L727 Galian tanah berbatu 1.7.8.1 (a) Cara manual 1.7.8.1.a (a) Penggalian 1 m3 tanah berbatu sedalam > 0 s.d. 1 m untuk volume 200 s.d 2000 m3 " alan ode | Sataan | Kochinion | HavenSatuan | Jamiab Hares x *: Kode | Satuan | Koefi zp) pl T z z z 5 é 7 A [Tenaga Kerja 1 |Pekena Lot | on 1,3810 2 |Mandor Loa | on 0/1351 ‘Jumiah Harga Tenaga Kena 5 [Bahan 1 I I Tamla Harga Bahan c I D = ‘F|Harge Satuan Pekerjaan per~ m>(D+E) -201- 1.7.8.1.b (a) Penggalian 1 m3 tanah berbatu sedalam > 1m s.d. 2m untuk volume s.d 200 m3 Harga Satuan Jamlah Harga No] Uraian Kode | Satuan | Koefisien ta er T z 3 a 3 é 7 A [Tenaga Kee 1 |Pekena. Lot | o# 1,500 2 |Mandor Loa |_o# 0/150 ‘Jamlah Harga Tenaga Kerja| B [Bahan I I I ‘Jamlah Harga Bahan © [Fevalatan I I I Jumiah Harza Peralatan ‘D_[iumlah Harga Tenaga Kevja, Bahan dan Peralatan (AB-C) E [Biaya ‘dan Keuntungan (Maksimum 15%) | 15%=D. F_|Harga Satuan Pekerjaan per - m?(D+E) D.04 Pompa Dewatering 1) Pengoperasian pompa disesuailan dengan kebutuhan dengan satuan per-jam namun kesiagaan pompa disiapkan dapat beroperasi 24 jam 2) Tersedia 20% pompa cadangan (misallcan untuk 5 buah pompa dioperasikan di jan 1 cadangan). Adapun biaya operasi per 1-buah pompa per-jam dihitung dengan AHSP berikut: D.04.a Pengoperasian per-jam pompa air diesel daya 7,5 KW dengan suction head maks. 3 m dan discharge head maks. 10 m pada suction head 1 m dan discharge head 10 m). (kapasitas 50 L/s Harga | Jumlah No| Uraian Kede | Satuan | Keefisien | Satuan| Harga (Rp) | Ro} T = 6 7 A [Tenaga Kerja Jumilah Harga Tenaga Kerjal 'B [Bahan I I T I Jumlah Haga Bahan C [Peralatan 1 |Pomapa air diesel 7,5 KW: Bees tie £396 | jam 12 Tumlah Harga Peralatan 1D |Jumlab Harga Tenaga Kerja, Bahan dan Peralatan (A'B+C) [Biaya umum dan Keuntungan (Maksirmum 15%) [Tse=D F |Harga Satuan Pekerjaan per - jam (D+E} A.S Pekerjaan Dewatering (Normatif) Berbagai jenis pekerjaan yang dikelompokkan dalam pekerjaan Dewatering meliputi pembuatan dan pemasangan kistdam dan/atau perkuatan dinding serta pemompaan air pada daerah kerja yang analisanya adalah sebagai berikut: D.O1 Kistdam pasir/tanah D.O1.a 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 x 65cm Harga, No Uraian Kode | Satuan | Koefisien | Satuan | “Harga (Rp) {Rp} T 2 a = S 6 7 a [te a t [Peresa Low OH 0,040 2 [Mande L.04 OH 0.004 Jumilah Harga Tenaga Kerja] B [Bahan 1 |Karung plastile/bagor/goni | M.136.a| buah | 1,000 2 | Tali rapia/plastile/rami M15Le | m’ 2,000 3_|Sewa pasir* M.05.b.3| _m* 0,012 Jumlah Harga Bahan © |Peralatan Jumiah Harga Peralatan D_[Jumlah Harga Tenaga Kesja, Bahan dan Peralatan (A+B+C} jaya wanam fungan F_|Harga Satuan Pekerjaan per - buah (D+E) Catatan: —°) Kosfisien dikitung 50% tapi gunakan HSD pasir 100%, jika penggunaan Kisidam seed, paciy dimanfantian Kembali, “) Kode bahan dan harga agar disesusikan dengan yang dicunakan D.01.b 1 Buah kistdam pasir/tanah dibungims karung plastik/bagor/goni/rami atau terpal ukuran 45 x 120 em Harga | Jumlah No Uraian Kode Satuan | Koefisien |Satuan] Harga (Re) iRp) T 3 = EI A [Tenaga Kerja 1 |Pekerja_ Lol OH 0,075 2 |Tukang jahit L.02 OH 0,025 3_|Mandor L.04 OH 0,008 Jumilah Harga Tenaga Kexjal B [Bahan 1 |Karung plastik/pacor/ | M.136.a m 1,300 zoni/terpal 2 |Tali/benang pengikat M.126.b m 2,000 3_|Sewa pasir* M.05.a.2 m? 0.030 Famlah, Eahan| oO [Peralatan I I I Jamlah Harga D_|Jumiah Harga Tenaga Kerja, Sahan dan Feralatan (A+B+C) E |Biaya umum dan Keuntungan (Maksimum 15%) [15% xD. F_|Harga Satuan Pekerjaan per - buah (D+E) Tatatan 7)” Rowtesen GRURE 06 A pypggunaan KECIaR ITAL pun RERTATR “~) Kode bahan dan harga agar disesuaikan dengan yang digunakan 2.a.5.(a) _ Bongkar dan pemanfaatan batu bekas pasangan 2.1. 2.1.2.a.5.a.a) Bongkar 1 m* pasangan batu dan pembersihan batu (manual) Harga Jumlah (Rp) No Uraian Kode | Satuan | Koefisien | Satuan Farge (RD) 2 3 a 5 6 7 Tenaga Kerja Pekerja Lol | oH 1,400 Mandor Los | on 0140 hom >| Jumlah Harga Tenaga Kerja, cs] Bahan T Jumlah Harga Bahan| Peralatan*) Palu/godam (baja keras}|T0.25.b] buah. 0,008 Pahat beton (baja keras) |T0.25.a] buah 0,012 Linggis (baja keras) 70.20 | _buah 0,020 stro Ha Jumlah Harga Peralatan [Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) Biaya umum dan Keuntungan (Maksimum 15%) 15%=D ss|t5) 0) Harga Satuan Pekerjaan per - m° (D+E) -252- 2.1.2.2.5.b.(a) Bongkar 1 m? pasangan batu (manual) Harga | Jumiah No Uraian Kode |Satuan | Koefisien| Satuan | “H: (Rp) (Pel T 2 3 a Ey 6 7 A [Tenaga Kerja 1 |Pekerja. Loi | OH 1,200 2 |Mandor Los | OH 0.120 Jamlah Harga Tenaga Kerja| B [Bahan Jumiah Harga Bahan| |Feraiatan 4) 1 |Palu/godam (baja keras) |To.25.| buah 0,006 2 |Pahat beton (baja keras) |To.25.a| buah 0,009 3 |Linggis (baja keras) 70.20 |_buah 0.020 Jumiah Harga Peralatan| 1D [Jumish Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) E |Biaya umum dan Keuntungan (Maksimum 15%) is%xD F |Harga Satuan Pekerjaan per - m3 (D+E) 4 Jika tidak perlu menggunakan peralatan Khusus (baja keras), maka HSD utk Cisd.C3=0 +*) Hasil pembersihan 1m* pasangan batu yang dibongkar, umumnya menghasilkan 0,55-0,65 m° bata 2.1.2.2.5.c(a) Bongkar 1 m® pasangan batu dengan jack hammer Harga Jumiah No Uraian Kode |Satuan|Koefisien| Satan | Hat Rel (Ra Z z SITs 5 é 7 A |Tenaga Kea 1 [eczene x01 | o# | 0,200 2 (Manor cos | on | 0020 Jumiah Harge Tenaga Kava B Baisa Taian Hage Bann Parasia 1 |Jack hammer (5 KW) + Genset| (2H E1se| Hari | 005 Jumlah Harga Peralatan| aan Haga Tenaga Kegja Bahan den Foraiatan AvEC) © |Biaya umum dan Keuntungan (Malsimum 15%) 15%6=xD F |Harga Satuan Pekerjaan per - m°(D+E) -266- 2.2.2.(a) Campuran Beton untuk lantai, kolom dan balok 2.2.2.1.fa) Pembuatan Campuran Beton Secara Manual 2.2.2.1.a(a) 1 m> beton mutu fe’ 7,4 MPa (K100) Harga | Jumilah No Uraian Kode Satuan | Koefisien Satuan Harga (Rp) iR T z 3 7 5 = A | Tenaga Kerja 1 | Pekerja Lol OH 1,6500 2 |Tukang batu L.a2 OH 0,2750 3 | Kepala tukang L.a3 OH 0,0275 4 |Mandor L.o4 OH 0,1650 Jumiah Harga Tenaga Kerja B |Bahan 1 = |PC / Portland cement M.23, ke 227 2 |PB/ Pasir beton M0503] ke 869 3 |Kr / Kerikil ‘M.04.d.3, ke 1.000 4 [Air M.02.a.3) | Liter 215 Jumiah Harga Bahan C [Peralatan Jumiah Harga Peralatan D [Jumiah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) E |Biaya umum dan Keunt (Maksimum 15%) 15% xD F_|Harga Satuan Pekerjaan per - m?(D+E) 2.2.2.1.b.(e) Membuat 1 m° Beton Mutu f. = 7,4 Mpa (K100) Harga No Uraian Kode | Satuan Koefisien Satuan (Bp) A_| TENAGA Pekerja L.o1 OH 1,650 Tukang batu L.02 OH 0.275 Kepala tukang L.o3 OH 0,028 Mandor L.04 OH 0,083 Jumlah Harga Tenaga Kerja B | BAHAN Semen Portland (SP) ke 247,000 Pasir beton ke 869 Kenkil (Maks 30mm) ke 999 Air Liter" 215 Jumlah Harga Bahan C | PERALATAN, Jumlah Harga Peralatan D_|Jumlah (AsB+C] E | Biaya Umum dan Keunfungan is%=D [Overhead & Profit] (Maksimum 15%) F_| area Satuan Pekerjaan [D+5) -290- 2.2.12.b{c) Pemasangan 1 m*Pondasi Siklop bertulang, 60% beton campuran ISP : 2 PB : 3 Kr dan 40% batu belah Harge Tamlab No Uraian Kode | Satuan | Koefisien | Satuan Harge (Bp) Be) A_[TENAGA Pekexja_ Loi OH 3,400 ‘Tukang batu L.o2 OH 0,850 Kepala tukane 103 OH 0,085, Mandor Los | on 0.170 Tumlah Hares Tenaza Kerja B | BAHAN Batu bela a 7480 Semen Portland Ke 194,000 (SP) Pasir baton = o3i2 Kerildl im 0.468 Besi beton Ke 126,000 Bendrat Ke 1,800 Jumish Harga Bahan | PERALATAN Tamlah harga peralatan D_[Jamlak FEC] E | Biya Umum dan Keuntungan Ts%e=D (Overhead & Profit) Maksimum 15%) F_ | Harga Satuan Pekerjaan [D-E] 2.2.12.b(a) Perbandingan volume 60% Beton : 40% Batu Belah, pakai Molen (1 m3 Beton Sikloop campuran Beton fc’ = 14,5 MPa (K-175) dan. Batu Belah) Harga | Jumiah No. Uraian Kede | Satuan | Koefisien | Satuan | Harga Rp) Rp) 1 2 3 4 5 & 7 ‘A [Tenaga Kerja 1 |Pekerja L.o1 OH 0,8910 2 |Tukang batu L.02 OH 0,2970 3_|Mandor L.o4 OH 0,0891 Jumilah Harga Tenaga Kerjal B [Bahan i |Batu belah M.03.4.3 | m3 0,5810 2 |PC / Portland Cement M23 ke 2275 3 |PB / Pasir Beton M.05.a3| kg 530.5 4 |Ke / Kerilal / Agregat M.04.c3 | kg 718,2 5 |air M.02.0.3)| Liter 150.1 Jumlah Harga Bahaal © |Peralatan ilMolen kapasitas0,3m3_| £.29.c_ | Hai 0.1309 Jumiah Harga Peralatan| D_|Jumiah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) E |Biaya Umum dan Keuntungan(Maksimum 15%) 15% x D| F [Harga Satuan Pekerjaan per - m3 (D+E) TM.04.2..7)__Pembuatan dan Pengecoran 1 m3 Campuran Beton fe! = 26,4 MPa (K-300), Kedap Air Normal 0. iraiann je | satwan | Koefisien | Marea Satuan | Jumlah Targa Nev * Keae | & Kern i (pl T 2 z = 6 7 A. [Fenaga Kega 1 [Pokerja Lor os 0.1606] 19.910,86 3.198,53. 2 |rukang bata Loz oo 0.0803] 23.893,00 1.919,12 3 [Kepaia Tukang, Los ou o.0080| 24,985,741 200,69 4 [Manaor Los ou. o.or61| _24.985.71 02.27 ‘Jumlah Harga Tenaga Kena] 5720.01 B [Bahan >) 1 |PC: Pordand Cement M23 kg, 406] 1.400,00| —_568.400.00 2 |PB: Pasis Beton e.ose3| kg esq] iia.s3| 78,544.22 3 fice Keni / agregae arosas| kg 1026| 11790] 120,961.00 4 [aie M.02.2.3)| Liter 215 26.18, 5,628.87 ‘Jumlah Harga Bahan] 773.534,09 © [Peratatan 1 | Loader, Wheel 1,62 m3; 170 HP p27» | Jam 0.0602) 629,57 37.93 2 |Batching Plant Beton; Kap. 25-75 m3/jam eo3c | Jam 0.0819| 328.279,59| 17,027.28 5 | Truck Mixer Beton - 7 m3; 130 HP esop | am 0.1076, 319.910,29| 34,434,986 4 | Pompa beton 0 6°, 90 KW.130 bar. T-50my/H1s4 £45.q | Jam 0.0201| 210.285,14 4.403,32 5 Concrete Vibrator 45 mun: 10 HP 7o.42 | Jam o.1908| 7876.31 048,05, ‘Jumiah Haga Peralaten| 56,814.51 ‘D_[Jumiah Harga Tenaga Kerja, Bahan dan Poralatan (A=B=C) 336.069,20 © [Biaya Umum dan Keuntungan (Maksimum 15%] 15% =D] 125.410,38. F |Harga Satuan Pekerjaan per m3 (D+) '961.479,50 B.24.c Pembesian 100 m2 dan Wiremess (jaring kawat Kotak) Ferrocement Harga | Jumlah No. Uraian Kode | Satuaa | Koefisien | Satuan | Harga (Rp) (Rp) 1 2 3 4 5 6 7 A [Tenaga Kerja 1 |Pekerja L.O1 OH 0,360 2 |Tukang besi L.02 OH 0,120 3 | Kepala tukeng L.03 | OH 0,012, 4 |Mandor L.o4 OH 0,036 Jumlah Harga Tenaga Kerja, B |Bahan 1 |Tulangan Utama $ 6mm | M.S6.c] Kg 135 2 |Tulangan Bagi 6 4mm M55] Kg 60 3 |Kawat Kasa/Kawat- Kotak/Wiremess M6 M.56.c | m2 102 4. |Kawat tali beton/bendrat_| M.68 | _ke os Jumlah Harga Bahan C |Peralatan Jumlah Harga Peralatan D_|Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (AtB=C) E_[Biaya umum dan Keuntungan (Maksimum 15%) 15% =D F_|Harga Satuan Pekerjaan per - m (D+E} -632- B.11.c 1 m? bekisting lantai beton biasa gunakan papan 3/20 cm (TP) Harga_ | Jumlah No. Uraian Kode |Satuan|Koefisien| Satuan | Harga (Rp) (Rp) I 2 3 a 5 6 7 A |Tenaga Kerja 1 |Pekerja L.o1 | OH 0,300 2 |Tukang kayu L.02 | OH 0,150 3 |Kepala tukang Los | OH 0,015 4 _|Mandor L.o4 | OH 0,030 Jumlah Harga Tenaga Kerja| B [Bahan 1 |Papan 3/20 cm kelas I) M.35.a| m® 0,014 2 |Kaso 5/7 em + M.37.b| ms 0,003 3 |PakuScmdan7om | M.72.be] kg 0,3 4 |Minyak bekisting M.i41 | Liter 0,2 Jumlah Harga Bahan © [Peralatan Jamlah Harga Peralatan 1D [Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (AtB+C) E |Biaya umum dan Keuntungan (Maksimum 15%) is%=D ¥F [Harga Satuan Pekerjaan per - m2 (D+E) CATATAN: * Bahan digunakan berulang kali: yang ke-1, koefisien 0,036 (papan} dan 0,008 (Kaso) yang ke-2, koefisien menjadi 0,022 (papan) dan 0,004 (Kaso) yang ke-3, koefisien menjadi 0,014 (papan) dan 0,003 (Kaso) yang ke-4, koefisien meniadi 0.011 (papan) dan 0.002 (Kaso) B.18.b Bongkar 1 m? bekisting secara hati-hati (termasuk membersihkan dan membereskan puing-puing) *) Harga Jumlah No Uraian Kode | Satuan | Koefisien | Satuan Harga (Rp) (Rp) 1 2 3 4 5 6 7 A_ [Tenaga Kerja 1 |Pekerja Lol | OH 0,060 2_|Mandor L.04 | _OH 0,006 Jumlah Harga Tenaga Kerja\ B [Bahan Jumlah Harga Bahan C_[Peralatan Jumlah Harga Peralatan D_[Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+O) E_|Biaya umum dan Keuntungan (Maksimum 15%) 15% x D F_|Harga Satuan Pekerjaan per - m?(D+E) *) Untuk beton expose dan/atau pemanfaatan kembali bekisting TM.01.1.2.3) _ Menggali Saluren tansh biasa atau tanah lint berpasir kedalaman > 2- 4m dan dimuat ke DT \No.| ‘Uraian Kode | Satuan |Koofision| U*™#* Satuan | Jamlah Harge (Re) (Re) | 1 2 3 3 3 6 7 I ‘A [Tenaga Kerja, | 1 |Pekerja Lor | os | 00193] 19.210,86 385,08 | 2 |Mandor tot | os | o,0019| _24.985,71 48,32 | Jumlah Harga Tenaga Kerja EER B [Bahan I [ I | Jumlah Harga Bahan| | © |Peralatan | 1 |Exavator (Standar) - 125 HP e154] jam | 0.01934] 314,143.83 6,075.54 | Jumlah Harga Peralatan| 6,075.54 1D jumiah Harge tenaga kerja, Bahan dan Peralatan (A*B+O), 6,508.04 | E |Biaya Umum dan Keuntungan (Maksimum 15%) 15% xD 976.34 | F [Marga Satuan Pekerjaan per - m3 (D+E) 7.485,30 | T™M.01.1.a.6) Galian Cadas/Tanah Keras kedalaman 0 - < 2 m; JH+Genset 2KW 1. Uraian Mode | Satuan | Kooftaten | HAré® Setuan | Junmlah Harge | ‘Ep. en | z z z z = é 71 1 [emaga Reva | 1 [Peicers tor | os 0.0884] 19.010,86 1759.12] 2 |Mandor tos | os o.00ss|___24.985,71 22075 | “Tuleh Farge Tenaga Kes Terr | B [Bahan I I I | Tamla Harga Bahaal © Perelman 1 flack Hammer + Genset 2 KW (6 HP) E196 | jam | 0.0884] __30.410,29 2.68685] 2 |Bveavator(Standar| 125 HP E1se | jam | oars] a1s.14189 6.722104 0 ea Fae] Janae No Ursian, Kode | Sstuan | Koefisien | Satwan ey z z = = 7 A [Tenaga Rega 1 [Pekena tor | on 2 |Tukang bat Loz | on 5 [Mander tos | om © [Bahan a |Bara balan agos.es| am 2 | Pasir pasang Mose 3] ine 3 |Poriand cement M23 | ie Ceasar 1 1 i 1D [Jamia Harge Tenaga Kega, Bahan dan Feralatan (A¥B*C) [Biaya umum dan Keunts P[Hargs Satuan Pekerjaan per - a (DE) [Harga Satan Pelerjaan per _ m3 (DE) Hage as No Ursian Kode |Setuan] Woctision] Seika | “Hares ep ict T z z =z = é 7 A [Tenaga Reger 1 [Poker Loi | on 1,000 2 [ruteag bata rez | on | 0\500 3 [Mander os | on | o:100 ‘Jumiah Hares Tenaga Keral = [Bahan 1 [Batu bean M0303] me 1,200 2 |Pasir pasane, M.05.63] me 01520 3 [Portland coment 33 | ee 163 Tamiah Harga Baha] [Pevalatan 1 [Mote kapastas 03. | e320] an | 0.0726 ‘Jumlsh Harz ‘D [Jamiah Harga Tenaga Kerja, Bahan dan Paralatan (A-B+C) [Baya uaum dan Keuatuagen (Malcsimum 15%) 13820 FE 2.2.6.(a) Penulangan beton 2.2.6.1(a) Penulangan 100 kg baja tulangan dengan tulangan polos atau sirip 2.2,6.1,a.(a) Penulangan pelat untuk besi beton $< 12 mm, cara Manual Harga | Jumlah No Uraian Kode | Satuan | Koefisien| Satuan | Harga (Pp) ep) 1 2 3 4 5 6 i A [Tenaga Kerja 1 |Pekerja Lor | on 0,700 2 |Tukang besi Lo2 | on 0,700 3. |Kepala tukang Los | On 0,070 4 |Mandor Loa | on 0,070 Jumiah Harga Tenaga Kerja B [Bahan i |Besi Beton (polos/ulir) | M.60.d| kg 105 2 |Kawat tali beton M72 |__kg 15 Jumiah Harga Bahan| © [Peralatan Jumiah Harga Peralatan D_[Jumlah Haga Tenaga Kerja, Bahan dan Peralatan (A+B+C) E_ |Biaya umum dan Keuntungan (Maksimmam 15%) 15%=D F_|Harga Satuan Pekerjaan per - 100kg(D+E) 2.2.6.1.b.(c) Penulangan 100 kg dengan Besi Polos atau Besi Sirip Hargs Jamlab No Uraian Kode | Satuan | Koefisien | Satuan Harga (Bp) (Bp) A_[TENAGA Pekexja, Lor OF OF Tuleang best L.02 [OH 0.7 Kepela tukang Loz | _O# 0,07 Mando Lot [On 0,04 Jumlab Harga Tenaga Kena B | BAHAN Best beton (polos /ulir) ke 105 Kawat benrad Ee rs TJamlab Harga Bahan C_|PERALATAN Jumlah Harga Peralatan D [Jamia (a-E-C) © [Biya Umum dan Keuntunean 1s%xD (Overhead & Profit) (Maksimum 15%) F_| Hares Satuan Pekerjaan (D+E} 3.2.2.1.(a) Siaran, Plesteran dan Acian 3.2.2.1.1 | Pekerjaan siaran mortar jenis PC-PP untuk 1m? dinding 3.2.2.1.1.a(a) Siaran dengan mortar tipe M, fc’ = 17,2 MPa B.L11.1 _(setara 1 PC: 2 PP) No] Uraian Kode | Satuan | Koefisien Hangs Seems, vee 1 2 3 4 5 6 7 A | Tenaga Kerja 1 | Pekerja L.01 OH 0,200 2 |Tukang bata L.02 OH 0,200 3 |Kepala Tukang L.03 OH 0,020 4 |Mandor L.04 OH 0,020 Jumlah Harga Tenaga Kerjal B |Bahan 1|Pasirpasang |M.05.b.3| mt 0,005 2 |Portiand cement | M33 | keg 2.340 Jumiah Harga Bahan| C |Peralatan Jumiah Peralatan| D [Jumiah Harga Tenaga Kerja, Bahan dan Peralatan (AtB+C) E |Biaya umum dan Keuntunean (Maksimum 15%) 15% xD F [Harga Satuan Pekerjaan per - m? (D+E) 3.2.2.1.2.a(a) Siaran dengan mortar tipe S, fe” = 12,5 MPa (setara 1 PC: 3 PP) No Urai Kode |S Koefisien| area Satuan | Jumlah Harga aan jatuan | Koefisien (Rp) (Rp) 1 2 3 a 5 6 7 A |Tenaga Kerja 1 |Pekerja L.o1 | OH 0,200 2 |Tukang bata L.o2 | OH 0,200 3 |Kepala tukang L.03 | OH 9,020 4 |Mandor L.o¢ | On 0,020 Jamiah Harga Tenaga Kerja| B |Bahan 1|Pasirpasang | M.05.b.3| mt 0,0054 2 [Portland cement | M.23 | kg 1,820 Jumiah Harga Bahan| C [Peralatan Jumiah, Peralatan| D [Jumiah Harga Tenaga Kegja, Bahan dan Peralatan (A+B+C) = [Biava unum dan Keuntungan (Maksimum 15%] 15%xD F [Harga Satuan Pekerjaan per - m?(D+B) -301- 3.2.2.2.(a) 1 m? Pekerjaan plesteran dengan mortar jenis PC-PP 3.2.2.2.14a) Trasraam tebal 1 cm, dengan mortar campuran fe'= 25 MPa, (Setara 1 PC: 1 FP) Nol Uraian Kode |Satuan | Koefisien | #82 Satuan | Jumlah Harga Rel (Re) T 2 3 4 5 6 i A [Tenaga Rega i |Pekerja Loi | on 0,100 2 |Tukang bata ro2 | on 0,100 3 |Kepaiatukang | 03 | OH 0.010 4 |Mandor uo¢_ | on g.010 Jumlah Harga Tenaga Kerjal B Bahan 1|Pasirpasang | M.05.b.3| m* | 0,0107 2 |Portiand cement | M23 | ke 10,336 Jumiah Harga Bahan| C [Peraiatan Jamlah Harga Peralatan| D [Jumiah Harga Tenaga Rega, Bahan dan Peralatan (ATE?) E |Biaya umum dan Keuntungan (Makeimum 15%) i5%=xD F [Harga Satuaa Pekerjaan per - m?(D+E) 3.2.2.2.2(a) Trasraam tebal 1 cm, dengan mortar tipe M, fe? = 17,2 MPa (Setara 1 PC : 2 PP) No] Uraian Kode |Satuan|Koefisien | Hat8aSatuan / Jumlah Harga (Rp) (Re) 1 2 3 4 5 6 7 A [Tenaga Kerja 1 |Pekernja Loi | on 0,100 2 | Tukang batu Lo2 | on 0,100 3 |Kepalatukeng | 03 | OH 0.010 4 |Mandor Loa | on 0.010 Jumiah Harga Tenaga Kerjal B |Bahan 1|Pasirpasang | M.05.0.3| m* | 0.0134 2 |Portiand cement | M23 | ke 6816 Jumlah Harga Bahan| C [Peraiatan Jumlah Harga Feralatan| D |Jumiah Hares Tenaza Kerja, Bahan dan Peralatan (A+B+C) E [Biaya umum dan Keuntungan (Maksimum 15%) 1s%xD F [Harga Satuan Pekerjaan per - m?(D+E) -334- 4.1.11(c) Pemasangan i m Pipa PVC 6 600 mm Jumiab No | Uraian Kode |Satuan | Koefisien | Harga Satuan | yyy. Re) Ro) A_|TENAGA KERJA Pekerja Loi [On O57 Takang pipa L.02 [OH 0479 Mander 1.04 [OH 0,096, JUMLAH HARGA TENAGA KERJA, B_ | BAHAN Fipa FVC @ 600 mm m 1,000 JUMLAH HARGA BAHAN C_[ PERALATAN Sewa Tripot/Tackel hart 0145 JUMLAH HARGA ALAT D_|Jumiah ATO E |Biaya Umum dan Keuntungan]9exD (Maksimum 15%) F_| Harga Satuan Pelrerjaan [D=E) 4.1.12(c) Pemasangan i m Pipa PVC © 800 mm Jumiah No Uraian Kode | Satuan | Koefisien | area Satuan | “poo cs) te A_|TENAGA KERJA Pekerja LO1 [On 1518 Takang pipa L.02 [OH e] Mandor 1.04 [OH 0,162, JUMLAH HARGA TENAGA KERJA, B_ | BAHAN Fipa PVC @ 500 mm = 7,000 JUMLAH HARGA BAHAN C_[PERALATAN Sewa Tripot/Tackel hart 0250, JUMLAH HARGA ALAT D_ | Jumiah (A550) E |Bisya Umum dan Keuntungan|..0exD (Maksieum 15%) F_|Harga Satuan Pekerjaan (75) 1.5.2 Pasangan batu bronjong kawat 1.5.2.1 Pasangan Batu Bronjong kawat dibuat sendiri 1.5.2.1.1 Pasangan batu bronjong kawat dengan lubang Heksagonal 80x100 mm 1.5.2.1.1.a.(a) 1 m3 bronjong kawat digalvanis, lubang heksagonal 80 x 100mm; beda tinggi > 0 s.d. 1m’ No raian Kou | Satuan Harga Satuan | Jumloh Harga (Rp) () i 2 3 a 5 6 7 A. [Tenaga Kerja 1 [Pekerja Penganyam Lot | ox | 0.2887 3. [Pekerja Pengisi Batu tat | of | 0.3300 2. |Dukang (anyamisi bata) voz | on [0.3957 4 |Mandor vot | on [0616 Jumlah Harga Tenaga Kerjé B [Bahan 1 {Batu uk. 12-25cm M03.4.3 | in? 13] 2 |Kawat Bronjong ) 2-4 mm M73.a kg 13,850 3 |Pasir pasang * M.05.b.3 mn 0,432| Jumlah Harga Bahan| © [Peralatan Jumlah Peralatan| D__|Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) © [Biaya Umum dan Keuntungan (Maksimum 15%) 15% xD| _|Harga Satuan Pekerjaan per - m3 (D*E] asa iencnyans esta angen dencan tenth elas [) mas oacgags Eons ea ‘Bronjong yang kentak deagea tanah -279- 2.2.6.{a) Penulangan beton 2.2.6.1{a) Penulangan 100 kg baja tulangan dengan tulangan polos atau sirip 2.2.6.1.a(a) Penulangan pelat untuk besi beton @ < 12 mm, cara Manual Haga | Jumlah No Uraian Kode | Satuan | Koefisien | Satuan Harga (Rp) Rp) T 2 z = 5 6 7 ‘A [Tenaga Kerja 1 |Pekerja. Lo. | on 0,700 2 |Tukang besi Loz | On 9,700 3 |Kepala tukang L.03 OH 0,070 4 |Mandor L.04 | OH 9.070 Jumiah Harga Tenaga Kerja B |Bahan 1 |Besi Beton (polos/ulir) | M.60.d| kg 105 2 |Kawat tali beton M72 |__ ke 15 Jumish Harga Bahan| C |Peralatan Jumiah Harga Peralatan!| D_|Jumiah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) E |Biaya umum dan Keuntungan (Maksimum 15%) 15% =D F Harga Satuan Pekerjaan per - 100kg (D+E) P.09.c_1 m' Peilskaal/Mistar duga muka air (mengacu AHSP Hidrologi) ‘Harga | Jumlah No Uraian Kode |Satuan|Koefisien /Satuan| Har; (Rp) (Rp) T z 3 a 5. © 7 A_ [Tenaga Kena 1 |Pekerja Lo1| On | 0,250 2 |Mandor L.04 | OH | 0,025 3_|Akhli madya(sipil/hidrologi)| L.08 | OH | 0,025 Jumlah Harga Tenaga Kerja| B [Bahan 1 |Mistar Ukur 7 Allumunium.lebar 8 - 15cm M768 mu 1 2* |Pas. bata merah Ipe: 4ps_ |P.02.0.2)| m3 0,09 3* |Batang skoor L.40.40.4 | M.59.d) kg 5,50 4 |Pelat setripg+3x30x300mm | M.s8.f| kg 0,50 5_|Dynabol/raamset 0 8mm-Sem| M.65.a | Buah 4,00 Jumlah Harga Bahan| C JPeralatan 1_|Alat bantu = Ls 1,00 Jumlah Harga Peralatan| ‘D_|Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) E |Biaya Umum dan Keuntungan (Maksimum 15%) 15% x D| F_|Harga Satuan Pekerjaan per - m' (D+E) >) dika dipasang pada dinding tembok/pasangan, Koclisien ini = 0 atau HSD = 0 “201+ 1.7.8.1.b (a) Penggalian 1 m3 tanah berbatu sedalam > 1m s.d. 2m untuk volume s.d 200 m3 No Ural Kode | Satuan | Koefisien | Harga Satuan | Jumiah Harga (Rp) (Rp) I 2 3 4 5 6 7 ‘A [Tenaga Kerja 1 |Pekerja Lo1 | oH 1,500 2 |Mandor Los | oH 0.150 Jumlah Harga Tenaga Kerja B [Bahan [ [ I [ Jumlah Harga Bahan C [Peralatan Jumlah Harga Peralatan ‘D_|Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) E__[Biaya umum dan Keuntungan (Maksimum 15%) 15%xD F_|Harga Satuan Pekerjaan per - m3 (D+E) 1.6.3.(a) 1 m' Pasangan Pipa Suling-suling Harga | Jumlah No Uraian Kode | Satuan | Koefisien | Satuan | Harga (Rp) (Rp) 1 ai 3 4 5 6 7 ‘A | Tenaga Kerja 1. | Pekerja L.01 OH 0,010 2, | Mandor L.04 OH 0,001 Jumlah Harga Tenaga Kerja B | Bahan 1. | Pipa PVC 9 1's.d 02" M.117.b-e | m’ 1,050 2. | qjuk M.43 kg 0,100 3._| Kerikil M.04.b.3 | m3 0,018 Jumlah Harga Bahan C | Peralatan Jumlah Harga Peralatan D_|Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) E_| Biaya Umum dan Keuntungan (Maksimum 15%) 15% xD F_| Harga Satuan Pekerjaan per - m' (D+E) 1.7.13 Timbunan dan pemadatan (termasuk perataan dan perapihan) 1.7.14.a (a) 1 m® Timbunan atau urugan kembali tanah biasa/liat berpasir No| Uraian Kode | Satuan [Koefisien| ars", Satuan | Jumlat Harga i a 3 z 5 6 7 A [Tenaga Kerja 1 [Pekerja Lor | OH 0,100 2. |Mandor Lo4 | On 0,010 Jumlah Harga Tenaga Kerjal B [Bahan 1 [Tanah biasa/liat Iberpasir M.08.4.2| _m3 1,400 Jumlah Harga Bahan| C |[Peralatan [ I Jumlah Harga Peralatan| D_Vumlah Harga Tenaga Kerja, Bahan dan Peralatan (A*B+C) E_|Biaya umum dan Keuntungan (Maksimum 15%) | 15% x D| F_|Harga Satuan Pekerjaan per - m® (D+E) 1.7.14.¢ (a) 1_m Pemadatan tanah Harga__| Jumilah No Uraian Kode | Satuan | Koefisien | Satuan Harga Rp) ip ‘A [Tenaga Kerja 1 |Pekerja Lo1| On 0.0446 2 [Mandor 1.04 | OH 0.0045 Juamiah Harga Tenaga Kerja| 5 [Bahan Jumiah Harga Bahan © /Peralatan 1_|Mesin Stamper, 250kg|E.31.d| Hari 0,0223 Jamlah Harga Peralatan| D [Jumiah Harga Tenaga Kerja, Bahan dan Peralatan (A¥B+C) E |Biaya umum dan Keuntungan (Maksimum 15%) 15% = D| F [Harga Satuan Pelerjaan per - m>(D+E) 2.2.10.(a) Pembongkaran konstruksi beton Perhitungan praktis pembongkaran beton dan atau bertulang ditentukan oleh tingkat mutu beton dan kemudahan pembongkarannya. Pada kondisi normal sering dihitung pembongkaran sekitar 2,5 x upah pembuatan beton. Jika dibutuhkan analisa yang rinci pembongkaran beton bertulang sebagai berikut: 2.2.10.a.{a) Bongkar 1 m* beton dengan Jack hammer Harga | Jumlah No Uraian Kode Satuan | Koefisien Satuan Harga (Rp) (Rp) 1 2 3 4 5 6 7 A [Tenaga Kerja 1 |Pekerja LOL OH 0,200 2 |Mandor 1.04 OH 0,020 Jumlah Harga Tenaga Kerja B |Bahan Jumlah Harga Bahan C |Peralatan 1 | Jack hammer; 12 HP. E.19.a Hari 0,05 Jumlah Harga Peralatan D_[Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) E_|[Biaya umum dan Keuntungan (Maksimum 15%) 15% xD F_|Harga Satuan Pekerjaan per - m°(D+E) 212{6)1id(a) Pembesian kolom, balok, ring balk dan sloof untuk besi beton $< 12mm Harga Jumlah No Uraian Kode | Satuan | Koefisien Satuan Harga (Rp) (RD 1 2 3 4 5 6 7 ‘A [Tenaga Kerja 1 |Pekerja L.01 OH 1,600 2 |Tukang besi L.02 OH 1,600 3. |Kepala tukang L.03 | OH 0,160 4_|Mandor L.04 | OH 0,160 Jumiah Harga Tenaga Kerja B |Bahan 1 |Besi Beton (polos/ulir) | M.60.d | kg 105 2__|Kawat tali beton M.72 | __kg 2.8 Jumilah Harga Bahan C |Peralatan Jumilah Harga Peralatan D_|Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) E__|Biaya umum dan Keuntungan (Maksimum 15%) 15% xD F_|Harga Satuan Pekerjaan per - 100kg (D+E) 1.6 Batu Muka, Batu Candi dan Geotekstil 1.6.1 1 m? Pasangan batu muica dan batu candi .6.1.a,(a)_1 m?Pasangan batu muka : i Farga Jumlab No Uraian Kode Satuan | Koefisien Satuan Hi: is i 1 2 3 4 5 6 7 A [Tenaga Kerja 1 |Pekerja LOL OH 0,240 2 |Tukang batu L.02 OH 0,120 3 |Kepala tukang L.03 OH 0,012 4 |Mandor L.04 OH 0,024 Jumilah B |Bahan 1 |Batu muka M.26.b m? 1,250 2 |Pasir pasang M.03.b.3 | m® 0.025 3 |Portland cement M.23, ke 5,000 Jumiah Harga Bahan C [Peralatan Jumlah Peralatan| D_Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) © |Biaya umum dan Keuntungan (Maksimum 15%) 15% xD F |Harga Satuan Pekerjaan per - m? (D+E) harus menyatu Pematangan batu dicecusizan dengan sperifilrant telmile, cara pemacangan batu dan batu mules mys

You might also like