INDIVIDUAL GRADATION
Sample No : 1 Total Weight = 28520 gms.
IS Sieve Size in mm. Wt. Retained in gm. % Wt. Retained Cum % Retained % Passing Limit as per JMF
Remarks :
EPC Contractor's Representative Authority Engineer Representative
PROJECT :- FOUR LANNING OF RATAPANI STRETCH FROM KMS. 8+300 TO KMS. 20+680 ( LENGTH 12+380 KMS.)
OFOBEDULLAGANJ- ITARSI SECTION OF NH-46 (OLD NH-69) IN THE STATE OF MADHYA PRADESH.
IS Sieve Size in mm. Wt. Retained in gm. % Wt. Retained Cum % Retained % Passing
IS Sieve Size in mm. Wt. Retained in gm. % Wt. Retained Cum % Retained % Passing
IS Sieve Size in mm. Wt. Retained in gm. % Wt. Retained Cum % Retained % Passing
Remarks :
EPC Contractor's Representative Authority Engineer Representative
20+680 ( LENGTH 12+380 KMS.)
OF MADHYA PRADESH.
4/30/2023
5/1/2023
JOINTLY
JOINTLY
gms.
gms.
gms.
INDIVIDUAL GRADATION
Sample No : 1 Total Weight = 11705
IS Sieve Size in mm. Wt. Retained in gm. % Wt. Retained Cum % Retained % Passing
Remarks :
4/30/2023
5/1/2023
JOINTLY
JOINTLY
gms.
gms.
Limit as per JMF
gms.
Limit as per JMF
gineer Representative
PROJECT :- FOUR LANNING OF RATAPANI STRETCH FROM KMS. 8+300 TO KMS. 20+680 ( LENGTH 12+380 KMS.)
OFOBEDULLAGANJ- ITARSI SECTION OF NH-46 (OLD NH-69) IN THE STATE OF MADHYA PRADESH.
INDIVIDUAL GRADATION
Sample No : 1 Total Weight = 1000 gms.
IS Sieve Size in mm. Wt. Retained in gm. % Wt. Retained Cum % Retained % Passing Limit as per JMF
Remarks :
INDIVIDUAL GRADATION
Sample No : 1 Total Weight = 100 gms.
IS Sieve Size in mm. Wt. Retained in gm. % Wt. Retained Cum % Retained % Passing Limit as per JMF
Remarks :
EPC Contractor's Representative Authority Engineer Representative
PROJECT :- FOUR LANNING OF RATAPANI STRETCH FROM KMS. 8+300 TO KMS. 20+680 ( LENGTH 12+380
KMS.) OFOBEDULLAGANJ- ITARSI SECTION OF NH-46 (OLD NH-69) IN THE STATE OF MADHYA PRADESH.
Remarks :
EPC Contractor's Representative Authority Engineer Representative
PROJECT :- FOUR LANNING OF RATAPANI STRETCH FROM KMS. 8+300 TO KMS. 20+680 ( LENGTH
12+380 KMS.) OFOBEDULLAGANJ- ITARSI SECTION OF NH-46 (OLD NH-69) IN THE STATE OF MADHYA
PRADESH.
Remarks :
Hydrated
lime
100.00
100.00
100.00
100.00
100.00
100.00
97.33
87.67
PROJECT :- FOUR LANNING OF RATAPANI STRETCH FROM KMS. 8+300 TO KMS. 20+680 ( LENGTH 12+380 KMS.) OFOBEDULLAGANJ- ITARSI
SECTION OF NH-46 (OLD NH-69) IN THE STATE OF MADHYA PRADESH.
PERCENTAGE PASSING
JMF GRAPH
120
100100.00
100
98.29 100
97.5
95
93
82.93
80
78
75
65.45
65
63
60
54 55
46
43.84
42
40
38
35
33.72
28
21 20
14
11.32
8 7
5.37
5
2
0
0.01 0.1 1 10 100
Remarks :
EPC Contractor's Representative Authority Engineer Representative
PROJECT :- FOUR LANNING OF RATAPANI STRETCH FROM KMS. 8+300 TO KMS. 20+680 ( LENGTH 12+380 KMS.) OFOBEDULLAGANJ-
ITARSI SECTION OF NH-46 (OLD NH-69) IN THE STATE OF MADHYA PRADESH.
110
PERCENTAGE PASSING
100
100.00
100 100
98.29
95
93
91 90 90
82.93
80
75 75
72
70
65.45
63
60
58
54 55
50 50
43.84
42
39 40
38
33.72
29 30
28
21 20
15
11.32 10
8
7 7
5.37
3
2
0
0.01 0.1 1 10 100
JMF LOWER LIMIT
Remarks :
Bitumen OBC - 4.3 % Min - 4.0 % (+/-) 0.3 % 4 4.6 4.0 - 4.60
Remarks :
Bulk Specific Gravity of aggregate Gsb 2.761 2.761 2.761 2.761 2.761
Maximum Specific Gravity of paving Mix Gmm 2.666 2.645 2.623 2.602 2.582
Bulk Specific Gravity of compacted mix Gmb 2.446 2.474 2.486 2.512 2.475
Voids in Mineral Aggregate =100-((Gmb*Ps)/Gsb)) VMA 14.07 13.53 13.56 13.11 14.84
Air Voids in the compacted mix=(Gmm-Gmb)/Gmm)*100) Va 8.26 6.45 5.23 3.47 4.13
Voids Filled with Bitumen (Vma-Va)/Vma)*100) Vfb 41.28 52.33 61.41 73.53 72.16
Remarks :
9.000
8.000
Va
2.450
7.000
6.000
2.400
5.000
4.000
2.350 3.000
2.000
2.300 3.0 3.5 4.0 4.5 5.0
3.0 3.2 3.4 3.6BITUMEN
3.8 4.0CONTENT
4.2 4.4 4.6 4.8 5.0 BITUMEN CONTENT
15.0 75.0
70.0
VMA
14.0
VFb
65.0
13.0 60.0
55.0
12.0
50.0
11.0 45.0
40.0
10.0
35.0 3.0 3.2 3.4 3.6 3.8 4.0 4.2 4.4 4.6 4.8 5.0
3.0 3.2 3.4 3.6 3.8 4.0 4.2 4.4 4.6 4.8 5.0
BITUMEN CONTENT BITUMEN CONTENT
4100
5.0
3900
FLOW
3700 4.5
3500
4.0
3300
3100 3.5
2900
3.0
2700
2500 2.5
3.0 3.5 4.0 4.5 5.0 5.5 3.0 3.2 3.4 3.6 3.8 4.0 4.2 4.4 4.6 4.8 5.0
BITUMEN CONTENT BITUMEN CONTENT
REMARKS :
EPC Contractor's Representative Authority Engineer Representative
PROJECT :- FOUR LANNING OF RATAPANI STRETCH FROM KMS. 8+300 TO KMS. 20+680 ( LENGTH 12+380 KMS.)
OFOBEDULLAGANJ- ITARSI SECTION OF NH-46 (OLD NH-69) IN THE STATE OF MADHYA PRADESH.
% Of
Bitumen Wt.In Wt.In S.S.D.W Bulk
Sr.No Volume Stability
by Wt. Air Water t In Air Density
Of Mix
Volume
Corrected
Gmb Reading Load Correcti Flow
Load
on
1 4475.0 2660.0 4485.0 1825.0 2.452 340 2782.6 0.92 2560 3.10
2 3.0 4484.0 2642.0 4490.0 1848.0 2.426 375 3069.0 0.90 2762 2.90
3 4465.0 2660.0 4475.0 1815.0 2.46 315 2578.0 0.92 2372 3.20
1 4496.0 2686.0 4504.0 1818.0 2.473 402 3290.0 0.92 3027 3.50
2 3.5 4433.0 2654.0 4443.0 1789.0 2.478 410 3355.4 0.95 3188 3.40
3 4412.0 2635.0 4420.0 1785.0 2.472 420 3437.3 0.95 3265 3.60
1 4102.0 2460.0 4110.0 1650.0 2.486 430 3519.1 1.09 3836 3.80
2 4.0 4110.0 2465.0 4120.0 1655.0 2.483 400 3273.6 1.09 3568 3.60
3 4202.0 2524.0 4212.0 1688.0 2.489 410 3355.4 1.06 3557 3.50
1 4306.0 2596.0 4311.0 1715.0 2.511 420 3437.3 1.03 3540 4.80
2 4.5 4259.0 2565.0 4262.0 1697.0 2.51 420 3437.3 1.03 3540 4.40
3 4315.0 2605.0 4321.0 1716.0 2.515 430 3519.1 1.03 3625 4.60
1 4269.0 2565.0 4285.0 1720.0 2.482 490 4010.2 1.00 4010 5.20
2 5.0 4286.0 2562.0 4290.0 1728.0 2.48 380 3109.9 1.00 3110 5.10
3 4288.0 2563.0 4304.0 1741.0 2.463 400 3273.6 1.00 3274 5.30
Remarks :
TEST PROPERTIES CURVES FOR HOT MIX DESIGN DATA BY THE MARSHALL METHOD
Bitumen vs VMA
15.00
VMA in %
14.50
Bitumen vs Unit weight
2. 600 14.00
2. 550
13.50
2. 500
2. 450
13.00
2. 400 12.50
2. 350
12.00
2. 300
3.0 3.5 4.0 4.5 5.0 5.5
3.0 3. 5 4.0 4.5 5.0 5.5 6.0
Bitumen vs VFB
80.00
Bitumen Content Vs Stability
VFB in %
4000
70.00
3600
60.00
3200
2800 50.00
2400
40.00
2000
30.00
1600
3.0 3.5 4.0 4.5 5.0 5.5
3.0 3.5 4.0 4.5 5.0 5.5
BITUMEN CONTENT in %
BITUMEN CONTENT in %
AIR VOID S in %
FLOW in mm.
BITUMEN VS FLOW
Bitumen Vs Airvoids 8.0
12.00
11.00 7.0
10.00
6.0
9.00
8.00 5.0
7.00 4.0
6.00
3.0
5.00
4.00 2.0
3.00 3.0 3.5 4.0 4.5 5.0 5.5
3.0 3.5 4.0 4.5 5.0 5.5 6.0 BITUMEN COMTENT in %
BITUMEN CONTENT in %
Remarks :
EPC Contractor's Representative Authority Engineer Representative
PROJECT :- FOUR LANNING OF RATAPANI STRETCH FROM KMS. 8+300 TO KMS. 20+680 ( LENGTH
12+380 KMS.) OFOBEDULLAGANJ- ITARSI SECTION OF NH-46 (OLD NH-69) IN THE STATE OF
MADHYA PRADESH.
VMA
VA
VFB
DENSITY
STABILITY
FLOW
3.0 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
BITUMEN %
PASSING
TOO LOW
TOO HIGH
REMARKS :
63 - 50 -- -- -- --
50 - 40 -- -- -- --
40 - 25 -- -- -- --
REMARKS :
(4.5+4.3+4.4+4.3+4.1+4.2)
Optimum Binder Content =
6
Note :- Air Voids MORT & H Specification Limit Is 3 - 5 % .Average Value 4.0% taken for OBC
Remarks :
INATION
er Representative
PROJECT :- FOUR LANNING OF RATAPANI STRETCH FROM KMS. 8+300 TO KMS. 20+680 ( LENGTH
12+380 KMS.) OFOBEDULLAGANJ- ITARSI SECTION OF NH-46 (OLD NH-69) IN THE STATE OF
MADHYA PRADESH.
Trial 1 2 3
Size Of orifice 4 mm
Viscosity in (Sec ) 38 60 76
Remarks :- Specification limit @ 135 0C is 400 CST (Minimum) As per IS: 73 -2013
EPC Contractor's Representative Authority Engineer Representative
PROJECT :- FOUR LANNING OF RATAPANI STRETCH FROM KMS. 8+300 TO KMS. 20+680 ( LENGTH 12+380 KMS.) OFOBEDULLAGANJ-
ITARSI SECTION OF NH-46 (OLD NH-69) IN THE STATE OF MADHYA PRADESH.
1 0000
La bo ra tory m ixing ra n ge
1 000
100
10
1
12 0
1 40
15 0
1 60
17 0
1 90
20 0
130
180
TEMPERATURE I N CENTIGRADE
LABORATORY MIXING RANGE -150-190 CST TEMPERATURE AT REQUIRED CST - 1750C -1850C
LABORATORY COMPACTION RANGE -250-310 CST TEMPERATURE AT REQUIRED CST - 1580C -1680C
- - - -
A) Gse = Pmm-Pb/((Pmm/Gmm)-(Pb/Gb))
Gse = 100-4.3/((100/2.611)-(4.3/1.030))
Gse= 2.804
B) Gsb =P1+P2+…..+Pn/((P1/G1)+(P2/G2)+…..(Pn/Gn))
Gsb =20+20+21+39/((20/2.859)+(20/2.826)+(21/2.809)+(39/2.659))
Gsb= 2.761
C) Gsa =P1+P2+…..+Pn/((P1/G1)+(P2/G2)+…..(Pn/Gn))
Gsa = 20+20+21+39/((20/2.905)+(20/2.872)+(21/2.883)+(39/2.790))
Gsa = 2.848
REMARKS :
EPC Contractor's Representative Authority Engineer Representative
PROJECT :- FOUR LANNING OF RATAPANI STRETCH FROM KMS. 8+300 TO KMS. 20+680 ( LENGTH 12+380 KMS.) OFOBEDULLAGANJ-
ITARSI SECTION OF NH-46 (OLD NH-69) IN THE STATE OF MADHYA PRADESH.
Tested By : Jointly
Description/Trail No: 1 2
PROJECT :- FOUR LANNING OF RATAPANI STRETCH FROM KMS. 8+300 TO KMS. 20+680 ( LENGTH 12+380
KMS.) OFOBEDULLAGANJ- ITARSI SECTION OF NH-46 (OLD NH-69) IN THE STATE OF MADHYA PRADESH.
Test
MORT & H specification
Sr.No Description Of Test Test Method Result
Limit (Table No -500-18)
Observed
1 Combined Flakiness & Elongation Indice IS : 2386 Part 1 31.70 Max 35 %
2 Aggregate Impact value IS : 2386 Part 4 17.0 Max 27%
3 Water Absorption (Combined ) IS : 2386 Part 3 0.69 Max 2%
4 Retained Stability ASTM:D-1559 89.32% Minimum 80%
Minimum Retained Coating
5 Coating & Stripping Value IS : 6241 98%
95 %
BLENDING OF AGGREGATE :-
Sieve Analysis were carried out for each individual crushed aggregate
The Average Grading were adopted for blending together the combined grading .
A series of blending were made to get different combined grading and Marshall properties Test were
carried out on different grading to find out the best suited properties.
The Proportion of aggregate used is as given below :-
Sr.No Size Of aggregate from Hot Bins % Used by the weight of dry aggregate
The Bitumen was tested in our Laboratory and results are As follows
The Marshall Properties of DBM mix at 4.0 % Binder Content selected for Job mix duly observed
at Laboratory are as follows
CONCLUSION :- The Above properties indicates that bitumen mix to Requirements of MORTH Section
505 Can be achived by adopting the Proposed combined aggrggate Grading with 4.3 %
Bitumen Content
EPC Contractor's Representative Authority Engineer Representative
PROJECT :- FOUR LANNING OF RATAPANI STRETCH FROM KMS. 8+300 TO KMS. 20+680 ( LENGTH
12+380 KMS.) OFOBEDULLAGANJ- ITARSI SECTION OF NH-46 (OLD NH-69) IN THE STATE OF MADHYA
PRADESH.
CLIENT : NATIONAL HIGHWAY AUTHORITY OF INDIA
AUTHORITY ENGINEER : M/S LION ENGINEERING CONSULTANTS PVT. LTD.
EPC CONTRACTOR : M/S BANSAL CONSTRUCTION WORKS PVT. LTD.
DESCRIPTION TEMPERATURE 0 C
Mixed Material ( 0
c) 165 MAXIMUM
Laying ( 0
c) 150 MINIMUM
REMARKS :
REF :
Pouring Temperatu :1350C
PERIOD OF COOLING IN ATMOSPHERE : 1 Hr
Room Temperature : 25 C
O
OBSERVATIONS :
TEMP. AT WHICH
SAMPLE TOUCHES
560C 55.6 0C - - 55.8 0C
BOTTOM PLATE ( IN
CENTIGRADE)
REMARKS Specification
: Limit 50 0C as per IS 73-2013
EPC Contractor's Representative Authority Engineer Representative
PROJECT :- FOUR LANNING OF RATAPANI STRETCH FROM KMS. 8+300 TO KMS. 20+680 ( LENGTH
12+380 KMS.) OFOBEDULLAGANJ- ITARSI SECTION OF NH-46 (OLD NH-69) IN THE STATE OF MADHYA
PRADESH.
Volume
Correcte
Gmb Reading Load Correcti Flow
d Load
on
1 4165.0 2502.0 4170.0 1668.0 2.497 410 3355.4 1.06 3557 3.80
2 4.3 4155.0 2506.0 4161.0 1655.0 2.511 420 3437.3 1.09 3747 3.90
3 4156.0 2501.0 4160.0 1659.0 2.505 390 3191.8 1.09 3479 4.00
1 4152.0 2502.0 4170.0 1668.0 2.489 370 3028.1 1.06 3210 3.80
2 4.3 4161.0 2505.0 4161.0 1656.0 2.513 380 3109.9 1.06 3297 3.50
3 4145.0 2501.0 4160.0 1659.0 2.498 360 2946.2 1.06 3123 3.70
3210
RETAINED STABILITY = 3594
X 100 .= 89.32% > 80%
Remarks :
EPC Contractor's Representative Authority Engineer Representative
1637-1665 1.09
1666-1694 1.06
1695-1723 1.03
1724-1752 1
PROJECT :- FOUR LANNING OF RATAPANI STRETCH FROM KMS. 8+300 TO KMS.
20+680 ( LENGTH 12+380 KMS.) OFOBEDULLAGANJ- ITARSI SECTION OF NH-46 (OLD
NH-69) IN THE STATE OF MADHYA PRADESH.
RFI No. :
Source of Materals panjara stone quarry Date of Sampling 4/30/2023
Location / Chainage 11+300 LHS 100mtr Date of Testing 5/5/2023
Collect From : Stock Yard Sampled By : Jointly
Used For Materals : DBM Tested By : Jointly
3.0 2.666
3.5 2.645
4.0 2.623
4.5 2.602
5.0 2.582
REMARKS :