8534.52 8534.52 E350 MRR 5 8534.52 0 0
6000 1510 1 16 1137.936 1137.936 E350 MRR 0 0 1 1137.936
12000 2500 1 20 4710 4710 E350 MRR 1 4710 0 0
6000 - 72 125NBX4.85 6998.4 6998.4 E250 MRR 0 0 72 6998.4
TOTAL.: 151 85816.482 69 71812.663 82 14003.819
J-030 PENNAR PRODUCTION DETAILS (APRIL MO
production Dispatch Dispatch
production
JOB NAME PH NO Weight (MT) Completed completed completed
Balance (MT)
(MT) (MT) (MT)
PENNAR 4 83.67 65.449 18.221 19.26 64.41
PENNAR 5 30.8 0 0 0 0
PENNAR 6 80.65 0 0 0 0

TOTAL.: 195.12 65.449 18.221 19.26 64.41


N DETAILS (APRIL MONTH)

RM Received wt (MT) Balance wt (MT) Remarks

108.7 0 RM RECEIVED
0 24.33 5,8MM RM BALANCE
66.4 - 24, 32MM BALANCE

175.1 24.33
JOB NO PROJECT NAME TOTAL WT RECEIVED RAW MATERIAL CUTTING

J-33 BHAVANI TIMBERS 85.803 71.8 45.2


J-28/INDOOR NACIN 78.2 63.4 42.1
J-28/AIRPORT NACIN 13.3 7.3 7.3
J-28/OUTDOOR NACIN 42.7 27.2 27.2
J-28/PARADE GROUND NACIN 62.8 31.7 31.7
J-30/PH5 PENNAR 24.4 5.6 5.6
J-30/PH6 PENNAR 80.4 66.4 35.2
PTW FABRICATION PRODUCTION EFFECTIVE RAW
MATERIAL WT
11.8 11.8 5,8,16MM RM BALANCE 14.003
14.3 13.3 6,14,16MM RM BALANCE 14.8
2.5 0 14 MM RM BALANCE 6
0 0 14,28MM RM BALANCE 15.5
0 0 8,10,14MM RM BALANCE 31.1
5.6 0 5,8MM RM BALANCE 24.4
3.4 0 24, 32MM BALANCE 14
RM PHYSICAL STOCK AS ON 02.05.2023
THK WIDTH LENGTH QTY WT
5 1500 5400 4 1271.7
5 1510 12000 5 3556.05
6 1510 6300 1 448.0623
6 1510 10100 4 2873.2884
6 1800 4800 8 3255.552
6 1800 6000 0 3560.76
8 1500 5050 18 8562.78
8 1500 5400 8 4069.44
8 1500 6000 0 1695.6
8 1500 10000 8 7536
8 1500 12000 2 2260.8
8 2500 5000 1 785
10 1500 6000 0 2119.5
10 1500 8100 5 4768.875
10 1500 9000 1 1059.75
10 1500 6400 12 9103.488
12 1500 6000 1 847.8
12 1510 6300 1 896.1246
14 1500 6000 6 5934.6
14 1500 10000 5 8242.5
14 1510 10000 5 8297.45
14 1510 10500 5 8712.3225
16 1250 12000 3 5652
16 1450 6000 2 2185.44
16 1500 12000 1 2260.8
16 2000 8300 3 6254.88
16 2000 11000 5 13816
20 1510 12500 1 2963.375
20 2000 8000 1 2512
20 2500 12000 2 9420
25 2500 12000 1 5887.5
28 2450 6000 1 3231.06
28 2500 12000 1 6594
32 2450 6000 1 3692.64
MS SCRAP 4500.22
Grand Total 122 158827.3578
LENGTH WIDTH QTY THK WT
12000 1510 0 6 0.00
5050 1500 0 8 0.00
5050 1500 18 8 8562.78
12000 1510 0 10 0.00
10000 1510 0 10 0.00
10000 1510 5 14 8297.45
11000 2000 5 16 13816.00
12500 1510 1 20 2963.38
6000 1800 0 6 3560.76
6000 1500 0 8 1695.60
6000 1500 0 10 2119.50
6000 1500 6 14 5934.60
6300 1510 1 6 448.06
6300 1510 1 12 896.12
10100 1510 4 6 2873.29
4800 1800 8 6 3255.55
5400 1500 8 8 4069.44
6400 1510 12 10 9103.49
10500 1510 5 14 8712.32
8300 2000 3 16 6254.88
12000 2500 1 28 6594.00
10000 1500 8 8 7536.00
8100 1500 5 10 4768.88
6000 1500 1 12 847.80
10000 1500 5 14 8242.50
12000 1500 1 16 2260.80
12000 2500 2 20 9420.00
6000 2450 1 28 3231.06
6000 2450 1 32 3692.64
12000 1510 5 5 3556.05
12000 1510 0 8 0.00
12000 1510 0 10 0.00
6300 1510 0 10 0.00
12000 1510 0 12 0.00
12000 2500 0 20 0.00
5400 1500 4 5 1271.70
5000 2500 1 8 785.00
12000 2500 1 25 5887.50
12000 1250 3 16 5652.00
8000 2000 1 20 2512.00
6000 1450 2 16 2185.44
12000 1500 2 8 2260.80
9000 1500 1 10 1059.75