Factory Name

Address
Department
Sub-station Name: Daily Checklist for Power Transformer Month: ……………..……../2023
Transformer Capacity:

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
SI Checking Point
1 Oil Level Indicator(Main Transformer)
2 Oil Level Indicator (OLTC)
3 Silica Gel Colour ( Main Transformer)
4 Oil Leakage (Y/N)
5 Transformer Oil Temperature in ⁰C
6 Grounding is okay?
7 Any abnormal Sound? (Y/N)
8 Surrounding Area Clean (Y/N)
9
10
11
12
13

14 Comment / Observation

Signature of the staff