690 Canton - Bulletin #1 Drawings
690 Canton - Bulletin #1 Drawings
BULLETIN 01 11-16-2022
BULLETIN 01 11-16-2022
BULLETIN 01 11-16-2022
1
IFC 09-19-2022
IFC 09-19-2022
IFC 09-19-2022
Sheet Sheet Sheet
Number Sheet Name Number Sheet Name Number Sheet Name
GENERAL SP-121 2ND FLOOR SPRINKLER PARTIAL FLOOR PLAN (WEST) ● ● M-301 MECHANICAL SECTION SHEET NO. 1 ● ●
T000 TITLE SHEET, LOCUS PLAN AND DRAWING INDEX ● ● SP-122 2ND FLOOR SPRINKLER PARTIAL FLOOR PLAN (EAST) ● ● M-351 MECHANICAL AIR HANDLING UNIT PART PLAN SHEET NO. 1 ●
T001 ARCHITECTURAL NOTES, SYMBOLS, MOUNTING HEIGHTS & ABBREVIATIONS ● SP-123 2ND FLOOR SPRINKLER PARTIAL FLOOR PLAN (NORTH) ● M-352 MECHANICAL MER PART PLAN SHEET ● ●
T002 CODE SUMMARY ● SP-130 3RD FLOOR SPRINKLER FLOOR PLAN (OVERALL) ● ● M-401 MECHANICAL AIR SIDE DIAGRAM ●
T003 EGRESS PLAN ● SP-131 3RD FLOOR SPRINKLER PARTIAL FLOOR PLAN (WEST) ● M-411 MECHANICAL WATER SIDE DIAGRAM ●
T004 CONTROL AREA PLANS ● ● SP-132 3RD FLOOR SPRINKLER PARTIAL FLOOR PLAN (EAST) ● ● M-501 MECHANICAL HOT WATER FLOW DIAGRAM ● ●
T005 SUITE NUMBERING DIAGRAMS ● SP-133 3RD FLOOR SPRINKLER PARTIAL FLOOR PLAN (NORTH) ● M-502 MECHANICAL CHILLED WATER FLOW DIAGRAM ●
SP-140 ROOF LEVEL SPRINKLER FLOOR PLAN (OVERALL) ● M-601 MECHANICAL DETAIL SHEET NO.1 ●
ARCHITECTURE SP-141 ROOF LEVEL SPRINKLER PARTIAL FLOOR PLAN (WEST) ● M-602 MECHANICAL DETAIL SHEET NO.4 ●
AD100 GROUND FLOOR OVERALL DEMOLITION PLAN ● SP-142 ROOF LEVEL SPRINKLER PARTIAL FLOOR PLAN (EAST) ● M-603 MECHANICAL DETAIL SHEET NO.3 ●
AD100.2 GROUND FLOOR DEMOLITION PLAN WEST ● ● SP-143 ROOF LEVEL SPRINKLER PARTIAL FLOOR PLAN (NORTH) ● M-604 MECHANICAL DETAIL SHEET NO.4 ● PRELIMINARY
FOR REVIEW ONLY
AD100.3 GROUND FLOOR DEMOLITION PLAN EAST ● ● SP-600 SPRINKLER SCHEDULES & DETAIL SHEET ● M-605 MECHANICAL DETAIL SHEET NO.5 ●
THESE DOCUMENTS ARE FOR DESIGN REVIEW
AD101 FIRST FLOOR OVERALL DEMOLITION PLAN ● M-606 MECHANICAL DETAIL SHEET NO.7 ● AND NOT INTENDED FOR BIDDING,
AD101.2 FIRST FLOOR DEMOLITION PLAN WEST ● ● PLUMBING M-607 MECHANICAL DETAIL SHEET NO.8 ● CONSTRUCTION, OR PERMIT PURPOSES.
AD101.3 FIRST FLOOR DEMOLITION PLAN EAST ● ● P-001 PLUMBING COVER SHEET AND DRAWING INDEX ● ● M-701 MECHANICAL SCHEDULE SHEET NO. 1 ● THEY WERE PREPARED BY OR UNDER THE
SUPERVISION OF
AD102 SECOND FLOOR OVERALL DEMOLITION PLAN ● DP-100 GROUND FLOOR PLUMBING DEMOLITION PLAN ● M-702 MECHANICAL SCHEDULE SHEET NO. 2 ● CI DESIGN.
AD102.2 SECOND FLOOR DEMOLITION PLAN WEST ● ● DP-101 1ST FLOOR PLUMBING DEMOLITION PLAN ● M-703 MECHANICAL SCHEDULE SHEET NO. 3 ● ●
AD102.3 SECOND FLOOR DEMOLITION PLAN EAST ● ● DP-102 2ND FLOOR PLUMBING DEMOLITION PLAN ● M-704 MECHANICAL SCHEDULE SHEET NO. 4 ●
AD102.4 SECOND FLOOR DEMOLITION PLAN NORTH ● DP-103 3RD FLOOR PLUMBING DEMOLITION PLAN ● M-705 MECHANICAL SCHEDULE SHEET NO. 5 ● ●
AD103 THIRD FLOOR OVERALL DEMOLITION PLAN ● P-100 GROUND FLOOR PLUMBING FLOOR PLAN ● ● M-706 MECHANICAL SCHEDULE SHEET NO. 6 ●
AD103.2 THIRD FLOOR DEMOLITION PLAN WEST ● ● P-101 GROUND FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (WEST) ● ● M-910 MECHANICAL FIRST FLOOR PRESSURIZATION PLAN ● C
AD103.3 THIRD FLOOR DEMOLITION PLAN EAST ● ● P-102 GROUND FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (EAST) ● ● M-920 MECHANICAL SECOND FLOOR PRESSURIZATION PLAN ●
AD103.4 THIRD FLOOR DEMOLITION PLAN NORTH ● P-103 GROUND FLOOR DRAINAGE PARTIAL FLOOR PLAN (WEST) ● ● M-930 MECHANICAL THIRD FLOOR PRESSURIZATION PLAN ●
AD401 ROOF DEMOLITION PLAN ● ● P-104 GROUND FLOOR DRAINAGE PARTIAL FLOOR PLAN (EAST) ● ●
A100 GROUND FLOOR CONSTRUCTION PLAN ● P-105 GROUND FLOOR AIR/VAC PARTIAL FLOOR PLAN (WEST) ● ELECTRICAL N
A100.1 GROUND FLOOR CONSTRUCTION PLAN WEST ● ● P-106 GROUND FLOOR AIR/VAC PARTIAL FLOOR PLAN (EAST) ● E-001 ELECTRICAL COVER SHEET & DRAWING INDEX ● ●
A100.2 GROUND FLOOR CONSTRUCTION PLAN EAST ● ● P-110 1ST FLOOR PLUMBING FLOOR PLAN (OVERALL) ● ● E-002 ELECTRICAL GENERAL NOTES ●
A101 FIRST FLOOR CONSTRUCTION PLAN ● P-111 1ST FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (WEST) ● ● E-003 ELECTRICAL LIGHTING FIXTURE SCHEDULE ●
A101.1 FIRST FLOOR CONSTRUCTION PLAN WEST ● ● P-112 1ST FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (EAST) ● ● ED-100 GROUND FLOOR ELECTRICAL DEMOLITION PLAN ●
A101.2 FIRST FLOOR CONSTRUCTION PLAN EAST ● P-113 1ST FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (NORTH) ● ED-110 1ST FLOOR ELECTRICAL DEMOLITION PLAN ● ●
A102 SECOND FLOOR CONSTRUCTION PLAN ● P-114 1ST FLOOR DRAINAGE PARTIAL FLOOR PLAN (WEST) ● ● ED-120 2ND FLOOR ELECTRICAL DEMOLITION PLAN ●
A102.1 SECOND FLOOR CONSTRUCTION PLAN WEST ● ● P-115 1ST FLOOR DRAINAGE PARTIAL FLOOR PLAN (EAST) ● ● ED-130 3RD FLOOR ELECTRICAL DEMOLITION PLAN ●
A102.2 SECOND FLOOR CONSTRUCTION PLAN EAST ● P-116 1ST FLOOR DRAINAGE PARTIAL FLOOR PLAN (NORTH) ● ED-140 ROOF LEVEL ELECTRICAL DEMOLITION PLAN ●
A102.3 SECOND FLOOR CONSTRUCTION PLAN NORTH ● P-117 1ST FLOOR AIR/VAC PARTIAL FLOOR PLAN (WEST) ● E-100 GROUND FLOOR ELECTRICAL FLOOR PLAN (OVERALL) ● ●
A103 THIRD FLOOR CONSTRUCTION PLAN ● P-118 1ST FLOOR AIR/VAC PARTIAL FLOOR PLAN (EAST) ● E-101 GROUND FLOOR ELECTRICAL PARTIAL POWER PLAN (WEST) ● ●
A103.1 THIRD FLOOR CONSTRUCTION PLAN WEST ● ● P-119 1ST FLOOR AIR/VAC PARTIAL FLOOR PLAN (NORTH) ● E-102 GROUND FLOOR ELECTRICAL PARTIAL POWER PLAN (EAST) ● ●
A103.2 THIRD FLOOR CONSTRUCTION PLAN EAST ● ● P-120 2ND FLOOR PLUMBING FLOOR PLAN (OVERALL) ● E-110 1ST FLOOR ELECTRICAL FLOOR PLAN (OVERALL) ●
A103.3 THIRD FLOOR CONSTRUCTION PLAN NORTH ● P-121 2ND FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (WEST) ● ● E-111 1ST FLOOR ELECTRICAL PARTIAL POWER PLAN (WEST) ●
A200 GROUND FLOOR REFLECTED CEILING PLAN ● P-122 2ND FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (EAST) ● ● E-111.M 1ST FLOOR ELECTRICAL PARTIAL MECHANICAL POWER PLAN (WEST) ● ●
A200.2 GROUND FLOOR REFLECTED CEILING PLAN - WEST ● ● P-123 2ND FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (NORTH) ● E-112 1ST FLOOR ELECTRICAL PARTIAL POWER PLAN (EAST) ●
A200.3 GROUND FLOOR REFLECTED CEILING PLAN - EAST ● ● P-124 2ND FLOOR DRAINAGE PARTIAL FLOOR PLAN (WEST) ● E-112.M 1ST FLOOR ELECTRICAL PARTIAL MECHANICAL POWER PLAN (EAST) ● ●
A201 FIRST FLOOR REFLECTED CEILING PLAN ● P-125 2ND FLOOR DRAINAGE PARTIAL FLOOR PLAN (EAST) ● ● E-120 2ND FLOOR ELECTRICAL FLOOR PLAN (OVERALL) ●
A201.2 FIRST FLOOR REFLECTED CEILING PLAN WEST ● ● P-126 2ND FLOOR DRAINAGE PARTIAL FLOOR PLAN (NORTH) ● E-121 2ND FLOOR ELECTRICAL PARTIAL POWER PLAN (WEST) ●
A201.3 FIRST FLOOR REFLECTED CEILING PLAN EAST ● P-127 2ND FLOOR AIR/VAC PARTIAL FLOOR PLAN (WEST) ● E-121.M 2ND FLOOR ELECTRICAL PARTIAL MECHANICAL POWER PLAN (WEST) ● ●
A202 SECOND FLOOR REFLECTED CEILING PLAN ● P-128 2ND FLOOR AIR/VAC PARTIAL FLOOR PLAN (EAST) ● E-122 2ND FLOOR ELECTRICAL PARTIAL POWER PLAN (EAST) ●
TRUE NORTH N A202.2 SECOND FLOOR REFLECTED CEILING PLAN WEST ● ● P-129 2ND FLOOR AIR/VAC PARTIAL FLOOR PLAN (NORTH) ● E-122.M 2ND FLOOR ELECTRICAL PARTIAL MECHANICAL POWER PLAN (EAST) ● ●
PROJECT NORTH
A202.3 SECOND FLOOR REFLECTED CEILING PLAN EAST ● P-130 3RD FLOOR PLUMBING FLOOR PLAN (OVERALL) ● E-123 2ND FLOOR ELECTRICAL PARTIAL POWER PLAN (NORTH) ●
A202.4 SECOND FLOOR REFLECTED CEILING PLAN NORTH ● P-131 3RD FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (WEST) ● ● E-130 3RD FLOOR ELECTRICAL FLOOR PLAN (OVERALL) ●
A203 THIRD FLOOR REFLECTED CEILING PLAN ● P-132 3RD FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (EAST) ● ● E-131 3RD FLOOR ELECTRICAL PARTIAL POWER PLAN (WEST) ● ●
A203.2 THIRD FLOOR REFLECTED CEILING PLAN WEST ● ● P-133 3RD FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (NORTH) ● E-131.M 3RD FLOOR ELECTRICAL PARTIAL MECHANICAL POWER PLAN (WEST) ● ●
N A203.3 THIRD FLOOR REFLECTED CEILING PLAN EAST ● ● P-134 3RD FLOOR DRAINAGE PARTIAL FLOOR PLAN (WEST) ● ● E-132 3RD FLOOR ELECTRICAL PARTIAL POWER PLAN (EAST) ●
A203.4 THIRD FLOOR REFLECTED CEILING PLAN NORTH ● P-135 3RD FLOOR DRAINAGE PARTIAL FLOOR PLAN (EAST) ● ● E-132.M 3RD FLOOR ELECTRICAL PARTIAL MECHANICAL POWER PLAN (EAST) ● ●
LOCUS A300
A300.2
GROUND FLOOR FINISH PLAN
GROUND FLOOR FINISH PLAN - WEST
●
● ●
P-136
P-137
3RD FLOOR DRAINAGE PARTIAL FLOOR PLAN (NORTH)
3RD FLOOR AIR/VAC PARTIAL FLOOR PLAN (WEST)
●
●
E-133
E-140
3RD FLOOR ELECTRICAL PARTIAL POWER PLAN (NORTH)
ROOF LEVEL ELECTRICAL FLOOR PLAN (OVERALL)
●
●
A300.3 GROUND FLOOR FINISH PLAN - EAST ● P-138 3RD FLOOR AIR/VAC PARTIAL FLOOR PLAN (EAST) ● E-141 ROOF LEVEL ELECTRICAL PARTIAL POWER PLAN (WEST) ●
A301 FIRST FLOOR FINISH PLAN ● P-139 3RD FLOOR AIR/VAC PARTIAL FLOOR PLAN (NORTH) ● E-142 ROOF LEVEL ELECTRICAL PARTIAL POWER PLAN (EAST) ●
A301.2 FIRST FLOOR FINISH PLAN - WEST ● ● P-140 ROOF LEVEL PLUMBING FLOOR PLAN (OVERALL) ● E-143 ROOF LEVEL ELECTRICAL PARTIAL POWER PLAN (NORTH) ●
A301.3 FIRST FLOOR FINISH PLAN - EAST ● ● P-141 ROOF LEVEL PLUMBING PARTIAL FLOOR PLAN (WEST) ● ● E-200 GROUND FLOOR ELECTRICAL REFLECTED CEILING PLAN (OVERALL) ●
A302 SECOND FLOOR FINISH PLAN ● P-142 ROOF LEVEL PLUMBING PARTIAL FLOOR PLAN (EAST) ● E-201 GROUND FLOOR ELECTRICAL PARTIAL REFLECTED CEILING PLAN (WEST) ● ●
A302.2 SECOND FLOOR FINISH PLAN - WEST ● ● P-143 ROOF LEVEL PLUMBING PARTIAL FLOOR PLAN (NORTH) ● E-202 GROUND FLOOR ELECTRICAL PARTIAL REFLECTED CEILING PLAN (EAST) ●
A302.3 SECOND FLOOR FINISH PLAN - EAST ● ● P-400 PLUMBING DOMESTIC WATER RISER DIAGRAM ● ● E-210 1ST FLOOR ELECTRICAL REFLECTED CEILING PLAN (OVERALL) ● B
CLIENT: J. CALNAN
A401 ROOF CONSTRUCTION PLAN ● ● MD-130 3RD FLOOR MECHANICAL DEMOLITION PLAN ● E-603 ELECTRICAL - DETAILS SHEET NO. 4 ●
A700 ELEVATOR PLANS, SECTIONS & DETAILS ● MD-140 ROOF LEVEL MECHANICAL DEMOLITION PLAN ● E-700 ELECTRICAL - SCHEDULES SHEET NO. 1 ●
WESTWOOD, MA
A800 ELEVATIONS ● ● M-100 GROUND FLOOR MECHANICAL FLOOR PLAN (OVERALL) ● ● E-701 ELECTRICAL - SCHEDULES SHEET NO. 2 ●
A850 ROOF AND WALL PENETRATION DETAILS ● M-101 GROUND FLOOR MECHANICAL PARTIAL FLOOR PLAN (WEST) ● ● E-702 ELECTRICAL - SCHEDULES SHEET NO. 3 ● ●
A900 PARTITION TYPES ● M-102 GROUND FLOOR MECHANICAL PARTIAL FLOOR PLAN (EAST) ● ● E-703 ELECTRICAL - SCHEDULES SHEET NO. 4 ● ●
A901 DETAILS ● M-110 1ST FLOOR MECHANICAL FLOOR PLAN (OVERALL) ● ● E-704 ELECTRICAL - SCHEDULES SHEET NO. 5 ● ●
A920 SCHEDULE ● ● M-111 1ST FLOOR MECHANICAL PARTIAL FLOOR PLAN (WEST) ● ● E-705 ELECTRICAL - SCHEDULES SHEET NO. 6 ● ●
M-112 1ST FLOOR MECHANICAL PARTIAL FLOOR PLAN (EAST) ● ● E-706 ELECTRICAL - SCHEDULES SHEET NO. 7 ● ●
STRUCTURAL M-120 2ND FLOOR MECHANICAL FLOOR PLAN (OVERALL) ● ● E-707 ELECTRICAL - SCHEDULES SHEET NO. 8 ● ●
S000 GENERAL NOTES I ● M-121 2ND FLOOR MECHANICAL PARTIAL FLOOR PLAN (WEST) ● ● E-708 ELECTRICAL - SCHEDULES SHEET NO. 9 ● ●
S001 GENERAL NOTES II ● M-122 2ND FLOOR MECHANICAL PARTIAL FLOOR PLAN (EAST) ● ●
S100 PART PLAN - (EXISTING) FOUNDATION/ GROUND FLOOR ● M-123 2ND FLOOR MECHANICAL PARTIAL FLOOR PLAN (NORTH) ● FIRE ALARM
S101 PART PLAN - (EXISTING) FIRST FLOOR FRAMING ● M-130 3RD FLOOR MECHANICAL FLOOR PLAN (OVERALL) ● ● FA-000 FIRE ALARM - NOTES, SYMBOLS & DRAWING INDEX ● ●
S102 PART PLAN - (EXISTING) SECOND FLOOR FRAMING ● M-131 3RD FLOOR MECHANICAL PARTIAL FLOOR PLAN (WEST) ● ● DFA-100 GROUND FLOOR FIRE ALARM DEMOLITION PLAN ● ●
S103 PART PLAN - (EXISTING) THIRD FLOOR FRAMING ● M-132 3RD FLOOR MECHANICAL PARTIAL FLOOR PLAN (EAST) ● ● DFA-110 1ST FLOOR FIRE ALARM DEMOLITION PLAN ●
S104A PART PLAN - (EXISTING) ROOF FRAMING - WEST ● M-133 3RD FLOOR MECHANICAL PARTIAL FLOOR PLAN (NORTH) ● DFA-120 2ND FLOOR FIRE ALARM DEMOLITION PLAN ●
S104B PART PLAN - (EXISTING) ROOF FRAMING - EAST ● ● M-140 ROOF LEVEL MECHANICAL FLOOR PLAN (OVERALL) ● ● DFA-130 3RD FLOOR FIRE ALARM DEMOLITION PLAN ●
S105 (NEW) DUNNAGE FRAMING PLAN ● ● M-141 ROOF LEVEL MECHANICAL PARTIAL FLOOR PLAN (NORTH) ● ● FA-100 GROUND FLOOR FIRE ALARM FLOOR PLAN (OVERALL) ●
S200 CONCRETE DETAILS I ● M-142 ROOF LEVEL MECHANICAL PARTIAL FLOOR PLAN (EAST) ● ● FA-101 GROUND FLOOR FIRE ALARM PARTIAL FLOOR PLAN (WEST) ● ●
S300 STEEL DETAILS I ● M-143 ROOF LEVEL MECHANICAL PARTIAL FLOOR PLAN (NORTH) ● FA-102 GROUND FLOOR FIRE ALARM PARTIAL FLOOR PLAN (EAST) ●
S301 STEEL DETAILS II ● M-200 GROUND FLOOR MECHANICAL PIPING FLOOR PLAN (OVERALL) ● ● FA-110 1ST FLOOR FIRE ALARM FLOOR PLAN (OVERALL) ●
S302 STEEL DETAILS III ● M-201 GROUND FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (WEST) ● ● FA-111 1ST FLOOR FIRE ALARM PARTIAL FLOOR PLAN (WEST) ●
1 11/16/2022 BULLETIN 01
S400 SECTIONS AND DETAILS I ● M-202 GROUND FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (EAST) ● ● FA-112 1ST FLOOR FIRE ALARM PARTIAL FLOOR PLAN (EAST) ●
S401 SECTIONS AND DETAILS II ● M-210 1ST FLOOR MECHANICAL PIPING FLOOR PLAN (OVERALL) ● FA-120 2ND FLOOR FIRE ALARM FLOOR PLAN (OVERALL) ●
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
M-211 1ST FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (WEST) ● FA-121 2ND FLOOR FIRE ALARM PARTIAL FLOOR PLAN (WEST) ●
DELIVERABLE: CONSTRUCTION
SPRINKLER M-212 1ST FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (EAST) ● FA-122 2ND FLOOR FIRE ALARM PARTIAL FLOOR PLAN (EAST) ●
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
SP-001 SPRINKLER COVER SHEET AND DRAWING INDEX ● ● M-220 2ND FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (OVERALL) ● ● FA-123 2ND FLOOR FIRE ALARM PARTIAL FLOOR PLAN (NORTH) ● ISSUE DATE: SEPTEMBER 19, 2022
DSP-100 GROUND FLOOR SPRINKLER DEMOLITION PLAN ● M-221 2ND FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (WEST) ● ● FA-130 3RD FLOOR FIRE ALARM FLOOR PLAN (OVERALL) ● Copyright (c) by CI Design,Inc. All Rights Reserved.
DSP-101 1ST FLOOR SPRINKLER DEMOLITION PLAN ● ● M-222 2ND FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (EAST) ● ● FA-131 3RD FLOOR FIRE ALARM PARTIAL FLOOR PLAN (WEST) ● DRAWN BY: AC
DSP-102 2ND FLOOR SPRINKLER DEMOLITION PLAN ● ● M-223 2ND FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (NORTH) ● FA-132 3RD FLOOR FIRE ALARM PARTIAL FLOOR PLAN (EAST) ●
CHECKED BY: LG/BR
DSP-103 3RD FLOOR SPRINKLER DEMOLITION PLAN ● ● M-230 3RD FLOOR MECHANICAL PIPING FLOOR PLAN (OVERALL) ● FA-133 3RD FLOOR FIRE ALARM PARTIAL FLOOR PLAN (NORTH) ●
PROJECT NUMBER: JA22019
SP-100 GROUND FLOOR SPRINKLER FLOOR PLAN ● ● M-231 3RD FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (WEST) ● FA-140 ROOF LEVEL FIRE ALARM FLOOR PLAN (OVERALL) ●
SHEET TITLE:
SP-101 GROUND FLOOR SPRINKLER PARTIAL FLOOR PLAN (WEST) ● ● M-232 3RD FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (EAST) ● ● FA-400 FIRE ALARM RISER DIAGRAM ●
SP-102 GROUND FLOOR SPRINKLER PARTIAL FLOOR PLAN (EAST) ● M-233 3RD FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (NORTH) ● TITLE SHEET, LOCUS
SP-110 1ST FLOOR SPRINKLER FLOOR PLAN (OVERALL) ● ● M-240 ROOF LEVEL MECHANICAL PIPING PARTIAL FLOOR PLAN (OVERALL) ● ●
SP-111 1ST FLOOR SPRINKLER PARTIAL FLOOR PLAN (WEST) ● M-241 ROOF LEVEL MECHANICAL PIPING PARTIAL FLOOR PLAN (WEST) ● ● PLAN AND DRAWING
SP-112 1ST FLOOR SPRINKLER PARTIAL FLOOR PLAN (EAST) ● ● M-242 ROOF LEVEL MECHANICAL PIPING PARTIAL FLOOR PLAN (EAST) ● ●
SP-113 1ST FLOOR SPRINKLER PARTIAL FLOOR PLAN (NORTH) ● M-243 ROOF LEVEL MECHANICAL PIPING PARTIAL FLOOR PLAN (NORTH) ● INDEX
11/16/2022 4:58:41 PM
SHEET NUMBER:
5 4 3 2 1 T000
2 HR RATED SEPARATION ARCHITECTURE PLANNING INTERIORS
MAX % BUILDING LEVEL CONTROL AREA PLAN LEGEND LANDSCAPE ARCHITECTURE GRAPHICS
75% NOTE: ALL HORIZONTAL CONTRUCTION AND SUPPORTING STRUCTURE BETWEEN CONTROL D
CONTROL AREA 1G CONTROL AREA 2G CONTROL AREA 3G GROUND B AREAS WILL BE 2 HOUR FIRE RATED.
AREA #2G
C
CONTROL
CONTROL
AREA #1
AREA #2
CLIENT: J. CALNAN
WESTWOOD, MA
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
CONTROL CONTROL
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
5 4
SCALE:1 : 300
3 2 1
SCALE:1 : 300
T004
DEMOLITION PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
1 2 3 4 5 12. REMOVE FROM THE CONSTRUCTION SITE, AT THE EARLIEST POSSIBLE TIME, ALL
DEBRIS, RUBBISH, SALVAGED ITEMS, COMBUSTIBLE, AND OTHER MATERIALS
RESULTING FROM DEMOLITION. AREA OF DEMOLITION TO BE LEFT BROOM CLEAN.
COORDINATE DEBRIS REMOVAL CONTAINER LOCATION WITH BUILDING OWNER.
E
STORAGE STORAGE 16. DIMENSIONS ARE TAKEN TO THE FACE OF EXISTING WALLS AND EQUIPMENT U.N.O.
D03 006 007 PRELIMINARY
17. CLEARLY MARK LOCATION AND EXTENT OF CUTTING AND PATCHING PRIOR TO FOR REVIEW ONLY
D04 WOMENS COMMENCEMENT OF WORK TO MINIMIZE DEMOLITION.
D03 MECH. D05 THESE DOCUMENTS ARE FOR DESIGN REVIEW
D05 D06 D03 015 AND NOT INTENDED FOR BIDDING,
010 18. ANY ITEMS INDICATED TO BE REMOVED AND SALVAGED REMAIN OWNER'S
D25 CONSTRUCTION, OR PERMIT PURPOSES.
D04 D06 PROPERTY. REMOVE, CLEAN, LABEL, AND DELIVER TO OWNER'S DESIGNATED THEY WERE PREPARED BY OR UNDER THE
D04
ELEC. CELL SITE CLOSET STORAGE AREA. SUPERVISION OF
FIRE PUMP MAIL CI DESIGN.
013 021
CLEANING CLOSET 009 018
LOADING 003
F 002 BLDG MGMT
7' - 11" 8' - 11" 5' - 3" 6' - 4" 1' - 1" C
016
EMR. DEMOLITION PLAN LEGEND
022
D20 D20 N
CORRIDOR EXISTING FLOORING TO REMAIN AS INDICATED
D03
008 3' - 4" 6" 11' - 6" 1' - 10" 6' - 0" 9' - 9" LOBBY
017
ELEV.
3' - 4" 1' - 1"
PARTITION TO BE DEMOLISHED
D26 019
D20 D20 D20
9' - 1"
DOOR AND FRAME TO BE DEMOLISHED
D20 D02
D24
D24
CLIENT: J. CALNAN
D23 REMOVE PORTION OF CEILING AS REQUIRED FOR INSTALLATION OF NEW
MEP SYSTEMS. REINSTALL TO UNIFORM FINISH.
WESTWOOD, MA
D24 REMOVE PARKING SPACE.
I D25 REMOVE CAGED STORAGE.
D26 REMOVE PORTION OF CMU WALL TO ACCEPT THE NEW LOUVER.
COORDINATE WITH MEP AND STRUCTURAL DRAWINGS.
D27 REMOVE WALL TILE.
D28 REMOVE WOOD TRIM AT OPENING.
D29 REMOVE OVERHEAD DOOR.
D30 REMOVE PORTION OF SLAB FOR NEW 3'X3'X5' PIT. COORDINATE WITH NEW
WORK AND MEP DRAWINGS.
1
GENERATOR
031
2 / AD100.3
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
GROUND FLOOR
DEMOLITION PLAN
WEST
11/16/2022 4:58:07 PM
5 4 3 2
SCALE: 1/8" = 1'-0"
1 AD100.2
DEMOLITION PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
10 11 12 13 14 12. REMOVE FROM THE CONSTRUCTION SITE, AT THE EARLIEST POSSIBLE TIME, ALL
DEBRIS, RUBBISH, SALVAGED ITEMS, COMBUSTIBLE, AND OTHER MATERIALS
RESULTING FROM DEMOLITION. AREA OF DEMOLITION TO BE LEFT BROOM CLEAN.
COORDINATE DEBRIS REMOVAL CONTAINER LOCATION WITH BUILDING OWNER.
E
13. INTEGRITY AND RATING OF ALL FIREPROOFING AND RATED PARTITIONS ARE TO BE
LIMIT OF BUILDING MAINTAINED DURING DEMOLITION.
ABOVE
14. MAINTAIN AND PROTECT EXISTING UTILITIES TO REMAIN OPERATIONAL DURING
DEMOLITION BEFORE PROCEEDING WITH WORK. COORDINATE WITH LOCAL
AUTHORITIES AS REQUIRED.
FITNESS 15. ERECT AND MAINTAIN PASSAGEWAYS IN ORDER TO PROVIDE SAFE PASSAGE FOR
020 PERSONS AROUND AREA OF DEMOLITION AND CONDUCT ALL DEMOLITION
OPERATIONS IN A MANNER THAT WILL PREVENT DAMAGE TO STRUCTURES,
ADJACENT BUILDING, AND ALL PERSONS.
16. DIMENSIONS ARE TAKEN TO THE FACE OF EXISTING WALLS AND EQUIPMENT U.N.O.
PRELIMINARY
17. CLEARLY MARK LOCATION AND EXTENT OF CUTTING AND PATCHING PRIOR TO FOR REVIEW ONLY
COMMENCEMENT OF WORK TO MINIMIZE DEMOLITION. THESE DOCUMENTS ARE FOR DESIGN REVIEW
AND NOT INTENDED FOR BIDDING,
18. ANY ITEMS INDICATED TO BE REMOVED AND SALVAGED REMAIN OWNER'S CONSTRUCTION, OR PERMIT PURPOSES.
PROPERTY. REMOVE, CLEAN, LABEL, AND DELIVER TO OWNER'S DESIGNATED THEY WERE PREPARED BY OR UNDER THE
CELL SITE CLOSET STORAGE AREA. SUPERVISION OF
CI DESIGN.
021
F
C
EMR.
CORRIDOR
028
DEMOLITION PLAN LEGEND
STORAGE STORAGE
022
CELL SITE CLOSET 024 025 N
STORAGE
023 EXISTING FLOORING TO REMAIN AS INDICATED
D26 026 STORAGE STORAGE
029 030
STAIR
DOOR AND FRAME TO BE DEMOLISHED
027
D20
D24
CLIENT: J. CALNAN
D23 REMOVE PORTION OF CEILING AS REQUIRED FOR INSTALLATION OF NEW
MEP SYSTEMS. REINSTALL TO UNIFORM FINISH.
WESTWOOD, MA
D24 REMOVE PARKING SPACE.
I D25 REMOVE CAGED STORAGE.
D26 REMOVE PORTION OF CMU WALL TO ACCEPT THE NEW LOUVER.
COORDINATE WITH MEP AND STRUCTURAL DRAWINGS.
D27 REMOVE WALL TILE.
D28 REMOVE WOOD TRIM AT OPENING.
D29 REMOVE OVERHEAD DOOR.
D30 REMOVE PORTION OF SLAB FOR NEW 3'X3'X5' PIT. COORDINATE WITH NEW
WORK AND MEP DRAWINGS.
1
A1 / AD100.2
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
GROUND FLOOR
DEMOLITION PLAN
EAST
11/16/2022 4:58:09 PM
5 4 3 2
SCALE: 1/8" = 1'-0"
1 AD100.3
DEMOLITION PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
D13 14. MAINTAIN AND PROTECT EXISTING UTILITIES TO REMAIN OPERATIONAL DURING
DEMOLITION BEFORE PROCEEDING WITH WORK. COORDINATE WITH LOCAL
OFFICE AUTHORITIES AS REQUIRED.
CONFERENCE 112
D05 15. ERECT AND MAINTAIN PASSAGEWAYS IN ORDER TO PROVIDE SAFE PASSAGE FOR
117 PERSONS AROUND AREA OF DEMOLITION AND CONDUCT ALL DEMOLITION
D04
LOBBY OPERATIONS IN A MANNER THAT WILL PREVENT DAMAGE TO STRUCTURES,
RECEPTION 102 ADJACENT BUILDING, AND ALL PERSONS.
D27 STAIR
103 16. DIMENSIONS ARE TAKEN TO THE FACE OF EXISTING WALLS AND EQUIPMENT U.N.O.
D28 198
PRELIMINARY
17. CLEARLY MARK LOCATION AND EXTENT OF CUTTING AND PATCHING PRIOR TO FOR REVIEW ONLY
COMMENCEMENT OF WORK TO MINIMIZE DEMOLITION. THESE DOCUMENTS ARE FOR DESIGN REVIEW
AND NOT INTENDED FOR BIDDING,
18. ANY ITEMS INDICATED TO BE REMOVED AND SALVAGED REMAIN OWNER'S CONSTRUCTION, OR PERMIT PURPOSES.
D08 PROPERTY. REMOVE, CLEAN, LABEL, AND DELIVER TO OWNER'S DESIGNATED THEY WERE PREPARED BY OR UNDER THE
STORAGE AREA. SUPERVISION OF
D07 CI DESIGN.
D07 INTERVIEW CORRIDOR
OFFICE OFFICE OFFICE D15 OFFICE COPY OFFICE 110
D15 COFFEE CLO. 196
116 115 113 109 108 107
F 114 111
COATS C
106 DEMOLITION PLAN LEGEND
11' - 7" 9' - 9" STAIR
COATS
1 195
4' - 7" 104 CLO. N
194 EXISTING FLOORING TO REMAIN AS INDICATED
ELEV.
PARTITION TO BE DEMOLISHED
STAIR 019
OFFICE ELEC.
199
9' - 8"
CONFERENCE CONFERENCE D02
118 193 DOOR AND FRAME TO BE DEMOLISHED
128 129 ELEVATOR LOBBY
TRAINING 111
D14 D14
19' - 3"
9' - 1"
132
119 133 110
PHONE
131 EXISTING DOOR AND FRAME TO REMAIN
G IDF
134
D08
OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE CALL PLAYBACK COFFEE OFFICE
DEMOLITION PLAN KEY NOTES
120 D07 121 122 123 124 125 126 137 138
D13 136
COATS D01 REMOVE PORTION OF SLAB FOR NEW SHAFT. COORDINATE WITH
135 AV CONSTRUCTION PLAN AND STRUCTURAL DRAWINGS.
VESTIBULE 148 D02 REMOVE PORTION OF SLAB FOR NEW ELEVATOR. COORDINATE WITH
145 CONSTRUCTION PLAN AND STRUCTURAL DRAWINGS
D03 UNLESS NOTED OTHERWISE REMOVE ALL CEILINGS, LIGHT FIXTURES,
DIFFUSERS AND DEVICES. COORDINATE WITH MEP DRAWINGS.
SEATING D04 UNLESS NOTED OTHERWISE REMOVE FLOORING AND WALL BASE.
153 D05 EXISTING CEILING TO REMAIN.
D06 EXISTING FLOORING AND BASE TO REMAIN.
SERVERY D07 REMOVE CASEWORK.
D03 D04 146 D08 REMOVE CASEWORK, SINK, FAUCET AND ASSOCIATED PLUMBING.
OFFICE OFFICE COORDINATE WITH MEP DRAWINGS.
TYP. BOARD ROOM D09 REMOVE STAIR TREADS, RISERS, HANDRAILS AND ASSOCIATED
140 139
149 STRUCTURE. COORDINATE WITH STRUCTURAL DWGS.
D10 REMOVE RAISED FLOORING IN ITS ENTIRETY. REMOVE ASSOCIATED STAIRS, B
CLIENT: J. CALNAN
D23 REMOVE PORTION OF CEILING AS REQUIRED FOR INSTALLATION OF NEW
150 MEP SYSTEMS. REINSTALL TO UNIFORM FINISH.
WESTWOOD, MA
D24 REMOVE PARKING SPACE.
I D25 REMOVE CAGED STORAGE.
D26 REMOVE PORTION OF CMU WALL TO ACCEPT THE NEW LOUVER.
COORDINATE WITH MEP AND STRUCTURAL DRAWINGS.
D27 REMOVE WALL TILE.
D28 REMOVE WOOD TRIM AT OPENING.
D29 REMOVE OVERHEAD DOOR.
D30 REMOVE PORTION OF SLAB FOR NEW 3'X3'X5' PIT. COORDINATE WITH NEW
WORK AND MEP DRAWINGS.
1
A1 / AD101.3
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
DRAWN BY: UE
CHECKED BY: LG/BR
PROJECT NUMBER: JA22019
SHEET TITLE:
FIRST FLOOR
DEMOLITION PLAN
WEST
11/16/2022 4:58:16 PM
5 4 3 2
SCALE: 1/8" = 1'-0"
1 AD101.2
DEMOLITION PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
19' - 7"
188 EXISTING WINDOW TO BE DEMOLISHED
D01
COMPUTER ROOM UPS UPS
166 172 173 OFFICE
EXISTING PARTITION TO REMAIN
176
D03 D04 1
TYP. D13
EXISTING DOOR AND FRAME TO REMAIN
G
CLIENT: J. CALNAN
D23 REMOVE PORTION OF CEILING AS REQUIRED FOR INSTALLATION OF NEW
150 D13 MEP SYSTEMS. REINSTALL TO UNIFORM FINISH.
WESTWOOD, MA
D24 REMOVE PARKING SPACE.
I D25 REMOVE CAGED STORAGE.
D26 REMOVE PORTION OF CMU WALL TO ACCEPT THE NEW LOUVER.
COORDINATE WITH MEP AND STRUCTURAL DRAWINGS.
D27 REMOVE WALL TILE.
D28 REMOVE WOOD TRIM AT OPENING.
D29 REMOVE OVERHEAD DOOR.
D30 REMOVE PORTION OF SLAB FOR NEW 3'X3'X5' PIT. COORDINATE WITH NEW
WORK AND MEP DRAWINGS.
1
A1 / AD101.2
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
DRAWN BY: UE
CHECKED BY: LG/BR
PROJECT NUMBER: JA22019
SHEET TITLE:
FIRST FLOOR
DEMOLITION PLAN
EAST
11/16/2022 4:58:20 PM
5 4 3 2
SCALE: 1/8" = 1'-0"
1 AD101.3
DEMOLITION PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
9' - 8"
307 308 D01 326
ELEC. DOOR AND FRAME TO BE DEMOLISHED
BREAK 329
18' - 11"
319
PANTRY EXISTING WINDOW TO BE DEMOLISHED
CONFERENCE IT OFFICE OFFICE OFFICE OFFICE OFFICE D08
293
306 325 324 323 322 321 320
8' - 10"
OFFICE OFFICE SERVER EXISTING PARTITION TO REMAIN
D08
290 291 292 CORRIDOR
327 EXISTING DOOR AND FRAME TO REMAIN
G
10"
7' - 0"
D08 1
CLIENT: J. CALNAN
D07 D23 REMOVE PORTION OF CEILING AS REQUIRED FOR INSTALLATION OF NEW
D13 MEP SYSTEMS. REINSTALL TO UNIFORM FINISH.
WESTWOOD, MA
D24 REMOVE PARKING SPACE.
I D25 REMOVE CAGED STORAGE.
D26 REMOVE PORTION OF CMU WALL TO ACCEPT THE NEW LOUVER.
COORDINATE WITH MEP AND STRUCTURAL DRAWINGS.
D27 REMOVE WALL TILE.
D28 REMOVE WOOD TRIM AT OPENING.
D29 REMOVE OVERHEAD DOOR.
D30 REMOVE PORTION OF SLAB FOR NEW 3'X3'X5' PIT. COORDINATE WITH NEW
WORK AND MEP DRAWINGS.
1
A1 / AD102.3
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
DRAWN BY: UE
CHECKED BY: LG/BR
PROJECT NUMBER: JA22019
SHEET TITLE:
SECOND FLOOR
DEMOLITION PLAN
WEST
11/16/2022 4:58:25 PM
5 4 3 2
SCALE: 1/8" = 1'-0"
1 AD102.2
DEMOLITION PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
7' - 2"
328
ELEC. 231 230 229
WOMENS OFFICE DOOR AND FRAME TO BE DEMOLISHED
329 333 228
19' - 6"
D01 EXISTING WINDOW TO BE DEMOLISHED
MKTG PROD. ROOM
232
EXISTING PARTITION TO REMAIN
OFFICE
CORRIDOR 233
D13
327 EXISTING DOOR AND FRAME TO REMAIN
G
CLIENT: J. CALNAN
D23 REMOVE PORTION OF CEILING AS REQUIRED FOR INSTALLATION OF NEW
D13 MEP SYSTEMS. REINSTALL TO UNIFORM FINISH.
WESTWOOD, MA
D24 REMOVE PARKING SPACE.
I D25 REMOVE CAGED STORAGE.
D26 REMOVE PORTION OF CMU WALL TO ACCEPT THE NEW LOUVER.
COORDINATE WITH MEP AND STRUCTURAL DRAWINGS.
D27 REMOVE WALL TILE.
D28 REMOVE WOOD TRIM AT OPENING.
D29 REMOVE OVERHEAD DOOR.
D30 REMOVE PORTION OF SLAB FOR NEW 3'X3'X5' PIT. COORDINATE WITH NEW
WORK AND MEP DRAWINGS.
1
A1 / AD102.2
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
DRAWN BY: UE
CHECKED BY: LG/BR
PROJECT NUMBER: JA22019
SHEET TITLE:
SECOND FLOOR
DEMOLITION PLAN
EAST
11/16/2022 4:58:30 PM
5 4 3 2
SCALE: 1/8" = 1'-0"
1 AD102.3
DEMOLITION PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
1 2 3 4 5 A1 / AD103.4 12. REMOVE FROM THE CONSTRUCTION SITE, AT THE EARLIEST POSSIBLE TIME, ALL
DEBRIS, RUBBISH, SALVAGED ITEMS, COMBUSTIBLE, AND OTHER MATERIALS
RESULTING FROM DEMOLITION. AREA OF DEMOLITION TO BE LEFT BROOM CLEAN.
COORDINATE DEBRIS REMOVAL CONTAINER LOCATION WITH BUILDING OWNER.
E
13. INTEGRITY AND RATING OF ALL FIREPROOFING AND RATED PARTITIONS ARE TO BE
MAINTAINED DURING DEMOLITION.
D13
14. MAINTAIN AND PROTECT EXISTING UTILITIES TO REMAIN OPERATIONAL DURING
DEMOLITION BEFORE PROCEEDING WITH WORK. COORDINATE WITH LOCAL
PANTRY AUTHORITIES AS REQUIRED.
CONFERENCE 525 D08 CORRIDOR
15. ERECT AND MAINTAIN PASSAGEWAYS IN ORDER TO PROVIDE SAFE PASSAGE FOR
509 526 PERSONS AROUND AREA OF DEMOLITION AND CONDUCT ALL DEMOLITION
OPERATIONS IN A MANNER THAT WILL PREVENT DAMAGE TO STRUCTURES,
OPEN OFFICE 7' - 6" ADJACENT BUILDING, AND ALL PERSONS.
513
4' - 4"
16. DIMENSIONS ARE TAKEN TO THE FACE OF EXISTING WALLS AND EQUIPMENT U.N.O.
PRELIMINARY
17. CLEARLY MARK LOCATION AND EXTENT OF CUTTING AND PATCHING PRIOR TO FOR REVIEW ONLY
COMMENCEMENT OF WORK TO MINIMIZE DEMOLITION. THESE DOCUMENTS ARE FOR DESIGN REVIEW
AND NOT INTENDED FOR BIDDING,
18. ANY ITEMS INDICATED TO BE REMOVED AND SALVAGED REMAIN OWNER'S CONSTRUCTION, OR PERMIT PURPOSES.
PROPERTY. REMOVE, CLEAN, LABEL, AND DELIVER TO OWNER'S DESIGNATED THEY WERE PREPARED BY OR UNDER THE
1 STORAGE AREA. SUPERVISION OF
CONFERENCE RECEPTION CI DESIGN.
508 522
D15 OFFICE OFFICE D15 D21
F 510 511
C
CLO. DEMOLITION PLAN LEGEND
520 ELEVATOR LOBBY
STAIR
528
D07 DN 529 N
EXISTING FLOORING TO REMAIN AS INDICATED
3' - 4"
D01 9' - 2" 11' - 6" 1' - 10"
OFFICE OFFICE
4' - 7" ELEV.
507 519 PARTITION TO BE DEMOLISHED
STORAGE 019
STAIR 524
DN
9' - 8"
512 MAIL STORAGE ELEC.
521 DOOR AND FRAME TO BE DEMOLISHED
523 530
OPEN OFFICE D02
517
19' - 3"
2' - 1"
CONFERENCE
518 EXISTING PARTITION TO REMAIN
9' - 6"
CLO. 5' - 1" CORRIDOR
D13 STORAGE 8' - 0"
7' - 0" 516 459
515 D20 EXISTING DOOR AND FRAME TO REMAIN
G CLO.
CLO.
5"
514 CLO.
10' - 8" 479 477
BREAK
COATS 476
DEMOLITION PLAN KEY NOTES
CLO.
485 RECEPTION
494 D01 REMOVE PORTION OF SLAB FOR NEW SHAFT. COORDINATE WITH
OFFICE 478 CONSTRUCTION PLAN AND STRUCTURAL DRAWINGS.
506
SERVER OFFICE OFFICE D02 REMOVE PORTION OF SLAB FOR NEW ELEVATOR. COORDINATE WITH
498 499 500 CONFERENCE FILE CONSTRUCTION PLAN AND STRUCTURAL DRAWINGS
D03 UNLESS NOTED OTHERWISE REMOVE ALL CEILINGS, LIGHT FIXTURES,
BREAK 489 488
DIFFUSERS AND DEVICES. COORDINATE WITH MEP DRAWINGS.
492 D04 UNLESS NOTED OTHERWISE REMOVE FLOORING AND WALL BASE.
D05 EXISTING CEILING TO REMAIN.
OFFICE D06 EXISTING FLOORING AND BASE TO REMAIN.
RECEPTION
505 D07 REMOVE CASEWORK.
484
D08 REMOVE CASEWORK, SINK, FAUCET AND ASSOCIATED PLUMBING.
CLO.
COORDINATE WITH MEP DRAWINGS.
PRINT 493 D09 REMOVE STAIR TREADS, RISERS, HANDRAILS AND ASSOCIATED
D15 504 STRUCTURE. COORDINATE WITH STRUCTURAL DWGS.
D15
D10 REMOVE RAISED FLOORING IN ITS ENTIRETY. REMOVE ASSOCIATED STAIRS, B
CLIENT: J. CALNAN
D23 REMOVE PORTION OF CEILING AS REQUIRED FOR INSTALLATION OF NEW
502 501 497 496 495 491 MEP SYSTEMS. REINSTALL TO UNIFORM FINISH.
WESTWOOD, MA
D13 D24 REMOVE PARKING SPACE.
I D25 REMOVE CAGED STORAGE.
D26 REMOVE PORTION OF CMU WALL TO ACCEPT THE NEW LOUVER.
COORDINATE WITH MEP AND STRUCTURAL DRAWINGS.
D27 REMOVE WALL TILE.
D28 REMOVE WOOD TRIM AT OPENING.
D29 REMOVE OVERHEAD DOOR.
D30 REMOVE PORTION OF SLAB FOR NEW 3'X3'X5' PIT. COORDINATE WITH NEW
WORK AND MEP DRAWINGS.
1
A1 / AD103.3
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
DRAWN BY: UE
CHECKED BY: LG/BR
PROJECT NUMBER: JA22019
SHEET TITLE:
THIRD FLOOR
DEMOLITION PLAN
WEST
11/16/2022 4:58:34 PM
5 4 3 2
SCALE: 1/8" = 1'-0"
1 AD103.2
DEMOLITION PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
19' - 7"
426 CLO. 440 EXISTING WINDOW TO BE DEMOLISHED
432 BREAK
446
EXISTING PARTITION TO REMAIN
8' - 0" 1
EXISTING DOOR AND FRAME TO REMAIN
G
CLO.
477
D13
BREAK
476
DEMOLITION PLAN KEY NOTES
ENTRY RECEPTION OFFICE OFFICE OFFICE
473 472 462 461 460 D01 REMOVE PORTION OF SLAB FOR NEW SHAFT. COORDINATE WITH
CONSTRUCTION PLAN AND STRUCTURAL DRAWINGS.
RECEPTION
COATS D02 REMOVE PORTION OF SLAB FOR NEW ELEVATOR. COORDINATE WITH
457 CONSTRUCTION PLAN AND STRUCTURAL DRAWINGS
456
CONFERENCE D03 UNLESS NOTED OTHERWISE REMOVE ALL CEILINGS, LIGHT FIXTURES,
1' - 6" OPEN OFFICE DIFFUSERS AND DEVICES. COORDINATE WITH MEP DRAWINGS.
CLO. 441
447 D04 UNLESS NOTED OTHERWISE REMOVE FLOORING AND WALL BASE.
474
D05 EXISTING CEILING TO REMAIN.
D06 EXISTING FLOORING AND BASE TO REMAIN.
D07 REMOVE CASEWORK.
D08 REMOVE CASEWORK, SINK, FAUCET AND ASSOCIATED PLUMBING.
STOR. COORDINATE WITH MEP DRAWINGS.
MAIL/COPY 1
1 463 D09 REMOVE STAIR TREADS, RISERS, HANDRAILS AND ASSOCIATED
453 STORAGE D15 STRUCTURE. COORDINATE WITH STRUCTURAL DWGS.
D15
449 D10 REMOVE RAISED FLOORING IN ITS ENTIRETY. REMOVE ASSOCIATED STAIRS, B
CLIENT: J. CALNAN
443 D23 REMOVE PORTION OF CEILING AS REQUIRED FOR INSTALLATION OF NEW
D13 MEP SYSTEMS. REINSTALL TO UNIFORM FINISH.
WESTWOOD, MA
D24 REMOVE PARKING SPACE.
I D25 REMOVE CAGED STORAGE.
D26 REMOVE PORTION OF CMU WALL TO ACCEPT THE NEW LOUVER.
COORDINATE WITH MEP AND STRUCTURAL DRAWINGS.
D27 REMOVE WALL TILE.
D28 REMOVE WOOD TRIM AT OPENING.
D29 REMOVE OVERHEAD DOOR.
D30 REMOVE PORTION OF SLAB FOR NEW 3'X3'X5' PIT. COORDINATE WITH NEW
WORK AND MEP DRAWINGS.
1
A1 / AD103.2
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
DRAWN BY: UE
CHECKED BY: LG/BR
PROJECT NUMBER: JA22019
SHEET TITLE:
THIRD FLOOR
DEMOLITION PLAN
EAST
11/16/2022 4:58:38 PM
5 4 3 2
SCALE: 1/8" = 1'-0"
1 AD103.3
DEMOLITION PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
12. REMOVE FROM THE CONSTRUCTION SITE, AT THE EARLIEST POSSIBLE TIME, ALL
DEBRIS, RUBBISH, SALVAGED ITEMS, COMBUSTIBLE, AND OTHER MATERIALS
RESULTING FROM DEMOLITION. AREA OF DEMOLITION TO BE LEFT BROOM CLEAN.
COORDINATE DEBRIS REMOVAL CONTAINER LOCATION WITH BUILDING OWNER.
13. INTEGRITY AND RATING OF ALL FIREPROOFING AND RATED PARTITIONS ARE TO BE
MAINTAINED DURING DEMOLITION.
15. ERECT AND MAINTAIN PASSAGEWAYS IN ORDER TO PROVIDE SAFE PASSAGE FOR
PERSONS AROUND AREA OF DEMOLITION AND CONDUCT ALL DEMOLITION
OPERATIONS IN A MANNER THAT WILL PREVENT DAMAGE TO STRUCTURES,
ADJACENT BUILDING, AND ALL PERSONS.
16. DIMENSIONS ARE TAKEN TO THE FACE OF EXISTING WALLS AND EQUIPMENT U.N.O.
PRELIMINARY
17. CLEARLY MARK LOCATION AND EXTENT OF CUTTING AND PATCHING PRIOR TO FOR REVIEW ONLY
COMMENCEMENT OF WORK TO MINIMIZE DEMOLITION. THESE DOCUMENTS ARE FOR DESIGN REVIEW
AND NOT INTENDED FOR BIDDING,
18. ANY ITEMS INDICATED TO BE REMOVED AND SALVAGED REMAIN OWNER'S CONSTRUCTION, OR PERMIT PURPOSES.
PROPERTY. REMOVE, CLEAN, LABEL, AND DELIVER TO OWNER'S DESIGNATED THEY WERE PREPARED BY OR UNDER THE
STORAGE AREA. SUPERVISION OF
CI DESIGN.
SKYLIGHT
C
RD
DEMOLITION PLAN LEGEND
N
EXISTING FLOORING TO REMAIN AS INDICATED
PARTITION TO BE DEMOLISHED
SKYLIGHTS
ATRIUM SMOKE EXISTING WINDOW TO BE DEMOLISHED
VENT
CLIENT: J. CALNAN
D23 REMOVE PORTION OF CEILING AS REQUIRED FOR INSTALLATION OF NEW
MEP SYSTEMS. REINSTALL TO UNIFORM FINISH.
WESTWOOD, MA
D24 REMOVE PARKING SPACE.
D25 REMOVE CAGED STORAGE.
D26 REMOVE PORTION OF CMU WALL TO ACCEPT THE NEW LOUVER.
COORDINATE WITH MEP AND STRUCTURAL DRAWINGS.
D27 REMOVE WALL TILE.
D28 REMOVE WOOD TRIM AT OPENING.
D29 REMOVE OVERHEAD DOOR.
D30 REMOVE PORTION OF SLAB FOR NEW 3'X3'X5' PIT. COORDINATE WITH NEW
WORK AND MEP DRAWINGS.
1
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
ROOF DEMOLITION
PLAN
11/16/2022 4:58:40 PM
5 4 3 2
SCALE: 1/16" = 1'-0"
1 AD401
CONSTRUCTION PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
PLANS 15. CLEARLY MARK LOCATION AND EXTENT OF CUTTING AND PATCHING PRIOR TO
C08 ELEC TEL MENS COMMENCEMENT OF WORK.
1' - 2"3' - 0"
012
007 010 013 GAME ROOM
006A C08 BOILER ROOM
16. CONTRACTOR TO CHOP, TRENCH, OR CORE SLAB AS REQUIRED. FILL AND PATCH
8' - 1"
006 019
A5 SLAB TO ACCOMMODATE ALL UNDERGROUND UTILITIES SUCH AS SANITARY, STORM,
4' - 10"
3A-FS
C08 DN A100.1 DOMESTIC WATER LINES, ELECTRICAL CONDUIT, SPRINKLER MAINS, ETC.
STORAGE CONTRACTOR TO VERIFY IF SLAB IS STRUCTURAL. IF SO, DO NOT COMMENCE ANY
004 CUTTING UNTIL APPROVAL IS OBTAINED FROM ARCHITECT.
PRELIMINARY
DW & FIRE 17. PIPES, DUCTS, ETC. IN THAT WOULD OTHERWISE BE VISIBLE IN FINISHED SPACES FOR REVIEW ONLY
CLEANING CLOSET TO BE CONCEALED WITH FURRING OR CEILINGS U.N.O.
4H1 3A1FS SERVICE ROOM THESE DOCUMENTS ARE FOR DESIGN REVIEW
003 AND NOT INTENDED FOR BIDDING,
15' - 5" 14' - 1" 009 WOMENS 18. CONTRACTOR TO COORDINATE LOCATIONS OF PLUMBING CLEAN-OUT ACCESS CONSTRUCTION, OR PERMIT PURPOSES.
MECH 014 PANELS NOTED ON PLUMBING DRAWINGS WITH NEW CONSTRUCTION. THEY WERE PREPARED BY OR UNDER THE
PH ROOM
008 ELEC. CELL SITE CLOSET SUPERVISION OF
005 6M-E MAIL 19. REFER TO STRUCTURAL AND MEP/FP DRAWINGS AND SPECIFICATIONS FOR MORE CI DESIGN.
011 020
017 INFORMATION.
C06 C15
LOADING
F 002 BLDG MGMT
C
3A-AE 015
EMR.
CONSTRUCTION PLAN LEGEND
005 006 004
021
FREIGHT
ELEVATOR
N
CORRIDOR EXISTING CONSTRUCTION
8M2 146 LOBBY
8M2 033
016 NEW CONSTRUCTION
034 ELEV.
8M2A 102
032 8M2
EMR ELEV LOBBY EXISTING DOOR AND FRAME
C13
8' - 5"
C13
8' - 6"
034 C01 035
3A2FS
3A2FS
10' - 3"
STORAGE STAIR 9' - 7" NEW DOOR AND FRAME
030 032
8' - 11" 11' - 8" 9' - 5" NOT IN SCOPE OF WORK
C13
9' - 1"
A1
A700 1 HOUR RATED WALL
STORAGE
031
G
2 HOUR RATED WALL
ALIGN
CLIENT: J. CALNAN
WESTWOOD, MA
I
GENERATOR
1 029
A1 / A100.2
4' - 7"
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
1 2 3 4 5 6
DELIVERABLE: CONSTRUCTION
1' - 0"
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
GROUND FLOOR
CONSTRUCTION PLAN
WEST
11/16/2022 4:55:55 PM
5
SCALE: 1/2" = 1'-0"
4 3 2
SCALE: 1/8" = 1'-0"
1 A100.1
CONSTRUCTION PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
LIMIT OF BUILDING 14. MAINTAIN FIRE RATING OF CONSTRUCTION WHERE ANY ITEMS ARE BUILT INTO
2F-F CONSTRUCTION. FIRE STOP AND SEAL PENETRATIONS IN FIRE RATED
ABOVE
CONSTRUCTION IN ACCORDANCE TO APPLICABLE U.L. ASSEMBLY RATING.
2' - 4"
15. CLEARLY MARK LOCATION AND EXTENT OF CUTTING AND PATCHING PRIOR TO
COMMENCEMENT OF WORK.
GAME ROOM
019 2' - 0" 16. CONTRACTOR TO CHOP, TRENCH, OR CORE SLAB AS REQUIRED. FILL AND PATCH
SLAB TO ACCOMMODATE ALL UNDERGROUND UTILITIES SUCH AS SANITARY, STORM,
DOMESTIC WATER LINES, ELECTRICAL CONDUIT, SPRINKLER MAINS, ETC.
C20
CONTRACTOR TO VERIFY IF SLAB IS STRUCTURAL. IF SO, DO NOT COMMENCE ANY
5' - 2"
CUTTING UNTIL APPROVAL IS OBTAINED FROM ARCHITECT.
PRELIMINARY
17. PIPES, DUCTS, ETC. IN THAT WOULD OTHERWISE BE VISIBLE IN FINISHED SPACES FOR REVIEW ONLY
1 TO BE CONCEALED WITH FURRING OR CEILINGS U.N.O. THESE DOCUMENTS ARE FOR DESIGN REVIEW
AND NOT INTENDED FOR BIDDING,
18. CONTRACTOR TO COORDINATE LOCATIONS OF PLUMBING CLEAN-OUT ACCESS CONSTRUCTION, OR PERMIT PURPOSES.
PANELS NOTED ON PLUMBING DRAWINGS WITH NEW CONSTRUCTION. THEY WERE PREPARED BY OR UNDER THE
CELL SITE CLOSET SUPERVISION OF
19. REFER TO STRUCTURAL AND MEP/FP DRAWINGS AND SPECIFICATIONS FOR MORE CI DESIGN.
020 INFORMATION.
1
F
C
EMR. C06
CORRIDOR
026
CONSTRUCTION PLAN LEGEND
STORAGE PH ROOM
021
3A-AE
CELL SITE CLOSET 023 024 N
STORAGE
022 C15 EXISTING CONSTRUCTION
025 STORAGE STORAGE
027 028 NEW CONSTRUCTION
C13
C13
036 EXISTING DOOR AND FRAME
G
2 HOUR RATED WALL
ALIGN
CLIENT: J. CALNAN
WESTWOOD, MA
I
A1 / A100.1
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
DRAWN BY: UE
CHECKED BY: LG/BR
PROJECT NUMBER: JA22019
SHEET TITLE:
GROUND FLOOR
CONSTRUCTION PLAN
EAST
11/16/2022 4:55:58 PM
5 4 3 2
SCALE: 1/8" = 1'-0"
1 A100.2
CONSTRUCTION PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
16' - 0"
19' - 1"
16. CONTRACTOR TO CHOP, TRENCH, OR CORE SLAB AS REQUIRED. FILL AND PATCH
3A-FS 3A2FS
SLAB TO ACCOMMODATE ALL UNDERGROUND UTILITIES SUCH AS SANITARY, STORM,
DOMESTIC WATER LINES, ELECTRICAL CONDUIT, SPRINKLER MAINS, ETC.
CONTRACTOR TO VERIFY IF SLAB IS STRUCTURAL. IF SO, DO NOT COMMENCE ANY
C05 CUTTING UNTIL APPROVAL IS OBTAINED FROM ARCHITECT.
142 3A1FS PRELIMINARY
LOBBY 17. PIPES, DUCTS, ETC. IN THAT WOULD OTHERWISE BE VISIBLE IN FINISHED SPACES
3' - 9"
FOR REVIEW ONLY
3A-FS TO BE CONCEALED WITH FURRING OR CEILINGS U.N.O. THESE DOCUMENTS ARE FOR DESIGN REVIEW
C05 C05 C05 100
AND NOT INTENDED FOR BIDDING,
18. CONTRACTOR TO COORDINATE LOCATIONS OF PLUMBING CLEAN-OUT ACCESS CONSTRUCTION, OR PERMIT PURPOSES.
12' - 2"
11' - 0" 33' - 0" 33' - 0" PPE PANELS NOTED ON PLUMBING DRAWINGS WITH NEW CONSTRUCTION.
5' - 0"
141 THEY WERE PREPARED BY OR UNDER THE
100A SUPERVISION OF
CL CL CL 141
OFFICE 19. REFER TO STRUCTURAL AND MEP/FP DRAWINGS AND SPECIFICATIONS FOR MORE CI DESIGN.
2F-F 2F-F
2' - 6" 144 INFORMATION.
C06 3' - 7"
7' - 10" 14' - 0"
2F-F
2' - 4"
1' - 9"
F 138 139
3A-FS 6A-FS
C06
2F-F 3A-FS 3A1FS 3' - 4" C
A1
A901 10' - 0" 2' - 6" 6' - 3" 10' - 0"
CLO.
CONSTRUCTION PLAN LEGEND
CL C05 C05 CL
147
9' - 5"
145 N
7' - 3"
132B ELEC
EXISTING CONSTRUCTION
145 3A-FS
4H2
3A-FS 4' - 3"
NEW CONSTRUCTION
ELEV.
5' - 0" 8' - 5" C11
B1 102
3A2FS 8M2A
A700 ELEC. EXISTING DOOR AND FRAME
8' - 5"
SUPPORT SUPPORT 103
FREIGHT
138 139 C01 ELEVATOR
146 NEW DOOR AND FRAME
IDF
143 10' - 0"
NOT IN SCOPE OF WORK
8' - 0"
10' - 7"
4H2
3A-FS 3A-FS
2' - 6" 3A-FS 3A1FS 1 HOUR RATED WALL
3A-FS
100B
G 3A-FS 2 HOUR RATED WALL
C12
135 3A-FS
3A-FS ALIGN
4H2 CORRIDOR
9' - 6"
8' - 10"
8' - 5"
CORRIDOR
3A-FS 3A-FS 128
14' - 10"
8' - 5"
3' - 0" 6" LOBBY
7' - 0" C05 FURNISH AND INSTALL SINK, FAUCET AND ASSOCIATED PLUMBING.
129A 101 REFER TO CASEWORK TYPE DRAWINGS A360.
3' - 6"
3A-FS
2F-F C06 FURNISH AND INSTALL SAFETY SHOWER. REFER TO CASEWORK TYPE
CHEM. WASTE PANTRY DRAWING A360.
SUPPORT 3A-FS
134 PPE 3A2FS 3' - 0" C07 FURNISH AND INSTALL VERTICAL BIKE STORAGE
133 130
C08 CONSTRUCT 4" THICK EQUIPMENT PAD. COORDINATE WITH MEP AND
15' - 0"
131 B3 A800
3A-FS STRUCTURAL DRAWINGS.
CL C09 INFILL OPENING TO UNIFORM FINISH.
3A-FS 6A-FS 11' - 1" S-1
C11 FUTURE IDF ROOM TO BE COORDINATED WITH TENANT.
3A-FS
2' - 6" 3A-FS F-1 C12 CONSTRUCT NEW DRYWALL SILL. REFER TO DETAIL ON A3/A901.
C05 1" 1' - 0" 10' - 8" C13 INSTALL NEW STORM PROOF LOUVER. COORDINATE WITH MEP AND
134 133 STRUCTURAL DRAWINGS. B
2F-F OFFICE
2F-F C06 C14 UPGRADE WALL AS REQUIRED TO MAINTAIN 1 HOUR RATED
10"
3A-FS 129 CONSTRUCTION.
C06 2F-F
2' - 3" 13' - 3" 1' - 3" 5' - 0" 8' - 10" C15 CONSTRUCT 5' X 5' X 5' PH PUMP PIT.
6' - 4"
3A-FS
3A-FS C16 INSTALL STOREFRONT SYSTEM WHERE OVERHEAD DOOR WAS
REMOVED.
CL CL CL C17 METAL GRATE STAIRS WITH HANDRAILS AND GUARDRAILS.
44' - 0" 33' - 0" 31' - 6" C18 OSHA COMPLAINT GUARDRAIL.
C19 CONSTRUCT 3' X 3' X 5' EJECTOR PUMP PIT.
C05 C05 C05 C20 WOOD DOOR WITH DECORATIVE METAL MESH SCREEN.
3A2FS
CLIENT: J. CALNAN
C12
WESTWOOD, MA
1"1' - 1"
I
A1 / A101.2
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
DRAWN BY: UE
CHECKED BY: LG/BR
PROJECT NUMBER: JA22019
SHEET TITLE:
FIRST FLOOR
CONSTRUCTION PLAN
WEST
11/16/2022 4:56:03 PM
5 4 3 2
SCALE: 1/8" = 1'-0"
1 A101.1
CONSTRUCTION PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
C12 C12 1' - 2" 14. MAINTAIN FIRE RATING OF CONSTRUCTION WHERE ANY ITEMS ARE BUILT INTO
CONSTRUCTION. FIRE STOP AND SEAL PENETRATIONS IN FIRE RATED
CONSTRUCTION IN ACCORDANCE TO APPLICABLE U.L. ASSEMBLY RATING.
SUPPORT 15. CLEARLY MARK LOCATION AND EXTENT OF CUTTING AND PATCHING PRIOR TO
259 COMMENCEMENT OF WORK.
19' - 0"
3A2FS
CL 16. CONTRACTOR TO CHOP, TRENCH, OR CORE SLAB AS REQUIRED. FILL AND PATCH
3A-FS 16' - 1" SLAB TO ACCOMMODATE ALL UNDERGROUND UTILITIES SUCH AS SANITARY, STORM,
DOMESTIC WATER LINES, ELECTRICAL CONDUIT, SPRINKLER MAINS, ETC.
C05 CONTRACTOR TO VERIFY IF SLAB IS STRUCTURAL. IF SO, DO NOT COMMENCE ANY
CUTTING UNTIL APPROVAL IS OBTAINED FROM ARCHITECT.
259 PRELIMINARY
17. PIPES, DUCTS, ETC. IN THAT WOULD OTHERWISE BE VISIBLE IN FINISHED SPACES FOR REVIEW ONLY
3A-FS TO BE CONCEALED WITH FURRING OR CEILINGS U.N.O. THESE DOCUMENTS ARE FOR DESIGN REVIEW
C05 C05 C05 AND NOT INTENDED FOR BIDDING,
CORRIDOR 18. CONTRACTOR TO COORDINATE LOCATIONS OF PLUMBING CLEAN-OUT ACCESS CONSTRUCTION, OR PERMIT PURPOSES.
PPE 262 PANELS NOTED ON PLUMBING DRAWINGS WITH NEW CONSTRUCTION.
5' - 0"
10' - 11" 33' - 0" 33' - 0" 258B 264 205B THEY WERE PREPARED BY OR UNDER THE
258 SUPERVISION OF
CL CL CL OFFICE 19. REFER TO STRUCTURAL AND MEP/FP DRAWINGS AND SPECIFICATIONS FOR MORE CI DESIGN.
2F-F 8' - 0" 12' - 10" 17' - 8" 6' - 8" 7' - 10" 262 INFORMATION.
2' - 6"
3' - 8"
C06
CLO. CLO.
2' - 4"
256 257
F C06 C05 206 207
3A-FS 1 C
A1
A901
10' - 0"
CL 6A-FS
2F-F C05 10' - 0"
C11
CONSTRUCTION PLAN LEGEND
3A-FS CL
255 N
263 EXISTING CONSTRUCTION
5' - 6"
4H2 4H2
1' - 6"
3A2FS
MIN
SUPPORT 3A-FS ELEV. LOBBY NEW CONSTRUCTION
SUPPORT ELEV.
257 265
256 8M2A 3A1FS 102 ELEC.
IDF CONFERENCE
FREIGHT 209 EXISTING DOOR AND FRAME
261 C01 263
5' - 1" 8' - 5" ELEVATOR
3A-FS
3A-FS 8M2 146
3A1FS 3F-FS NEW DOOR AND FRAME
4H1
11' - 5" 8' - 1" 11' - 0" NOT IN SCOPE OF WORK
CORRIDOR 8' - 5" 242C C14 4H2
8' - 0"
3A-FS CORRIDOR
255 3A-FS 7' - 5" 16' - 0" 8' - 0" 1 HOUR RATED WALL
C12 242
G
ELEC. 3A1FS 2 HOUR RATED WALL
3' - 0"
3' - 0"
1' - 6"
1' - 6"
3A1FS STOR.
247C 244 242B 241 234
251 241 ALIGN
4H2 3A1FS 244 3A1FS 3A-FS 9' - 0" 3A1FS
UTILITIES 8' - 5" 1' - 3"
11' - 2"
14' - 11"
251 PANTRY
3A-FS
250 4A1FS CONSTRUCTION PLAN KEY NOTES
18' - 0"
12' - 0"
CL FREEZER 3A-FS C09 INFILL OPENING TO UNIFORM FINISH.
248 C11 FUTURE IDF ROOM TO BE COORDINATED WITH TENANT.
3A-FS 6A-FS OFFICE C12 CONSTRUCT NEW DRYWALL SILL. REFER TO DETAIL ON A3/A901.
3A-FS CLO.
1" 1' - 2" 246 C13 INSTALL NEW STORM PROOF LOUVER. COORDINATE WITH MEP AND
2' - 6" 245 STRUCTURAL DRAWINGS.
252 249 B
CLIENT: J. CALNAN
WESTWOOD, MA
C12 1' - 1"
I
A1 / A102.2
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
DRAWN BY: UE
CHECKED BY: LG/BR
PROJECT NUMBER: JA22019
SHEET TITLE:
SECOND FLOOR
CONSTRUCTION PLAN
WEST
11/16/2022 4:56:08 PM
5 4 3 2
SCALE: 1/8" = 1'-0"
1 A102.1
CONSTRUCTION PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
C12 14. MAINTAIN FIRE RATING OF CONSTRUCTION WHERE ANY ITEMS ARE BUILT INTO
C12 3A-FS CONSTRUCTION. FIRE STOP AND SEAL PENETRATIONS IN FIRE RATED
CONSTRUCTION IN ACCORDANCE TO APPLICABLE U.L. ASSEMBLY RATING.
HUDDLE HUDDLE
12' - 8"
3A2FS 378 379 15. CLEARLY MARK LOCATION AND EXTENT OF CUTTING AND PATCHING PRIOR TO
COMMENCEMENT OF WORK.
19' - 3"
PPE
377 3A-FS 3A-FS 16. CONTRACTOR TO CHOP, TRENCH, OR CORE SLAB AS REQUIRED. FILL AND PATCH
SLAB TO ACCOMMODATE ALL UNDERGROUND UTILITIES SUCH AS SANITARY, STORM,
14' - 0" DOMESTIC WATER LINES, ELECTRICAL CONDUIT, SPRINKLER MAINS, ETC.
378 379 CONTRACTOR TO VERIFY IF SLAB IS STRUCTURAL. IF SO, DO NOT COMMENCE ANY
OPEN LAB 344B 344A CUTTING UNTIL APPROVAL IS OBTAINED FROM ARCHITECT.
5' - 9"
373 377B PRELIMINARY
C05 C05 C05 17. PIPES, DUCTS, ETC. IN THAT WOULD OTHERWISE BE VISIBLE IN FINISHED SPACES
3A-FS FOR REVIEW ONLY
8"
C12 TO BE CONCEALED WITH FURRING OR CEILINGS U.N.O. THESE DOCUMENTS ARE FOR DESIGN REVIEW
3' - 0"
AND NOT INTENDED FOR BIDDING,
C08 18. CONTRACTOR TO COORDINATE LOCATIONS OF PLUMBING CLEAN-OUT ACCESS
3A-FS 3' - 0" 3' - 1" 2' - 6"1' - 6"2' - 6" 3A-FS CONSTRUCTION, OR PERMIT PURPOSES.
3' - 1" 382 PANELS NOTED ON PLUMBING DRAWINGS WITH NEW CONSTRUCTION. THEY WERE PREPARED BY OR UNDER THE
10' - 11" 33' - 0" 33' - 0" SUPERVISION OF
7" 3' - 0" 3A-FSZ 3A-FS
CL CL CL 19. REFER TO STRUCTURAL AND MEP/FP DRAWINGS AND SPECIFICATIONS FOR MORE CI DESIGN.
4' - 3" 1' - 6" 1 INFORMATION.
C06 376
25' - 7"
A901 C06 382
2' - 4"
F
2' - 6" 3A-FS
C08
C
374 375
2F-F
3A-FS SUPPORT 1' - 10" 5' - 0" MECH
A800 CONSTRUCTION PLAN LEGEND
A1
8' - 5"
376 381
3' - 0"
373 3A-FS N
5' - 5" 4H2 EXISTING CONSTRUCTION
3' - 0"
1' - 6" C08
S-1 4H2
4H2 3' - 0" 3' - 0" 10"
LAB UTILITILES &
11"
368 SUPPORT
10"
374 F-1 3A-FS
7' - 6"
A5 102
3A-FS 6A-FS 5' - 0" 8' - 5" 10' - 0" 21' - 8" FREIGHT
ELEVATOR ELEC. EXISTING DOOR AND FRAME
C01 WELLNESS A800
315
6' - 0"
146
3A-FS 3A-FS 3A2FS 383
3' - 0"
C12 6' - 0" ELEVATOR LOBBY
SUPPORT SUPPORT 4' - 1" 2' - 6" 2' - 4" 2' - 6" 5' - 2" 2' - 6" 2' - 4" 2' - 6" NEW DOOR AND FRAME
3"
381 350
368 369 383
3A-FSZ 9' - 6"
NOT IN SCOPE OF WORK
8' - 5"
CORRIDOR
CORRIDOR 3A-FS 3A-FS
9' - 4"
C14
8' - 5"
372 380 STORAGE
3A-FS 372 7' - 0" 3A-FS 4H2 1 HOUR RATED WALL
6' - 11" 4H2 7' - 5" 6' - 2" 5' - 6" 346 3A-FS
3A-FS
G
2 HOUR RATED WALL
3' - 0"
3' - 0"
1' - 7"
2' - 11"
4' - 4" 3A1FS
3' - 0"
3' - 0"
347B
364 361A 358 357 3A-FS 347A 343 ALIGN
3A-FS IDF 3' - 6" 8' - 5" STORAGE
3A-FS 7' - 5" 3A-FS 7' - 5" 359 345
ELEC. CLOSET
LAB UTILITILES & 358 357 4A-FS 4A-FS CONSTRUCTION PLAN KEY NOTES
C12 SUPPORT SUPPORT STORAGE PPE SUPPORT PPE
19' - 5"
367 366 365 364 362 361 C01 FURNISH AND INSTALL FREIGHT ELEVATOR.
C11
C02 INFILL CONCRETE FLOOR.
C05 FURNISH AND INSTALL SINK, FAUCET AND ASSOCIATED PLUMBING.
REFER TO CASEWORK TYPE DRAWINGS A360.
3A-FS 6A-FS 3A-FS 3A-FS 3A-FS 3A-FS
C06 FURNISH AND INSTALL SAFETY SHOWER. REFER TO CASEWORK TYPE
361B DRAWING A360.
OPEN OFFICE C07 FURNISH AND INSTALL VERTICAL BIKE STORAGE
367 366 365 363 362
347 C08 CONSTRUCT 4" THICK EQUIPMENT PAD. COORDINATE WITH MEP AND
STRUCTURAL DRAWINGS.
C09 INFILL OPENING TO UNIFORM FINISH.
C06 C06 C11 FUTURE IDF ROOM TO BE COORDINATED WITH TENANT.
C06
3A2FS C12 CONSTRUCT NEW DRYWALL SILL. REFER TO DETAIL ON A3/A901.
2' - 6" 2' - 6" C13 INSTALL NEW STORM PROOF LOUVER. COORDINATE WITH MEP AND
STRUCTURAL DRAWINGS. B
2' - 4"
CLIENT: J. CALNAN
356
C12
WESTWOOD, MA
0" 1' - 1"
I
A1 / A103.2
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
DRAWN BY: UE
CHECKED BY: LG/BR
PROJECT NUMBER: JA22019
SHEET TITLE:
THIRD FLOOR
CONSTRUCTION PLAN
WEST
11/16/2022 4:56:13 PM
5 4 3 2
SCALE: 1/8" = 1'-0"
1 A103.1
CONSTRUCTION PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
19' - 0"
314
16. CONTRACTOR TO CHOP, TRENCH, OR CORE SLAB AS REQUIRED. FILL AND PATCH
PPE
SLAB TO ACCOMMODATE ALL UNDERGROUND UTILITIES SUCH AS SANITARY, STORM,
321 DOMESTIC WATER LINES, ELECTRICAL CONDUIT, SPRINKLER MAINS, ETC.
OPEN LAB
CONTRACTOR TO VERIFY IF SLAB IS STRUCTURAL. IF SO, DO NOT COMMENCE ANY
324 CUTTING UNTIL APPROVAL IS OBTAINED FROM ARCHITECT.
C05 C05 PRELIMINARY
5' - 0"
313 17. PIPES, DUCTS, ETC. IN THAT WOULD OTHERWISE BE VISIBLE IN FINISHED SPACES FOR REVIEW ONLY
TO BE CONCEALED WITH FURRING OR CEILINGS U.N.O. THESE DOCUMENTS ARE FOR DESIGN REVIEW
AND NOT INTENDED FOR BIDDING,
3A-FS 18. CONTRACTOR TO COORDINATE LOCATIONS OF PLUMBING CLEAN-OUT ACCESS CONSTRUCTION, OR PERMIT PURPOSES.
4' - 1"
3A2FS 3A-FS C12 PANELS NOTED ON PLUMBING DRAWINGS WITH NEW CONSTRUCTION. THEY WERE PREPARED BY OR UNDER THE
33' - 0" 44' - 0"
SUPERVISION OF
2F-F CL CL 19. REFER TO STRUCTURAL AND MEP/FP DRAWINGS AND SPECIFICATIONS FOR MORE CI DESIGN.
A1 INFORMATION.
4' - 5"
14' - 3" 2' - 6" 2' - 6"
4" A901 C06 C06
319
2' - 4"
2' - 4"
MENS
2' - 5"
F
318 A1 C
322 323 A901
2F-F CONSTRUCTION PLAN LEGEND
3A-FS 324
4H2 3A-FS
7' - 8"
LAB UTILITILES &
SUPPORT SUPPORT
STORAGE 3A-FS 3A-FS N
JAN. 319 322 EXISTING CONSTRUCTION
323 4H2
316 326 325
8' - 5"
344 3A2FS 390 5' - 7" 19' - 10"
4H2 3A-FS 1 HOUR RATED WALL
3A-FS 3A-FS 3A1FS
EQ
3"
G
2 HOUR RATED WALL
3' - 0"
3' - 1"
6' - 0"
10"
EQ
1
335B 334
343 3A-FS 3A-FS ALIGN
STORAGE 7' - 0" 7' - 0" 6' - 4"
8' - 5" 3A-FS
345 OFFICE OFFICE 3A-FS 3A1FS 4H2 SUPPORT SUPPORT
4A-FS
337 340
3A2FS ELEC.
SUPPORT
LAB UTILITILES & FREEZER 329 328 CONSTRUCTION PLAN KEY NOTES
20' - 3"
333
19' - 5"
PPE 334 STORAGE 331
3A-FS C12
332 3A-FS C01 FURNISH AND INSTALL FREIGHT ELEVATOR.
335
C02 INFILL CONCRETE FLOOR.
3A-FS C05 FURNISH AND INSTALL SINK, FAUCET AND ASSOCIATED PLUMBING.
REFER TO CASEWORK TYPE DRAWINGS A360.
3A-FS C06 FURNISH AND INSTALL SAFETY SHOWER. REFER TO CASEWORK TYPE
3A1FS 3A-FS 3A1FS 3A-FS
335C DRAWING A360.
332 329 328 C07 FURNISH AND INSTALL VERTICAL BIKE STORAGE
2' - 10"
C08 CONSTRUCT 4" THICK EQUIPMENT PAD. COORDINATE WITH MEP AND
STRUCTURAL DRAWINGS.
338
C09 INFILL OPENING TO UNIFORM FINISH.
OPEN OFFICE
7' - 11"
2' - 4"
C14 UPGRADE WALL AS REQUIRED TO MAINTAIN 1 HOUR RATED
CL CL CL
C11 3A1FS 9' - 8" 33' - 0" 33' - 0" CONSTRUCTION.
C06 A1
A901 C15 CONSTRUCT 5' X 5' X 5' PH PUMP PIT.
STORAGE 2F-F
IDF C16 INSTALL STOREFRONT SYSTEM WHERE OVERHEAD DOOR WAS
348 339 C12 REMOVED.
C17 METAL GRATE STAIRS WITH HANDRAILS AND GUARDRAILS.
3A-FS C05 C05
OPEN LAB C18 OSHA COMPLAINT GUARDRAIL.
C05
336 C19 CONSTRUCT 3' X 3' X 5' EJECTOR PUMP PIT.
C20 WOOD DOOR WITH DECORATIVE METAL MESH SCREEN.
5' - 1"
19' - 1"
CLIENT: J. CALNAN
WESTWOOD, MA
C12
I
A1 / A103.1
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
DRAWN BY: UE
CHECKED BY: LG/BR
PROJECT NUMBER: JA22019
SHEET TITLE:
THIRD FLOOR
CONSTRUCTION PLAN
EAST
11/16/2022 4:56:17 PM
5 4 3 2
SCALE: 1/8" = 1'-0"
1 A103.2
ARCHITECTURE PLANNING INTERIORS
CEILING PLAN GENERAL NOTES LANDSCAPE ARCHITECTURE GRAPHICS
8. FOR EXTERIOR BUILDING MOUNTED LIGHT LOCATIONS, SEE A500 SERIES EXTERIOR
ELEVATIONS.
9. ALL DROPPED A.C.T. CEILING GRIDS ARE TO BE EQUIDISTANT OFF PARTITIONS U.N.O.
E A800
13. PROVIDE FIRESTOPPING / DRAFT-STOPPING ABOVE CEILINGS AS REQUIRED BY
GWB-1
EQ L EQ
CL CL CL CL CL R1 CODE.
7' - 8" 11' - 6" 11' - 6" 11' - 6" 11' - 6" 7' - 6" OPEN DECK R4 8' - 0" R4
P3 M4 M3 M4
C
7' - 11" CL 11' - 3" CL 11' - 3" CL 11' - 3" CL 11' - 3" CL 7' - 1" 10' - 6"
EQ
EQ
14. PROVIDE FIRE RESISTANT ENCLOSURE FOR ALL RECESSED LIGHT FIXTURES IN
9' - 8"
FIRE RATED CORRIDORS.
GWB-1
P2 P2 P2 P2 P2 P2 EQ EQ R03 8' - 0" M3 M4 M4 M3 M4 M4 15. USE PLENUM RATED CABLE, CONDUIT, BOXES, ETC. IN PLENUM RATED WALLS AND
R03 R03
CL
EQ
10' - 6"
EQ
EQ EQ SD 16. CONTRACTOR TO PAINT ALL SUPPLY / RETURN GRILLES AND LIGHT TRIM IN
CL GWB-1 M3 M4 M3 M4 M4 DRYWALL CEILINGS AND SOFFITS THE SAME COLOR TO MATCH ADJACENT DRYWALL
8' - 0" M6 SURFACE. PAINT ALL SUPPLY / RETURN GRILLES AND LIGHT TRIM IN A.C.T. CEILINGS
EQ EQ (OTHER THAN WHITE) TO MATCH A.C.T. COLOR.
R4
7' - 6"
OPEN DECK R03 PRELIMINARY
SD FOR REVIEW ONLY
OPEN DECK R03 10' - 6" 17. ALL EXPOSED PIPES, CONDUITS, DUCTS, ETC. IN FINISHED AREAS SHALL BE
SD PAINTED TO MATCH FINISHED CEILING CONDITION U.N.O. THESE DOCUMENTS ARE FOR DESIGN REVIEW
10' - 6" R03 AND NOT INTENDED FOR BIDDING,
EQ
CL
P2 P2 P2 P2 P2 P2 R03 R03 R03 CI DESIGN.
CL
R03
EQ
F
EQ EQ C
CL
R03
CEILING PLAN LEGEND
EQ L EQ
N
P2 P2 P2 P2 P2 P2 P2 P2 P2 P2
C
EQ
P3 P2
CL
2' - 4"
CL
EQ
EQ
R04 2' X 2' RECESSED LED LIGHT FIXTURE
G
CEILING SERVICE PANEL (CASEWORK TYPE
DRAWING A360)
CLIENT: J. CALNAN
WESTWOOD, MA
I
A1 / A200.3
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
GROUND FLOOR
REFLECTED CEILING
PLAN - WEST
11/16/2022 4:56:23 PM
5 4 3 2
SCALE: 1/8" = 1'-0"
1 A200.2
ARCHITECTURE PLANNING INTERIORS
CEILING PLAN GENERAL NOTES LANDSCAPE ARCHITECTURE GRAPHICS
8. FOR EXTERIOR BUILDING MOUNTED LIGHT LOCATIONS, SEE A500 SERIES EXTERIOR
ELEVATIONS.
9. ALL DROPPED A.C.T. CEILING GRIDS ARE TO BE EQUIDISTANT OFF PARTITIONS U.N.O.
12. LIGHT FIXTURES, SPRINKLER HEADS, EXIT SIGNS, AND OTHER CEILING ELEMENTS
SHALL BE CENTERED OR QUARTERED IN INDIVIDUAL CEILING TILE U.N.O.
F
CL CL CL C
9' - 4" 10' - 0" 10' - 0" ACT-1
R1 R1 R1 R1 R1 R1
EQ
8' - 0"
R03
R03 R03 P3
OPEN DECK
P3 P3
CEILING PLAN LEGEND
8' - 0"
N
EQ
R1 R03 R03
GYPSUM CEILING
G
CEILING SERVICE PANEL (CASEWORK TYPE
DRAWING A360)
CLIENT: J. CALNAN
WESTWOOD, MA
I
A1 / A200.2
GROUND FLOOR
REFLECTED CEILING
PLAN - EAST
11/16/2022 4:56:26 PM
5 4 3 2
SCALE: 1/8" = 1'-0"
1 A200.3
ARCHITECTURE PLANNING INTERIORS
CEILING PLAN GENERAL NOTES LANDSCAPE ARCHITECTURE GRAPHICS
6 7 8
1. SEE SPECIFICATIONS FOR DETAILED INFORMATION.
CL CL R4 R4 R4 R4 9. ALL DROPPED A.C.T. CEILING GRIDS ARE TO BE EQUIDISTANT OFF PARTITIONS U.N.O.
CL
5' - 0"
R4 R4
5' - 0"
CL CL 10. CONTRACTOR TO FIELD VERIFY DIMENSIONS AND CONNECTION POINTS PRIOR TO
5' - 0" COMMENCEMENT OF NEW CONSTRUCTION. IN CASE OF CONFLICT, THE CONTRACTOR
R4 R4 SHALL NOTIFY THE ARCHITECT PRIOR TO PROCEEDING WITH WORK.
CL
R4 R4 R4 R4
5' - 0"
11. ALL ITEMS TO BE SUPPLIED AND INSTALLED BY CONTRACTOR UNLESS
1 2 1' - 4" 4" 3 8" 1' - 8" 4 5 SPECIFICALLY LISTED AS "N.I.C." OR "BY OTHERS".
CL CL CL CL CL CL CL CL CL CLCL CLCL CL CL CL CL CL CL CL CL R4 R4
R4 R4
CL
5' - 5" 5' - 8" 4' - 4" 6' - 8" 3' - 4" 7' - 8" 2' - 4" 8' - 8" 9' - 8" 10' - 0" 9' - 4" 8' - 4" 6' - 2" 2' - 9" 5' - 3" 5' - 3" 2' - 9" R4 R4
12. LIGHT FIXTURES, SPRINKLER HEADS, EXIT SIGNS, AND OTHER CEILING ELEMENTS
5' - 0"
SHALL BE CENTERED OR QUARTERED IN INDIVIDUAL CEILING TILE U.N.O.
E 13. PROVIDE FIRESTOPPING / DRAFT-STOPPING ABOVE CEILINGS AS REQUIRED BY
R4 R4
CL
3' - 6"
CODE.
5' - 0"
7' - 1"
EQ
14. PROVIDE FIRE RESISTANT ENCLOSURE FOR ALL RECESSED LIGHT FIXTURES IN
ST R2 R2 R2 R2 R2 R2 FIRE RATED CORRIDORS.
5' - 4"
ST R4 R4
CL
CSP-1
CL
15. USE PLENUM RATED CABLE, CONDUIT, BOXES, ETC. IN PLENUM RATED WALLS AND
5' - 0"
P1 CSP-1 P1 CSP-1 P1
CL
P1 P1 P1 P1 P1 P1 P1 P1 P1 CEILINGS. ALL PENETRATIONS ARE TO BE COMPLETELY SEALED. SEE MEP/FP
CL
CL
OPEN DECK CL
7' - 2"
R01
EQ
3' - 4" 16. CONTRACTOR TO PAINT ALL SUPPLY / RETURN GRILLES AND LIGHT TRIM IN
5' - 0"
13' - 8"
ST
R2
ST
DRYWALL CEILINGS AND SOFFITS THE SAME COLOR TO MATCH ADJACENT DRYWALL
ST R2 R2 R2 R2 R2 R2 SURFACE. PAINT ALL SUPPLY / RETURN GRILLES AND LIGHT TRIM IN A.C.T. CEILINGS
CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 R4
CL
CL
4' - 10" L
CL
EQ EQ EQ EQ
6' - 0"
8'CL- 6" 6' - 0" CL CL FOR REVIEW ONLY
ST
GWB-1 17. ALL EXPOSED PIPES, CONDUITS, DUCTS, ETC. IN FINISHED AREAS SHALL BE
6' - 0" PAINTED TO MATCH FINISHED CEILING CONDITION U.N.O. THESE DOCUMENTS ARE FOR DESIGN REVIEW
EQ
P1 P1 P1 P1 P1 P1 P1 P1 P1 9' - 0" SD
AND NOT INTENDED FOR BIDDING,
ST
CL
ST
CL
CL
CL
R1 18. SEE A920 SERIES FINISH SCHEDULE FOR ADDITIONAL CEILING FINISH INFORMATION.
P1 P1 THEY WERE PREPARED BY OR UNDER THE
4' - 0"
CL
ST R02 SD ACT-1 SUPERVISION OF
8' - 6" 19. REFER TO STRUCTURAL AND MEP/FP DRAWINGS AND SPECIFICATIONS FOR MORE
R01 R2 R2 R2 R2 R2 R2 CI DESIGN.
8' - 0"
ST R4 R4 INFORMATION.
CL
CL CL
EQ
OPEN DECK 6' - 0" 6' - 0"
4' - 0"
ST 13' - 8" 9" R4
CL
R4 R4 R4
CL
CL
F
CL CL CL CL CL CL 1' - 11"
CL CL CL CL CL 7"
6' - 11" 7' - 9" 4' - 8" 7' - 9" 7' - 9" 3' - 1" C
7' - 5" 1' - 6" 20' - 7" 9" 11' - 2" CL
3' - 11" L 4' - 0"
1' - 1"
3"
CEILING PLAN LEGEND
LL 3"
ST
P1.2 P1.2 P1 P1 R2 R2 R2 R2 R2 R2
C
CL
ST
R4
CC
CL
CL
R2
R1 R1 R1 N
5' - 0"
CSP-1 CSP-1
CL
9' - 9"
9' - 9"
P1 OPEN DECK OPEN DECK
CL
R4
CL
13' - 8" 13' - 8" 8' - 6"
6' - 1"
5' - 0"
SUSPENDED CEILING TILE ASSEMBLY
ST
P1.2 P1.2 R1 P1 P1 R2 R2 R2 R2 R1
4' - 11" L
C
CL
CL
R4
R03
2' X 4' RECESSED LED LIGHT FIXTURE
5' - 0"
6' - 0"
6' - 0"
R01 R01 ACT-1 SD
20' - 0"
CL
R04 CSP-1 CSP-1 CSP-1 CSP-1
ST
4' - 0" L
4' - 0" L
C
C
11"
5' - 1"
5' - 0"
SUSPENDED LIGHT FIXTURE
P1.2 P1.2 R1 P1 P1 R2 R2 R2 R2 R1
CL
CL
CL
R4 A3
CL
R1 R1 R1 R1
5' - 3"
5' - 3"
ST A920 1' - 6" DOWNLIGHT OR PENDANT CAN LIGHT
6' - 11"
G
CL
ST DRAWING A360)
ACT-1
7' - 10"
8' - 6" A4 R4 R4 R4
P1 A920
CL
7"
7' - 9"
CLCL CL CL CL CL CL
11"
13' - 8" EQ EQ 7' - 9" 9" 7' - 3" 3' - 9" 4' - 3" 6' - 11" 1' - 1" R3 GWB-1
8' - 6" GWB-1
CL R2 R2 R2 R2 R2 R2 9' - 0"
CSP-1 R01 CSP-1 R2 R2
CL CL
3' - 4"
2' - 3"
ST
1' - 11"
R4 R4 R4
P1.2 P1.2
CEILING PLAN KEY NOTES
1' - 2"
P1
6' - 3"
CL
4' - 0"
ST
ST
P1
CL
8' - 8"
P1 P1 R01 P1 P1 OPEN DECK R2 GWB-1 R01 TIGHTEN ANY LOOSE DUCT WORK AND WIRING. PAINT EXPOSED DECK,
CL
ST
10' - 0"
P1
CL
13' - 8" 9' - 0" STRUCTURE, AND DUCT AND WIRING PER FINISH LEGEND.
ST
OPEN DECK
7' - 0"
OPEN DECK ACT-1 R02 PAINT GWB CEILING PER FINISH LEGEND.
6' - 6"
ST
P1.2 P1.2 R2 R04 INFILL BOTTOM LEVEL OF SHAFT PER DETAILS ON A901.
P1 CSP-1 P1
CL
CSP-1 CSP-1
CL
3' - 6" L
C
EQ EQ 7' - 3"
CL CL
B
P1 P1 P1 P1 P1 P1 P1ST P1 P1 P1 P1 P1
CL
36' - 6"
ACT-1
8' - 6"
R2 R2 R2 R2 R2 R2
12' - 0"
R2 R2
ST ST
CLIENT: J. CALNAN
7' - 5"
CSP-1 R2 R2 R2 R2 R2 R2
4' - 0" L
C
R2 R2
WESTWOOD, MA
I
5' - 5" 5' - 7" 4' - 4" 6' - 8" 3' - 4" 7' - 8" 2' - 4" 8' - 8" 1' - 4" 8' - 10" 1' - 2" 10' - 0" 1' - 8" 8' - 4" 2' - 0" 8' - 0" 3' - 0" 6' - 11" 4' - 1" 5' - 11" 5' - 1" 4' - 11"
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
A1 / A201.3
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
FIRST FLOOR
REFLECTED CEILING
PLAN WEST
11/16/2022 4:56:42 PM
5 4 3 2
SCALE: 1/8" = 1'-0"
1 A201.2
ARCHITECTURE PLANNING INTERIORS
CEILING PLAN GENERAL NOTES LANDSCAPE ARCHITECTURE GRAPHICS
8. FOR EXTERIOR BUILDING MOUNTED LIGHT LOCATIONS, SEE A500 SERIES EXTERIOR
ELEVATIONS.
R4 R4
9. ALL DROPPED A.C.T. CEILING GRIDS ARE TO BE EQUIDISTANT OFF PARTITIONS U.N.O.
6"
13. PROVIDE FIRESTOPPING / DRAFT-STOPPING ABOVE CEILINGS AS REQUIRED BY
4' - 10" L 3' - 11"
CODE.
EQ
C
ST
FIRE RATED CORRIDORS.
12' - 4" R2 R2 R2 R2 R2 R2
P1 P1 15. USE PLENUM RATED CABLE, CONDUIT, BOXES, ETC. IN PLENUM RATED WALLS AND
CSP-1 P1 CSP-1
CL
P1 P1 P1 P1 P1 P1 P1 P1 P1 CEILINGS. ALL PENETRATIONS ARE TO BE COMPLETELY SEALED. SEE MEP/FP
CL
R4 R4
DRAWINGS AND SPECIFICATIONS FOR MORE INFORMATION.
7' - 2"
ST
ST
EQ
16. CONTRACTOR TO PAINT ALL SUPPLY / RETURN GRILLES AND LIGHT TRIM IN
4' - 2" 4' - 9" 5' - 3" 5' - 3" 4' - 9" DRYWALL CEILINGS AND SOFFITS THE SAME COLOR TO MATCH ADJACENT DRYWALL
CSP-1 CSP-1 CSP-1 CSP-1 CL CL CL CLST CL R4 R4 SURFACE. PAINT ALL SUPPLY / RETURN GRILLES AND LIGHT TRIM IN A.C.T. CEILINGS
CSP-1 CSP-1 R1
4' - 10" L
R2 R2 R2 R2 R2
CL ST
PRELIMINARY
EQ EQ CL CL CL CL FOR REVIEW ONLY
1' - 6" 6' - 0" 17. ALL EXPOSED PIPES, CONDUITS, DUCTS, ETC. IN FINISHED AREAS SHALL BE
6' - 0" 1' - 7"1' - 6" THESE DOCUMENTS ARE FOR DESIGN REVIEW
EQ L EQ
ACT-1 PAINTED TO MATCH FINISHED CEILING CONDITION U.N.O.
EQ
P1 P1 P1 P1 P1 P1 P1 P1 P1 R01 AND NOT INTENDED FOR BIDDING,
CL
8' - 6" R4 R4 R4 R4 R4 R4 R4
CL
ST
C
CONSTRUCTION, OR PERMIT PURPOSES.
ST
18. SEE A920 SERIES FINISH SCHEDULE FOR ADDITIONAL CEILING FINISH INFORMATION.
P1 P1 THEY WERE PREPARED BY OR UNDER THE
CL
R3 R1
6' - 0"
ST SD SUPERVISION OF
19. REFER TO STRUCTURAL AND MEP/FP DRAWINGS AND SPECIFICATIONS FOR MORE CI DESIGN.
OPEN DECK
INFORMATION.
EQ
12' - 4" R2 R2 R2 R2 R2 R02
ST R4 R4 R4 R4 R4
CL
ST
F CL CL CL 6" C
8' - 10" 22' - 0" 10' - 6" OPEN DECK R3
OPEN DECK
1'L - 4"L 4' - 2"
12' - 4"
6"
12' - 4"
1' - 1"
CEILING PLAN LEGEND
ST
P1.2 P1.2
EQ
EQ
C C
ST
R01
R1 R1 R01
1' - 4"
CSP-1 CSP-1 R2 R2 R2 R2 R2
N
ST
1
ST
R3 R3 GYPSUM CEILING
P1
8' - 8"
CL
CL
CL
SUSPENDED CEILING TILE ASSEMBLY
ST ACT-1
P1.2 P1.2
2' - 5" L
4' - 9" 1' - 9" 10' - 0" 2' - 9" 4' - 8" 2' - 5" 3' - 1" 10' - 0" 2' - 5" 3' - 5"
C
8' - 6"
EQ
EQ
R1 R2 R2 R2 R2 R1 P3 R03 P3
CL CL CL CL CL CL CL CL 2' X 4' RECESSED LED LIGHT FIXTURE
CSP-1 CSP-1
CL
R1 R1
20' - 0"
ACT-1
8' - 6"
ST A1
ACT-1 SUSPENDED LIGHT FIXTURE
P1.2 P1.2 A4 A920
3' - 0" L
8' - 6"
C
R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 GWB-1
A920 8' - 6"C
OPEN DECK CL L DOWNLIGHT OR PENDANT CAN LIGHT
CSP-1 CSP-1 C 10" EQ EQ
CL
12' - 4" EQ L EQ EQ EQ
G P1
CL
1' - 5"
R3 GWB-1 R3
7' - 0"
1' - 3"
10' - 0" 10' - 0" 10' - 0" 4' - 7" R1 R1 R1 R1 R1
12' - 4" 8' - 6"
8' - 7"
EQ
EQ
OPEN DECK 8' - 6"
1' - 9"
8' - 6"
5' - 1"
ST
P1 8' - 6"
CL
ST
12' - 4" 2 HOUR RESISTANT SPRAY FIREPROOFING
P1 P1 P1 P1 R1 R1
ST
CL
R1
20' - 0"
EQ EQ
CSP-1 CSP-1 P1
4' - 11" L
CL
C
EQ
CL
R01 R2 R2 R2 ACT-1 ACT-1 ACT-1
ST
ST R1 R1 8' - 6" 8' - 6" 8' - 6"
EQ
EQ EQ
12' - 0"
OPEN DECK R1 R1 R1 R1 R1
P1.2 P1.2 R1
CEILING PLAN KEY NOTES
CL
12' - 4" CL
5' - 6"
R01 R01
EQ
R01 TIGHTEN ANY LOOSE DUCT WORK AND WIRING. PAINT EXPOSED DECK,
P1
CL
EQ
CSP-1 CSP-1 P1 P1 P1 P1 R01 STRUCTURE, AND DUCT AND WIRING PER FINISH LEGEND.
4' - 6" L
C
CL
R1 R1
ST
ST P1 R1 R1
R03 EXISTING CEILING AND LIGHTS TO REMAIN.
CL
ST
P1.2 P1.2
CL
EQ
12' - 4"
7"
ACT-1 ACT-1
8' - 6" 8' - 6" B
R2 R2 R2 R2 R2 R1 R1 R2 R2
ST R1
ACT-1 ACT-1
ST
8' - 6" 8' - 6"
P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1
CL
36' - 3"
R2 R1 R1
R2 R2 R2 R2 R2 R2 R2 R2
12' - 0"
ST ST
CLIENT: J. CALNAN
R2 R2 R2 R2 R2 R2 R2 R2
7' - 4"
CSP-1
4' - 1" L
C
WESTWOOD, MA
I
4' - 11" 6' - 0" 4' - 0" 7' - 0" 3' - 0" 8' - 0" 2' - 0" 8' - 8" 1' - 4" 8' - 4" 1' - 8" 10' - 0" 1' - 4" 8' - 8" 2' - 0" 8' - 0" 3' - 0" 7' - 0" 4' - 1" 5' - 11" 5' - 0" 5' - 0"
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
A1 / A202.3
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
SECOND FLOOR
REFLECTED CEILING
PLAN WEST
11/16/2022 4:56:52 PM
5 4 3 2
SCALE: 1/8" = 1'-0"
1 A202.2
ARCHITECTURE PLANNING INTERIORS
CEILING PLAN GENERAL NOTES LANDSCAPE ARCHITECTURE GRAPHICS
8. FOR EXTERIOR BUILDING MOUNTED LIGHT LOCATIONS, SEE A500 SERIES EXTERIOR
ELEVATIONS.
9. ALL DROPPED A.C.T. CEILING GRIDS ARE TO BE EQUIDISTANT OFF PARTITIONS U.N.O.
9"
9"
4' - 6" L 4' - 3"
CODE.
5' - 0"
R2 R2 R2 R2
CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 R1 R1 R1 R1 R2 R2 R2 14. PROVIDE FIRE RESISTANT ENCLOSURE FOR ALL RECESSED LIGHT FIXTURES IN
C
P1
CL
FIRE RATED CORRIDORS.
R01 ACT-1 ACT-1
8' - 6" 8' - 6" 15. USE PLENUM RATED CABLE, CONDUIT, BOXES, ETC. IN PLENUM RATED WALLS AND
P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 CEILINGS. ALL PENETRATIONS ARE TO BE COMPLETELY SEALED. SEE MEP/FP
CL
10' - 0"
OPEN DECK R1 R1 R1 R1 DRAWINGS AND SPECIFICATIONS FOR MORE INFORMATION.
12' - 6" R1 R1
7' - 4"
R1 R1 R1 R1 16. CONTRACTOR TO PAINT ALL SUPPLY / RETURN GRILLES AND LIGHT TRIM IN
R2 DRYWALL CEILINGS AND SOFFITS THE SAME COLOR TO MATCH ADJACENT DRYWALL
P1 SURFACE. PAINT ALL SUPPLY / RETURN GRILLES AND LIGHT TRIM IN A.C.T. CEILINGS
CL
ACT-1
ST
ST
CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 (OTHER THAN WHITE) TO MATCH A.C.T. COLOR.
4' - 8" L
C
1' - 7"
R1 R1 R1
5' - 0"
ST 8' - 6"
EQ EQ PRELIMINARY
17. ALL EXPOSED PIPES, CONDUITS, DUCTS, ETC. IN FINISHED AREAS SHALL BE FOR REVIEW ONLY
ST
CL 1 PAINTED TO MATCH FINISHED CEILING CONDITION U.N.O. THESE DOCUMENTS ARE FOR DESIGN REVIEW
R1 R1
ST
ST
P1 P1 P1 P1 P1 OPEN DECK P1 P1 P1 P1 P1 R1 AND NOT INTENDED FOR BIDDING,
CL
CL CL CL CL R1
R01 12' - 6" R4 R4 R4 R4 R4 R4 R4 CONSTRUCTION, OR PERMIT PURPOSES.
10' - 0" 10' - 0" 10' - 0" 18. SEE A920 SERIES FINISH SCHEDULE FOR ADDITIONAL CEILING FINISH INFORMATION.
5' - 11"
CL THEY WERE PREPARED BY OR UNDER THE
9' - 7"
EQ EQ GWB-1 SUPERVISION OF
R02 19. REFER TO STRUCTURAL AND MEP/FP DRAWINGS AND SPECIFICATIONS FOR MORE
9' - 7"
CL
ST ACT-1
ST
3' - 9"
ST
8' - 6" R4 R4 R4 R4 R4
R1
P1 P1 P1 P1
CL
R1 R1
ST
F CSP-1
CL
CSP-1 CSP-1
3' - 5" L
7"
C
C
OPEN DECK
6' - 3"
1' - 9"
P1 P1 12' - 6"
CL
12' - 0"
R1 R1 OPEN DECK OPEN DECK
ST7' - 3"
12' - 6" P1 12' - 6"
CL
11' - 0" 7' - 8" 3' - 4" 16' - 8"
N
9' - 8"
EQ
R1 R1
4' - 7"
CL CL CL CL R01 CL 3' - 1"
R01 R01 GYPSUM CEILING
CSP-1
CL
CSP-1
CL
P1 P1 P1 P1
CL
GWB-1 OPEN DECK
P1 P1 OPEN DECK P1
CL
L
STC
9' --0"
10' 0" 12' - 6"
5' - 5"
SUSPENDED CEILING TILE ASSEMBLY
ST
12' - 6"
ST
ST
R1
9' - 6"
R2
EQ
P1 CL R1
EQ
CL
ST
ST
EQ
CL
5' - 0"
CL 1' - 6" 4' - 3" 5' - 3" 4' - 9" 5' - 6" CSP-1
C
OPEN DECK 8' - 6" 2' X 2' RECESSED LED LIGHT FIXTURE
CSP-1P1 P1 CSP-1 CSP-1 P1 OPEN DECK P1CSP-1
CL
CL
12' - 6" CL CL CL CL
12' - 6"
R01 ST
ACT-1
R01 SUSPENDED LIGHT FIXTURE
R1 R1 ACT-1 R1 ACT-1 8' - 6"
R1 R1 GWB-1
EQ
A4
EQ
4' - 3" 2' - 3" 10' - 0" 2' - 3" 4' - 0" 4' - 0" 2' - 3" 10' - 0" 2' - 3" 4' - 4" 8' - 6" R1 R1 R1 8' - 6" R1 R1 R1 R1 R1 R1
A4 9' - 0"
A920 A3 DOWNLIGHT OR PENDANT CAN LIGHT
CL CL CL CL CL CL CL CL
A920 A920
G
GWB-1 R3 R3 CEILING SERVICE PANEL (CASEWORK TYPE
R3 GWB-1 R3 GWB-1 R3 ACT-1
OPEN DECK ST
OPEN DECK 8' - 6" DRAWING A360)
5' - 0"
8' - 6" 8' - 6" 8' - 6"
ST 12' - 6" GWB-1 12' - 6" ST GWB-1 1 HOUR RESISTANT SPRAY FIREPROOFING
R01 R01 9' - 0" OPEN DECK ACT-1 R2
EQ
EQ
EQ
ST
CL
12' - 6" R1 8' - 6" R1
R01 R2 R2 R2 R2 R2 R2 R2 R2
4' - 6"
EQ
EQ
EQ CL EQ 2 HOUR RESISTANT SPRAY FIREPROOFING
ST
CL
CL
ST
12' - 6"
12' - 6" 12' - 6" P1 P1
CL
CL
ST EQ CL EQ
9' - 6"
EQ ST
EQ
EQ
4' - 3" 2' - 3" 10' - 0" 2' - 3" 4' - 0" 4' - 0" 2' - 3" 10' - 0" 2' - 3" 4' - 4" R01 EQ EQ 2' - 6" 3' - 1" 5' - 5" 4' - 7" ST 6' - 5" 3' - 7" 6' - 7" R2
EQ
R01 C R2 R2 R2 R2 R2 R2 R2 R2
CL CL CL CL CL CL CL
ST CL L CL CL CL CL CL CL
R2 R2 R01 TIGHTEN ANY LOOSE DUCT WORK AND WIRING. PAINT EXPOSED DECK,
STRUCTURE, AND DUCT AND WIRING PER FINISH LEGEND.
ST ACT-1 R02 PAINT GWB CEILING PER FINISH LEGEND.
ST
8' - 6"
R1 R1
P1 P1 R1 R1 R1 R2
ST
CL
P1 P1 ST P1 P1 R2 R2 R2
ST
R1 R1 R1
ACT-1 ACT-1 ACT-1
ACT-1 ACT-1 ACT-1 8' - 6" 8' - 6" 8' - 6" R2
R1 R1
P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 R2 8' - 6" 8' - 6" 8' - 6"
3' - 1" L
R01
C
R1 R1
8' - 11"
1' - 10"
ST ST
ACT-1
CLIENT: J. CALNAN
CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 8' - 6"
C
R1 R1
R1 R1
WESTWOOD, MA
I
4' - 11" 6' - 1" 3' - 11" 7' - 1" 2' - 11" 8' - 1" 3' - 4" 7' - 2" 1' - 5" 8' - 7" 1' - 5" 10' - 0" 1' - 7" 8' - 5" 1' - 11" 8' - 1" 3' - 1" 6' - 11" 4' - 1" 5' - 11" 5' - 1" 4' - 11"
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
A1 / A203.3
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
THIRD FLOOR
REFLECTED CEILING
PLAN WEST
11/16/2022 4:57:02 PM
5 4 3 2
SCALE: 1/8" = 1'-0"
1 A203.2
ARCHITECTURE PLANNING INTERIORS
CEILING PLAN GENERAL NOTES LANDSCAPE ARCHITECTURE GRAPHICS
8. FOR EXTERIOR BUILDING MOUNTED LIGHT LOCATIONS, SEE A500 SERIES EXTERIOR
ELEVATIONS.
P1.4
ACT-1
8' - 6" 9. ALL DROPPED A.C.T. CEILING GRIDS ARE TO BE EQUIDISTANT OFF PARTITIONS U.N.O.
8"
4' - 1"
CL CODE.
EQ EQ
R2 R2 R2 R2 R2 R1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 14. PROVIDE FIRE RESISTANT ENCLOSURE FOR ALL RECESSED LIGHT FIXTURES IN
CSP-1 CSP-1 CSP-1
CL
EQ
FIRE RATED CORRIDORS.
5' - 3"
ACT-1 15. USE PLENUM RATED CABLE, CONDUIT, BOXES, ETC. IN PLENUM RATED WALLS AND
ACT-1 8' - 6" CEILINGS. ALL PENETRATIONS ARE TO BE COMPLETELY SEALED. SEE MEP/FP
P1 P1 P1 P1 P1 P1 P1 P1 P1 P1
CL
8' - 6" P1 DRAWINGS AND SPECIFICATIONS FOR MORE INFORMATION.
CL
R1
R1
6' - 9"
16. CONTRACTOR TO PAINT ALL SUPPLY / RETURN GRILLES AND LIGHT TRIM IN
R2 R2 R2 R2 DRYWALL CEILINGS AND SOFFITS THE SAME COLOR TO MATCH ADJACENT DRYWALL
SURFACE. PAINT ALL SUPPLY / RETURN GRILLES AND LIGHT TRIM IN A.C.T. CEILINGS
EQ
ST
ST
CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 (OTHER THAN WHITE) TO MATCH A.C.T. COLOR.
CL
1' - 7"
ST
PRELIMINARY
4' - 11"
17. ALL EXPOSED PIPES, CONDUITS, DUCTS, ETC. IN FINISHED AREAS SHALL BE FOR REVIEW ONLY
ST
PAINTED TO MATCH FINISHED CEILING CONDITION U.N.O. THESE DOCUMENTS ARE FOR DESIGN REVIEW
OPEN DECK
ST
ST
R1 R1 R1 R1 R1 R1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 AND NOT INTENDED FOR BIDDING,
12' - 6"
CL
R4 R4 1 CONSTRUCTION, OR PERMIT PURPOSES.
18. SEE A920 SERIES FINISH SCHEDULE FOR ADDITIONAL CEILING FINISH INFORMATION.
THEY WERE PREPARED BY OR UNDER THE
5' - 3"
CL
SUPERVISION OF
7' - 10"
EQ EQ 19. REFER TO STRUCTURAL AND MEP/FP DRAWINGS AND SPECIFICATIONS FOR MORE
9' - 1"
CI DESIGN.
P1 INFORMATION.
CL
ST
ST
R4 GWB-1 ST
R1 R1 8' - 6"
CL
F CSP-1
CL
10' - 0"
2' - 11"
ST
6' - 4"
C
P1 P1
CL
CL CL CL CL CL CL
P1
5' - 8" 4' - 8" 5' - 4" 4' - 2" 1' - 6" EQ EQ
ST
CEILING PLAN LEGEND
R3
CL
R1 R1 R1 R1 A4 N
EQ
EQ
CL
ST
6' - 4"
A920
CSP-1
ST GYPSUM CEILING
CL
10' - 0"
OPEN DECK P1 OPEN DECK P1 GWB-1
R3
CL
ST C
OPEN DECK P1 8' - 6"
12' - 6" 12' - 6" SUSPENDED CEILING TILE ASSEMBLY
ST
ST
12' - 6"
8' - 6"
ST
8' - 4"
11' - 0"
EQ
EQ
P1
ST
CL
R1 R1
EQ
EQ
2' X 4' RECESSED LED LIGHT FIXTURE
ST
CSP-1
7' - 10"
4' - 2" L
C
OPEN DECK ST
5' - 0"
12' - 6" CSP-1 CSP-1
CL
CL
P1 OPEN DECK P1 P1 OPEN DECK P1
CL
2' X 2' RECESSED LED LIGHT FIXTURE
CL
P1.5 12' - 6" 12' - 6"
1' - 11"
CL
ACT-1 ACT-1 CL CL SUSPENDED LIGHT FIXTURE
11" GWB-1 1' - 3" 8' - 3" 7" 4' - 9" 4' - 4" 3' - 5" 5' - 0" 1' - 7" 4' - 5"
EQ
EQ
8' - 6" 8' - 6" 8' - 6"
EQ EQ
R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 CL CL CL CL CL CL
CL CL CL CSP-1 CSP-1
2' - 6" L
CL
DOWNLIGHT OR PENDANT CAN LIGHT
1' - 11"
5' - 0"
R1 R1 CSP-1 CSP-1 DRAWING A360)
CL
R1 12' - 6" 12' - 6"
ST
GWB-1 OPEN DECK OPEN DECK
EQ
1 HOUR RESISTANT SPRAY FIREPROOFING
EQ
CSP-1
EQ
11' - 1"
EQ
CL
ACT-1 R2 12' - 6" 12' - 6"
ST
8' - 6" R2 R2
8' - 6" R1 ACT-1 ACT-1 R01
EQ
EQ
EQ
R01
8' - 6" 8' - 6" 2 HOUR RESISTANT SPRAY FIREPROOFING
ST
R01 CSP-1P1 R01 P1 P1 R01 P1 P1 OPEN DECK
CL
P1 OPEN DECK P1
CL
CL
CL
P1
ST
ST
R1 R1
ST
R1 P1 P1 P1 R01 CSP-1 12' - 6" 12' - 6" CSP-1
CL
CL
CL
CL
OPEN DECK
12' - 6"
ST
ST
ST
ST
R01
EQ
EQ
EQ
EQ
CEILING PLAN KEY NOTES
EQ
EQ
EQ
R2 R2 R2 1' - 9"2' - 0" 7' - 3" 1' - 9" 9' - 0" 3' - 5" 4' - 8" 1' - 3" 8' - 9" 4' - 9" 4' - 4" 3' - 11" 4' - 6" 1' - 7" 4' - 5"
EQ EQ EQ EQ
CL CL CL CL CL ST CL CL CL CL CL CL CL
CL CL EQ EQ EQ EQ
R2 R1 R1
CL CL R01 TIGHTEN ANY LOOSE DUCT WORK AND WIRING. PAINT EXPOSED DECK,
ACT-1 STRUCTURE, AND DUCT AND WIRING PER FINISH LEGEND.
8' - 6" ST
ST
R2 R2 R2 R2 R2
ST
P1 P1 P1 P1 P1 P1
CL
ST ST
IDF
ACT-1
8' - 6" 339
R2 R2 R2 R2 R2
P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1
CL
R1 OPEN DECK
9" 12' - 6"
CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1
R01
12' - 0"
R1 R1 R1 R1
ST ST
CLIENT: J. CALNAN
CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1 CSP-1
C
R1 R1 R1 R1
WESTWOOD, MA
I
5' - 0" 5' - 0" 6' - 0" 4' - 0" 7' - 0" 3' - 0" 8' - 0" 2' - 0" 8' - 6" 1' - 6" 8' - 8" 1' - 4" 10' - 0" 1' - 6" 10' - 1" 1' - 4" 8' - 8" 1' - 5" 8' - 7" 2' - 5" 7' - 7" 3' - 5"
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
A1 / A203.2
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
THIRD FLOOR
REFLECTED CEILING
PLAN EAST
11/16/2022 4:57:14 PM
5 4 3 2
SCALE: 1/8" = 1'-0"
1 A203.3
FINISH PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
4. SEE A920 SERIES FOR FINISH SCHEDULE AND FLOOR TRANSITION DETAILS.
11. PROVIDE AND INSTALL ADEQUATE SOLID FIRE RETARDANT WOOD BLOCKING AT
ALL EXISTING AND NEW PARTITIONS TO RECEIVE MILLWORK, SHELVING, WALL
MOUNTED EQUIPMENT, PLUMBING ACCESSORIES, ETC. BLOCKING TO COMPLY WITH
AWPA U1 AND ASTM E84 REQUIREMENTS.
1 12. CLEARLY MARK LOCATION AND EXTENT OF CUTTING AND PATCHING PRIOR TO
COMMENCEMENT OF WORK.
1 2 3 4 5
STOR. 13. WHERE FINISH FLOORING IS TO BE INSTALLED OVER EXISTING CONCRETE SLABS
018 ON GRADE, TEST THE CONCRETE PER ASTM F2170-11 FOR MOISTURE CONTENT TO
ENSURE THE SUBSTRATE MEETS THE FINISH FLOORING MANUFACTURER'S
E INSTALLATION REQUIREMENTS. THE COST OF ANY SLAB MOISTURE MITIGATION FOR
FLOORING INSTALLATION SHALL BE IN THE CONTRACTOR'S BASE BID PRICE.
PT-1 WP-1
ELEC WB-1
F03 -
007 PT9
BOILER ROOM GAME ROOM
TL WB-1
006 SC PT-1 019
1
EP PT-1 1 WB-2
1 WB-2 CPT
5&6
PT-10
WB-1
FINISH PLAN LEGEND
DN STORAGE
004 TL
EP PT-1
1
1 WB-2 CPT FLOOR FINISH,
1 PRELIMINARY
SEE A920 FOR FINISH SCHEDULE FOR REVIEW ONLY
EP PT-1 SC PT-1 THESE DOCUMENTS ARE FOR DESIGN REVIEW
CLEANING CLOSET
1 WB-2 1 WB-2 PT-1 WALL AND BASE FINISH, AND NOT INTENDED FOR BIDDING,
003 DW & FIRE
VB-1 SEE A920 FOR FINISH SCHEDULE CONSTRUCTION, OR PERMIT PURPOSES.
SERVICE ROOM THEY WERE PREPARED BY OR UNDER THE
009 MAIL CELL SITE CLOSET SUPERVISION OF
LOADING 017 020 CI DESIGN.
PH ROOM EP PT-1
002
005 1 WB-2
CARPET (CPT-1)
F
C
EMR. CARPET (CPT-2)
021
SC PT-1 SC PT-1
STAIR 1 WB-2 1 WB-1
STORAGE WOOD FLOORING (WF)
032
030
EPOXY (EP)
STORAGE
031
CLIENT: J. CALNAN
WESTWOOD, MA
I
A1 / A300.3
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
GROUND FLOOR
FINISH PLAN - WEST
11/16/2022 4:57:17 PM
5 4 3 2
SCALE: 1/8" = 1'-0"
1 A300.2
FINISH PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
4. SEE A920 SERIES FOR FINISH SCHEDULE AND FLOOR TRANSITION DETAILS.
6 7 8 5. CONTRACTOR TO COORDINATE CONSTRUCTION WITH ALL TRADES PRIOR TO
COMMENCEMENT OF WORK. T 617.848.9511
BOSTON, MA
6. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING, PATCHING, AND 250 SUMMER STREET
REPLACING ANY DAMAGE DUE TO CONSTRUCTION OR INSTALLATION OF TRADES.
REPAIR, PATCH, AND FINISH OF EXISTING CONDITIONS DAMAGED BY NEW WORK ci-designinc.com
SHALL MATCH ADJACENT WORK.
11. PROVIDE AND INSTALL ADEQUATE SOLID FIRE RETARDANT WOOD BLOCKING AT
TL ALL EXISTING AND NEW PARTITIONS TO RECEIVE MILLWORK, SHELVING, WALL
2 MOUNTED EQUIPMENT, PLUMBING ACCESSORIES, ETC. BLOCKING TO COMPLY WITH
AWPA U1 AND ASTM E84 REQUIREMENTS.
CPT CPT
3 3 12. CLEARLY MARK LOCATION AND EXTENT OF CUTTING AND PATCHING PRIOR TO
DN F01 CPT F01 COMMENCEMENT OF WORK.
1 2 3 4 5 4
PT-1 PT-1 DN 13. WHERE FINISH FLOORING IS TO BE INSTALLED OVER EXISTING CONCRETE SLABS
WB-1 WB-1 ON GRADE, TEST THE CONCRETE PER ASTM F2170-11 FOR MOISTURE CONTENT TO
ENSURE THE SUBSTRATE MEETS THE FINISH FLOORING MANUFACTURER'S
E INSTALLATION REQUIREMENTS. THE COST OF ANY SLAB MOISTURE MITIGATION FOR
FLOORING INSTALLATION SHALL BE IN THE CONTRACTOR'S BASE BID PRICE.
1
UP
SUPPORT
142 F01
VCT PT-1
1 WB-2
A5
A301.2 FINISH PLAN LEGEND
1' - 0" UP
1
1' - 0"
OFFICE CPT FLOOR FINISH,
1 PRELIMINARY
144 SEE A920 FOR FINISH SCHEDULE FOR REVIEW ONLY
LOBBY THESE DOCUMENTS ARE FOR DESIGN REVIEW
F01 PT-1
PPE CPT PT-1 WALL AND BASE FINISH, AND NOT INTENDED FOR BIDDING,
100 VB-1 CONSTRUCTION, OR PERMIT PURPOSES.
141 F01 1 WB-1 SEE A920 FOR FINISH SCHEDULE
THEY WERE PREPARED BY OR UNDER THE
SUPERVISION OF
VCT PT-1 TL PT-1 CI DESIGN.
1 WB-2 1&2 TB-1
CARPET (CPT-1)
F
C
CLO. CARPET (CPT-2)
ELEC 147
CPT
145
1
VCT
EXISTING TO REMAIN N
1 PT-1
WB-1
VINYL COMPOSITE TILE (VCT)
1' - 0"
136
PT-1
VCT PT-1 WB-2
1 WB-2 F01 LOBBY
1 F01
101
CLIENT: J. CALNAN
WESTWOOD, MA
I
A1 / A301.3
12X24
1' - 0"
TYP.
TL-2: MITTENS
12X12 CUT TILES
1' - 0"
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
1' - 0"
PLAN - WEST
11/16/2022 4:57:23 PM
1' - 0" 2' - 0" 1' - 0" 1' - 0" 2' - 0" 1' - 0"
5
SCALE: 1/2" = 1'-0"
4 3 2
SCALE: 1/8" = 1'-0"
1 A301.2
FINISH PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
4. SEE A920 SERIES FOR FINISH SCHEDULE AND FLOOR TRANSITION DETAILS.
11. PROVIDE AND INSTALL ADEQUATE SOLID FIRE RETARDANT WOOD BLOCKING AT
ALL EXISTING AND NEW PARTITIONS TO RECEIVE MILLWORK, SHELVING, WALL
MOUNTED EQUIPMENT, PLUMBING ACCESSORIES, ETC. BLOCKING TO COMPLY WITH
AWPA U1 AND ASTM E84 REQUIREMENTS.
CPT
3 12. CLEARLY MARK LOCATION AND EXTENT OF CUTTING AND PATCHING PRIOR TO
F01 COMMENCEMENT OF WORK.
10 11 12 13 14
PT-1 DN 13. WHERE FINISH FLOORING IS TO BE INSTALLED OVER EXISTING CONCRETE SLABS
WB-1 ON GRADE, TEST THE CONCRETE PER ASTM F2170-11 FOR MOISTURE CONTENT TO
ENSURE THE SUBSTRATE MEETS THE FINISH FLOORING MANUFACTURER'S
E INSTALLATION REQUIREMENTS. THE COST OF ANY SLAB MOISTURE MITIGATION FOR
FLOORING INSTALLATION SHALL BE IN THE CONTRACTOR'S BASE BID PRICE.
1
UP
OFFICE IDF SUPPORT
106 111 112
1 CPT PT-1
CPT VCT PT-1
1
1 WB-1
1 WB-2 FINISH PLAN LEGEND
1' - 0" UP
PT-1
1' - 0"
CARPET (CPT-1)
F MENS
107 C
CARPET (CPT-2)
SUPPORT SUPPORT
JAN.
114 115 EXISTING TO REMAIN N
108 VCT PT-1 VCT PT-1
1 WB-2 1 WB-2 VINYL COMPOSITE TILE (VCT)
F01 WOMENS
ELEC. 109
CERAMIC FLOOR TILE (CT)
103
STAIR
VCT PT-1 117 WOOD FLOORING (WF)
1 WB-2
EPOXY (EP)
F01
CORRIDOR CPT PT-1 ELEC IDF CORRIDOR VCT PT-1
2 WB-1 126 125 116 1 WB-2
140
CLIENT: J. CALNAN
WESTWOOD, MA
I
A1 / A301.2
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
5 4 3 2
SCALE: 1/8" = 1'-0"
1 A301.3
FINISH PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
4. SEE A920 SERIES FOR FINISH SCHEDULE AND FLOOR TRANSITION DETAILS.
11. PROVIDE AND INSTALL ADEQUATE SOLID FIRE RETARDANT WOOD BLOCKING AT
ALL EXISTING AND NEW PARTITIONS TO RECEIVE MILLWORK, SHELVING, WALL
MOUNTED EQUIPMENT, PLUMBING ACCESSORIES, ETC. BLOCKING TO COMPLY WITH
AWPA U1 AND ASTM E84 REQUIREMENTS.
12. CLEARLY MARK LOCATION AND EXTENT OF CUTTING AND PATCHING PRIOR TO
1 2 3 4 5
A1 / A302.4 COMMENCEMENT OF WORK.
SUPPORT
259
VCT PT-1
1 WB-2
FINISH PLAN LEGEND
DN
1
OFFICE
262 CPT FLOOR FINISH,
1 PRELIMINARY
SEE A920 FOR FINISH SCHEDULE FOR REVIEW ONLY
PPE CPT PT-1 THESE DOCUMENTS ARE FOR DESIGN REVIEW
F01 1 WB-1 CORRIDOR F01 PT-1 WALL AND BASE FINISH, AND NOT INTENDED FOR BIDDING,
258 F01 264 VB-1 SEE A920 FOR FINISH SCHEDULE CONSTRUCTION, OR PERMIT PURPOSES.
CPT PT-1 CPT THEY WERE PREPARED BY OR UNDER THE
1 SUPERVISION OF
VCT PT-1 1 WB-1 1
CI DESIGN.
1 WB-2
CPT PT-1
2 WB-1 CLO. CLO. CARPET (CPT-1)
F 206 207
C
F02
UP CARPET (CPT-2)
STAIR
OFFICE HUDDLE
PT-3
237 236 WB-1
CLIENT: J. CALNAN
WESTWOOD, MA
I
A302.3 / A1
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
5 4 3 2
SCALE: 1/8" = 1'-0"
1 A302.2
FINISH PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
4. SEE A920 SERIES FOR FINISH SCHEDULE AND FLOOR TRANSITION DETAILS.
11. PROVIDE AND INSTALL ADEQUATE SOLID FIRE RETARDANT WOOD BLOCKING AT
ALL EXISTING AND NEW PARTITIONS TO RECEIVE MILLWORK, SHELVING, WALL
MOUNTED EQUIPMENT, PLUMBING ACCESSORIES, ETC. BLOCKING TO COMPLY WITH
AWPA U1 AND ASTM E84 REQUIREMENTS.
12. CLEARLY MARK LOCATION AND EXTENT OF CUTTING AND PATCHING PRIOR TO
COMMENCEMENT OF WORK.
A1 / A302.4 10 11 12 13 14
13. WHERE FINISH FLOORING IS TO BE INSTALLED OVER EXISTING CONCRETE SLABS
ON GRADE, TEST THE CONCRETE PER ASTM F2170-11 FOR MOISTURE CONTENT TO
ENSURE THE SUBSTRATE MEETS THE FINISH FLOORING MANUFACTURER'S
E INSTALLATION REQUIREMENTS. THE COST OF ANY SLAB MOISTURE MITIGATION FOR
OFFICE FLOORING INSTALLATION SHALL BE IN THE CONTRACTOR'S BASE BID PRICE.
CPT
214
1
PT-1 CONFERENCE SUPPORT
WB-1 215 216
EP PT-1
CPT PT-1 VCT PT-1 1 WB-2
1 WB-1 1 WB-2
IDF
CLIENT: J. CALNAN
WESTWOOD, MA
I
A1 / A302.2
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
5 4 3 2
SCALE: 1/8" = 1'-0"
1 A302.3
FINISH PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
4. SEE A920 SERIES FOR FINISH SCHEDULE AND FLOOR TRANSITION DETAILS.
11. PROVIDE AND INSTALL ADEQUATE SOLID FIRE RETARDANT WOOD BLOCKING AT
ALL EXISTING AND NEW PARTITIONS TO RECEIVE MILLWORK, SHELVING, WALL
ENTRY MOUNTED EQUIPMENT, PLUMBING ACCESSORIES, ETC. BLOCKING TO COMPLY WITH
200 AWPA U1 AND ASTM E84 REQUIREMENTS.
CPT
1 CPT PT-1 12. CLEARLY MARK LOCATION AND EXTENT OF CUTTING AND PATCHING PRIOR TO
OFFICE OPEN OFFICE 3 WB-1 COMMENCEMENT OF WORK.
273 274 PT-1 13. WHERE FINISH FLOORING IS TO BE INSTALLED OVER EXISTING CONCRETE SLABS
CLO. WB-1 ON GRADE, TEST THE CONCRETE PER ASTM F2170-11 FOR MOISTURE CONTENT TO
CPT PT-1 CPT PT-1 275 ENSURE THE SUBSTRATE MEETS THE FINISH FLOORING MANUFACTURER'S
1 WB-1 1 WB-1 INSTALLATION REQUIREMENTS. THE COST OF ANY SLAB MOISTURE MITIGATION FOR
COFFEE ELEC FLOORING INSTALLATION SHALL BE IN THE CONTRACTOR'S BASE BID PRICE.
CLO. STORAGE
270 201
272 271
B
OFFICE
269 CPT PT-1 CORRIDOR
1 WB-1
CPT PT-1
202
F01 FINISH PLAN LEGEND
1 WB-1 OFFICE CPT
267 2
C
EXISTING TO REMAIN N
OPEN OFFICE
205 CERAMIC FLOOR TILE (CT)
EPOXY (EP)
LVT PT-1 1
1 WB-2
1
FINISH PLAN KEY NOTES
PT
-4
D
E OFFICE
DN CPT
214
1
PT-1
WB-1
CLIENT: J. CALNAN
WESTWOOD, MA
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
5 4 3 2
SCALE: 1/8" = 1'-0"
1 A302.4
FINISH PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
4. SEE A920 SERIES FOR FINISH SCHEDULE AND FLOOR TRANSITION DETAILS.
11. PROVIDE AND INSTALL ADEQUATE SOLID FIRE RETARDANT WOOD BLOCKING AT
ALL EXISTING AND NEW PARTITIONS TO RECEIVE MILLWORK, SHELVING, WALL
MOUNTED EQUIPMENT, PLUMBING ACCESSORIES, ETC. BLOCKING TO COMPLY WITH
AWPA U1 AND ASTM E84 REQUIREMENTS.
12. CLEARLY MARK LOCATION AND EXTENT OF CUTTING AND PATCHING PRIOR TO
COMMENCEMENT OF WORK.
1 2 3 4 5 A1 / A303.4
13. WHERE FINISH FLOORING IS TO BE INSTALLED OVER EXISTING CONCRETE SLABS
ON GRADE, TEST THE CONCRETE PER ASTM F2170-11 FOR MOISTURE CONTENT TO
ENSURE THE SUBSTRATE MEETS THE FINISH FLOORING MANUFACTURER'S
E INSTALLATION REQUIREMENTS. THE COST OF ANY SLAB MOISTURE MITIGATION FOR
FLOORING INSTALLATION SHALL BE IN THE CONTRACTOR'S BASE BID PRICE.
HUDDLE HUDDLE
378 379
PPE PT-3 PT-3
WB-1 WB-1
377 CPT PT-1
CPT PT-1
1 WB-1 1 WB-1
OPEN LAB VCT PT-1
373
1 WB-2 FINISH PLAN LEGEND
VCT PT-1 F01
1 WB-2 CPT FLOOR FINISH,
1 PRELIMINARY
SEE A920 FOR FINISH SCHEDULE FOR REVIEW ONLY
THESE DOCUMENTS ARE FOR DESIGN REVIEW
CORRIDOR PT-1 WALL AND BASE FINISH, AND NOT INTENDED FOR BIDDING,
344 VB-1 SEE A920 FOR FINISH SCHEDULE CONSTRUCTION, OR PERMIT PURPOSES.
THEY WERE PREPARED BY OR UNDER THE
CPT PT-1 SUPERVISION OF
1 CI DESIGN.
2 WB-1
CAFE
PT-4
382 CARPET (CPT-1)
F F02
C
LVT PT-1
MECH 1 WB-1 CARPET (CPT-2)
SUPPORT STAIR
381
376 320
EXISTING TO REMAIN N
VCT PT-1 EP PT-1 T-1
LAB UTILITILES &
SUPPORT 1 WB-2 1 EB-1
STORAGE
375 ELEVATOR LOBBY VINYL COMPOSITE TILE (VCT)
374
WELLNESS
350
VCT PT-1 VCT PT-1 383 PT-1
1 WB-2 1 WB-2 WB-2 CERAMIC FLOOR TILE (CT)
SUPPORT SUPPORT STAIR CORRIDOR LVT PT-1 TL PT-1 ELEV. ELEC.
1 WB-1 1 TB-1 315
368 369 371 372 102
VCT WOOD FLOORING (WF)
1
VCT PT-1 VCT PT-1
1 WB-2 F02 1
1 WB-2 F01 1
CORRIDOR F01 EPOXY (EP)
VCT PT-1 CPT PT-1
F01 380 2 WB-1
1 WB-2 1 CORRIDOR
ELEC. CLOSET STORAGE
358 357 346 F02 344
VCT PT-1 VCT PT-1 VCT PT-1 VCT PT-1 VCT PT-1
VCT PT-1 1 WB-2 1 WB-2 1 WB-2
1 WB-2 1 WB-2
1 WB-2
CPT PT-1
F01 1 WB-1
OPEN OFFICE
347 CPT
1
CLIENT: J. CALNAN
WESTWOOD, MA
I
A1 / A303.3
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
5 4 3 2
SCALE: 1/8" = 1'-0"
1 A303.2
FINISH PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
4. SEE A920 SERIES FOR FINISH SCHEDULE AND FLOOR TRANSITION DETAILS.
11. PROVIDE AND INSTALL ADEQUATE SOLID FIRE RETARDANT WOOD BLOCKING AT
ALL EXISTING AND NEW PARTITIONS TO RECEIVE MILLWORK, SHELVING, WALL
MOUNTED EQUIPMENT, PLUMBING ACCESSORIES, ETC. BLOCKING TO COMPLY WITH
AWPA U1 AND ASTM E84 REQUIREMENTS.
12. CLEARLY MARK LOCATION AND EXTENT OF CUTTING AND PATCHING PRIOR TO
COMMENCEMENT OF WORK.
A1 / A303.4 10 11 12 13 14
PT-3 13. WHERE FINISH FLOORING IS TO BE INSTALLED OVER EXISTING CONCRETE SLABS
WB-1 ON GRADE, TEST THE CONCRETE PER ASTM F2170-11 FOR MOISTURE CONTENT TO
ENSURE THE SUBSTRATE MEETS THE FINISH FLOORING MANUFACTURER'S
E INSTALLATION REQUIREMENTS. THE COST OF ANY SLAB MOISTURE MITIGATION FOR
FLOORING INSTALLATION SHALL BE IN THE CONTRACTOR'S BASE BID PRICE.
OFFICE
314 PPE
321
CPT PT-1 OPEN LAB
1 WB-1
VCT PT-1 324 FINISH PLAN LEGEND
1 WB-2
1 VCT PT-1
F01 1 WB-2 CPT FLOOR FINISH,
1 PRELIMINARY
SEE A920 FOR FINISH SCHEDULE FOR REVIEW ONLY
THESE DOCUMENTS ARE FOR DESIGN REVIEW
PT-1 WALL AND BASE FINISH, AND NOT INTENDED FOR BIDDING,
VB-1 SEE A920 FOR FINISH SCHEDULE CONSTRUCTION, OR PERMIT PURPOSES.
THEY WERE PREPARED BY OR UNDER THE
SUPERVISION OF
CI DESIGN.
PT-1
WB-2
B
HUDDLE HUDDLE
CLIENT: J. CALNAN
1 WB-1 1 WB-1
WESTWOOD, MA
I
A1 / A303.2
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
5 4 3 2
SCALE: 1/8" = 1'-0"
1 A303.3
FINISH PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
4. SEE A920 SERIES FOR FINISH SCHEDULE AND FLOOR TRANSITION DETAILS.
11. PROVIDE AND INSTALL ADEQUATE SOLID FIRE RETARDANT WOOD BLOCKING AT
OFFICE ALL EXISTING AND NEW PARTITIONS TO RECEIVE MILLWORK, SHELVING, WALL
388 MOUNTED EQUIPMENT, PLUMBING ACCESSORIES, ETC. BLOCKING TO COMPLY WITH
AWPA U1 AND ASTM E84 REQUIREMENTS.
CPT PT-1
1 WB-1 12. CLEARLY MARK LOCATION AND EXTENT OF CUTTING AND PATCHING PRIOR TO
COMMENCEMENT OF WORK.
VCT
1
IDF 1 CARPET (CPT-1)
385 C
PT-1
WB-2 CARPET (CPT-2)
CPT PT-1
C 1 WB-1
OFFICE
EXISTING TO REMAIN N
F01
307
VINYL COMPOSITE TILE (VCT)
CPT PT-1
IDF 1 WB-1
306 CERAMIC FLOOR TILE (CT)
CPT PT-1
D 1 WB-1
CONFERENCE
312
CPT PT-1
1 WB-1
HUDDLE
379
CLIENT: J. CALNAN
WESTWOOD, MA
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
5 4 3 2
SCALE: 1/8" = 1'-0"
1 A303.4
LABORATORY CASEWORK IDENTIFICATION TAG FLOOR MOUNTED CABINETS ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
ABOVE CEILING
2' - 8" 2' - 8"
EXTEND 3"
DEPTH (INCHES) 18" DEEP STAINLESS Sim
STEEL POLISHER SHELF 1
TYPE (B-BENCH/T-TABLE/SST- S.S. TABLE) WIDTH (INCHES) WITH 120V PLUG BEHIND A360
1' - 2"
T 617.848.9511
ABOVE CEILING
BASIC BENCH TYPE X - 30xxXXX
BOSTON, MA
EXTEND 3"
LOWER STORAGE ITEMS 4" PHENOLIC BACK 250 SUMMER STREET
(LEFT SIDE TO RIGHT SIDE) Sim SPLASH
1 ACRYLIC DRYING RACK ci-designinc.com
A360 W/ SS DRIP TRAY
3' - 4"
REFERENCE PLUMBING
DRAWINGS
REFRENCE PLUMBING D
DRAWINGS
4"0"
1" PHENOLIC TOP
BASIC LAB BENCH TYPES
4"
REFERENCE PLUMBING
DRAWINGS
PAINTED STL SIDE
PANEL
3' - 0"
3' - 0"
FOOT PEDALS
FOR POWER, EP, AP LOCATIONS UPRIGHTS SO THEY ARE FLUSH BACK TO BACK Sim
2
REQUIREMENTS TWO SETS OF ADJUSTABLE
3/4' PHENOLIC SHELVES A360
DATA OUTLET - TYP WITH PAINTED STEEL END 1" PHENOLIC TOP
BRACKETS (TYP.)
FAUCET BY MANUFACTURER
HUNG CABINET OR
1' - 6"
(ADJUSTABLE HEIGHT)
RECEPTACLE RECEPTACLE FOR REVIEW ONLY
(TYP) ADJUSTABLE THESE DOCUMENTS ARE FOR DESIGN REVIEW
.VARIES
1"PHENOLIC TOP HEIGHT PAINTED AND NOT INTENDED FOR BIDDING,
3' - 0"
LEVELING STEEL TABLE CONSTRUCTION, OR PERMIT PURPOSES.
FEET HUNG CABINET OR THEY WERE PREPARED BY OR UNDER THE
LEGS
DRAWER UNIT WHERE SUPERVISION OF
SCHEDULED CI DESIGN.
LEVELING FEET
8' - 0"
2' - 0" 2' - 7 1/2" 1' - 6" 2' - 8" 1' - 6"
LIGHT SWITCH
(OPEN)
SAFETY SHOWER
CLIENT: J. CALNAN
1 A360
REFER TO PLUMBING DRAWINGS
WESTWOOD, MA
REFER TO PLUMBING
DRAWINGS
CL 7"
TIE WIRING TO THREADED 4 1/2"
NOTE:
ROD, TYP.
PROVIDE FLOOR DEMARCATION
GRAPHIC AT ALL SAFETY SHOWERS.
4 1/2"
3"
SPACE
2' X 2' UTILITY PANEL REFER TO PLUMBING
BREAK METAL CL 7" 1' - 10" 1" DRAWINGS
FACTORY FINISH WHITE PIPE
DATA DROP, 2
SPACE
(REFER TO ELECTRICAL
4' - 7"
3' - 0"
PIPE SUPPORT FRAME
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
CASEWORK TYPES
4"
FINISHED FLOOR AS
QUICK DISCONNECT
SPARE GAS FITTINGS, 2
(REFER TO PLUMBING
SS / EW-1
GUARDIAN RECESSED EMERGENCY SHOWER
4" SCHEDULED
4"
DRAWINGS. BLANK OFF GBF1672
11/16/2022 4:57:55 PM
5
SCALE: 1 1/2" = 1'-0"
4 3
SCALE: 1 1/2" = 1'-0"
2
SCALE: 1 1/2" = 1'-0"
1
SCALE: 1 1/2" = 1'-0"
A360
ROOF PLAN GENERAL NOTES ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
12. ALL ROOF PENETRATIONS FOR EQUIPMENT AND PIPING SHALL BE FULLY PACKED
AND SEALED IN ACCORDANCE WITH APPLICABLE BUILDING AND FIRE CODES.
14. PROVIDE TAPERED RIGID INSULATION UNDER ROOFING AT ALL AREAS TO ENSURE
PROPER DRAINAGE. MINIMUM SLOPE SHALL BE 1/4" PER FOOT U.N.O.
6' - 0"
CLR
RP02
11' - 2"
6' - 0"
5' - 0"
3' - 0"
CLR
CLR
3' - 0"
CLR
RP05 3' - 0"
8' - 0" CLR
RP03
6' - 0"
CLR
RP04 RP02
13' - 6"
RP01
CLR
5' - 0"
3' - 0"
CLR
6' - 0"
CLR
RP02
3' - 0"
CLR
RP02 RP05
RP02 RP02
44' - 4"
8' - 0"
6' - 0" 10' - 0"
3' - 0"
CLR
CLR
6' - 0"
CLR
RP03
RP04
CLIENT: J. CALNAN
WESTWOOD, MA
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
ROOF CONSTRUCTION
PLAN
11/16/2022 4:57:59 PM
5 4 3 2
SCALE: 1/16" = 1'-0"
1 A401
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
PRELIMINARY
FOR REVIEW ONLY
THESE DOCUMENTS ARE FOR DESIGN REVIEW
AND NOT INTENDED FOR BIDDING,
CONSTRUCTION, OR PERMIT PURPOSES.
THEY WERE PREPARED BY OR UNDER THE
SUPERVISION OF
CI DESIGN.
LOUVER
CLIENT: J. CALNAN
WESTWOOD, MA
BOILER ROOM EXTERIOR INFILL ELEVATION
SCALE: 1/2" = 1'-0" B1
PT-1
G.C. TO PROVIDE G.C. TO PROVIDE
BRUSHED ALUMINUM T-1 PT-1 BRUSHED ALUMINUM
T-1 JOLLY STRIP AT JOLLY STRIP AT
TRANSITION, ALIGN WITH TRANSTITION, ALIGN
EDGE OF COUNTERTOP WITH EDGE OF
COUNTERTOP
F-1
F-1 F-1
1 11/16/2022 BULLETIN 01
S-1 A REV DATE DESCRIPTION
SS-1 S-1 SS-1 DESIGN ISSUED FOR
SS-1 S-1
DELIVERABLE: CONSTRUCTION
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
DRAWN BY: BZ
DW DW CHECKED BY: LG
PROJECT NUMBER: JA22019
WB-2 WB-2 SHEET TITLE:
WB-2
ELEVATIONS
1" 3' - 6" 3' - 0" 1' - 9" 1" 1' - 6" 2' - 1" 3' - 6" 1' - 6" 2' - 4" 1" 1' - 6" 1' - 6" 2' - 0" 3' - 6" 2' - 8" 1' - 6" 1"
Sim Sim Sim Sim Sim
Sim Sim Sim B3 B5 B1 B4 B2 Sim
B1 B2 B3 Sim Sim Sim Sim
B4 B5 B1 B2 B3
A901 A901 A901 A901 A901
A901 A901 A901 A901 A901 A901 A901 A901
11/16/2022 4:58:01 PM
5
SCALE: 1/2" = 1'-0"
4 3
SCALE: 1/2" = 1'-0"
2 1
SCALE: 1/2" = 1'-0"
A800
FINISH SCHEDULE ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
SPEC / SERIES /
TYPE DESIGNATION MATERIAL MANUFACTURER COLOR FINISH SIZE NOTES
STYLE / TYPE
COOL DOWN MULTIPLAY II 18" X 36" TENANT OFFICE AREAS
CPT-1 CARPET TILE BENTLEY N/A
400057 6AMYT4 1 MONOLITHIC INSTALL PROVIDE NEXSTEP CUSHION BACKING
DUR-A-GLAZE GRIND
SC-1 SEALED CONCRETE DUR-A-FLEX CONCRETE GRAY URETHANE TOP COAT N/A GROUND FLOOR CORRIDORS, STORAGE, ELECTRICAL
AND SEAL
EP-1 EPOXY POURED DUR-A-FLEX CONCRETE GRAY DUR-A-GUARD PIGMENTED ARMOR TOP N/A BOILER ROOM, 3RD FLOOR MECHANICAL
EIDER WHITE
EPOXY TO VCT TRANSITION
SCALE: 6" = 1'-0" D3 PT-1 PAINT SHERWIN WILLIAMS
SW 7014
N/A EGGSHELL N/A GENERAL
EIDER WHITE
PT-2 PAINT SHERWIN WILLIAMS N/A SEMI-GLOSS N/A HOLLOW METAL DOORS AND FRAMES
SW 7014
ACIER
PT-3 PAINT SHERWIN WILLIAMS N/A EGGSHELL N/A ACCENT
WALLS & SW 9170
SURFACES
CL CL CL CAVERN CLAY
PT-4 PAINT SHERWIN WILLIAMS N/A EGGSHELL N/A ACCENT
SW 7701
PRELIMINARY
EIDER WHITE CASHMERE FOR REVIEW ONLY
PT-5 PAINT SHERWIN WILLIAMS N/A N/A WOOD DOORS
SW 7014 PEARL THESE DOCUMENTS ARE FOR DESIGN REVIEW
AND NOT INTENDED FOR BIDDING,
DOOR, SEE SCHEDULE DOOR, SEE SCHEDULE DOOR, SEE SCHEDULE BURNISHED METALLIC CONSTRUCTION, OR PERMIT PURPOSES.
1 PT-9 PAINT WOLF GORDON SCUFFMASTER N/A N/A GAME ROOM - BIKE RACK THEY WERE PREPARED BY OR UNDER THE
BR10303
SUPERVISION OF
CI DESIGN.
CAVIAR
PT-10 PAINT WOLF GORDON N/A EGGSHELL N/A GAME ROOM - WALLS
MARBLE DOUBLE SW6990
HOLLYWOOD BEVEL
THRESHOLD CERAMIC TILE PARADISE ARROW
SCHLUTER RENO TK T-1 WALL TILE L'AC PORCELANOSA GROUP MOSAICOS | PARADISE GROUT TBD 11" x 11" PANTRY MILLWORK WALL
ALUMINUM TRANSITION STRIP, GRIS C
CARPET WITH SEALED JOHNSONITE VINYL FLUSH WITH TILE
THIN SET LATEX CERAMIC TILE
EDGES TRANSITION ADAPTOR STRIP ACOUSTIC WALL
PORTLAND CEMENT CARPET WITH SEALED EDGES CARPET WITH SEALED EDGES WP-1 TURF 94 CORAL TORRENT TILE N/A 30" X 30" PANELS GAME ROOM
SETTING BED THIN SET LATEX PORTLAND PANEL
(SET UNDER THRESHOLD) (SET UNDER THRESHOLD)
VINYL COMPOSITION TILE CEMENT SETTING BED
CONCRETE SLAB CONCRETE SLAB CONCRETE SLAB ARKTOS
SS-1 SOLID SURFACE WILSONART QUARTZ N/A N/A TENANT PANTRY MILLWORK
MAX
1/4"
Q4037
GREY
MILLWORK PL-1 PLASTIC LAMINATE WILSONART
1500
N/A MATTE N/A TENANT CABINETS
VERANDA TEAK
PL-2 PLASTIC LAMINATE WILSONART N/A MATTE N/A TENANT COPY AREA COUNTERTOPS
8209
FEATHER UP WITH FLASH PATCH
AT TRANSITION STRIP TO MAINTAIN
MOON ROCK TRADITIONAL VINYL 4" CONTINUOUS
LEVEL TRANSITION AS REQUIRED WB-1 RUBBER JOHNSONITE T.B.D. AT CARPET
29 STRAIGHT ROLLED GOODS
C5 C4 C3
LEATHERED
CERAMIC TILE TO CARPET TRANSITION AT RESTROOMS CARPET TO VCT TRANSITION CERAMIC TILE TO CARPET TRANSITION TB-1 TILE CROSSVILLE BUNNY OWEN STONE
GROUT TBD
4" X 24" BULLNOSE LOBBY
SCALE: 6" = 1'-0" SCALE: 6" = 1'-0" SCALE: 6" = 1'-0"
1
ACOUSTICAL CEILING OFFICES
ACT-1 ARMSTRONG WHITE DUNE 1774 ANGLED TEGULAR 24" X 24"
SEE PLAN TILE GRID: ARMSTRONG, PRELUDE, 15/16" EXPOSED TEE, WHITE
FOR WALL TYPE
ACOUSTICAL CEILING LABS
ACT-2 ARMSTRONG WHITE CLEANROOM VL 868 SQUARE LAY-IN 24" X 24"
TILE GRID: ARMSTRONG, PRELUDE, 15/16" EXPOSED TEE, WHITE
CEILING
CEILING BRIGHT
PT-6 PAINT SHERWIN WILLIAMS N/A FLAT N/A NEW AND EXISTING GWB CEILINGS AND SOFFITS
WHITE
EPOXY FLOOR WITH F-1 Kohler Co. K-596-CP VIBRANT STAINLESS WITH S-1
LAB-1 WATERSAVER L412 - 8VBBH STAINLESS STEEL
6"
INTEGRAL COVE BASE FEATHER UP WITH FLASH PATCH FEATHER UP WITH FLASH PATCH
AT TRANSITION STRIP TO MAINTAIN AT TRANSITION STRIP TO MAINTAIN LAB-2 WATERSAVER L412 - 8VBBH STAINLESS STEEL
LEVEL TRANSITION AS REQUIRED LEVEL TRANSITION AS REQUIRED S-1 KOHLER ELUHAD211550PD STAINLESS STEEL WITH F-1
CLIENT: J. CALNAN
SB-4 ELKAY EWS2520SACC STAINLESS STEEL PROVIDE INTEGRATED TOUCH-FREE, BATTERY POWERED LKB722C
FAUCET, BUFFED SATIN FINISH
WESTWOOD, MA
SS/EW-1 GUARDIAN EQUIPMENT GBF1672 Recessed Emergency Shower, Wall Mounted Exposed Shower Head
INTEGRAL EPOXY FLOOR BASE
SCALE: 3" = 1'-0" B5 CERAMIC TILE TO WALL BASE TRANSITION
SCALE: 6" = 1'-0" B4 CERAMIC TILE TO WALL TILE TRANSITION
SCALE: 6" = 1'-0" B3
STRUCTURE ABOVE
B.O. GYPBD. SOFFIT
PAINTED 5/8" GYPBD. XX'-XX" A.F.F.
METAL STUD DIAGONAL
B.O. GYPBD. SOFFIT ON 3-5/8" METAL
METAL STUD DIAGONAL BRACING AT 48" O.C.
STUDS AT 16" O.C. METAL STUD DIAGONAL SECURED TO UNDERSIDE
XX'-XX" A.F.F. FASTENED TO BRACING AT 48" O.C.
BRACING AT 48" O.C. OF STRUCTURE ABOVE
UNDERSIDE OF SECURED TO UNDERSIDE
PAINTED 5/8" GYPBD. SECURED TO UNDERSIDE A REV DATE DESCRIPTION
STRUCTURE ABOVE OF STRUCTURE ABOVE
SOFFIT ON 3-5/8" METAL OF STRUCTURE ABOVE
DESIGN ISSUED FOR
STUDS AT 16" O.C. DELIVERABLE: CONSTRUCTION
SUSPENDED CEILING
Autodesk Docs://690 Canton/JA22019_690 Canton_ARCH.rvt
SEE RCP
6"
6"
SEE FINISH SCHEDULE Copyright (c) by CI Design,Inc. All Rights Reserved.
SEE RCP
6"
PAINTED 5/8" GYPBD. SOFFIT DRAWN BY: Author
PAINTED 5/8" GYPBD. SIDEWALL SPRINKLER HEAD; ON 3-5/8" METAL STUDS AT 16"
SOFFIT ON 3-5/8" METAL CHECKED BY: LG/BR
COORDINATE WITH SOFFIT O.C. FASTENED TO UNDERSIDE B.O. CEILING
STUDS AT 16" O.C. CONSTRUCTION. SEE F.P. OF STRUCTURE ABOVE PROJECT NUMBER: JA22019
B.O. CEILING XX'-XX" A.F.F.
DWGS. FOR MORE INFO SHEET TITLE:
SEE RCP FOR HEIGHT
F.R. 2x BLOCKING
B.O. GYPBD. SOFFIT
XX'-XX" A.F.F.
SUSPENDED CEILING TILE AND GRID SCHEDULE
AS REQUIRED B.O. GYPBD. SOFFIT SYSTEM, SEE FINISH SCHEDULE
B.O. GYPBD. SOFFIT B.O. CEILING
SUSPENDED CEILING TILE SEE RCP FOR HEIGHT
CL
METAL STUDS AT 16" O.C. FASTENED TO SYSTEM, SEE FINISH SCHEDULE OF STRUCTURE ABOVE
UNDERSIDE OF STRUCTURE ABOVE
5
SCALE: 3" = 1'-0"
4 3
SCALE: 3" = 1'-0"
2
SCALE: 3" = 1'-0"
1
SCALE: 3" = 1'-0"
A920
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
DRAWING NUMBER
SHEET NUMBER
2. EXISTING PIPING WHERE SHOWN FOR VARIOUS SYSTEMS IS DIAGRAMMATIC ONLY.
CONSTRUCTION
F FIRE STANDPIPE PIPING FIRE HOSE RACK (PLAN) 2. THE INSTALLATION, COMPONENTS, SIZING, SPACING, CLEARANCES, POSITION & TYPE OF SYSTEMS CONFORMS TO 780
IFC PROGRESS
1
ISSUED FOR
BULLETIN 01
CMR SECTION 903.3, NFPA-13-2013 CHAPTER 6.
09/02/2022
09/19/2022
3. BECOME THOROUGHLY FAMILIAR WITH ACTUAL EXISTING CONDITIONS AT THE BUILDING OF THE PRESENT INSTALLATIONS,
11/16/2022
LOW PRESSURE FIRE DEPARTMENT INCLUDING LOCATIONS, SIZES, AND ELEVATIONS OF PIPING, TO WHICH CONNECTIONS MUST BE MADE OR WHICH MUST BE DRAWING TITLE
F(LP) FIRE HOSE CABINET (RISER)
CONNECTION CHANGED OR ALTERED. THE INTENT OF THE WORK IS SHOWN ON THE DRAWINGS AND DESCRIBED HEREINAFTER, AND NO 3. ONLY APPROVED DEVICES SHALL BE USED AS PER NFPA-13-2013, SECTION 6.1.1. T 617.848.9511
HIGH PRESSURE FIRE DEPARTMENT CONSIDERATION WILL BE GRANTED BY REASON OF LACK OF FAMILIARITY ON THE PART OF THE CONTRACTOR WITH BOSTON, MA
F(HP) FIRE HOSE CABINET (PLAN) 4. SPRINKLERS SHALL BE PROTECTED AGAINST FREEZING & INJURY AS PER 780 CMR SECTION 116.2.
CONNECTION ACTUAL PHYSICAL CONDITIONS AT THE SITE. 250 SUMMER STREET
SP 4. INSTALL ALL WORK IN FULL ACCORDANCE WITH THE REQUIREMENTS OF ALL LOCAL AND GOVERNMENTAL DEPARTMENTS 5. INSPECTIONS & TESTS OF SPRINKLER SYSTEMS SHALL BE CONDUCTED AS PER 780 CMR SECTION 901.5 & 901.5. ci-designinc.com
SPRINKLER MAIN PIPING FIRE HOSE VALVE 1 SP-001 SPRINKLER DRAWING INDEX, ABBREVIATIONS, SYMBOLS, ETC.
HAVING JURISDICTION OVER THESE MATTERS, AS WELL AS WITH ANY REQUIREMENTS OF THE NFPA, UL, AND OTHER
FIRE DEPARTMENT CONNECTION (WALL APPLICABLE CODES. SECURE AND PAY FOR NECESSARY APPROVALS, PERMITS, INSPECTIONS, ETC., AND DELIVER THE 6. THE OCCUPANCY OF THE AREAS TO BE SPRINKLERED SHALL BE IN ACCORDANCE WITH 780 CMR 903.
SPRINKLER BRANCH PIPING OFFICIAL RECORDS OF THE GRANTING OF PERMITS TO THE ARCHITECT WITHOUT ADDITIONAL COST TO THE OWNER. 2 DSP-100 GROUND FLOOR SPRINKLER DEMOLITION PLAN
MOUNTED)
7. WATER SUPPLY TEST CONNECTION & GAUGES SHALL BE PROVIDED AS PER NFPA-13-2013 CHAPTER 8.
SPRINKLER BRANCH PIPING UNDER FIRE DEPARTMENT CONNECTION (FREE 5. PREPARE AND SUBMIT FOR APPROVAL MANUFACTURER'S SHOP DRAWINGS AND DATA FOR EQUIPMENT, AND DETAILED 3 DSP-101 1ST FLOOR SPRINKLER DEMOLITION PLAN
CONSTRUCTION STANDING) DRAWINGS OF ALL SPRINKLER PIPING WORK. 8. SPACING, LOCATION & POSITION OF SPRINKLERS SHALL BE IN ACCORDANCE WITH NFPA-13-2013 CHAPTER 8. D
4 DSP-102 2ND FLOOR SPRINKLER DEMOLITION PLAN
DR SPRINKLER DRAIN PIPING SIGHT GLASS 6. KEEP AN ACCURATE RECORD ON ALL DEVIATIONS BETWEEN WORK SHOWN ON DRAWINGS AND THAT WHICH IS ACTUALLY 9. THERE IS NO HIGH-PILED STORAGE AS DEFINED IN 2015 IFC
PERFORMED. 5 DSP-103 3RD FLOOR SPRINKLER DEMOLITION PLAN
D DRY SYSTEM SPRINKLER MAIN PIPING PIPE SLEEVE 10. ALL PIPES PASSING THOUGH WALLS SHALL BE IN ACCORDANCE WITH 780 CMR 714.
7. ALL FIRE PROTECTION VALVES SHALL HAVE TAMPER SWITCHES. 6 SP-100 GROUND FLOOR SPRINKLER FLOOR PLAN (OVERALL) ● ●
11. DISTANCE OF SPRINKLERS FROM HEAT SOURCE SHALL BE AS PER TABLE 8.3.2.5(A) OF NFPA-13-2013.
DRY SYSTEM SPRINKLER BRANCH PIPING PIPE TURNING UP 8. ALL FIRE PROTECTION OS&Y VALVES SIZE 4" & LARGER & PRESSURE DIFFERENTIAL OF 200 PSI & GREATER SHALL BE 7 SP-101 GROUND FLOOR SPRINKLER PARTIAL FLOOR PLAN (WEST) ● ●
PROVIDED WITH A VALVED BYPASS. 12. ALL VALVES SHALL BE IDENTIFIED AS PER CHAPTER 6.7.4 OF NFPA-13-2013
PA PREACTION SYSTEM SPRINKLER MAIN PIPING PIPE TURNING DOWN 8 SP-102 GROUND FLOOR SPRINKLER PARTIAL FLOOR PLAN (EAST) ● ●
9. ALL FIRESTOPPING MUST BE APPROVED PRODUCTS THAT ARE UL RATED.
13. DRAINAGE SHALL CONFORM TO CHAPTER 8.16.2 OF NFPA-13-2013
PREACTION SYSTEM SPRINKLER BRANCH 9 SP-110 1ST FLOOR SPRINKLER FLOOR PLAN (OVERALL) ● ●
PIPE TAP 10. ALL SPRINKLER HEADS TO BE INSTALLED SHALL BE NEW.
PIPING 14. FITTINGS SHALL BE PROVIDED AS PER CHAPTER 6.4 OF NFPA-13-2013
EXISTING PIPING (REFER TO LETTER 10 SP-111 1ST FLOOR SPRINKLER PARTIAL FLOOR PLAN (WEST) ● ●
CAPPED PIPE 11. PROVIDE CAGES FOR ALL SPRINKLER HEADS LOCATED IN ELECTRIC ROOMS, IDF CLOSETS, AND SWITCHGEAR ROOMS.
DESIGNATION ABOVE) 15. VALVES SHALL BE APPROVED TYPE AS PER CHAPTER 6.7 OF NFPA-13-2013
11 SP-112 1ST FLOOR SPRINKLER PARTIAL FLOOR PLAN (EAST) ● ●
12. CONTRACTOR SHALL INCLUDE IN THE BID AN ALLOWANCE TO FURNISH AND INSTALL 10 ADDITIONAL SPRINKLER HEADS
EXISTING PIPING TO BE REMOVED PIPE BREAK 16. PIPE HANGERS SHALL BE PROVIDED AS PER CHAPTER 9 OF NFPA-13-2013
PER FLOOR AND 10 FEET OF LINEAR PIPE PER HEAD INSTALLED. EXACT LOCATIONS OF THESE SPRINKLER HEADS SHALL 12 SP-113 1ST FLOOR SPRINKLER PARTIAL FLOOR PLAN (NORTH) ● ●
BE DETERMINED. THIS ALLOWANCE IS IN ADDITION TO THE SPARE SPRINKLER HEADS/WRENCHES AND STORAGE.
17. PROVISIONS SHALL BE MADE TO FACILITATE FLUSHING SYSTEM PIPING AS PER CHAPTER 8.16.3 OF NFPA-13-2013
NORMALLY OPEN VALVE ON HORIZONTAL 13 SP-120 2ND FLOOR SPRINKLER FLOOR PLAN (OVERALL) ● ●
AUTOMATIC FIRE PUMP SHOWN IN PLAN 18. SPRINKLERS SHALL BE AN APPROVED TYPE AS PER CHAPTER 6.2 OF NFPA-13-2013
NORMALLY CLOSED VALVE ON HORIZONTAL 14 SP-121 2ND FLOOR SPRINKLER PARTIAL FLOOR PLAN (WEST) ● ●
19. TEMPERATURE RATING OF SPRINKLERS SHALL COMPLY WITH CHAPTER 6.2.5 OF NFPA-13-2013
15 SP-122 2ND FLOOR SPRINKLER PARTIAL FLOOR PLAN (EAST) ● ●
VALVE ON VERTICAL
20. MINIMUM CLEARANCE OF 18” BELOW SPRINKLER DEFLECTORS SHALL BE MAINTAINED AS PER CHAPTER 8.5.5.3 OF
JOCKEY PUMP SHOWN IN PLAN NFPA-13-2013 16 SP-123 2ND FLOOR SPRINKLER PARTIAL FLOOR PLAN (NORTH) ● ●
OS&Y VALVE ON HORIZONTAL
21. CONCEALED PIPING SHALL BE INSPECTED PRIOR TO BEING COVERED PER 780 CMR SECTION 901.5 AND 2015 IFC 106. 17 SP-130 3RD FLOOR SPRINKLER FLOOR PLAN (OVERALL) ● ●
OS&Y ON VERTICAL
22. SPRINKLER SYSTEM ALARMS SHALL BE PROVIDED AS PER 780 CMR SECTION 903.4, AND CHAPTER 6.9 OF NFPA-13-2013 18 SP-131 3RD FLOOR SPRINKLER PARTIAL FLOOR PLAN (WEST) ● ●
AUTOMATIC FIRE PUMP/ JOCKEY PUMP CHECK VALVE 23. SPARE SPRINKLER HEADS AND WRENCH TO BE KEPT ON PREMISES AS PER CHAPTER 6.2.9 OF NFPA-13-2013 19 SP-132 3RD FLOOR SPRINKLER PARTIAL FLOOR PLAN (EAST) ● ●
SHOWN ON RISER
CHECK VALVE W/ AUTOMATIC BALL DRIP DEMOLITION NOTES 24. ENGINEER SHALL BE RESPONSIBLE FOR THE DESIGN TO COMPLY WITH THE REQUIREMENTS OF 780 CMR 903 & 20 SP-133 3RD FLOOR SPRINKLER PARTIAL FLOOR PLAN (NORTH) ● ●
NFPA-13-2013
21 SP-600 SPRINKLER SCHEDULES & DETAIL SHEET ● ●
PRESSURE REGULATING VALVE 1. ALL DEMOLITION WORK SHALL BE IN ACCORDANCE WITH CLIENT BUILDING STANDARDS, SPECIFICATIONS AND GUIDELINES 25. ALL SPRINKLER BRANCH PIPING SHALL BE A MINIMUM OF 1 INCH AS PER CHAPTER 8 OF NFPA-13-2013
SPRINKLER FLOOR CONTROL ASSEMBLY FOR TENANT ALTERATION AND IS SUBJECT TO THEIR REVIEW AND COMMENTS. ALL DEMOLITION WORK SHALL COMPLY
SOLENOID OPERATED VALVE WITH ALL STATE AND LOCAL CODES. 26. SPRINKLER HEADS ARE APPROVED UNDER BSA & MEA NUMBERS AS SHOWN ON SPRINKLER SCHEDULE.
SPRINKLER FLOOR CONTROL ASSEMBLY
W/ PRV 2. DEMOLITION TO BE PERFORMED IN AREAS OF EXISTING CONSTRUCTION. SERVICES RUNNING THROUGH DEMOLITION 27. WATER SUPPLIES TO SPRINKLER SYSTEM SHALL BE IN ACCORDANCE WITH 780 CMR SECTION 903.3.5, AND NFPA-13-2013
ZONE CHECK VALVE AREAS FEEDING OTHER AREAS MUST BE LEFT INTACT UNTIL SUCH TIME AS THEY CAN BE REMOVED CHAPTER 23. ABBREVIATIONS
WATER FLOW DETECTOR
3. CONTRACTOR TO VERIFY WITH BUILDING MANAGER AND CONSULTING ENGINEER TO DETERMINE IF ANY EQUIPMENT LINES 28. FIRE PROTECTION SYSTEM ACCEPTANCE TESTS SHALL BE PERFORMED IN ACCORDANCE WITH 780 CMR SECTION 901.5
PRESSURE RELIEF VALVE ABD AUTOMATIC BALL DRIP F.H.C. FIRE HOSE CABINET OPNG. OPENING
IN THE AREA TO BE DEMOLISHED SUPPLY OTHER PORTIONS OF THE BUILDING AND MUST REMAIN.
F HEAT TRACED PIPE W/SERVICE NOTED A.C. AIR CONDITIONING F.H.R. FIRE HOSE RACK OPP. OPPOSITE
4. 29. QUICK RESPONSE SPRINKLER HEADS SHALL NOT BE PERMITTED FOR USE IN EXTRA HAZARD OCCUPANCIES PER NFPA
DCDA DOUBLE CHECK DETECTOR ASSEMBLY ALL EXISTING BASE BUILDING SERVICES SHALL REMAIN INTACT AND OPERATIONAL. THIS CONTRACTOR MUST VERIFY ALL
13-2013 ITEM 8.4.1.2 & 11.2.3.2.2.2. ADJ. ADJUSTABLE F.H.V. FIRE HOSE VALVE OVHD. OVERHEAD C
EXISTING TO REMAIN SERVICES WITH BUILDING ENGINEERS PRIOR TO START OF DEMOLITION.
3-WAY ROOF MANIFOLD
REDUCED PRESSURE DETECTOR ASSEMBLY 30. SPRINKLER HEADS IN LIGHT HAZARD OCCUPANCIES SHALL BE IN ACCORDANCE WITH THE FOLLOWING REQUIREMENTS A.F.F. ABOVE FINISHED FLOOR FIN. FINISH(ED)
5. PROVIDE ALL MATERIALS, LABOR AND SUPERVISION REQUIRED TO REMOVE, RELOCATE AND ALTER THE EXISTING FIRE
PROTECTION SYSTEMS AS INDICATED ON THE PLANS. AS APPLICABLE: A.F.P. AUTOMATIC FIRE PUMP FIN.FL FINISH(ED) FLOOR PA PREACTION
4-WAY ROOF MANIFOLD
DRY PIPE VALVE A.F.W.H ANTI-FREEZE WALL HYDRANT FIN.GR. FINISHED GRADE PAN. PANEL
6. 30.1 HEADS SHALL BE QUICK RESPONSE TYPE PER NFPA 13-2013 ITEM 3.6.4.7
CONTRACTOR SHALL INVESTIGATE SPACE BEFORE STARTING TO DEMOLISH THE WORK, AND BE FAMILIAR WITH THE
SYSTEM TO BE REMOVED. HE SHALL REPORT TO ARCHITECT & ENGINEER ANY DEVIATION FROM SCOPE OF WORK TO BE A.P. ACCESS PANEL FL. FLOOR PAV PREACTION VALVE
PA PREACTION VALVE 30.3 HEADS FOR MODIFICATION OR ADDITION TO AN EXISTING SYSTEM EQUIPPED WITH STANDARD RESPONSE SPRINKLER
DEMOLISHED. @ AT FPRF. FIREPROOFING P.E. PASSENGER ELEVATOR
HEADS SHALL MEET NFPA 13-2013 ITEM 8.3.3.1
7. THE CONTRACTOR SHALL WALK THE SITE PRIOR TO BID TO BECOME FAMILIAR WITH ALL EXISTING CONDITIONS. F.P.S.C. FIREPROOF SELF CLOSING PERF. PERFORATED
P.A.P. PREACTION PANEL
31. QUICK RESPONSE SPRINKLER HEADS & STANDARD RESPONSE SPRINKLER HEADS SHALL NOT BE INTERMIXED WITHIN A
BFP BACKFLOW PREVENTER FS FIRE SERVICE PIPE PL. PLATE
8. PROTECT ALL EQUIPMENT TO REMAIN FROM DAMAGE, WATER DUST, ETC. OR REPLACE AS REQUIRED AT CONTRACTOR'S COMPARTMENT PER NFPA 13-2013 ITEM 8.3.3.2.
NG/AC NITROGEN GENERATOR / AIR COMPRESSOR BITUM. BITUMINOUS F.S.P. FIRE STANDPIPE PLAS. PLASTER
EXPENSE. 32. WHEN EXISTING LIGHT HAZARD SYSTEMS ARE CONVERTED TO USE QUICK RESPONSE HEADS, ALL SPRINKLERS IN A
BLDG. BUILDING FT. FOOT, FEET PLBG. FIRE PROTECTION
9. PRIOR TO START OF WORK, CONTRACTOR SHALL REVIEW THESE DRAWING AND CAREFULLY INSPECT THE SITE WITH COMPARTMENT SPACE SHALL BE QUICK RESPONSE PER NFPA 13-2013 ITEM 8.3.3.4.
G.A.P GRAPHIC ANNUNCIATOR BLKHD. BULKHEAD FTG. FITTING P.O. PLUGGED OUTLET
REGARD TO EXISTING CONDITIONS. SHOULD IT BE OBSERVED THAT SOME CONDITIONS ARE IN DISCREPANCY WITH THOSE 33. TEMPORARY SPRINKLERS SHALL BE REMOVED UPON THE COMPLETION OF WORK. B.O.P. BOTTOM OF PIPE FXT. FIXTURE POL. POLISH(ED)
SHOWN ON THE PLANS, SUCH CONDITIONS SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND
HEAT DETECTOR THE ENGINEER FOR REVIEW AND POSSIBLE CORRECTIVE MEASURES. 34. A FIRE WATCH GUARD WITH A CERTIFICATE OF FITNESS AS DICTATED BY 527 CMR 1.0 CHAPTER 41 SHALL BE MAINTAINED BOT. BOTTOM PR. PAIR
10. ALL EQUIPMENT, PIPING, ETC. TO BE REMOVED, SHALL BE DISPOSED OF, RELOCATED, TURNED OVER TO THE OWNER DURING SHUT DOWNS AND ALL HOURS WHEN OPERATIONS ARE NOT IN PROGRESS. WATCH SERVICES SHALL BE BR. BRANCH GA. GAUGE PRV PRESSURE REDUCING VALVE
SMOKE DETECTOR CONDUCTED BY A COMPETENT PERSON. G.C. SHALL BE RESPONSIBLE FOR THE FIRE WATCH AND ALL PROTECTIVE
(OBTAIN RECEIPT), OR SALVAGED AS DIRECTED. BSMNT BASEMENT GALV. GALVANIZED PTN. PARTITION
MEASURES REQUIRED BY MANAGEMENT & AHJ AT THEIR EXPENSE.
MANUAL PULL STATION G.C. GENERAL CONTRACTING
11. PROVIDE INTERIM WORK, IF REQUIRED, FOR CONTINUED UNINTERRUPTED SERVICE WHERE SHUTDOWN IS REQUIRED.
CAB. CABINET GEN. GENERAL R.A. RETURN AIR
35 PROVIDE A HYDROSTATIC PRESSURE TEST OF 200 PSI FOR TWO (2) HOURS.
BELL 12. REMOVED PIPING OR SPRINKLER HEADS SHALL NOT BE REUSED. C.B. CATCH BASIN GR. GRADE R.C.V. RISER CONTROL VALVE
13. THIS CONTRACTOR SHALL NOT INTERRUPT ANY OF THE SERVICES OF THE EXISTING BUILDING NOR INTERFERE WITH THE CEM. CEMENT(ITIOUS) REFR. REFRIGERATOR
HORN
SERVICES IN ANY WAY WITHOUT THE EXPRESSED PERMISSION OF THE OWNER. SUCH INTERRUPTIONS AND C.F. CUBIC FEET HGT. HEIGHT REING. REINFORCED
INTERFERENCES SHALL BE MADE AS BRIEF AS POSSIBLE AND ONLY AT A TIME COORDINATED WITH THE OWNER.
FP
FIRE STANDPIPE RISER LABEL
MASSACHUSETTS SPECIAL INSPECTION NOTES C.I. CAST IRON HORIZ. HORIZONTAL REQT'S REQUIREMENTS
# 14. WHERE THE WORK MAKES TEMPORARY SHUTDOWNS OF SERVICES UNAVOIDABLE, THEY SHALL BE MADE AT NIGHT OR AT CLG. CEILING H.P. HIGH POINT REV. REVISED
TIMES AS WILL CAUSE THE LEAST INTERFERENCE WITH THE ESTABLISHED OPERATING ROUTINE OF THE BUILDING.
1. AN INDEPENDENT SPECIAL INSPECTOR SHALL BE RETAINED TO PERFORM SPECIAL INSPECTIONS AS WELL AS FILE FORM CLOS. CLOSET HR. HOUR RM. ROOM
FP
SECTION/DETAIL REFERENCE 15. THIS CONTRACTOR SHALL ARRANGE THE WORK SCHEDULE TO ASSURE THAT TIE-INS & SERVICE SHUTDOWNS ONLY R-1 FOR FIRE PROTECTION SYSTEMS DESIGN AS DOCUMENTED ON THESE PLANS IN ACCORDANCE WITH THE NYC C.O. CAPPED OUTLET HTG. HEAT(ING) R.O. ROUGH OPENING
# BUILDING CODE.
OCCUR DURING THE ACTUAL TIME REQUIRED TO MAKE THE CONNECTIONS BETWEEN NEW AND EXISTING SYSTEMS.
COL. COLUMN HTR. HEATER R.V. RELIEF VENT
NODE FOR HYDRAULIC CALCULATIONS 2. FIRE PROTECTION ACCEPTANCE TESTS REQUIRED PER THE NINTH EDITION OF 780 CMR SECTION 901.5
16. THIS CONTRACTOR SHALL GIVE AMPLE WRITTEN NOTICE IN ADVANCE TO THE OWNER OF ANY REQUESTED SHUTDOWNS. COMP'T COMPLIMENT HEATING, VENTILATION, &
H.V.A.C.
CONC. CONCRETE AIR-CONDITIONING SCHED. SCHEDULE
C
L CENTER LINE SYMBOL 17. ANY AND ALL REQUIRED DEMOLITION WORK TO BE PERFORMED ABOVE EXISTING SUSPENDED CEILINGS AND FURRED OUT 3. SPECIAL INSPECTION REQUIRED FOR FIRE-RESISTANT PENETRATIONS AND JOINTS PER THE NINTH EDITION OF 780 CMR
WALLS SHALL BE DONE AT THE TIME WHEN THE EXISTING CEILINGS AND FURRED OUT WALLS ARE REMOVED BY THE SECTION 110.3.7 & 2015 IBC 1705.17. CONF. CONFERENCE S.E. SERVICE ELEVATOR
DIRECTION OF LIQUID FLOW GENERAL CONTRACTOR. CORR. CORRIDOR I.D. INSIDE DIAMETER SECT. SECTION
4. SPECIAL INSPECTION REQUIRED FOR POST-INSTALLED ANCHORS PER THE NINTH EDITION OF 780 CMR 1705.3.
18. TO ENSURE CONTINUOUS OPERATION, MAKE ALL NECESSARY TEMPORARY CONNECTIONS BETWEEN NEW AND EXISTING CONST. CONSTRUCTION I.E. INVERT ELEVATION SHT. SHEET
DIRECTION OF LIQUID FLOW (PUMPED) WORK. ALL COSTS RESULTING FROM TEMPORARY SHUTDOWNS SHALL BE BORNE BY THIS CONTRACTOR. 5. FINAL INSPECTION REQUIRED PER THE NINTH EDITION OF 780 CMR SECTION 110.3.10 CON'T CONTINUATION INSUL. INSULATION SIM. SIMILAR (TO)
CLIENT: J. CALNAN
EA. EACH MFR. MANUFACTURE TEL. TELEPHONE
EL. ELEVATION MH. MANHOLE TEMP. TEMPORARY
WESTWOOD, MA
ELEC. ELECTRICAL MIN. MINIMUM TER. TERRACE
690 CANTON
ELEV. ELEVATOR MISC. MISCELLANEOUS THRU. THROUGH
EMER. EMERGENCY MTD. MOUNTED T.O.S. TOP OF SLAB
E.M.R. ELEVATOR MACHINE ROOM MTG. MEETING T.T.B. TIGHT TO BEAM
ENCL. ENCLOSURE MTL. METAL TYP. TYPICAL
ENGR. ENGINEER
ENTR. ENTRANCE N.C. NORMALLY CLOSED UON UNLESS OTHERWISE NOTED
E.O.S. END/EDGE OF SLAB N.I.C. NOT IN CONTRACT
EQUIP. EQUIPMENT No. NUMBER VERT. VERTICAL
EXIST. EXISTING N.O. NORMALLY OPEN VEST. VESTIBULE
EXH. EXHAUST NOM. NOMINAL V.O. VALVED OUTLET
EXP. EXPRESS N.T.S. NOT TO SCALE
EXP.JT. EXPANSION JOINT W. WITH
EXT. EXTERIOR O.C. ON CENTER WF. WIDE FLANGE
O.D. OUTSIDE DIAMETER W.P. WATERPROOFING
F.A.I. FRESH AIR INTAKE OFF. OFFICE
FDN. FOUNDATION 1 11/16/2022 BULLETIN 01
F.H. FIRE HYDRANT A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
DRAWN BY: YP
CHECKED BY: CL
BUILDING DEPARTMENT NOTE PROJECT NUMBER: 28047.E.001
SHEET TITLE:
THIS PLAN IS APPROVED FOR WORK INDICATED ON THE APPLICATION SPECIFICATION SHEET. ALL
OTHER MATTERS SHOWN ARE NOT TO BE RELIED UPON, OR TO BE CONSIDERED AS EITHER BEING
APPROVED OR IN ACCORDANCE WITH APPLICABLE CODES.
SHEET NUMBER:
5 4 3 2 1
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
6 7 8 9
C
EXISTING SPRINKLER HEADS
TO REMAIN IN SERVICE.
1
DN
D
EXISTING BRANCH PIPING AND
SPRINKLER MAIN TO BE REMOVED EXISTING BRANCH PIPING AND
BACK TO FCVA. STANDPIPE AND SPRINKLER MAIN TO BE REMOVED
FCVA TO REMAIN. BACK TO FCVA. STANDPIPE AND
FCVA TO REMAIN.
1 2 3 4 5 10 11 12 13 14
DN
CLIENT: J. CALNAN
I
WESTWOOD, MA
690 CANTON
REMOVE THE EXISTING SPRINKLER HEADS AND REMOVE THE EXISTING SPRINKLER HEADS REMOVE THE EXISTING SPRINKLER HEADS
PROVIDE NEW UPRIGHT TEMPORARY HEADS AND PROVIDE NEW UPRIGHT TEMPORARY AND PROVIDE NEW UPRIGHT TEMPORARY
DURING CONSTRUCTION. PROVIDE SPRINKLER HEADS DURING CONSTRUCTION. PROVIDE HEADS DURING CONSTRUCTION. PROVIDE
SPACING OF 130 S.F. IN THIS AREA. SPRINKLER SPACING OF 130 S.F. IN THIS SPRINKLER SPACING OF 130 S.F. IN THIS
AREA. AREA.
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_FP22_690 Canton.rvt
SHEET NUMBER:
5 4 3 2 1 DSP-101
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
6 7 8 9
A
1
C
EXISTING SPRINKLER HEADS
TO REMAIN IN SERVICE.
D
EXISTING BRANCH PIPING AND
SPRINKLER MAIN TO BE REMOVED EXISTING BRANCH PIPING AND
BACK TO FCVA. STANDPIPE AND SPRINKLER MAIN TO BE REMOVED
FCVA TO REMAIN. BACK TO FCVA. STANDPIPE AND
FCVA TO REMAIN.
1 2 3 4 5 10 11 12 13 14
CLIENT: J. CALNAN
WESTWOOD, MA
REMOVE THE EXISTING SPRINKLER HEADS AND REMOVE THE EXISTING SPRINKLER HEADS AND REMOVE THE EXISTING SPRINKLER HEADS AND
PROVIDE NEW UPRIGHT TEMPORARY HEADS PROVIDE NEW UPRIGHT TEMPORARY HEADS PROVIDE NEW UPRIGHT TEMPORARY HEADS
690 CANTON
DURING CONSTRUCTION. PROVIDE SPRINKLER DURING CONSTRUCTION. PROVIDE SPRINKLER DURING CONSTRUCTION. PROVIDE SPRINKLER
SPACING OF 130 S.F. IN THIS AREA. SPACING OF 130 S.F. IN THIS AREA. SPACING OF 130 S.F. IN THIS AREA.
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_FP22_690 Canton.rvt
2ND FLOOR
SPRINKLER
DEMOLITION PLAN
11/14/2022 6:49:41 PM
SHEET NUMBER:
5 4 3 2 1 DSP-102
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
6 7 8 9
D
EXISTING BRANCH PIPING AND
SPRINKLER MAIN TO BE REMOVED EXISTING BRANCH PIPING AND
BACK TO FCVA. STANDPIPE AND SPRINKLER MAIN TO BE REMOVED
FCVA TO REMAIN. BACK TO FCVA. STANDPIPE AND
FCVA TO REMAIN.
1 2 3 4 5 10 11 12 13 14
CLIENT: J. CALNAN
WESTWOOD, MA
REMOVE THE EXISTING SPRINKLER HEADS AND REMOVE THE EXISTING SPRINKLER HEADS AND REMOVE THE EXISTING SPRINKLER HEADS AND
PROVIDE NEW UPRIGHT TEMPORARY HEADS PROVIDE NEW UPRIGHT TEMPORARY HEADS PROVIDE NEW UPRIGHT TEMPORARY HEADS
690 CANTON
DURING CONSTRUCTION. PROVIDE SPRINKLER DURING CONSTRUCTION. PROVIDE SPRINKLER DURING CONSTRUCTION. PROVIDE SPRINKLER
SPACING OF 130 S.F. IN THIS AREA. SPACING OF 130 S.F. IN THIS AREA. SPACING OF 130 S.F. IN THIS AREA.
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_FP22_690 Canton.rvt
3RD FLOOR
SPRINKLER
DEMOLITION PLAN
11/14/2022 6:49:45 PM
SHEET NUMBER:
5 4 3 2 1 DSP-103
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
NUMBER OF
SIZE
SPRINKLERS
1 IN 2
1½ IN 5 T 617.848.9511
BOSTON, MA
2 IN 10 250 SUMMER STREET
NOTE: MINIMUM PIPE SIZES
SHOWN FOR REFERENCE ONLY. ci-designinc.com
ACTUAL PIPE SIZES REQUIRED
SUBJECT TO REVIEW OF
CONTRACTOR SUBMISSION OF
HYDRAULIC CALCULATION.
D
6 7 8 9
C
D
1 2 3 4 5 10 11 12 13 14
E STOR.
018
BOILER ROOM? ELEC TEL PLANS MENS
GAME ROOM
006 ? 007 010 012 013
STORAGE 019
GENERATOR
029
CLIENT: J. CALNAN
WESTWOOD, MA
690 CANTON
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_FP22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
GROUND FLOOR
SPRINKLER FLOOR
PLAN
11/14/2022 6:49:47 PM
SHEET NUMBER:
5 4 3 2 1 SP-100
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
NUMBER OF
SIZE
SPRINKLERS
1 IN 2
1½ IN 5 T 617.848.9511
BOSTON, MA
2 IN 10 250 SUMMER STREET
NOTE: MINIMUM PIPE SIZES
SHOWN FOR REFERENCE ONLY. ci-designinc.com
ACTUAL PIPE SIZES REQUIRED
SUBJECT TO REVIEW OF
CONTRACTOR SUBMISSION OF
6 7 8 HYDRAULIC CALCULATION.
D
1 2 3 4 5
1
1
E
STOR.
018
PLANS
BOILER ROOM ? ELEC TEL MENS
012 GAME ROOM
006 ? 007 010 013
019
STORAGE
DW & FIRE SERVICE ROOM
004
009 EXISTING FIRE PUMP WOMENS
1500 GPM, 70 PSI
014
TO EXISTING FCVA
C
MECH
TO EXISTING FIRE PUMP
008 CELL SITE CLOSET
PH ROOM MAIL
ELEC. 020
CLEANING CLOSET 005 017
011
LOADING
003
F 002 BLDG MGMT
3" SPRINKLER MAIN 015
6" F (EXISTING) EMR.
3" 021
SP CORRIDOR SP
PROVIDE EXPANSION FITTINGS FOR PIPES 3" SP LOBBY
033
F
3" 3" CROSSING THE EXPANSION JOINT 6" F 016 ELEV.
102
STORAGE
031
G
CLIENT: J. CALNAN
WESTWOOD, MA
690 CANTON
I
GENERATOR
029
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_FP22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
GROUND FLOOR
SPRINKLER PARTIAL
FLOOR PLAN (WEST)
11/14/2022 6:49:52 PM
SHEET NUMBER:
5 4 3 2 1 SP-101
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
NUMBER OF
SIZE
SPRINKLERS
1 IN 2
1½ IN 5 T 617.848.9511
BOSTON, MA
2 IN 10 250 SUMMER STREET
NOTE: MINIMUM PIPE SIZES
SHOWN FOR REFERENCE ONLY. ci-designinc.com
ACTUAL PIPE SIZES REQUIRED
SUBJECT TO REVIEW OF
CONTRACTOR SUBMISSION OF
HYDRAULIC CALCULATION.
D
6 7 8 9
GENERAL NOTES:
1. ALL EXPOSED PIPING IN LABS TO BE
PRIMED FOR PAINTING.
DN
D
C
1 2 3 4 5 10 11 12 13 14
IDF
SUPPORT SUPPORT
111
142 112
OFFICE
LOBBY
106
PPE 100 PPE
OFFICE
141 113
144
F MENS
STAIR
CLO. 107
CLOS.
104
ELEC 147 JAN. SUPPORT
105 SUPPORT
145 ELEV.
108 115
ELEC. 114
SUPPORT SUPPORT FREIGHT ELEVATOR 102
WOMENS
STAIR 103 STAIR
138 139 IDF 146 109
137 117
143 CORRIDOR
116
G ELEC IDF
CORRIDOR CORRIDOR 126 125
OPEN LAB 132 128 UTILITIES OPEN LAB
UTILITIES
PPE
136 119 118
135 LOBBY 1
124
101
SUPPORT SUPPORT
PPE
CHEM. WASTE FREEZER CHEM. WASTE
133 122
131
134 123 121
OFFICE OFFICE
H 129 127
B
CLIENT: J. CALNAN
WESTWOOD, MA
690 CANTON
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_FP22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
SHEET NUMBER:
5 4 3 2 1 SP-110
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
NUMBER OF
SIZE
SPRINKLERS
1 IN 2
1½ IN 5 T 617.848.9511
BOSTON, MA
2 IN 10 250 SUMMER STREET
NOTE: MINIMUM PIPE SIZES
SHOWN FOR REFERENCE ONLY. ci-designinc.com
ACTUAL PIPE SIZES REQUIRED
SUBJECT TO REVIEW OF
CONTRACTOR SUBMISSION OF
8 9 HYDRAULIC CALCULATION.
D
DN
10 11 12 13 14
OFFICE
IDF
106
111
SUPPORT
112
SP
3"
F MENS
107
STAIR
6" F (EXISTING TO REMAIN)
104
CLOS. 6" F UP (EXISTING TO REMAIN)
105
JAN. SUPPORT
SUPPORT
108 115
ELEV. 114
102
SP
ELEC.
103 WOMENS
F
STAIR
109
117
G
6" ELEC IDF
6" F (EXISTING TO REMAIN)
126 125
UTILITIES
OPEN LAB
119
PPE 118
124
LOBBY
3"
101 1
SUPPORT B
123 121
OFFICE
127
H
SP
3"
CLIENT: J. CALNAN
WESTWOOD, MA
690 CANTON
I
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_FP22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
SHEET NUMBER:
5 4 3 2 1 SP-112
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
NUMBER OF
SIZE
SPRINKLERS
1 IN 2
1½ IN 5 T 617.848.9511
BOSTON, MA
2 IN 10 250 SUMMER STREET
NOTE: MINIMUM PIPE SIZES
SHOWN FOR REFERENCE ONLY. ci-designinc.com
ACTUAL PIPE SIZES REQUIRED
SUBJECT TO REVIEW OF
CONTRACTOR SUBMISSION OF
HYDRAULIC CALCULATION.
D
GENERAL NOTES:
6 7 8 9 1. ALL EXPOSED PIPING IN LABS TO BE
PRIMED FOR PAINTING.
ENTRY
200
ELEC
B
201
STAIR
CORRIDOR
203
202
IDF
204
OPEN OFFICE
205
C
D
1 2 3 4 5 10 11 12 13 14
E
OFFICE
214
CONFERENCE SUPPORT
SUPPORT
OFFICE 215 216
259
213
IDF
235
CLIENT: J. CALNAN
WESTWOOD, MA
690 CANTON
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_FP22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
2ND FLOOR
SPRINKLER FLOOR
PLAN (OVERALL)
11/14/2022 6:50:20 PM
SHEET NUMBER:
5 4 3 2 1 SP-120
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
NUMBER OF
SIZE
SPRINKLERS
1 IN 2
1½ IN 5 T 617.848.9511
BOSTON, MA
2 IN 10 250 SUMMER STREET
NOTE: MINIMUM PIPE SIZES
SHOWN FOR REFERENCE ONLY. ci-designinc.com
ACTUAL PIPE SIZES REQUIRED
SUBJECT TO REVIEW OF
OPEN OFFICE
CONTRACTOR SUBMISSION OF
6 7 8 205 HYDRAULIC CALCULATION.
D
1 2 3 4 5
SUPPORT
259
3"
C
PPE
SP SP CORRIDOR
258 3" SP 3" SP
OFFICE
264
PROVIDE EXPANSION FITTINGS FOR PIPES
262
CROSSING THE EXPANSION JOINT 3"
3" CLO. CLO.
3" FCVA (EXISTING TO REMAIN)
F
206 207
6" F UP/DN (EXISTING TO REMAIN) 6" F UP/DN (EXISTING TO REMAIN)
STAIR
208
IDF
F
261
SUPPORT ELEV. LOBBY
SUPPORT ELEV.?
257 265
256 CONFERENCE 102 ?
263 ELEC.
FREIGHT ELEVATOR
209
146
STAIR
PROVIDE CLOSELY SPACED SPRINKLER HEADS
254
3" SP
3" SP
241
UTILITIES
251
SUPPORT PPE
OPEN LAB 249 247 OFFICE OFFICE OFFICE
253 243 239 238
1
B
SP
252
FREEZER
SP
248
OPEN OFFICE
CLO.
234
245
H
3" PROVIDE EXPANSION FITTINGS FOR PIPES
CROSSING THE EXPANSION JOINT OFFICE OFFICE HUDDLE
CLIENT: J. CALNAN
WESTWOOD, MA
690 CANTON
I
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_FP22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
2ND FLOOR
SPRINKLER PARTIAL
FLOOR PLAN (WEST)
11/14/2022 6:50:27 PM
SHEET NUMBER:
5 4 3 2 1 SP-121
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
NUMBER OF
SIZE
SPRINKLERS
1 IN 2
1½ IN 5 T 617.848.9511
BOSTON, MA
2 IN 10 250 SUMMER STREET
NOTE: MINIMUM PIPE SIZES
SHOWN FOR REFERENCE ONLY. ci-designinc.com
ACTUAL PIPE SIZES REQUIRED
SUBJECT TO REVIEW OF
CONTRACTOR SUBMISSION OF
8 9 HYDRAULIC CALCULATION.
D
6"
EXISTING SPRINKLERS
PROTECTING ATRIUM TO REMAIN
E
OFFICE
214
CONFERENCE SUPPORT
215 216
OFFICE
213
3"
C
PPE
CORRIDOR 3" SP 3" SP SP
217
264
F
CLO. CLO.
F MENS
206 207
212
STAIR
208
JAN.
ELEV. LOBBY SUPPORT SUPPORT
ELEV. 210 3"
265 218 219
102
ELEC. WOMENS
209 211 STAIR
222
CORRIDOR
220 PROVIDE CLOSELY SPACED SPRINKLER HEADS
IN LIEU OF RATED GLASS AT DOOR
CORRIDOR
221
G
1
42"
ELEC.
1
3" SP
233 232 231 229
42"
1
PPE UTILITIES
OPEN LAB
224
42"
FREEZER
225
227
OPEN OFFICE
234
H
3" SP SP
HUDDLE
236
3"
CLIENT: J. CALNAN
WESTWOOD, MA
690 CANTON
IDF
235
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_FP22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
2ND FLOOR
SPRINKLER PARTIAL
FLOOR PLAN (EAST)
11/14/2022 6:50:35 PM
SHEET NUMBER:
5 4 3 2 1 SP-122
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
NUMBER OF
SIZE
SPRINKLERS
1 IN 2
1½ IN 5 T 617.848.9511
BOSTON, MA
2 IN 10 250 SUMMER STREET
NOTE: MINIMUM PIPE SIZES
SHOWN FOR REFERENCE ONLY. ci-designinc.com
ACTUAL PIPE SIZES REQUIRED
SUBJECT TO REVIEW OF
CONTRACTOR SUBMISSION OF
HYDRAULIC CALCULATION.
D
GENERAL NOTES:
1. ALL EXPOSED PIPING IN LABS TO BE
6 7 8 9
PRIMED FOR PAINTING.
A
CONFERENCE OFFICE OFFICE
OFFICE HUDDLE
389 391 300
301 302
OFFICE
388
OFFICE
387
B
CORRIDOR
303
ELEC
386
STAIR
304 ELEC
IDF 305
C
385 OFFICE
307
IDF
306 OFFICE
308
OFFICE OFFICE
313 309
HUDDLE C
D
311
CONFERENCE
312
OPEN OFFICE
1 2 3 4 5 10 11 12 13 14
384
E
HUDDLE HUDDLE
OFFICE
PPE 378 379
PPE
314
377
OPEN LAB 321
373
OPEN LAB
324
MENS
F CAFE
MECH STAIR 318
SUPPORT 382 SUPPORT
381 320 JAN.
376
SUPPORT 319 SUPPORT
LAB UTILITILES & STORAGE ELEV.
? 316 LAB UTILITILES & STORAGE
375 WELLNESS
102
? ELEC. 322
374 FREIGHT ELEVATOR WOMENS 323
383
SUPPORT SUPPORT 315 STAIR
STAIR 146 317 SUPPORT SUPPORT
368 369 371 CORRIDOR 327
CORRIDOR CORRIDOR 326 325
372 390
G 344
ELEC.CLOSET STORAGE
IDF STORAGE
358 357 346 OFFICE OFFICE SUPPORT SUPPORT
359 345 ELEC.
LAB UTILITILES & STORAGEPPE PPE 337 340 PPE 329 328
SUPPORT SUPPORT FREEZER
SUPPORT
334 SUPPORT LAB UTILITILES & STORAGE
365 364 361 335 331
367 366 332
362 333
OPEN OFFICE
347
OPEN OFFICE 1
ELEC
343 B
338
CLIENT: J. CALNAN
WESTWOOD, MA
690 CANTON
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_FP22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
3RD FLOOR
SPRINKLER FLOOR
PLAN (OVERALL)
11/14/2022 6:50:46 PM
SHEET NUMBER:
5 4 3 2 1 SP-130
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
NUMBER OF
SIZE
SPRINKLERS
1 IN 2
1½ IN 5 T 617.848.9511
BOSTON, MA
2 IN 10 250 SUMMER STREET
NOTE: MINIMUM PIPE SIZES
SHOWN FOR REFERENCE ONLY. ci-designinc.com
ACTUAL PIPE SIZES REQUIRED
SUBJECT TO REVIEW OF
CONTRACTOR SUBMISSION OF
8 9 HYDRAULIC CALCULATION.
OFFICE D
313
HUDDLE
D 311
CONFERENCE
312
EXISTING SPRINKLERS
PROTECTING ATRIUM TO REMAIN
OFFICE
314
PPE
321
SP 3" SP
C
OPEN LAB
3" 3"
324
MENS
F
318
STAIR
320
SUPPORT
SP
JAN.
316 319
ELEVATOR LOBBY SUPPORT
ELEV.
LAB UTILITILES & STORAGE
350 322
102
323
ELEC.
WOMENS
315
317
STAIR
SUPPORT SUPPORT
327
PROVIDE CLOSELY SPACED SPRINKLER HEADS 326 325
3" SP
IN LIEU OF RATED GLASS AT DOORS CORRIDOR
CORRIDOR
390
SP
344
G
STORAGE
346
STORAGE
345 OFFICE OFFICE
SUPPORT SUPPORT
337 340
ELEC. 329 328
PPE 334
FREEZER
335 LAB UTILITILES & STORAGE
3" SP
SUPPORT 331
333 332
OPEN OFFICE
ELEC
343
338
3" SP SP
IDF
OFFICE STORAGE
339
349 348
OPEN LAB
CLIENT: J. CALNAN
336
WESTWOOD, MA
690 CANTON
HUDDLE
HUDDLE
342
341
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_FP22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
3RD FLOOR
SPRINKLER PARTIAL
FLOOR PLAN (EAST)
11/14/2022 6:50:52 PM
SHEET NUMBER:
5 4 3 2 1 SP-132
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
A AIR FHV FIRE HOSE VALVE PAN. PANEL 1. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.
COLD WATER PIPING GAS VALVE
DRAWING NUMBER
SHEET NUMBER
ABD AUTOMATIC BALL DRIP FIN FINISH(ED) PAV PREACTION VALVE
CONSTRUCTION
IFC PROGRESS
CHECK VALVE W/ VACUUM BREAKER 2. EXISTING PIPING WHERE SHOWN FOR VARIOUS SYSTEMS IS DIAGRAMMATIC ONLY.
BULLETIN 01
ISSUED FOR
HOT WATER PIPING AD AREA DRAIN FIN.FL FINISH(ED) FLOOR PD PLAZA DRAIN
09.02.2022
09.19.2022
11.16.2022
ASSEMBLY
ADJ. ADJUSTABLE FIN.GR FINISHED GRADE PE PASSENGER ELEVATOR 3. BECOME THOROUGHLY FAMILIAR WITH ACTUAL EXISTING CONDITIONS AT THE BUILDING OF THE PRESENT INSTALLATIONS, DRAWING TITLE
HOT WATER CIRCULATION PIPING PRESSURE RELIEVE VALVE AFF ABOVE FINISHED FLOOR FL FLOOR PERF PERFORATED INCLUDING LOCATIONS, SIZES, AND ELEVATIONS OF PIPING, TO WHICH CONNECTIONS MUST BE MADE OR WHICH MUST BE T 617.848.9511
CHANGED OR ALTERED. THE INTENT OF THE WORK IS SHOWN ON THE DRAWINGS AND DESCRIBED HEREINAFTER, AND NO BOSTON, MA
AFP AUTOMATIC FIRE PUMP FPRF FIREPROOFING PL PLATE CONSIDERATION WILL BE GUARANTEED BY REASON OF LACK OF FAMILIARITY WITH ACTUAL PHYSICAL CONDITIONS AT THE 250 SUMMER STREET
140 140° HOT WATER PIPING STRAINER
AFPH ANTI-FREEZE POST HYDRANT F.P.S.C. FIREPROOF SELF CLOSING PLBG PLUMBING SITE.
ci-designinc.com
140 140° HOT WATER CIRCULATION PIPING ZONE CHECK VALVE ASSEMBLY AFWH ANTI-FREEZE WALL HYDRANT F(S) FIRE SERVICE PIPE PO PLUGGED OUTLET 4. INSTALL ALL WORK IN FULL ACCORDANCE WITH THE REQUIREMENTS OF ALL LOCAL AND GOVERNMENTAL DEPARTMENTS 1 P-001 PLUMBING COVER SHEET & DRAWING INDEX ● ● ●
AI AIR INTAKE FS FLOOR SINK POC POINT OF CONNECTION HAVING JURISDICTION OVER THESE MATTERS, AS WELL AS WITH ANY REQUIREMENTS OF THE NFPA, UL, AND OTHER
SANITARY PIPING ZONE DOUBLE CHECK VALVE ASSEMBLY AP ACCESS PANEL FSP FIRE STANDPIPE POE POINT OF ENTRY APPLICABLE CODES. SECURE AND PAY FOR NECESSARY APPROVALS, PERMITS, INSPECTIONS, ETC., AND DELIVER THE 2 DP-100 GROUND FLOOR PLUMBING DEMOLITION PLAN ● ●
OFFICIAL RECORDS OF THE GRANTING OF PERMITS TO THE ARCHITECT WITHOUT ADDITIONAL COST TO THE OWNER.
AR ARGON FT FOOT, FEET POL POLISH(ED) 3 DP-101 1ST FLOOR PLUMBING DEMOLITION PLAN ● ●
V VENT PIPNG DCV DOUBLE CHECK VALVE 5. PREPARE AND SUBMIT FOR APPROVAL MANUFACTURER'S SHOP DRAWINGS AND DATA FOR EQUIPMENT, AND DETAILED D
@ AT FTG. FITTING PR PAIR
DRAWINGS OF ALL PLUMBING WORK. 4 DP-102 2ND FLOOR PLUMBING DEMOLITION PLAN ● ●
AUTO AUTOMATIC FXT FIXTURE PRV PRESSURE REDUCING VALVE
G LOW PRESSURE NATURAL GAS PIPING RPZ REDUCED PRESSURE ZONE VALVE
AV ACID VENT PSI POUNDS PER SQUARE INCH 6. KEEP AN ACCURATE RECORD ON ALL DEVIATIONS BETWEEN WORK SHOWN ON DRAWINGS AND THAT WHICH IS ACTUALLY
5 DP-103 3RD FLOOR PLUMBING DEMOLITION PLAN ● ●
PERFORMED.
G(MP) MEDIUM PRESSURE NATURAL GAS PIPING PIPE SLEEVE AW ACID WASTE G GAS (LOW PRESSURE) PTN PARTITION
7. COORDINATE FINAL FLOOR DRAIN LOCATIONS WITH ARCHITECT FOR EXACT DIMENSIONAL LOCATIONS WITHIN THE ROOMS 6 P-100 GROUND FLOOR PLUMBING FLOOR PLAN ● ● ●
GA GAUGE PVC POLYVINYL CHLORIDE
G (HP) CONTAINING DRAINS.
HIGH PRESSURE NATURAL GAS PIPING PIPE TURNING UP BFP BACKFLOW PREVENTER GAL GALLONS 7 P-101 GROUND FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (WEST) ● ● ●
BLDG BUILDING GALV GALVANIZED RA RETURN AIR
GV GAS VENT PIPING PIPE TURNING DOWN 8 P-102 GROUND FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (EAST) ● ● ●
BLKHD BULKHEAD GC GENERAL CONTRACTING RCV RISER CONTROL VALVE
9 P-103 GROUND FLOOR DRAINAGE PARTIAL FLOOR PLAN (WEST)
L STORM PIPING PIPE TAP BMS BUILDING MANAGEMENT SYSTEM GD GARAGE DRAIN RD ROOF DRAIN MASSACHUSETTS PLUMBING NOTES ● ● ●
BOP BOTTOM OF PIPE GEN GENERAL REF REFRIGERATOR 10 P-104 GROUND FLOOR DRAINAGE PARTIAL FLOOR PLAN (EAST) ● ● ●
OF STORM OVER FLOW PIPING CAPPED PIPE BOT BOTTOM G (HP) GAS HIGH PRESSURE REINF REINFORCEMENTS THE PLUMBING SYSTEMS (SANITARY, WASTE, VENT, & WATER DISTRIBUTION) AND ALL ASSOCIATED EQUIPMENT WILL BE INSTALLED
AND MAINTAINED IN ACCORDANCE WITH THE FULL REQUIREMENTS OF THE NINTH EDITION OF THE MASSACHUSETTS STATE 11 P-105 GROUND FLOOR AIR/VAC PARTIAL FLOOR PLAN (WEST) ●
BR BRANCH G (MP) GAS MEDIUM PRESSURE REQT'S REQUIREMENTS
CWPD PUMP DISCHARGE PIPING PIPE BREAK BUILDING CODE 780 CMR AND THE UNIFORM STATE PLUMBING CODE 248 CMR 10.00
BSMNT BASEMENT GR GREASE REV REVISED 12 P-106 GROUND FLOOR AIR/VAC PARTIAL FLOOR PLAN (EAST) ●
BW BLACK WATER GRD GRADE RM ROOM 1. THE SANITARY SYSTEM SHALL BE PROVIDED IN FULL ACCORDANCE WITH THE GENERAL PROVISIONS OF 248 CMR 10.15.
GT COLD WATER FROM GRAVITY TANK VACUUM BREAKER 13 P-110 1ST FLOOR PLUMBING FLOOR PLAN (OVERALL) ● ● ●
BWV BLACK WATER VENT GT GRAVITY TANK RO REVERSE OSMOSIS 2. THE MATERIALS USED IN THE PLUMBING SYSTEM WILL BE PROVIDED IN FULL ACCORDANCE WITH 248 CMR 10.06.
CW(S) DOMESTIC WATER INCOMING SERVICE HOSE BIBB BWW BLACK WATER WASTE GV GAS VENT REVERSE OSMOSIS 14 P-111 1ST FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (WEST) ● ● ●
RODI 3. EQUIPMENT HOOK-UP AND THE JOINING OF PIPING WILL BE IN FULL COMPLIANCE WITH 248 CMR 10.07.
GW GRAY WATER DEIONIZED
15 P-112 1ST FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (EAST) ● ● ●
P COLD WATER PNEUMATIC TANK ZONE UNION CAB CABINET GWV GRAY WATER VENT REVERSE OSMOSIS 4. ALL PLUMBING PRODUCTS INSTALLED FOR THIS PROJECT SHALL BE LISTED OR VARIANCE APPROVED ON THE ACCEPTED
RODIR 16 P-113 1ST FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (NORTH) ●
CB CATCH BASIN GWW GRAY WATER WASTE DEIONIZED RETURN PLUMBING PRODUCTS SYSTEM AS REGULATED BY THE MASSACHUSETTS BOARD OF REGISTRATION OF PLUMBERS AND
P HOT WATER PNEUMATIC TANK ZONE HOT WATER CIRCULATION BALANCING VALVE GAS FITTERS.
CEM CEMENT(ITIOUS) ROP ROUGH OPENING 17 P-114 1ST FLOOR DRAINAGE PARTIAL FLOOR PLAN (WEST) ● ● ●
HOT WATER CIRCULATION PNEUMATIC TANK CF CUBIC FEET HB HOSE BIB ROR REVERSE OSMOSIS RETURN 5. THE INSTALLATION OF FIXTURES WILL BE IN FULL ACCORDANCE WITH 248 CMR 10.10.
P BACK WATER VALVE
ZONE 18 P-115 1ST FLOOR DRAINAGE PARTIAL FLOOR PLAN (EAST) ● ● ●
CI CAST IRON HC HOSE CABINET REDUCED PRESSURE ZONE
RPDA 6. TRAPS FOR FIXTURES AND DRAIN LINES WILL BE PROVIDED IN FULL COMPLIANCE WITH 248 CMR 10.08.
ST COLD WATER STREET PRESSURE ZONE PIPE CLEAN OUT CLG CEILING He HELIUM DETECTOR ASSEMBLY 19 P-116 1ST FLOOR DRAINAGE PARTIAL FLOOR PLAN (NORTH) ● ●
CLOS CLOSET HGT HEIGHT 7. VERTICAL AND HORIZONTAL PIPING WILL BE HUNG AND SUPPORTED AS DIRECTED IN SPECIFICATIONS AND WITH 248 CMR
HOT WATER CIRCULATION STREET REDUCED PRESSURE ZONE 10.11. 1ST FLOOR AIR/VAC PARTIAL FLOOR PLAN (WEST)
ST RPZ 20 P-117 ● ●
PRESSURE ZONE CO CAPPED OUTLET HORIZ HORIZONTAL ASSEMBLY
PIPE RUNNING TRAP (ON RISER)
HOT WATER CIRCULATION STREET CO2 CARBON DIOXIDE HP HORSEPOWER 8. THE WATER SUPPLY SYSTEMS OF THE SUBJECT BUILDING SHALL BE INSTALLED AND MAINTAINED IN FULL COMPLIANCE 21 P-118 1ST FLOOR AIR/VAC PARTIAL FLOOR PLAN (EAST) ● ●
ST WITH 248 CMR 10.14.
PRESSURE ZONE COL COLUMN HR HOUR S SOIL, SANITARY
22 P-119 1ST FLOOR AIR/VAC PARTIAL FLOOR PLAN (NORTH) ●
PIPE RUNNING TRAP (ON PLAN) COMP'T COMPARTMENT H2 HYDROGEN SCHED SCHEDULE 9. THE SANITARY DRAINAGE SYSTEM WILL BE SIZED AND INSTALLED IN FULL COMPLIANCE WITH 248 CMR 10.15(2) AND 248
CTPD COOLING TOWER PUMP DISCHARGE PIPING
CMR 10.15(3). 23 P-120 2ND FLOOR PLUMBING FLOOR PLAN (OVERALL)
CONC CONCRETE HTG HEAT(ING) SD SUMP DISCHARGE ● ●
PIPE RUNNING TRAP W/SINGLE CLEAN OUT
IRR IRRIGATION WATER PIPING CONF CONFERENCE HTR HEATER SE SERVICE ELEVATOR 10. THE VENT PIPING FOR THE SANITARY DRAINAGE SYSTEM OF THE SUBJECT BUILDING WILL BE INSTALLED IN FULL
(ON PLANS) 24 P-121 2ND FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (WEST) ● ● ●
COMPLIANCE WITH 248 CMR 10.16(13).
PIPE RUNNING TRAP W/SINGLE CLEAN OUT CORR CORRIDOR HEATING, VENTILATION & AIR SECT SECTION
ABD AUTO BALL DRIP DISCHARGE PIPING HVAC 25 P-122 2ND FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (EAST) ● ● ●
(ON RISERS) CONST CONSTRUCTION CONDITIONING SH SHOWER 11. ALL TRENCHING SHALL BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF 248 CMR 10.05(5).
PIPE RUNNING TRAP W/DOUBLE CLEAN OUT CON'T CONTINUATION HW HOT WATER SHT SHEET 26 P-123 2ND FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (NORTH) ● ●
IW INDIRECT WASTE PIPING (ON PLANS) 12 RODENT PROOFING SHALL BE IN ACCORDANCE WITH 248 CMR 10.57(8)(d). C
CONV CONVECTOR HWC HOT WATER CIRCULATION SIM SIMILAR (TO)
PIPE RUNNING TRAP W/DOUBLE CLEAN OUT 27 P-124 2ND FLOOR DRAINAGE PARTIAL FLOOR PLAN (WEST) ● ●
SD SUMP DISCHARGE PIPING COWP CLEAN OUT WALL PLATE HWH HOT WATER HEATER SLV SLEEVE 13. TEMPORARY TOILET FACILITIES SHALL BE PROVIDED FOR WORKMAN AS PER 248 CMR 10.19.
(ON RISERS)
CPVC CHLORINATED POLYVINYL CHLORIDE HZ HIGH ZONE SPRINKLER FLOOR CONTROL 28 P-125 2ND FLOOR DRAINAGE PARTIAL FLOOR PLAN (EAST) ● ● ●
RV SANITARY RELIEF VENT PIPING SPFCA
PIPE RUNNING TRAP W/SINGLE CLEAN OUT CT COOLING TOWER ASSEMBLY
29 P-126 2ND FLOOR DRAINAGE PARTIAL FLOOR PLAN (NORTH) ● ●
EXTENDED TO CODP (ON RISERS) CTMU COOLING TOWER MAKE UP INV INVERT SPO SANITARY PLUGGED OUTLET
YV SANITARY YOKE VENT PIPING
CTPD COOLING TOWER PUMP DISCHARGE SPR SPRINKLER 30 P-127 2ND FLOOR AIR/VAC PARTIAL FLOOR PLAN (WEST) ● ●
ED EJECTOR DISCHARGE PIPING CLEANOUT DECK PLATE CV CHECK VALVE JAN JANITOR SQ SQUARE 31 P-128 2ND FLOOR AIR/VAC PARTIAL FLOOR PLAN (EAST) ● ●
CW COLD WATER JC JANITOR'S CLOSET SQ. FT. SQUARE FEET MASSACHUSETTS SPECIAL INSPECTION NOTES
GR GREASE WASTE PIPING FLOOR/ ROOF/ AREA OR PLENUM DRAIN 32 P-129 2ND FLOOR AIR/VAC PARTIAL FLOOR PLAN (NORTH) ●
CWPD COLD WATER PUMP DISCHARGE JP JOCKEY PUMP SS STAINLESS STEEL
1. AN INDEPENDENT SPECIAL INSPECTOR SHALL BE RETAINED TO PERFORM SPECIAL INSPECTIONS AS DOCUMENTED ON
CWVO COLD WATER VALVED OUTLET JT JOINT SSFP SPECIAL SERVICE FIRE PUMP 33 P-130 3RD FLOOR PLUMBING FLOOR PLAN (OVERALL) ● ●
THESE PLANS IN ACCORDANCE WITH THE MASSACHUSETTS STATE BUILDING CODE
BURIED PIPING W/SERVICE NOTED ST STREET
GAS BOOSTER 2. SPECIAL INSPECTION REQUIRED FOR FIRE-RESISTANT PENETRATIONS AND JOINTS PER THE NINTH EDITION OF 780 CMR 34 P-131 3RD FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (WEST) ● ● ●
DOUBLE CHECK DETECTOR L LEADER STD STANDARD
DCDA SECTION 110.3.6 & 2015 IBC 1705.17.
HEAT TRACED PIPE W/SERVICE NOTED ASSEMBLY LAB LABORATORY STL STEEL 35 P-132 3RD FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (EAST) ● ● ●
DCTIRN DUCTILE IRON LAV LAVATORY STOR STORAGE 3. SPECIAL INSPECTION REQUIRED FOR POST-INSTALLED ANCHORS PER THE NINTH EDITION OF 780 CMR 1705.3.
36 P-133 3RD FLOOR SUPPLY WATER AND GAS PARTIAL FLOOR PLAN (NORTH) ●
GAS METER DCV DOUBLE CHECK VALVE. LCW LAB COLD WATER STP STREET PRESSURE
EXISTING PIPING W/SERVICE NOTED 4. FINAL INSPECTION REQUIRED PER THE NINTH EDITION OF 780 CMR SECTION 110.3.10
DET DETAIL LP LOW POINT STRUCT STRUCTURAL 37 P-134 3RD FLOOR DRAINAGE PARTIAL FLOOR PLAN (WEST) ● ● ●
EXISTING PIPING W/ SERVICE NOTED TO BE DF DRINKING FOUNTAIN LV LOCAL VENT (W/ BEDPAN WASHERS) SUSP SUSPENDED
DEMOLISHED 38 P-135 3RD FLOOR DRAINAGE PARTIAL FLOOR PLAN (EAST) ● ● ●
DI DEIONIZED LVR LOUVER SYMM SYMMETRICAL
CHECK VALVE 39 P-136 3RD FLOOR DRAINAGE PARTIAL FLOOR PLAN (NORTH) ●
DOMESTIC HOT WATER HEATER DIAG DIAGONAL LZ LOW ZONE
DOMESTIC WATER PUMP MIN MINIMUM 47 P-400 PLUMBING DOMESTIC WATER RISER DIAGRAM SHEET 1 ● ● ●
DWPD
DISCHARGE MISC MISCELLANEOUS UR URINAL EQUIPMENT NUMBER
END SUCTION PUMP 48 P-401 PLUMBING DOMESTIC WATER RISER DIAGRAM SHEET 2 ● ●
MTD MOUNTED UON UNLESS OTHERWISE NOTED
EA. EACH MTG MEETING 49 P-410 PLUMBING ACID WASTE RISER DIAGRAM ● ● ●
B
CLIENT: J. CALNAN
EXH EXHAUST N2O NITROUS OXIDE WASTE ANESTHETIC GAS 1. PLUMBING METERS TO BE PROVIDED AS AN ADD ALTERNATE
C
L CENTER LINE SYMBOL WAGD
EXP EXPRESS DISPOSAL
WESTWOOD, MA
DIRECTION OF LIQUID FLOW EXP. JT. EXPANSION JOINT OC ON CENTER WC WATER CLOSET
690 CANTON
EXT EXTERIOR OD OVERFLOW DRAIN WCO WALL CLEAN OUT
DIRECTION OF LIQUID FLOW (PUMPED) OF OVERFLOW
F FIRE OFF OFFICE
WE
WASTE ANESTHETIC GAS
DISPOSAL EXHAUST
PROFESSIONAL'S STATEMENT
POINT OF CONNECTION NEW WORK TO
EXISTING FAI FRESH AIR INTAKE OPNG OPENING WF WIDE FLANGE
1. TO THE BEST OF OUR KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGMENT, THESE
POINT OF DISCONNECTION NEW WORK TO FD FLOOR DRAIN OPP OPPOSITE WH WALL HYDRANT PLANS AND SPECIFICATIONS ARE IN COMPLIANCE WITH THE INTERNATIONAL ENERGY
EXISTING CONSERVATION CODE.
FDN FOUNDATION O2 OXYGEN WP WATERPROOFING
WATER FILTER FH FIRE HYDRANT OVHD OVERHEAD WPO WASTE PLUGGED OUTLET
FHC FIRE HOSE CABINET P PNEUMATIC WTS WATER TIGHT SEAL
VALVE ON VERTICAL PIPE FHR FIRE HOSE RACK PA PREACTION BUILDING DEPARTMENT NOTE
THIS PLAN IS APPROVED FOR WORK INDICATED ON THE APPLICATION SPECIFICATION SHEET. ALL
OTHER MATTERS SHOWN ARE NOT TO BE RELIED UPON, OR TO BE CONSIDERED AS EITHER BEING
APPROVED OR IN ACCORDANCE WITH APPLICABLE CODES.
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
PLUMBING
COVER SHEET &
DRAWING INDEX
SHEET NUMBER:
5 4 3 2 1 P-001
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
6 7 8 9
1
1 2 3 4 5 10 11 12 13 14
E STOR.
018
ELEC TEL PLANS MENS
BOILER ROOM GAME ROOM
012 ?
007 010 013
006 STORAGE 019
?
004 DW & FIRE SERVICE ROOM WOMENS
MECH 014
009 ELEC.
RPZ
MAIL CELL SITE CLOSET
PH ROOM 008
CLEANING CLOSET
RPZ
LOADING 011 020 1
005 017
F 003 BLDG MGMT
002 CORRIDOR
015 EMR. STORAGE PH ROOM
CELL SITE CLOSET STORAGE 026
CORRIDOR 021 023 024
LOBBY STORAGE STORAGE
ELEV. 022 025
033
016 027 028
EMRFREIGHT ELEVATOR
ELEV LOBBY 102 STAIR B
CLIENT: J. CALNAN
H
WESTWOOD, MA
690 CANTON
I
GENERATOR
029
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_P22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
GROUND FLOOR
PLUMBING FLOOR
PLAN
11/14/2022 6:32:27 PM
SHEET NUMBER:
5 4 3 2 1 P-100
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
6 7 8
D
E
STOR.
4" G 4" G
INCOMING 4" WATER SERVICE 018
GAS REGULATOR VENT
TERMINATE WITH GOOSENECK
AND INSECT SCREEN. HWCP-1,2 PLANS
BOILER ROOM ELEC TEL MENS
TYP. FOR 3
1 1/2" CW 012 GAME ROOM
006? P 007 010 013
?
1 1/2" HW 4"
? HWCP-3,4 1 019
1" HWC STORAGE ?
4" BFP FOR POTABLE WATER
HB 004
HWCP-5,6 2 1/2" NPCW DRAIN TO FD WITH AIR GAP
NP
3/4" NPCW
1 2" NPHW
1" NPHWC
AWEJ-1,2 HWH-3,4
2" TW DW & FIRE SERVICE ROOM WOMENS
TW
2" TW
1" TWC
1 2-1/2" BFP FOR NON-POTABLE LAB WATER 014 C
1" TWC
009
NEUTRALIZATION TANK DRAIN TO FD WITH AIR GAP
1" HWC
PROVIDE CONTAINMENT CURB 2 1/2" ELEC. CELL SITE CLOSET
RPZ
PH ROOM
1" NPHWC
MAIL
011 020
005 MECH 017
CLEANING CLOSET
RPZ
OI-1 CONNECT TO EXISTING 3" CW SERVING
2" NPHW
LOADING 008
003 ESH 2 1/2" CW EXISTING RESTROOMS AND FIXTURES
F 002 BLDG MGMT
2 1/2" NPCW
015
1 1/2" HW
EMR.
021
1 1/4" TW
3/4" TWC PROVIDE EXPANSION FITTINGS FOR PIPES
CORRIDOR
CROSSING THE EXPANSION JOINT LOBBY
033
016 ELEV.
102
STORAGE
CORRIDOR.
STAIR
030
032
STORAGE
031
G
CLIENT: J. CALNAN
WESTWOOD, MA
690 CANTON
I
GENERATOR
029
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_P22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
GROUND FLOOR
SUPPLY WATER AND
GAS PARTIAL FLOOR
11/15/2022 2:12:29 PM
PLAN (WEST)
SHEET NUMBER:
5 4 3 2 1 P-101
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
8 9
D
10 11 12 13 14
GAME ROOM
?
019
?
C
1
STAIR
036
CLIENT: J. CALNAN
WESTWOOD, MA
690 CANTON
I
GENERATOR
029
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_P22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
GROUND FLOOR
SUPPLY WATER AND
GAS PARTIAL FLOOR
11/15/2022 2:12:32 PM
PLAN (EAST)
SHEET NUMBER:
5 4 3 2 1 P-102
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
6 7 8
D
4" AW DROP TO
NEUTRALIZATION TANK
NEUTRALIZATION TANK
TOWN & COUNTRY NT-300
SE-1,2 PROVIDE CONTAINMENT CURB EXISTING DW AND FIRE
4" SAN DN TO SE-1 HWH-1,2 SERVICE ROOM TO REMAIN
PUMPING STATION FOR 2" V RISE
1 2 3 4 5
NEUTRALIZATION TANK
E
STOR.
4" FD
4" FD 018
2" V RISE 2" ED DROP IN SHAFT. CONNECT
4" FD 4" FD HWCP-1,2 TO EXISTING UNDERGOUND PLANS
BOILER ROOM ELEC PIPING AFTER CONNECTIONS MENS
HWH-3,4 FROM TOILET ROOM 012
007 GAME ROOM
006 013
HWCP-3,4 TEL CONNECT 3" S TO EXISTING ?
019
010 SANITARY RISER ?
4" FD HWCP-5,6
STORAGE CONNECT 3" V TO EXISTING
3" S UP VENT RISER
004
AWEJ-1,2 3" S 3" S 3" S
4" AW UP 4" AW UP 3" V
DW & FIRE SERVICE ROOM WOMENS
4" AW UP
4" AW
4" AW UP 009 EXISTING 4" BURIED 014 C
MECH SANITARY PIPING
008 ELEC. CELL SITE CLOSET
CLEANING CLOSET 2" V RISE
3" V MAIL
3" S
4" AV DN 011 020
003 4" AW 4" 017
CO 4" AW OI-1
LOADING CO 4" AW UP
4" FS 2" ED DROP IN SHAFT. CONNECT
F 002 TO EXISTING UNDERGOUND BLDG MGMT
4" AV UP PH ROOM PIPING AFTER CONNECTIONS
3" V RISE 4" AW UP 4" AW UP 015
4" AW UP 005 FROM TOILET ROOM
EMR.
3" S
2" SD DN 102
3" S
2" S UP
4" AW
4" AW
H
4" AW UP
4" AW UP
4" AW UP
CLIENT: J. CALNAN
4" AW UP
WESTWOOD, MA
4" AW UP CO 4" AW UP
690 CANTON
I
GENERATOR
029
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_P22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
GROUND FLOOR
DRAINAGE PARTIAL
FLOOR PLAN (WEST)
11/15/2022 2:12:34 PM
SHEET NUMBER:
5 4 3 2 1 P-103
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
8 9
D
10 11 12 13 14
GAME ROOM
?
019 CONNECT TO EXISTING
? 4" AW DROP TO
BURIED SANITARY PIPING
NEUTRALIZATION TANK
1 TO SANITARY POE
4" SAN DN TO BURIED
SANITARY PIPING 1
NEUTRALIZATION TANK
EXISTING BURIED SANITARY PIPE TOWN & COUNTRY NT-300 C
PROVIDE CONTAINMENT CURB
CELL SITE CLOSET
MAIL
020
017
4" AW UP
F CODP
4" AW UP
4" S CORRIDOR
LOBBY EMR. 3" S
CO PH ROOM 026
STORAGE
016 021
ELEV. CELL SITE CLOSET 024
023 STORAGE
4" S
4" AW CO
102 022 STORAGE STORAGE
025
CO 4" AW
027 028
2" AV UP
4" S 4" S
CO
CODP CO STAIR
3" S
036
4" AW
PROVIDE CONNECTION FOR
MECHANICAL CONDENSATE
3" S
W/ FUNNEL DRAIN AND
BACKWATER VALVE
3" S
4" AW
B
4" AW
4" AW
2" S UP
4" AW
H
4" AW
4" AW UP
4" AW UP
CLIENT: J. CALNAN
WESTWOOD, MA
4" AW UP 4" AW UP 4" AW UP
690 CANTON
I
GENERATOR
029
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_P22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
GROUND FLOOR
DRAINAGE PARTIAL
FLOOR PLAN (EAST)
11/15/2022 2:12:36 PM
SHEET NUMBER:
5 4 3 2 1 P-104
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
SHEET NOTES
1. ALL EXPOSED PIPING IN LABS TO BE PRIMED FOR PAINTING.
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
6 7 8 9
DN
D
1 2 3 4 5 10 11 12 13 14
IDF
SUPPORT SUPPORT
111
142 112
OFFICE
LOBBY
106
PPE 100 PPE
OFFICE
141 113
144
F MENS
STAIR
1 CLO. 107
CLOS.
ELEC 104
147 JAN. SUPPORT
105 SUPPORT
145 ELEV.
108 115
ELEC. 114
102 1
SUPPORT SUPPORT FREIGHT ELEVATOR WOMENS
STAIR 103 STAIR
138 139 IDF 146 109
137 117
143 CORRIDOR
116
G ELEC
CORRIDOR CORRIDOR PANTRY
126
120 UTILITIES B
CLIENT: J. CALNAN
WESTWOOD, MA
I
690 CANTON
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_P22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
SHEET NUMBER:
5 4 3 2 1 P-110
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
6 7 8
D
1 2 3 4 5
2" TW DN TW
1" TWC DN 1
1 1/2" CW DN P
1 1/2" HW DN SUPPORT
1
1" HWC DN
142
2 1/2" NPCW DN LSK
NP
2" NPHW DN
1" NPHWC DN 1
OFFICE
SK-1
LOBBY 106
LSK LSK LSK
2" TW UP 100 C
TW
1" HW PPE
1" TWC UP 1 1" CW 1
1 1 1/2" NPCW 141 OFFICE
1" NPHWC
1 1/2" NPCW UP NP 1 1/2" NPHW
2" TW 1 1/2" TW 144
1
3/4" HWC
F
1
ESH ESH 1
1 1/2" CW UP LSK LSK STAIR
P
1 1/2" NPCW
1" HW UP
1" TWC
1 1/2" CW
1 CLO. 104
CLOS.
2" TW
147
ELEC 105
1
145
1 1/2" NPHW UP NP ELEV.
1" NPHWC UP 1
102
ELEC.
1" HW
3/4" HWC SUPPORT SUPPORT FREIGHT ELEVATOR 103
STAIR
138 139 146
137 IDF
1
143
1" TWC
PROVIDE EXPANSION
2" TW
FITTINGS FOR PIPES
CROSSING THE 1 1/2" CW
EXPANSION JOINT 2" NPCW
G
CORRIDOR CORRIDOR
132 128
1 1/2" NPHW
OPEN LAB 1" NPHWC
UTILITIES
136 1" NPHWC
135
1 1/2" NPHW
LOBBY
1" HWC
1 1 1/2" HW 101
1
2" TW
SUPPORT B
SK-2
LSK
SK-1 OFFICE
127
H OFFICE
ESH ESH
3/4" HWC
1 129
3/4" HW
3/4" CW
1 1/2" TW
3/4" NPHW
3/4" NPHWC
3/4" NPCW
CLIENT: J. CALNAN
36"
LSK LSK LSK
WESTWOOD, MA
36"
PROVIDE EXPANSION
690 CANTON
FITTINGS FOR PIPES
CROSSING AT GRID 5
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_P22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
(WEST)
SHEET NUMBER:
5 4 3 2 1 P-111
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
8 9
D
DN
HWH-5
EXISTING WATER HEATER TO BE
REPLACED IN KIND
EXISTING PIPING AND
FIXTURES TO REMAIN
10 11 12 13 14
IDF
111
SUPPORT
112
LSEP-1
1 1/2" NPCW
LSEP-1
1" HW
104
CLOS.
105
JAN. SUPPORT
1" NPHWC
3/4" HWC
SUPPORT
108 115
ELEV. 114 1
1
102
1 1/2" NPHW
ELEC.
103 WOMENS
STAIR
109
117 NP 1 1/2" NPHW UP
2 1" NPHWC UP
CORRIDOR
1 UTILITIES
IDF PPE OPEN LAB
1" NPHWC 119
1 1/2" NPHW 125 124 118
1" HWC SK-1
LOBBY 1 1/2" HW 1
3/4" HWC
2" TW
101
1 1/2" NPHW
SUPPORT B
1" CW
1" HW
1" TWC
1" NPHWC
FREEZER
3/4" HWC
123 121
1" CW
3/4" NPHWC
3/4" NPHW
3/4" NPCW
3/4" TWC
3/4" TW
OFFICE
1" HW ESH
127
H 1 ESH
1 1/2" TW
CLIENT: J. CALNAN
LSK LSK LSK
WESTWOOD, MA
690 CANTON
I
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_P22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
(EAST)
SHEET NUMBER:
5 4 3 2 1 P-112
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
6 7 8
D
4" AV UP&DN AW
1 2 3 4 5
4" AW UP&DN 2
SUPPORT
142
3" S DN
LSK 2" V RISE
OFFICE
LSK CO LSK LSK
2" AV
CO 3" S 3" S 3" S LOBBY 3" S 3" S 106
2" AV 4" AW 4" AW SK-1
2"
2" AV 4" AW 100 C
V
2" AV CO
PPE 2" V 2" V 2" V
CO 4" AW
CO141 PROVIDE EXPANSION 1 OFFICE
4" AW
3" S
4" AV UP AW FITTINGS FOR PIPES
CO 2" AV 144
4" AW UP&DN 1 CROSSING GRID 5
(TYP.)
F
LSK STAIR
LSK
CLO. 104
3" S
CLOS.
2" V
147
ELEC 105
145
ELEV.
102
3" S
ELEC.
SUPPORT SUPPORT FREIGHT ELEVATOR 103
STAIR
138 139 146
137 IDF
143
3" S
1
2" S UP
2" V
5" L UP&DN
(EXISTING) 3" S
G 3" S
CO
CO 3" S 3" S UP
CO
CORRIDOR CORRIDOR
132 128
3" S
OPEN LAB
UTILITIES
136
135
LOBBY
1
3" S UP 101
4" AW UP
SUPPORT B
2" V
AW
OFFICE
4" AW UP&DN 3
LSK
127
H OFFICE
1 SK-1
129
1 CO 4" AW 2" S DN
4" AW
2" V RISE
3" AV
2" AV
1
1
1
1
4" AW
CO
CLIENT: J. CALNAN
4" AW
36"
2" AV
WESTWOOD, MA
2" AV 4" AW CO
36"
LSK CO LSK LSK
690 CANTON
I
4" AV UP AW
4" AW UP&DN 4
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_P22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
SHEET NUMBER:
5 4 3 2 1 P-114
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
8 9
D
DN
AW 4" AV UP
10 11 12 13 14
5 4" AW UP&DN
IDF
111
SUPPORT
AW 4" AV UP
112
6 4" AW UP&DN
OFFICE LSEP-1
LSK
106
2" AV
100
PPE
CO
3" S
4" AW
4" AW
113 CO 4" AW
3" S
3" S
104
CLOS.
105 2" V
JAN. 3" S CO SUPPORT
SUPPORT
108 115 2" AV DN
ELEV. 1 114
102 CONNECT TO EXISTING
3" S
ELEC.
3" S
2" V
CORRIDOR
116
1
5" L UP&DN
(EXISTING)
G
CO ELEC
126 2" V
SK-2
PANTRY
120
UTILITIES
IDF OPEN LAB
3" S
119
125 PPE 118
124
LOBBY SK-1
101 LSK
SUPPORT AW 4" AV UP B
4" AW
2" AV
2" S DN 2" S DN 123 121
2" V RISE
OFFICE
2" S UP
127
H
CO
3" AV
4" AW
2" AV
4" AW CO
CO 4" AW
CLIENT: J. CALNAN
LSK 2" AV
WESTWOOD, MA
2" AV
CO LSK LSK
690 CANTON
I
AW 4" AV UP
7 4" AW UP&DN
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_P22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
SHEET NUMBER:
5 4 3 2 1 P-115
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
OPEN OFFICE
6 7 PANTRY 8 205
230
D
1 2 3 4 5
3/4" HW
3/4" HWC
3/4" CW
E
SUPPORT
259
SK-1
2" NPCW UP&DN NP LSK LSK LSK
1 C
1" HW PPE
1 1/2" CW UP&DN 1" CW
1 1/2" NPCW 258 OFFICE CORRIDOR
P 1" NPHWC
1" HW UP&DN 1 1/2" NPHW 264
2" TW 1 1/2" TW 262
1
3/4" HWC UP&DN 3/4" HWC
CLO. CLO.
F 1 1
206 207
ESH
LSK LSK
1 1/2" NPCW
ESH
STAIR
1" TWC
1" CW
STAIR CORRIDOR
254 220
CORRIDOR
CORRIDOR
255
242
G 1 1
SK-2 ELEC. 30" 30"
STOR.
1
244
241
UTILITIES
251 PANTRY
1 1/2" NPHW
1" NPHWC 250
SUPPORT PPE
OPEN LAB 249 247 OFFICE OFFICE OFFICE
253 243 239 238
SK-1
1
2" TW
252
FREEZER
1" TWC
248
OFFICE
OPEN OFFICE
246 CLO.
ESH 234
245
H
1 ESH 1
3/4" HWC
3/4" HW
3/4" CW
1" TWC OFFICE HUDDLE
2" TW 1 1/2" TW
3/4" NPHW
3/4" NPHWC 237 236
2' - 6 3/4"
3/4" NPCW
CLIENT: J. CALNAN
LSK LSK LSK
WESTWOOD, MA
PROVIDE EXPANSION
690 CANTON
FITTINGS FOR PIPES
CROSSING AT GRID 5
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_P22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
(WEST)
SHEET NUMBER:
5 4 3 2 1 P-121
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
OPEN OFFICE
PANTRY 8 205 9
230
D
3/4" HW
3/4" HWC
HWH-5
EXISTING WATER HEATER TO BE
REPLACED IN KIND
3/4" CW
EXISTING PIPING AND
FIXTURES TO REMAIN
10 11 12 13 14
E
OFFICE
214
CONFERENCE SUPPORT
215 216
OFFICE
213 TW 1" TWC UP&DN
LSK 2 2" TW UP&DN
1
3/4" CW
3/4" HWC LSK LSK LSK
C
3/4" HW PPE 1 1/2" NPCW
1" NPHWC
CORRIDOR 217 1 1 1/2" NPHW
3/4" HWC 1" CW
264 1" HW
3/4" TW 1 1/2" TW 1 1/2" TW 1 1/2" TW 1 1/2" NPCW UP&DN
1" TWC NP
CLO. SK-1 1 2
CLO. 1 ESH
F MENS LSK
207
1 1/2" NPCW
206 LSK
212 1 1
1" HW
2" TW
2" TW
ESH
STAIR P 1 1/2" CW UP&DN
1" HW UP&DN
208 2
3/4" HWC UP&DN
1" NPHWC
3/4" HWC
1
JAN.
ELEV. LOBBY SUPPORT SUPPORT
ELEV. 210
265 218 219
1 1/2" NPHW
102
ELEC. WOMENS
1
209 211 STAIR
222
CORRIDOR NP 1" NPHWC UP&DN
2 1 1/2" NPHW UP&DN
220
CORRIDOR
221
G
1
STOR. 1
42"
241 ELEC.
1
PPE UTILITIES
OPEN LAB
224
42"
3/4" HWC
SK-1
2" TW
1 1/2" NPHW
B
1" CW
1" HW
1" TWC
1" NPHWC
CHEM. WASTE
FREEZER
3/4" HWC
225
1" CW
3/4" NPHWC
3/4" NPHW
3/4" NPCW
3/4" TWC
227
3/4" TW
OPEN OFFICE
1" HW ESH
234
H ESH
1
HUDDLE 1 1/2" TW
236
CLIENT: J. CALNAN
LSK LSK LSK
WESTWOOD, MA
690 CANTON
IDF
235
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_P22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
(EAST)
SHEET NUMBER:
5 4 3 2 1 P-122
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
OPEN OFFICE
PANTRY 8 205 9
230
D
3" S
2" V
10 11 AW 4" AW UP&DN 12 13 14
3" S
5 4" AV UP&DN
E
OFFICE
214
2" V
CONFERENCE SUPPORT
215 2" S216
UP AW 4" AW UP&DN
OFFICE 6 4" AV UP&DN
LSK
213 CO
3" S
3" S
CO
CO 4" AW 4" AW
2" V 2" V 3" S 3" S CO C
CO 3" S PPE 2" AV 2" AV
2" AV
3" S
CORRIDOR 217 3" AV
3" AV RISE
264 2" S DN SK-1
2" V RISE LSK
CLO. 1
CLO.
F MENS
206 207
212 CONNECT TO EXISTING
SANITARY AND VENT RISER LSK
2" V
STAIR
208
JAN.
ELEV. LOBBY SUPPORT SUPPORT
ELEV. 210
265 218 219
102 1
CONNECT TO EXISTING
ELEC. SANITARY AND VENT RISER
WOMENS
CONNECT TO EXISTING
209 211 1 STAIR
SANITARY RISER 2" V 2" V
3" S CO 222
CORRIDOR
220
3" S
3" S
CORRIDOR
STOR.
42"
241 ELEC.
1
2" V
233 232 231 229
42"
3" S
1
PPE UTILITIES
OPEN LAB
224
42"
LSK
AW 4" AW UP&DN
B
2" AV
227
OPEN OFFICE
234
H
HUDDLE
3" AV
4" AW CO
236
4" AW CO 4" AW CO
2" AV
2" AV
CLIENT: J. CALNAN
WESTWOOD, MA
2" AV
LSK LSK LSK
690 CANTON
IDF
235
AW 4" AW UP&DN
7 4" AV UP&DN
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_P22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
SHEET NUMBER:
5 4 3 2 1 P-125
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
6 7 8
OFFICE D
313
HUDDLE
D 311
CONFERENCE
312
OPEN OFFICE
1 2 3 4 5 384
HUDDLE HUDDLE
2" TW DN TW 378 379
1" TWC DN 1 PPE
377
NP SK-1
2" NPCW DN
1 OPEN LAB 3/4" N.P.C.W. CONNECTION
PROVIDE EXPANSION
FITTINGS FOR PIPES FOR MAKEUP WATER.
3/4" HW
373
3/4" HWC
PROVIDE RPZ.
3/4" CW
CROSSING AT GRID 5
TYP. FOR 3
LSK LSK LSK 1" HW
1" CW C
1" HW
RPZ
RPZ
1" CW
1 1/2" CW DN 3/4" HWC
1 1 1/2" NPCW 3/4" NPCW RPZ
1" HW DN P 1" NPHWC 3/4" HWC
1 1/2" TW 1 1/2" NPHW
1 1 1/2" TW 1" NPCW
3/4" HWC DN 1" TWC
F
ESH CAFE
1 1/2" NPHW DN NP
ESH 382 STAIR
MECH
2" TW
1" NPHWC DN 1 SUPPORT
1 HB 320
381
376
SK-2
1 SUPPORT
ELEVATOR LOBBY ELEV.
LAB UTILITILES & STORAGE 375 SK-2 350
WELLNESS 102
374 ELEC.
383
FREIGHT ELEVATOR 315
1
1 1/2" NPHW
1 146
3/4" HWC
1" TWC
SUPPORT SUPPORT
STAIR
368 369 1" HW
371 1" CW CORRIDOR
3/4" HWC
1" CW
1" NPHWC
1
2" TW
CORRIDOR
1" HW
380
CORRIDOR
372
344
1 1/2" NPCW
G
ELEC. CLOSET STORAGE
1
1 1/2" NPHW
358 357 346
1" NPHWC IDF STORAGE
359 345
1 1 347
1" TWC
2" TW 1 1/2" TW
1 1/2" NPHW OPEN OFFICE
1" NPHWC
1 1/2" NPCW 343
3/4" HWC
1" CW
1" HW
H
363
CLIENT: J. CALNAN
WESTWOOD, MA
690 CANTON
HUDDLE
OFFICE
355
356
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_P22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
(WEST)
SHEET NUMBER:
5 4 3 2 1 P-131
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
8 9
OFFICE D
313
HUDDLE
D 311
1
CONFERENCE
312 HWH-5
EXISTING WATER HEATER TO BE
REPLACED IN KIND
EXISTING PIPING AND
FIXTURES TO REMAIN
OPEN OFFICE
384 10 11 12 13 14
OFFICE
314
PPE
SK-1 1
321
2" TW DN
TW
2 1" TWC DN
LSK LSK
C
OPEN LAB
1 1/2" NPCW
1" NPHWC
324 1 1/2" NPHW
1" CW
3/4" HWC NP 1 1/2" NPCW DN
1" HW
1 1/2" TW 2" TW 2
1" TWC
MENS 1 ESH
F
318
P 1 1/2" CW DN
STAIR ESH 1" HW DN
1 2
2" TW
3/4" HWC DN
320
SUPPORT
JAN. 319 1
316
ELEVATOR LOBBY SUPPORT
ELEV.
LAB UTILITILES & STORAGE
350 322
102 NP
323 1 1/2" NPHW DN
ELEC.
2 1" NPHWC DN
WOMENS
315 1
317
STAIR
1" HW
SUPPORT SUPPORT
327
326 325
1 1/2" NPHW
1 1/2" NPCW
CORRIDOR
3/4" HWC
1" TWC
CORRIDOR
390
344
1" NPHWC
1" CW
2" TW
G
STORAGE
1 1
346
STORAGE
345 OFFICE OFFICE
SUPPORT SUPPORT
337 340
ELEC. 329 328
PPE 334
FREEZER
335 LAB UTILITILES & STORAGE
SUPPORT 331
333 332
SK-1
B
3/4" TWC
1 1/4" TW
ELEC 3/4" HWC
1" CW
343 1 1/2" NPHW 1
338 1" NPHWC
1 1/2" NPCW
3/4" NPHWC
3/4" NPCW
3/4" NPHW
3/4" TWC
H
3/4" TW
ESH
IDF
CONFERENCE OFFICE STORAGE
339
351 349 348 LSK LSK LSK ESH
OPEN LAB
CLIENT: J. CALNAN
336
WESTWOOD, MA
690 CANTON
HUDDLE
HUDDLE
342
341
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_P22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
(EAST)
SHEET NUMBER:
5 4 3 2 1 P-132
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
6 7 8
OFFICE D
313
HUDDLE
D 311
CONFERENCE
312
OPEN OFFICE
1 2 3 4" AV DN AW 4 5 384
2
2" AV
2" AV
3" V
3" AV
3" V
CAFE
3" FD STAIR
382
MECH
SUPPORT 1 320
381 1 3" FD
376
SUPPORT 4" V UP
SK-2 ELEVATOR LOBBY ELEV.
LAB UTILITILES & STORAGE 375 1 SK-2 350
3" FD WELLNESS 102
374 ELEC.
383
FREIGHT ELEVATOR 315
2" V
3" V
146
2" V
SUPPORT SUPPORT
STAIR
368 369
371
CORRIDOR
CORRIDOR 380
CORRIDOR
372 2" V 2" V 2" V
344
G
ELEC. CLOSET STORAGE
2" V
359 345
OPEN OFFICE
6" AV UP AW 2" V RISE 2" V RISE 343
4" AV DN 3 2" S DN 2" S DN
CLIENT: J. CALNAN
WESTWOOD, MA
690 CANTON
HUDDLE
OFFICE
355
356
AW
4" AV DN
4
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_P22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
SHEET NUMBER:
5 4 3 2 1 P-134
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
8 9
OFFICE D
313
HUDDLE
D 311
CONFERENCE
312
OPEN OFFICE
384 10 11 AW 6" AV UP 12 13 14
5 4" AV DN
OFFICE
314 AW
PPE
6 4" AV DN
2" V 2"321
V
SK-1
LSK LSK
2" AV
C
2" V
OPEN LAB
2" AV
2" AV
324
4" AV 4" AV
MENS
F
1 318
2" V
STORAGE
346
STORAGE
345 OFFICE OFFICE
SUPPORT SUPPORT
337 340
ELEC. 329 328
2" V
PPE 334
FREEZER
335 LAB UTILITILES & STORAGE
SUPPORT 331
333 332
2" V AW
SK-1 4" AV DN B
OPEN OFFICE
ELEC
343
338
3" AV
IDF 4" AV 4" AV
CONFERENCE OFFICE STORAGE
339
351 349 348 2" AV
2" AV
LSK LSK OPEN LAB LSK
CLIENT: J. CALNAN
336
WESTWOOD, MA
690 CANTON
HUDDLE
HUDDLE
342
341
AW 6" AV UP
7 4" AV DN
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_P22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
SHEET NUMBER:
5 4 3 2 1 P-135
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
6 7 8
D
1 2 3 4 5
AW
6" AV DN
1
4" V DN
P
4" VE DN
1
CLIENT: J. CALNAN
WESTWOOD, MA
690 CANTON
I
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_P22_690 Canton.rvt
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
ROOF LEVEL
PLUMBING PARTIAL
PLAN (WEST)
11/14/2022 6:37:58 PM
SHEET NUMBER:
5 4 3 2 1 P-141
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
P P NP TW
1" 1"
ROOF 1 2 1" 1 1 T 617.848.9511
EL. 51'-0"
BOSTON, MA
1"
3/4" 3/4" 250 SUMMER STREET
1 1/2"
1
ci-designinc.com
1 1/2"
2" 1"
TP 1"
TWC TWC
TRAP PRIMER TW TW
VALVE TO FD IN
MECH ROOM D
RPZ RPZ RPZ
3/4" 2"
1" 1 1/2"
1 1/2" 3/4"
1" 1"
3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4"
1 1/2"
LSK LSK LSK LSK LSK LSK NPCW
CW CW NPHW
HW HW NPHWC
HWC HWC
1" 1"
1" 1" 1 1/2"
3RD FLOOR 1
EL. 38'-0" 3/4" 3/4" 1 1/2"
2" 1"
1"
TWC TWC TWC TWC
TW TW TW TW
3/4" 3/4"
1" 1"
1 1/2" 1 1/2"
NPCW
NPHW
NPHWC
2ND FLOOR
EL. 25'-2" 3/4" 3/4" 1 1/2" 1 1/2"
1" 1" 1" 1" 1 1/2"
1 1/2" 1 1/2" 1 1/2"
1" 1" 1"
1"
3/4" 3/4" TWC TWC TWC TWC
TW TW TW TW
CW
HW
HWC
NPCW NPCW
CW NPHW NPHW
SK-2 SK-1 SK-1 SK-1 SK-1 SK-2
HW NPHWC NPHWC
3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4"
HWC
LSK LSK LSK LSK LSK LSK LSK LSK LSK LSK
1 1/2" 2 1/2"
1 1/2" 2"
1" 1"
B
1" 2"
CLIENT: J. CALNAN
NPHWC
CW CW HW
WESTWOOD, MA
1
690 CANTON
2"
HWC TW TW
(2) NON-POTABLE WATER RECIRCULATION PUMPS HWC
HWCP-5,6
RPZ TMV SET TO 80 DEG. F
(POTABLE)
1
3/4" CONNECTION FOR
MECH. MAKEUP WATER
CW CW
NPHWC
DOMESTIC WATER
(2)
HWH-3,4
NON-POTABLE WATER HEATERS (2)
HWH-1,2
POTABLE WATER HEATERS
RISER DIAGRAM
CONNECT TO SHEET 1
EXISTING INCOMING
SERVICE BACKFLOW
PREVENTER
SHEET NUMBER:
5 4 3 2 1 P-400
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
NP TW TW
2 1 1/2" 1 2 ROOF T 617.848.9511
EL. 51'-0" BOSTON, MA
1 1/2" 250 SUMMER STREET
1
1" 1"
2"
TWC TWC TWC TWC TWC TWC TWC TWC ci-designinc.com
TW TW TW TW TW TW TW TW
TWC TWC TWC TWC TWC TWC TWC
TW TW TW TW TW TW TW TW 1
2" 1" 2"
1 1"
TW D
2" 1"
1 TWC
TW
TWC
TW
1 1/2"
TWC
1 1/2"
1"
TWC
TWC
TWC
TWC
TW
TW
TW
TW
1" 1
3/4" 3/4" 3/4" 3/4" 3/4" 2"
TWC
TW
1-1/4" TW
TWC
TWC
TWC
TWC
TWC
TW
TW
TW
TW
TW
NPCW LSK LSK LSK LSK LSK 1 3/4" TWC
1-1/4" TW (TYP.)
NPHW 1"
3/4" TWC 1
NPHWC (TYP.) ESH ESH ESH ESH
2"
TW
1 1/2"
1 1/2"
1
1"
2" 1" 3RD FLOOR
TWC
TWC TWC TWC TWC TWC TWC TWC EL. 38'-0"
TW TW TW TW TW TW TW
TWC TWC TWC TWC TWC TWC TWC
TW TW TW TW TW TW TW TW 1
2" 1" 2"
1 1"
TW
TW
TWC
1" 1
2"
1 1/2" C
TWC
TWC
TWC
TWC
TWC
TW
TW
TW
TW
1 1/2" 1
TWC
3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 1"
TW
1" 2" 1-1/4" TW
LSK LSK LSK LSK LSK LSK LSK LSK LSK LSK 3/4" TWC
TWC
TWC
TWC
TWC
TW
TW
TW
TW
1 (TYP.)
1-1/4" TW
3/4" TWC ESH ESH ESH ESH
NPCW (TYP.)
NPHW
TW
ESH ESH ESH ESH
NPHWC
1 1/2"
2ND FLOOR
TWC TWC TWC TWC TWC TWC TWC EL. 25'-2"
1"
TW TW TW TW TW TW TW 1
1 1/2" 1 1/2" 2" 1" 2"
1 2" 2"
1" 1"
1 1/2"
TWC TWC TWC TWC TWC TWC TWC TWC
TW TW TW TW TW TW TW TW 1
2" 1" 1" 2"
1
TW TW
TWC TWC
TWC
3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4"
TW
3/4"
TWC
TWC
TWC
TWC
TWC
TWC
TWC
TWC
TW
TW
TW
TW
TW
TW
TW
TW
1 1
LSK LSK LSK LSK LSK LSK LSK LSK LSK
1-1/4" TW 1-1/4" TW
3/4" TWC 3/4" TWC
(TYP.) (TYP.)
ESH ESH ESH ESH ESH ESH ESH ESH
2"
1"
TW
1 1
TWC TWC TWC TWC TWC TWC TWC TWC
1" 1"
CLIENT: J. CALNAN
1 1
WESTWOOD, MA
2" 2"
690 CANTON
TW TW TW TW TW TW TW TW
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN ISSUED FOR
DELIVERABLE: CONSTRUCTION
ISSUE DATE: SEPTEMBER 19, 2022
Copyright (c) by CI Design,Inc. All Rights Reserved.
GROUND FLOOR
EL. 0'- 0" DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
DOMESTIC WATER
RISER DIAGRAM
SHEET 2
SHEET NUMBER:
5 4 3 2 1 P-401
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
1
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
AW AW AW AW AW AW AW AW
1 2 3 4 5 6 7 8
6" LVTR 6" LVTR 6" LVTR 6" LVTR
AV
AV
AV
AV
AV
AV
AV
AV
AV
AV
AV
AV
AV
AV
AV
AV
2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2"
LSK LSK LSK LSK LSK LSK LSK LSK LSK LSK LSK
3RD FLOOR
EL. 38'-0"
4" 3" 3" 3" 4" 3" 3" 3" 4" 3" 3"
AV
AV
AV
AV
AV
AV
AV
AV
3" 2" 3" 3" 2" 3"
LSK LSK LSK LSK LSK LSK LSK LSK LSK LSK
LSK LSK LSK LSK LSK LSK LSK
AV
LSK LSK
AV
AV
AV
AV
AV
AV
AV
AW
2ND FLOOR
AW
AW
AW
AW
EL. 25'-2"
4" 3" 4" 3" 4" 3"
4" 3" 3" 4" 3" 4" 3" 4" 3"
AW
AW
AW
AV
AV
AV
AV
2" 2"
AV
AV
AV
AV
2"
3" 3" 3"
3" 3" 2" 2" 2" 2" 2" 2" 2" 2" 2"
2" 2" 2" 2" 2" 2" 2" 2" 2" 2"
4" 4"
4" 4" 4" 4" 4" 4" 4" 4" 4" 4" 4" 4" 4" 4"
2" 2" 2" 2" 2" 2" LSK LSK LSK LSK
AW
LSK LSK LSK LSK LSK LSK LSK LSK LSK LSK LSK LSK LSK
AV
1ST FLOOR
B
AV
EL. 11'-0"
AV
AV
AW
2"
AV
AW
AV
AV
AW
AW
3"
AW
4" 3" 4" 3" 4" 3" 4" 3" 4" 3"
AW
AW
LSEP-1 LSEP-1
LAB SINK EJECTOR LAB SINK EJECTOR
PUMP (TYP. FOR 2) PUMP (TYP. FOR 2)
4" 4"
CLIENT: J. CALNAN
AV
4"
AV
WESTWOOD, MA
AW
690 CANTON
AW AW AW AW AW
4" 4" 4" 4" 4"
CONNECT TO CONNECT TO
EXISTING 5" EXISTING 5"
CENTRAL ACID CENTRAL ACID
SANITARY MAIN SANITARY MAIN
NEUTRALIZATION SYSTEM NEUTRALIZATION SYSTEM
BELOW PH ROOM BELOW PH ROOM
1 11/16/2022 BULLETIN 01
DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
PLUMBING ACID
WASTE RISER
DIAGRAM
SHEET NUMBER:
5 4 3 2 1 P-410
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
ci-designinc.com
ROOF
EL. 51'-0"
4" D
3" 3"
3" 2"
2" 2"
SK-2 SK-1 SK-1 SK-2 SK-2
SK-1 SK-1
2" 2" 2" 2" 2"
2" 2"
3RD FLOOR 3" FD 3" FD 3" FD 3" FD 3" FD 3" FD 3" FD
EL. 38'-0"
CO CO CO CO
3" CO 3" 3" 3"
CO 3"
3" 3"
3" 2"
2"
SK-2
2" 2"
SK-1 SK-1 SK-2 C
SK-1 SK-1
2" 2" 2"
2" 2"
2ND FLOOR
EL. 25'-2"
CO
3" 3" CO
3" 3"
3"
EP-1
SINK EJECTOR PUMP
1
2" CONNECT NEW 3" VENT PIPING TO
EXISTING 4" VENT (TYPICAL)
2" 2"
2"
2"
SK-1
2"
2"
SK-1
SK-1 SK-2 SK-2 SK-1
CONNECT NEW 3" SAN PIPING TO
2"
EXISTING 4" SAN (TYPICAL)
1ST FLOOR 2" 2" 2" 2"
EL. 11'-0" CO
3" 3" CO
EP-1 3" 3"
SINK EJECTOR PUMP
CLIENT: J. CALNAN
WESTWOOD, MA
690 CANTON
4" SAN FROM NEUTRALIZATION
TANK IN PH ROOM 024
2" 2"
SHEET NUMBER:
5 4 3 2 1 P-420
1
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
NOTE:
NOTE: GENERAL NOTE:
1. PROVIDE A DIFFERENTIAL PRESSURE TEST KIT
WATERPROOF EXISTING FLOOR OF ROOM WHERE FLOOR DRAIN IS
FOR BALANCING. TURN TEST KIT OVER TO
TO BE LOCATED USING THOROSEAL SEALANT OR APPROVED EQUAL. FOR DOMESTIC HOT
BUILDING ENGINEER AT COMPLETION OF
RESURFACE CHIPPED OUT WATER ONLY
PROJECT.
AREA WITH EPOXY CONCRETE TO HW. HEATER INLET RECIRCULATED
NORMALLY CLOSED CALL VALVE W/ 3 4" CAPPED HOT WATER TO (REFER TO HEATER WATER FROM HWC
UNION (TYPICAL) STRAINER, FLUSH WITH FINISHED FLOOR DETAIL)
HOSE END FOR DRAIN DOWN OR FLUSHING DOMESTIC SERVICE SYSTEM
3'x3' SEAMLESS LEAD FLANGE
THERMOSTATIC BALANCING VALVE W/ 12"MIN.
SHUT-OFF VALVE (TYP.) 1'-6"
UNIONS (SPEC. SECTION 220523) (TYP.) HOLBY TEMPERING VALVE DISCHARGE TO
15 8"MAX. T T
(TYP. FOR 2) WASTE LINE T 617.848.9511
FLOW BOSTON, MA
CHECK VALVE 250 SUMMER STREET
HOT WATER CIRCULATION ci-designinc.com
MAIN/RISER 51 2" UNION
TYPICAL FLOOR DRAIN INSTALLATION (EXISTING INSTALLATION) HW CIRCULATING PUMP & HOLBY VALVE ARRANGEMENT
NOTE: NOTES:
1. INSULATE HORIZONTAL STORM PIPING AS PER
SPECIFICATIONS. 1. HANGER SPACING AND SIZING SHALL BE AS PER SPECIFICATION.
RISER CLAMP AT EACH FLOOR (TYP.) 2. REFER TO FLOOR PLANS FOR PIPE SIZES. 2. SINGLE CONCRETE ANCHOR MAY BE USED ON PIPE 6" & SMALLER.
3. POST INSTALLED/CONCRETE ANCHOR SPACING SHALL NOT
EXCEED 10 FEET APART FOR ALL PIPING 4" & LARGER.
SLAB
PANTRY SINK EJECTOR PUMP
4. CONTRACTOR IS RESPONSIBLE FOR REPAIRING DAMAGE TO FIRE
FLOOR PROOFING DURING INSTALLATION TO MAINTAIN FIRE RATING.
INSULATION ELECTRO-PLATED
APPROVED TYPE COPPER CLAMP
BEAM CLAMP COPPER PIPE
PIPE OR ANCHOR THREAD ROD
INSTALLATION FOR USE ON 6"Ø PIPE & SMALLER INSTALLATION FOR USE ON 8"Ø PIPE & LARGER PLASTIC SHIELD
METAL DECK OR (TYPICAL)
CONCRETE SLAB
EXISTING WF OR CAST IN
STEEL PLACE
ENLARGED VIEW OF PIPE
SECURELY ATTACHED MEMBER POST INSTALLED ANCHOR SUPPORTS
TO BUILDING CONSTRUCTION. (SAME AS OTHER SIDE, METAL FRAMING
REFER TO SPECS. (TYPICAL) COORDINATE WITH (KINDORF)
METAL DECK OR
OTHER TRADES)
CONCRETE SLAB
OR CAST IN THREADED ROD
FLOOR FLOOR PLACE (SIZE AS
POST INSTALLED REQUIRED)
ANCHOR
U-BOLT OR PIPE STRAP METAL FRAMING
(KINDORF)
COUPLER ELECTRO-PLATED
"C" CLAMP TRAPEZE HANGER COPPER CLAMP
SECURE BASE OF STACK TO ASSEMBLY
BUILDING STRUCTURE WITH THREADED ROD
TRAPEZE HANGERS PIPE INSULATION C
(SIZE AS REQUIRED)
COPPER TUBING
NO-HUB PIPE BRACING FOR SANITARY/STORM PIPING PIPE HANGER DETAILS TYPICAL SUPPORT FOR INSULATED COPPER PIPING
1
NORMAL/EMERGENCY ELECTRICAL FEED
FLOW ELEVATOR SUMP PUMP CONTROLLER SUPPLIED BY ELEVATOR SUMP DISCHARGE
(115V/SINGLE PHASE) TO LOCAL
DIRECTION TO SANITARY/STORM
PLUMBING CONTRACTOR AND INSTALLED BY DISCONNECT SWITCH PRIOR TO ELEVATOR
AUTOMATIC TIMER KIT / DRAINAGE SYSTEM
ELECTRICAL CONTRACTOR SUMP PUMP CONTROLLER
AQUASTAT COMBINATION KIT
SLAB
HOSE BIBB MALE STANDARD
AQUASTAT THERMOMETER
ELECTRO-PLATED
APPROVED TYPE COPPER PIPE COPPER CLAMP COORDINATE ALL SERVICES IN THE ELEVATOR PIT
BEAM CLAMP AND HOISTWAY WITH THE ELEVATOR
OR ANCHOR ELEVATOR CONTRACTOR
BALL VALVE (TYP.) REFER TO FLOOR PLANS FOR THREAD ROD CONNECTION TO
BMS SYSTEM BY HOISTWAY
BALANCING VALVE PIPE SIZE AND CONTINUATION PLASTIC SHIELD LOCAL DISCONNECT SWITCH BY ELECTRICAL
BMS
(TYPICAL) CONTRACTOR IN LINE OF SIGHT OF SUMP PUMP
SWING CHECK VALVE CONTRACTOR
IN HORIZONTAL PUMP JUNCTION BOX SUPPLIED BY PLUMBING
CABLE PUMP/CONTROLLER SUPPLIED BY CONTRACTOR AND INSTALLED BY ELECTRICAL
ENLARGED VIEW OF PIPE
PLUMBING CONTRACTOR AND CONTRACTOR
SUPPORTS
METAL FRAMING INSTALLED BY ELECTRICAL ADEQUATELY SUPPORT SUMP DISCHARGE PIPING
(KINDORF) CONTRACTOR WITHIN ELEVATOR HOISTWAY AND PIT
ELEVATOR PIT
ACCESS POWER AND ALARM CABLING SUPPLIED BY
PLUMBING CONTRACTOR AND INSTALLED BY
ACCESS LADDER
ELECTRICAL CONTRACTOR
(BY OTHERS)
TYPICAL SUPPORT FOR UNINSULATED COPPER PIPING PIT SHAFT AND PIT WITH ELEVATOR ELEVATOR SUMP PUMP DETAIL
CLIENT: J. CALNAN
CONTRACTOR
NOTE:
WESTWOOD, MA
1. PIPE SHALL BE CAST IRON U.O.N.
NOTE:
2. REFER TO SPECIFICATIONS FOR PIPE, HOT WATER RE CIRCULATION FROM EMERGENCY
690 CANTON
1. PIPE SLEEVE FOR EXTERIOR WALL
FITTINGS, AND JOINT SCHEDULE. SHOWERS THROUGH HOT WATER RE CIRCULATING NOTES:
COLUMN STANDARD WEIGHT STEEL ABOVE OR BELOW GRADE. CAP UNTIL CONNECTION
2. FOR SMOKE PARTITIONS, PUMP. SEE SCHEDULE 1. PROVIDE REMOTE TYPE THERMOMETER IF MOUNTED HIGHER BY HVAC CONTRACTOR
FINISHED WALL SURFACE PIPE SLEEVE OF SIZE TO
PENETRATIONS SHALL BE SEALED THAN 6 FT ABOVE FLOOR.
PASS PIPE AND INSULATION LEANORD TM 5100 EM MIXER
SANITARY STACK OR DRAIN LEADER & CAULKED. FOR FIRE-RATED 2. INSTALL THERMOMETERS AND AQUASTATS IN OVERSIZED
(REFER TO FLOOR PLANS FOR SIZES) TERMINATE SLEEVE PIPE AND INSULATION TO BE PARTITIONS, PENETRATIONS SHALL 2" FULL SIZE BYPASS P TEES.
FLUSH WITH FINISHED CENTERED IN SLEEVE. DO BE FIRE-STOPPED IN ACCORDANCE 80° 3. SET WATER HEATER OUTPUT TO 140° F. CEILING
WALL SURFACE NOT SUPPORT PIPE FROM WITH ARCHITECTURAL DETAILS. HOT WATER SUPPLY
THE SLEEVE 3. REFER TO SPECIFICATIONS FOR RAIN LEADER
PRESSURE REDUCING VALVE, INSTALL AS REQUIRED
DETAILS WHEN EXCEEDING 60 PSI P CONNECT TO
CLEANOUT TEE WITH SOLENOID VALVE (NORMALLY OPEN) TO BE ACTIVATED
RISER CLAMP 110° INLET OF MIXING 4'-6"
COUNTERSINK PLUG. BY WATER DETECTOR IN DRAIN PAN
VALVE VACUUM RELIEF
EXTEND SLEEVE ABOVE FLOOR.
PROVIDE FIRE RATED SEALANT 27" HEAT TRAP
SEAL OR CAULK SLEEVE
AT ANNULAR SPACE INSTALL FINISHED ESCUTCHEON PLATE
THRU THE FIRE RATED 27" HEAT TRAP
WALLS IN A SMOKE FLUSH AGAINST ANY WALL EXPOSED TO JR SMITH BACKWATER
COLD WATER SUPPLY
TIGHT MANNER GENERAL PUBLIC VIEW AND OF SIZE TO VALVE No. 7080
HOT WATER
GAS SUPPLY RECIRCULATION
COMPLETELY COVER WALL OPENING.
FROM FIXTURES
REFER TO SPECIFICATIONS FOR
ESCUTCHEON PLATE REQUIREMENTS.
PRESSURE GAUGE (TYP.) 2"1/ 8 BEND 1'-5"±
FLOOR
P P
INTERIOR WALLS AMTROL EXPANSION TANK 1 11/16/2022 BULLETIN 01
6"x 2" WYE
SEALING AND A REV DATE DESCRIPTION
ANCHORING COLLAR G FLUE ISSUED FOR
COAT SLEEVE EXTERIOR SURFACE DESIGN
WITH TAR COMPOUND. SEAL SLEEVE DELIVERABLE: CONSTRUCTION
SEAL WATERTIGHT WITH
WITH TIGHTLY PACKED OAKUM & THERMOMETER IN OVERSIZED TEE
MASTIC OR ASPHALT ISSUE DATE: SEPTEMBER 19, 2022
POURED LEAD OR "LINK SEAL" THERMOSTATIC (TYP.)
Copyright (c) by CI Design,Inc. All Rights Reserved.
BALANCING VALVE RIG SHUTOFF VALVE (TYP.)
FLOOR DRAWN BY: YP
STORM OR SANITARY DRAIN. PIPE LONG RADIUS ELBOW TEMPERATURE AND PRESSURE CHECKED BY: CL
SHALL BE CAST IRON U.O.N. REFER RELIEF VALVE
PROJECT NUMBER: 28047.E.001
TO SPECIFICATIONS FOR PIPE, RELIEF PIPE - FULL SIZE OF
FITTINGS, & JOINT SCHEDULE.
STANDARD WEIGHT STEEL PIPE DISCHARGE OPENING TYPICAL CONDENSATE CONNECTION TO STORM SYSTEM SHEET TITLE:
G
SLEEVE INSTALLED DURING TO GAS TRAIN NOT TO SCALE
SLEEVE. DO NOT SUPPORT PIPE (SHOWN FOR REFERENCE ONLY)
WALL CONSTRUCTION FROM THE SLEEVE
GAS VALVE
DRAIN VALVE
SPILL OVER FUNNEL OR FLOOR
SCHEDULES &
CONTINUOUS WELD
FINISHED WALL SURFACE
DIRT LEG (IF STRAINER IS
DRAIN DETAILS SHEET
FOOTING DRIP PAN W/ LEAK DETECTOR
EXTERIOR WALLS INTERNAL TO EQUIPMENT,
DIRT LEG IS NOT REQUIRED) WIRED TO AUTO-SHUTOFF VALVE No.1
LEADER OR SANITARY STACK BASE W/ CLEANOUT 4" CONCRETE PAD
5 4 3
FINISHED FLOOR
2 1 P-600
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
TEMP. RISE F°
WATER TEMP.
(GPH
MODEL TANK
EQUIPMENT TAG DESIGNATION
STORAGE
GALS./HTR.
REMARKS
PLUMBING FIXTURE SCHEDULE AND SYMBOL KEY T 617.848.9511
W.W.P
BOSTON, MA
SIZE
1
250 SUMMER STREET
NOMENCLATURE ARCH REF. TAG FIXTURE TYPE PLUMBING SERVICES PLUMBING SIZE LEGEND COMMENTS/NOTES
PVI POTABLE WATER ci-designinc.com
HWH-1,2 HOT WATER HEATERS 2 50 L 300A-TPX 140 150 300 64" x 86" 100 587 500,000 500 SYSTEM
3
4"
C.W.
= 3 DROP
SK-1 SB-4 SINK 4"
H.W.
PVI NON-POTABLE WATER ELKAY EWS2520SACC
2" W. DN.
HWH-3,4 HOT WATER HEATERS 2 40 L 130A-GCML 140 150 130 52" x 52" 100 471 399,000 399 SYSTEM FAUCET: ELKAY LKB722C
2" V. RISE
D
1
RHEEM EXISTING WATER
ELDS30-TB HEATERS TO BE 3
HWH-5 HOT WATER HEATER 3 140 150 30 23"Ø x 30" 100 24 - - 4"
N.P.C.W.
REPLACED IN KIND LAB SINK AND = 3 DROP EPOXY SINK PROVIDED WITH
LSK SB-1/SB-2/SB-3 4"
N.P.H.W.
EYEWASH 2" A.W. DN. CASEWORK. REFER TO
2" A.V. RISE ARHITECTURAL PLANS.
NOTE: PROVIDE HOLBY TEMPERING VALVE AT EACH SET OF H.W. HEATERS 3 FAUCET: WATERSAVER
4" T.W.
3
DROP L412-8VBBH
4" T.W.C
DRAIN SCHEDULE
3
4"
C.W. KOHLER ELUHAD 211550PD
= 3 DROP FAUCET: KOHLER K-596-CP
SK-2 S-1 SINK 4" H.W.
FLOOR / ROOF
2" W. DN.
WIDE FLANGE
PERFORATED
(SEE NOTE A)
(SEE NOTE E)
(SEE NOTE C)
(SEE NOTE D)
(SEE NOTE B)
ADJUSTABLE
WATER DAM
EXTENSION
EXTENSION
EXTENSION
EXTERNAL
SERIES NO.
2" V. RISE
DRAIN TAG
STATIC
REMARKS
TYPE
EMERGENCY POWER
HORIZONTAL INLINE
1. COORDINATE WITH ARCHITECTURAL DETAILS TO CONFIRM DRAIN TYPES ABOVE.
HORIZONTAL SPLIT
VERTICAL INLINE
2. REFER TO ARCHITECTURAL DRAWINGS FOR FINISHES & GRATE TYPES. EQUIPMENT TAG DESIGNATION LOCATION MANUFACTURER MODEL REMARKS C
SUBMERSIBLE
3. SEDIMENT BUCKETS SHALL BE PROVIDED FOR DRAINS SERVING KITCHENS, MER'S, GARAGES, ANIMAL FACILITIES, TRASH/COMPACTOR ROOMS, AND RPZ'S. THESE DRAINS SHALL BE
END SUCTION
DEEP BODY TYPE DRAINS, WITH PROVISIONS TO ENSURE SEDIMENT BUCKET REPLACEMENT AFTER REMOVAL. THE GRATING SHALL REST ON THE BUCKET.
STAGES
FEEDER
4. SILL FLOOR DRAIN BODIES SHALL BE PROVIDED WITH TAPS AND PLUGS FOR TRAP PRIMER CONNECTIONS.
PHASE
CYCLE
VOLTS
R.P.M.
5. CONTRACTOR TO PROVIDE UNDERDECK CLAMP AS REQUIRED. PROVIDE IF INSTALLING DRAIN IN AN EXISTING SLAB.
VFD
H.P.
6. CONTRACTOR TO PROVIDE EXTENSION COLLAR TO PERMIT POSITIONING OF GRATES TO MEET THE FINISHED FLOOR LEVEL.
7. PROVIDE VANDAL PROOF GRATES UNLESS OTHERWISE NOTED.
8. PROVIDE HEEL PROOF GRATING FOR DRAIN COVERS IN AREAS WITH PEDESTRIAN TRAFFIC. BOILER ROOM 1
HWCP-1,2 H.W. CIRC. PUMPS BELL & GOSSETT ECOCIRC XL 55-45 15 25 1 --- --- --- --- ● 150 0-200 --- 208 1 60 --- ---
9. WHERE DRAINS ARE INSTALLED IN NON-MEMBRANE WATERPROOFED FLOORS WITH FILL, PROVIDE 3 FT. (1 M) X 3 FT. (1 M) SQUARE 16 OZ. COPPER FLASHING AT EACH DRAIN. 006 2 1---
10. REFER TO ARCHITECTURAL PLANS FOR TRENCH DRAIN SPECIFICATIONS.
11. DRAIN SCHEDULE BASED ON ZURN. REFER TO SPECIFICATIONS ALTERNATE APPROVED MANUFACTURERS.
12. PROVIDE STABILIZER AS REQUIRED FOR CONCRETE SLAB INSTALLATIONS, WITHOUT METAL DECK. BOILER ROOM 1
HWCP-3,4 H.W. CIRC. PUMPS BELL & GOSETT ECOCIRC XL 55-45 15 25 1 --- --- --- --- ● 150 0-200 2 --- 208 1 60 --- --- ---
006
BOILER ROOM 1
HWCP-5,6 H.W. CIRC. PUMP BELL & GOSETT ECOCIRC XL 55-45 15 25 1 --- --- --- --- ● 150 0-200 2 --- 208 1 60 --- --- ---
006
1
ESP-1 ELEVATOR SUMP PUMP ELEVATOR PIT LIBERTY PUMPS ELV280 50 15 1 ● --- --- ● --- --- --- 2 3450 115 1 60 --- ● ---
PROVIDE WITH
GOULDS WATER 1 CORD AND PLUG,
LSEP-1 LAB SINK EJECTOR PUMPS VARIES SDS-ST 25 26 1 ● --- --- ● --- --- --- 3 3000 115 1 60 --- ● ---
TECHNOLOGY PROVIDE ALARM
PACKAGE
NOTE: PROVIDE WITH
1. THE PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL THE ACID NEUTRALIZING TANK, GOULDS WATER 1 CORD AND PLUG,
SAMPLING SUMP, PH MONITORING ALARM SYSTEM AND MAKE ALL REQUIRED PIPING EP-1 SINK EJECTOR PUMPS PANTRY 230 SDS-ST 50 26 1 ● --- --- ● --- --- --- 3 3000 115 1 60 --- ● ---
TECHNOLOGY PROVIDE ALARM
CONNECTIONS. FURNISH AND INSTALL PH CONTROL PANEL, WALL MOUNTED NEMA 4X OR 12, PACKAGE
STEEL PANEL FINISHED WITH EPOXY PAINT, PRE-WIRED. (SEE SPECIFICATIONS)
2. ELECTRICAL CONTRACTOR TO FURNISH AND INSTALL ALL WIRING CABLE FROM JUNCTION PROVIDE WITH BPE
BOX PROBE ASSEMBLY TO CONTROL PANEL & CONDUIT. ALSO PROVIDE ELECTRIC POWER LSCP-D-208V
ACID WASTE EJECTOR BURT PROCESS 1
TO CONTROL PANEL. COORDINATE WITH ELECTRICAL CONTRACTOR. (SEE SPECIFICATION) AWEJ-1,2 pH ROOM 005 PPS-115-4-12-D 30 20 1 ● --- --- ● --- --- --- 2 --- 208 1 60 --- --- --- DUPLEX LIFT
PUMPS EQUIPMENT
STATION CONTROL
PANEL
AV
AV AV
15 BOILER ROOM
SE-1,2 SEWAGE EJECTOR PUMPS FLYGT 25 25 1 ● --- --- ● --- --- --- 1.5 1755 480 3 60 --- --- ---
006
18 17 17
1
14
AV
19
6 8
17 18 12
14 B
4 10 11 3 2
4" 7
9
5
16 1 GREASE & OIL INTERCEPTOR SCHEDULE
TO SANITARY
WASTE SYSTEM
FLOW
CAPACITY (LBS.)
MONITORING AND MIXING TANK 8 PH PROBE ASSEMBLY
FLOW RATE
16 CONCRETE PAD OR EPOXY COATED STEEL STAND,
LOCATION
9 PH PROBE SENSOR
SIZE
2 SAMPLING TANK
(G.P.M.)
BY INSTALLER
NOTES
3 ACID FEED TANK (ACID REAGENT TANK) 10 CAUSTIC CHEMICAL FEED PUMP 17 LOW LIQUID LEVEL ALARM ASSEMBLIES
QTY.
CAUSTIC / ALKALI FEED TANK (CAUSTIC
4 11 ACID CHEMICAL FEED PUMP 18 SPOT-TYPE LEAK DETECTION
REAGENT TANK)
PH PROBE ASSEMBLY WITH OI-1 pH ROOM 024 1 50 57 3" STRIEM OS-50 -
CLIENT: J. CALNAN
5 SPILL CONTAINMENT PALLET 12 SUPPORT 19 POLYPROPYLENE SHUT OFF VALVE
WESTWOOD, MA
6 CHEMICAL AGITATOR / MIXER 13 ACID VENT CONNECTIONS
690 CANTON
7 AGITATOR SHAFT AND MIXING BLADE 14 CONTROL PANEL
SPECIFICATIONS
1. ACID NEUTRALIZATION SYSTEM SHALL BE ACTIVE TYPE, WITH CHEMICAL TREATMENT AS MANUFACTURED BY TOWN & COUNTRY PLASTICS.
2. ONE (1) MODEL #NT300/ HDPE MIXING AND FINISHING TANK WITH 6" INLET AND OUTLET AND 4" VENT CONNECTION. THE TANK HAS A HEAVY-DUTY 1 2" THICK POLYPROPYLENE COVER WITH
REINFORCING BARS UNDERNEATH AND 6" FLANGED CONNECTION AND GASKETED, MATING FLANGE FOR MIXER / AGITATOR AND 3" FLANGED CONNECTION AND GASKETED, MATING
FLANGE WITH A pH PROBE ASSEMBLY. THIS TANK ALSO HAS TWO (2) 1 2" FEMALE THREADED CONNECTIONS: ONE (1) ACID INLET AND ONE (1) CAUSTIC INLET. THIS TANK #1 IS A CHEMICAL
TREATMENT MIXING TANK (MIXING / FINISHING TANK).
3. ONE (1) MODEL #NT-30M / HDPE SAMPLING SUMP TANK WITH 6" INLET AND OUTLET WITH 1 2" POLYPROPYLENE COVER WITH 3" FLANGED CONNECTION AND GASKETED, MATING FLANGE
WITH pH PROBE ASSEMBLY.
4. ONE (1) MODEL # "F-SERIES", TYPE #316 STAINLESS STEEL 1 3 DIRECT DRIVE AGITATOR ( MIXER) FOR TANK #1.
5. TWO (2) NTD-100M / HDPE CHEMICAL REAGENT FEED DRUM TANKS WITH MOUNTING FOR CHEMICAL FEED PUMPS AND NECESSARY INLET, VENT AND DISCHARGE CONNECTIONS. TANKS TO 1 11/16/2022 BULLETIN 01
BE SUPPLIED EACH WITH A LOW LIQUID LEVEL SENSOR TO BE WIRED TO THE MASTER CONTROL [ANEL. THESE ARE TANKS 4, 5. A REV DATE DESCRIPTION
6. ONE (1) MODEL #SKT-2 / HDPE SPILL CONTAINMENT TANK (WITH GRATES) TO BE INSTALLED UNDER REAGENT TANKS (#4 AND #5). TANK TO BE SUPPLIED WITH LEAK DETECTION SENSOR TO DESIGN ISSUED FOR
BE WIRED TO MASTER CONTROL PANEL. THIS IS TANK #6. DELIVERABLE: CONSTRUCTION
7. TWO (2) TC-LM SERIES CHEMICAL FEED METERING PUMPS TO BE INSTALLED ON NTD-100 CHEMICAL FEED TANKS. PUMPS WILL INCLUDE FOOT VALVE, CHECK VALVE AND ALL TUBING
NECESSARY FOR CONNECTION TO NT-500 TANK #1. ISSUE DATE: SEPTEMBER 19, 2022
8. ONE (1) PLC BASED TOUCHSCREEN MASTER CONTROL PANEL WITH (2) pH ELECTRODES (1 TO BE INSTALLED IN NT-2000 TANK #2 FOR MONITORING AND TREATMENT AND ONE (1) Copyright (c) by CI Design,Inc. All Rights Reserved.
INSTALLED IN NT-30 SAMPLING TANK FOR RECORDING), ALL NECESSARY RELAYS AND CONNECTIONS FOR MONITORING ALL LEVEL AND LEAK DETECTION AND pH TREATMENT.
DATALOGGER FOR RECORDING WILL BE INCLUDED ALONG WITH DRY CONTACTS FOR CONNECTION TO BMS. POWER REQUIREMENTS AND WIRING DETAILS WILL BE PROVIDED. DRAWN BY: YP
CHECKED BY: CL
PROJECT NUMBER: 28047.E.001
SHEET TITLE:
PLUMBING
SCHEDULES &
DETAILS SHEET
No.2
SHEET NUMBER:
5 4 3 2 1 P-601
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
BULLETIN 01
3. PRIOR TO ANY DEMOLITION, THIS CONTRACTOR SHALL TAKE PRIMARY AIR FLOW READINGS FOR CFM & STATIC PRESSURE FOR
1. HEATING VENTILATING AND AIR CONDITIONING MATERIALS, EQUIPMENT AND SYSTEMS SUBJECT TO SPECIAL INSPECTION: 250 SUMMER STREET
ALL EXISTING FAN POWERED BOXES WITHIN THIS SCOPE, AND SUBMIT BALANCING REPORTS TO THE BUILDING ENGINEER FOR
REVIEW. REQUIRED SPECIAL INSPECTION ci-designinc.com
Sheet Number Sheet Name 4. THIS CONTRACTOR SHALL PROVIDE TRAVERSE READINGS ON ALL DUCTWORK SCHEDULED TO REMAIN. TRAVERSE READINGS
M-001 MECHANICAL COVER SHEET & DRAWING INDEX ● ● ● ● SHALL BE PERFORMED BEFORE DEMOLITION OF ANY DUCTWORK.. A. SMOKE CONTROL SYSTEMS PER IBC 1705.18 & THE NINTH EDITION OF 780 CMR SECTION 909:
M-002 MECHANICAL ABBREVIATION, SYMBOLS, ETC ● ● ● ● 5. ALL EXISTING MEANS OF EGRESS FOR TENANTS OF THE BUILDING ARE TO BE MAINTAINED CLEAR AND FREE OF ALL
OBSTRUCTIONS. • COVERED MALL
M-003 MECHANICAL DAMPER MATRIX ●
6. ALL BUILDING MATERIALS IN THE CONSTRUCTION AREA ARE TO BE SECURED IN A LOCKED AREA. THE OWNER ASSUMES NO • ATRIUM
MD-100 GROUND FLOOR MECHANICAL DEMOLITION PLAN ● ● ● ● RESPONSIBILITY FOR THE SAFE KEEPING OF BUILDING MATERIALS. D
MD-110 1ST FLOOR MECHANICAL DEMOLITION PLAN ● ● ● 7. ALL DIMENSIONS OF DUCTWORK INDICATED ON PLANS ARE CLEAR INTERNAL DIMENSIONS. • STAGES & PLATFORMS
MD-120 2ND FLOOR MECHANICAL DEMOLITION PLAN ● ● ● 8. VOLUME DAMPERS HAVE BEEN INTENTIONALLY OMITTED FROM THE DUCTWORK PLANS. VOLUME DAMPERS ARE REQUIRED AT
• STAIR PRESSURIZATION
MD-130 3RD FLOOR MECHANICAL DEMOLITION PLAN ● ● ● EVERY LOW-PRESSURE SUPPLY, EXHAUST, AND RETURN DUCTWORK AS INDICATED IN THE SPECIFICATIONS AND DETAILS
(PROVIDE LOCK NUT AT DAMPERS). • UNDERGROUND BUILDINGS
MD-140 ROOF LEVEL MECHANICAL DEMOLITION PLAN ● ● ●
9. ALL DUCTWORK ENCLOSURES FOR HORIZONTAL OFFSETS SHALL BE OF 2HR RATED MINIMUM SHAFT WALL CONSTRUCTION (TOP,
M-100 GROUND FLOOR MECHANICAL FLOOR PLAN (OVERALL) ● ● ● ● BOTTOM AND SIDES) SHALL BE SUPPORTED INDEPENDENTLY OF THE DUCTWORK AND SHALL BE THE WORK OF ANOTHER X B. FIRE-RESISTANT PENETRATIONS AND JOINTS PER THE NINTH EDITION OF 780 CMR SECTION 110.3.6 &
M-101 GROUND FLOOR MECHANICAL PARTIAL FLOOR PLAN (WEST) ● ● ● ● CONTRACTOR. 2015 IBC 1705.17.
M-102 GROUND FLOOR MECHANICAL PARTIAL FLOOR PLAN (EAST) ● ● ● ● 10. ALL INSULATED PANELS BEHIND INACTIVE LOUVERS ARE TO BE SPECIFIED BY THE ARCHITECT AND INSTALLED UNDER THIS
M-110 1ST FLOOR MECHANICAL FLOOR PLAN (OVERALL) ● ● ● ● CONTRACT. C. SEISMIC ISOLATION SYSTEMS PER THE NINTH EDITION OF 780 CMR 1705.12.6, 1705.12.8 & 1705.13
M-111 1ST FLOOR MECHANICAL PARTIAL FLOOR PLAN (WEST) ● ● ● ● 11. THIS CONTRACTOR SHALL PROVIDE FULL HEIGHT SHEET METAL PLENUM AS INDICATED ON PLANS. WHERE THE SHEET METAL
X D. ENERGY EFFICIENCY INSPECTIONS PER THE NINTH EDITION OF 780 CMR 110.3.7.
PLENUMS ARE OPEN TO THE OUTDOORS ON ONE SIDE, THE PLENUM SHALL CONSIST OF DOUBLE WALL CONSTRUCTION WITH 3"
M-112 1ST FLOOR MECHANICAL PARTIAL FLOOR PLAN (EAST) ● ● ● ● THICK FIBERGLASS ACOUSTIC LINER SANDWICHED BETWEEN TWO SOLID SHEET METAL PANELS. X E. FINAL INSPECTION PER THE NINTH EDITION OF 780 CMR 110.3.10
M-120 2ND FLOOR MECHANICAL FLOOR PLAN (OVERALL) ● ● ● ● 12. REFER TO RISER DIAGRAMS FOR THE NUMBER AND LOCATIONS OF SUPPLY AIR TAPS AND RELIEF TAPS FOR THE STAIRS
M-121 2ND FLOOR MECHANICAL PARTIAL FLOOR PLAN (WEST) ● ● ● ● PROVIDED WITH PRESSURIZATION SYSTEM. 2. UPON COMPLETION OF VENTILATION SYSTEM, A TEST WILL BE CONDUCTED UNDER THE PRESENCE AND DIRECTION OF A
M-122 2ND FLOOR MECHANICAL PARTIAL FLOOR PLAN (EAST) ● ● ● ● 13. EXHAUST DUCTWORK TO FUME HOODS ARE TO BE 316L WELDED STAINLESS STEEL BACK TO EXHAUST HEADER (MINIMUM OF LICENSED PROFESSIONAL ENGINEER OR REGISTERED ARCHITECT QUALIFIED TO CONDUCT SUCH TESTS. THE TESTS SHALL
M-123 2ND FLOOR MECHANICAL PARTIAL FLOOR PLAN (NORTH) ● ● ● 10'-0"). PITCH DUCT WORK FROM HEADER BACK TO FUME HOOD. SHOW COMPLIANCE WITH CODE REQUIREMENTS FOR VENTILATION AND PROPER FUNCTION OF ALL OPERATING DEVICES
14. ALL CO2 SENSORS SHALL BE WALL MOUNTED AND SHALL BE INSTALLED AT AN ELEVATION OF NO MORE THAN 6'-0" AFF AND NO BEFORE THE SYSTEM IS APPROVED.
M-130 3RD FLOOR MECHANICAL FLOOR PLAN (OVERALL) ● ● ● ●
LESS THAN 3'-0" AFF. 3. THE LICENSED PROFESSIONAL ENGINEER OR ARCHITECT WHO CONDUCTS THE TEST SHALL FILE THE CERTIFICATE AS TO
M-131 3RD FLOOR MECHANICAL PARTIAL FLOOR PLAN (WEST) ● ● ● ● 15. LOCATE ALL THERMOSTATS SO THEY ARE NOT IN PROXIMITY TO ANY HEAT PRODUCING EQUIPMENT. WHETHER THE SYSTEM COMPLIES WITH APPLICABLE LAWS. THE TEST AND THE REPORT SHALL BE MADE IN A MANNER
M-132 3RD FLOOR MECHANICAL PARTIAL FLOOR PLAN (EAST) ● ● ● ● 16. FOR SIZES OF THE MOTOR CONTROL CENTERS (MCC, INCLUDING VARIABLE SPEED DRIVE) AND ARRANGEMENT AND/OR
SATISFACTORY TO THE SUPERINTENDENT.
M-133 3RD FLOOR MECHANICAL PARTIAL FLOOR PLAN (NORTH) ● ● ● GROUPING OF ISOLATED STARTERS REFER TO ELECTRICAL CONTRACT DOCUMENTS.
17. ALL DUCTWORK AND PIPING RUNNING THROUGH OR SERVING ELECTRICAL ROOMS SHALL BE INSTALLED A MINIMUM OF 6'-0" 4. A STATEMENT SHALL BE FILED BY THE OWNER THAT THE SYSTEM OF VENTILATION WILL BE KEPT IN CONTINUOUS OPERATION AT
M-140 ROOF LEVEL MECHANICAL FLOOR PLAN (OVERALL) ● ● ● ●
ABOVE ALL ELECTRICAL EQUIPMENT. ALL TIMES DURING NORMAL OCCUPANCY OF THE BUILDING AS REQUIRED BY THE APPLICABLE SECTION OF THE CODE.
M-141 ROOF LEVEL MECHANICAL PARTIAL FLOOR PLAN (WEST) ● ● ● ●
18. ALL MOTORS SHALL BE INVERTER DUTY RATED. 5. INTERNATIONAL MECHANICAL CODE CHAPTER 4 SECTION 401 SHALL GOVERN THE VENTILATION OF THE SPACES WITHIN THE
M-142 ROOF LEVEL MECHANICAL PARTIAL FLOOR PLAN (EAST) ● ● ● ● 19. ALL DIFFUSERS LOCATED IN GYPSUM BOARD AND INACCESSIBLE CEILINGS SHALL BE PROVIDED WITH CABLE OPERATED BUILDING INTENDED TO BE OCCUPIED.
M-143 ROOF LEVEL MECHANICAL PARTIAL FLOOR PLAN (NORTH) ● ● ● DAMPERS. 6. MECHANICAL VENTILATION BY A METHOD OF SUPPLY AIR AND RETURN OR EXHAUST AIR SHALL BE PROVIDED AS PER
M-200 GROUND FLOOR MECHANICAL PIPING FLOOR PLAN (OVERALL) ● ● ● ● 20. ACTIVE LINEAR DIFFUSER PLENUM SECTIONS SHALL BE OF THE SIZES AS SHOWN ON PLANS. EACH BRANCH TAP SERVING THE INTERNATIONAL MECHANICAL CODE CHAPTER 4, SECTION 403. THE AMOUNT OF SUPPLY AIR SHALL BE APPROXIMATELY EQUAL TO
M-201 GROUND FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (WEST) ● ● ● ● LINEAR DIFFUSER SHALL BE PROVIDED WITH A VOLUME DAMPER WHICH SHALL BE OPERABLE THROUGH THE ROOM SIDE FACE OF THE AMOUNT OF RETURN AND EXHAUST AIR. THE SYSTEM SHALL NOT BE PROHIBITED FROM PRODUCING NEGATIVE OR POSITIVE
M-202 GROUND FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (EAST) ● ● ● ● THE DIFFUSER. (CABLE OPERATED DAMPER). ACTIVE SUPPLY SECTIONS OF THE LINEAR DIFFUSERS SHALL BE PROVIDED WITH PRESSURE. THE SYSTEM TO CONVEY VENTILATION AIR SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH
PATTERN CONTROL DEVICES AND EQUALIZING GRIDS. ACTIVE OR INACTIVE RETURN SECTIONS SHALL NOT BE FURNISHED WITH INTERNATIONAL MECHANICAL CODE CHAPTER 6.
M-210 1ST FLOOR MECHANICAL PIPING FLOOR PLAN (OVERALL) ● ● ●
PATTERN CONTROL OR EQUALIZING GRIDS. REFER TO SPECIFICATIONS FOR MODEL NUMBERS. INACTIVE SECTIONS SHALL BE
M-211 1ST FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (WEST) ● ● ● PROVIDED WITH ALIGN SHIELD. 7. MECHANICAL VENTILATION SYSTEMS SHALL BE PROVIDED WITH MANUAL OR AUTOMATIC CONTROLS AS PER INTERNATIONAL
M-212 1ST FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (EAST) ● ● ● 21. ALL FSDs SHALL BE PROVIDED WITH ACCESS DOORS. MECHANICAL CODE CHAPTER 4 SECTION 405.
M-220 2ND FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (OVERALL) ● ● ● ● 22. FIRE DAMPERS SHALL BE PROVIDED IN ALL TRANSFER DUCTS THAT PENETRATE 1 HR RATED WALLS. 8. THE DESIGN, CONSTRUCTION, AND INSTALLATION OF MECHANICAL EXHAUST SYSTEMS, INCLUDING DUST, STOCK AND CONVEYOR
M-221 2ND FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (WEST) ● ● ● ● 23. PIPING EXPOSED TO THE OUTDOORS OR FREEZING SHALL BE WIRE HEAT TRACED BY THIS CONTRACTOR. REFUGE SYSTEMS, EXHAUST SYSTEMS SERVING COMMERCIAL COOKING APPLIANCES, AND ENERGY RECOVERY VENTILATION
24. ALL PRESSURE AND TEMPERATURE GAUGES ARE SCHEMATICALLY SHOWN ON THE PLANS. REFER TO SPECIFICATIONS FOR SYSTEMS SHALL BE AS PER INTERNATIONAL MECHANICAL CODE CHAPTER 5 SECTION 501
M-222 2ND FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (EAST) ● ● ● ●
EXACT TYPES AND LOCATIONS. 9. MECHANICAL AND PASSIVE SMOKE CONTROL SYSTEMS THAT ARE REQUIRED BY THE INTERNATIONAL MECHANICAL CODE SHALL
M-223 2ND FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (NORTH) ● ● ● 25. WHERE PIPING CONNECTIONS FOR EQUIPMENT DIFFER FROM THE LINE SIZE PIPING, IT SHALL BE THE RESPONSIBILITY OF THE BE AS PER INTERNATIONAL MECHANICAL CODE SECTION 513. GENERAL DESIGN REQUIREMENTS SHALL BE AS PER
M-230 3RD FLOOR MECHANICAL PIPING FLOOR PLAN (OVERALL) ● ● ● MECHANICAL CONTRACTOR TO FURNISH AND INSTALL THE NECESSARY REDUCER/EXPANDER FITTINGS TO ENABLE CONNECTION INTERNATIONAL CODE SECTION 513.2. SPECIAL INSPECTION AND TEST REQUIREMENTS SHALL BE AS PER INTERNATIONAL CODE
M-231 3RD FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (WEST) ● ● ● BETWEEN THE PIPING SYSTEM AND THE EQUIPMENT. SECTION 513.3.
M-232 3RD FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (EAST) ● ● ● ● 26. INSTALL INITIAL CROSS CONNECTION "FLUSH VALVES" AT THE BEGINNING AND END OF ALL WATER PIPE RUNS. VALVE SIZE SHALL
10. DUCT SYSTEMS USED FOR THE MOVEMENT OF AIR IN AIR CONDITIONING, HEATING, VENTILATING AND EXHAUST SYSTEMS SHALL
M-233 3RD FLOOR MECHANICAL PIPING PARTIAL FLOOR PLAN (NORTH) ● ● ● NOT BE LESS THAN TWO PIPE SIZES SMALLER THAN THE LINE SIZE WITH A MINIMUM SIZE OF 2".
CONFORM TO PROVISIONS OF INTERNATIONAL MECHANICAL CODE CHAPTER 6, SECTION 601.
27. DRAIN PAN SHALL BE PROVIDED UNDER PIPING LOCATED IN TECH AND ELECTRICAL ROOMS AND WHERE SHOWN ON DRAWINGS.
M-240 ROOF LEVEL MECHANICAL PIPING PARTIAL FLOOR PLAN (OVERALL) ● ● ● ● 11. THE INSTALLATION AND CONSTRUCTION OF DUCTWORK SHALL BE AS PER INTERNATIONAL MECHANICAL CODE CHAPTER 6,
PIPING DRAIN PANS SHALL BE PROVIDED WITH LEAK DETECTION TIED INTO THE BMS SYSTEM.
M-241 ROOF LEVEL MECHANICAL PIPING PARTIAL FLOOR PLAN (WEST) ● ● ● ● 28. ALL GRATINGS, CATWALKS AND STEEL RUNG ACCESS LADDERS WILL BE PROVIDED UNDER ANOTHER SECTION OF THE SECTION 603.
M-242 ROOF LEVEL MECHANICAL PIPING PARTIAL FLOOR PLAN (EAST) ● ● ● ● SPECIFICATIONS. EXCEPT AS NOTED ON PLANS. 12. PROTECTION OF DUCT PENETRATIONS AND AIR TRANSFER OPENINGS IN ASSEMBLIES REQUIRED TO BE PROTECTED SHALL BE
M-243 ROOF LEVEL MECHANICAL PIPING PARTIAL FLOOR PLAN (NORTH) ● ● ● 29. ALL WATER CLOSET DOORS SHALL BE PROVIDED WITH A 1" UNDERCUT. AS PER INTERNATIONAL MECHANICAL CODE CHAPTER 6, SECTION 607. FIRE DAMPERS, SMOKE DAMPERS, COMBINATION
C
M-301 MECHANICAL SECTION SHEET No. 1 ● ● 30. COORDINATE LOCATION AND FINISH OF ALL VISIBLE DEVICES WITH ARCHITECTURAL DRAWINGS/SPECIFICATIONS. FIRE/SMOKE DAMPERS AND CEILING RADIATION DAMPERS SHALL BE PROVIDED AT THE LOCATIONS PRESCRIBED IN SECTIONS
31. UNLESS OTHERWISE NOTED ON PLANS, ALL RETURN AIR INTO THE HUNG CEILING PLENUM SHALL BE VIA THE LIGHT FIXTURES 607.5.1 THROUGH 607.5.5. WHERE AN ASSEMBLY IS REQUIRED TO HAVE BOTH FIRE DAMPERS AND SMOKE DAMPERS,
M-351 MECHANICAL AIR HANDLING UNIT PART PLAN SHEET No. 1 ● ● ●
AND/OR ARCHITECTURAL SLOTS IN THE CEILING CONSTRUCTION. COMBINATION FIRE/SMOKE DAMPERS, OR A FIRE DAMPER AND A SMOKE DAMPER SHALL BE REQUIRED.
M-352 MECHANICAL MER PART PLAN SHEET ● ● 32. LOCATION OF DIRECT DIGITAL CONTROL (DDC) AND LOCAL (LC) PANELS SHOWN ON PLANS ARE SUGGESTED LOCATIONS ONLY.
M-401 MECHANICAL AIR SIDE DIAGRAM ● ● ● FINAL LOCATION AND EXACT QUANTITY OF DDC/LC PANELS, WILL BE DEPENDENT ON SELECTION OF ATC VENDOR AND SHALL BE 13. DUCT AND AIR TRANSFER OPENINGS THAT PENETRATE FIRE RATED PARTITIONS SHALL COMPLY WITH ALL REQUIREMENTS
M-411 MECHANICAL WATER SIDE DIAGRAM ● ● ● SUBJECT TO SHOP DRAWING SUBMITTAL, REVIEW AND APPROVAL BY THE ENGINEER AND ARCHITECT. LISTED UNDER THE INTERNATIONAL BUILDING CODE SECTION 716 AS APPLICABLE TO SYSTEM DESIGN.
M-501 MECHANICAL HOT WATER FLOW DIAGRAM ● ● ● ● 33. ALL MASONRY OPENINGS/WALL OPENINGS (M.O.) SHOWN ON THE PLANS SHALL BE 3 SQUARE FEET AND LOCATED ABOVE THE
M-502 MECHANICAL CHILLED WATER FLOW DIAGRAM ● ● ● APPROPRIATE HUNG CEILING LINE UNLESS OTHERWISE NOTED.
34. ALL LAB EXHAUST DUCTWORK THAT PASSES THROUGH A 2HR RATED WALL THAT IS PART OF A LABORATORY SUITE SHALL BE
M-601 MECHANICAL DETAIL SHEET No.1 ● ● ● ENCLOSED IN 2HR FIRE RATED CONSTRUCTION FROM THAT WALL TO THE RATED SHAFT WALL. (NO FSD'S SHALL BE PROVIDED IN
M-602 MECHANICAL DETAIL SHEET No.2 ● ● ● THE LABORATORY EXHAUST DUCTWORK).
M-603 MECHANICAL DETAIL SHEET No.3 ● ● ● 35. STORAGE CABINET LOCATED BELOW EACH FUME HOOD THAT IS USED FOR THE STORAGE OF ACIDS SHALL BE PROVIDED WITH A
M-604 MECHANICAL DETAIL SHEET No.4 ● ● ● 1-1/2" S/S PIPE THAT CONNECTS TO THE BACK OF THE CABINET AND TERMINATE AT THE WORK SURFACE OF THE FUME HOOD.
M-605 MECHANICAL DETAIL SHEET No.5 ● ● ● REFER TO THE ARCHITECTURAL DRAWINGS FOR LOCATION AND QUANTITY OF FUME HOODS WITH ACID STORAGE CABINETS.
CABINETS FOR STORAGE OF SOLVENTS SHALL BE PROVIDED WITH DOOR LOUVERS FOR VENTILATION VENT PIPE CONNECTION AS
M-606 MECHANICAL DETAIL SHEET No.7 ●
NOTED ABOVE.
M-607 MECHANICAL DETAIL SHEET No.8 ● 36. ALL PRESSURE VESSELS INCLUDING BUT NOT LIMITED TO STERILIZERS, CAGE WASHERS, ETC. SHALL BE PROVIDED WITH A
M-701 MECHANICAL SCHEDULE SHEET No. 1 ● ● ● PRESSURE RELIEF VALVE TO THE OUT OF DOORS.
M-702 MECHANICAL SCHEDULE SHEET No. 2 ● ● ● 37. ALL LIFE SAFETY EQUIPMENT, WHETHER ISOLATED OR NOT, SHALL BE BOLTED TO THE STRUCTURE TO ALLOW FOR CODE
M-703 MECHANICAL SCHEDULE SHEET No. 3 ● ● ● ● MANDATED SEISMIC ACCELERATION.
M-704 MECHANICAL SCHEDULE SHEET No. 4 ● ● 38. ALL SMOKE AND COMBINATION FIRE/SMOKE DAMPERS SHALL BE APPROVED FOR USE IN MASSACHUSETTS. DAMPERS SHALL BE
INSTALLED IN ACCORDANCE WITH APPROVED U.L. LISTING REQUIREMENTS.
M-705
M-706
MECHANICAL SCHEDULE SHEET No. 5
MECHANICAL SCHEDULE SHEET No. 6
●
●
●
●
●
●
● 39. EACH VARIABLE AIR VOLUME BOX (WITH AND WITHOUT REHEAT COIL), FAN POWERED BOX (WITH AND WITHOUT REHEAT COIL) VAV BOX NOMENCLATURE KEY
AND CONSTANT VOLUME BOX (WITH REHEAT COIL) SHALL BE PROVIDED WITH A THERMOSTAT FURNISHED AND INSTALLED UNDER
M-910 MECHANICAL FIRST FLOOR PRESSURIZATION PLAN ● THE B.A.T.C. SECTION OF THE SPECIFICATIONS. THERMOSTATS SHALL BE LOCATED AS SHOWN OR AS DIRECTED. FINAL
M-920 MECHANICAL SECOND FLOOR PRESSURIZATION PLAN ● LOCATIONS TO BE VERIFIED WITH THE ARCHITECT. FINISH AND COLOR TO BE SELECTED BY THE ARCHITECT. LOAD CALCULATION NOTE
M-930 MECHANICAL THIRD FLOOR PRESSURIZATION PLAN ● 40. VARIABLE AIR VOLUME AND CONSTANT AIR VOLUME BOXES AND SOUND TRAP SYMBOLS SHOWN ON DRAWINGS ARE SCHEMATIC,
SEE DETAIL OF INSTALLATION ON DRAWING FOR ACTUAL TYPICAL ARRANGEMENT REQUIRED. EQUIPMENT TYPE HEATING AND COOLING SYSTEM DESIGN LOADS FRO THE PURPOSE OF SIZNG SYSTEMS AND
41. ALL FPB AND VAV BOXES WITH REHEAT COILS SHALL BE PROVIDED WITH ACCESS DOORS UPSTREAM AND DOWNSTREAM OF
FLOOR LEVEL EQUIPMENT FOR THIS PROJECT HAVE BEEN DETERMINED IN ACCORDANCE WITH
COILS.
ANSI/ASHRAE/ACCA STANDARD 183-2007
42. BORDER TYPES, COLOR, FINISHES, AND METHOD OF ATTACHMENT FOR ALL DIFFUSERS, GRILLES AND REGISTERS SHALL BE EQUIPMENT NUMBER
COORDINATED WITH THE ARCHITECTURAL CEILING DETAILS AND SPECIFICATIONS.
43. ALL LINEAR DIFFUSERS ARE TO BE COORDINATED WITH ARCHITECTURAL PLANS FOR EXACT LENGTHS AND LOCATIONS. ALL
DEMOLITION NOTES FINISH COLORS AND TYPES SHALL BE AS PER ARCHITECTURAL DRAWINGS AND SPECIFICATIONS. VAV/CAV-2-1
(300, 150)
BUILDING DEPARTMENT NOTES
1. PRIOR TO STARTING ANY DEMOLITION WORK, THIS CONTRACTOR IS TO REVIEW THE EXTENT OF THE DEMOLITION WORK AND
VERIFY FUNCTION OF SERVICES WITH THE OUTSHINE BUILDING MANAGEMENT/FACILITIES AND CONFIRM THE SCOPE OF WORK. MINIMUM CFM SET POINT
THIS CONTRACTOR SHALL DEMOLISH ALL ASSOCIATED HVAC EQUIPMENT, DUCTWORK, PIPING, INSULATION, DAMPERS, ANCHORS, MAXIMUM CFM SET POINT THIS PLAN IS APPROVED FOR WORK INDICATED ON THE APPLICATION SPECIFICATION SHEET. ALL
HANGERS AND INSTRUMENTS IN AREA OF WORK AND AS INDICATED ON THE PLANS. OTHER MATTERS SHOWN ARE NOT TO BE RELIED UPON, OR TO BE CONSIDERED AS EITHER BEING
2. ALL DEMOLITION WORK SHALL BE COORDINATED WITH THE OUTSHINE BUILDING MANAGEMENT. ANY REQUIRED SYSTEM SHUT- APPROVED OR IN ACCORDANCE WITH APPLICABLE CODES.
DOWNS SHALL BE COMMUNICATED WITH THE OUTSHINE BUILDING MANAGEMENT IN ADVANCE.
3. ALL MECHANICAL SERVICES WITHIN THE AREA OF WORK THAT WILL BE AFFECTED SHALL BE IDENTIFIED AND TAGGED BEFORE
DEMOLITION. ALL DEMOLITION WORK SHALL BE COORDINATED WITH OUTSHINE . ALL SERVICES FOUND TO BE ABANDONED SHALL
BE DEMOLISHED.
4. EACH VAV AND FPB BOX SHOWN TO BE REUSED SHALL BE TESTED AND COMMISSIONED TO CONFIRM PRESSURE TUBES, CROSS B
CLIENT: J. CALNAN
END OF EACH SHIFT, THROUGHOUT DEMOLITION AND CONSTRUCTION. (300, 150)
12. REHEAT COIL SHALL BE THOROUGHLY CLEANED PRIOR TO RE-INSTALLATION.
13. CONTRACTOR TO SUBMIT FINAL AS-BUILT DRAWINGS ONCE THE DEMOLITION IS COMPLETE. THE AS-BUILT DRAWINGS WILL
WESTWOOD, MA
INDICATE DUCT/PIPE SIZE, LOCATIONS & ELEVATIONS. HEATING CFM SET POINT
14. THIS CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING DUCTWORK, PIPING & INSULATION WHERE REQUIRED.
690 CANTON
COOLING CFM SET POINT
15. FIREPROOFING AND INSULATION DISTURBED BY DEMOLITION WORK SHALL BE PATCHED AND RESTORED TO EXISTING
CONDITIONS; MATCHING THE BASE BUILDING WORK.
16. PATCH & REPAIR WATERPROOFING MEMBRANE WHERE REMOVAL OF EXISTING SUPPORTS DAMAGES MEMBRANE OR PRESENTS
WATER ENTRY POINT.
17. MAKE TEMPORARY CONNECTIONS AS REQUIRED BETWEEN NEW AND EXISTING WORK TO ENSURE CONTINUOUS OPERATION OF
THE FACILITY. ALL COSTS ASSOCIATED WITH AND RESULTING FROM TEMPORARY CONNECTIONS SHALL BE BORNE BY THIS
PROFESSIONAL'S STATEMENT
CONTRACTOR.
18. CONTRACTOR SHALL SAFE-OFF ANY OPEN ENDED DUCTWORK AFTER DEMOLITION TO ENSURE CONTINUOUS OPERATION OF THE TO THE BEST OF MY KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT, THESE PLANS AND
AIR SYSTEM SERVING THE REMAINDER OF THE FLOOR. SPECIFICATIONS ARE IN COMPLIANCE WITH THE NINTH EDITION OF 780 CMR & ASHRAE 90.1-2013
19. CONTRACTOR SHALL COORDINATE THE REMOVAL OF DEMOLITION DEBRIS WITH J. CALNAN BUILDING OWNER.
20. REMOVAL OF THE AIR CONDITIONING UNIT REFRIGERANT: REFRIGERANT SHALL BE REMOVED FROM AC UNITS AND DISPOSED OF
IN ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL REGULATIONS. NO REFRIGERANT SHALL BE RELEASED INTO THE
ATMOSPHERE. MECHANICAL ALTERNATES GENERAL EQUIPMENT
21. THIS CONTRACTOR SHALL COORDINATE WITH ALL TRADES.
22. THIS CONTRACTOR SHALL REMOVE THE EXISTING CONTROLLERS AND ASSOCIATED CONTROL DEVICES INCLUDING, BUT NOT
NOMENCLATURE KEY
LIMITED TO, DDC CONTROLLERS, TRANSFORMERS, TEMPERATURE SENSORS AND VALVES. THIS CONTROLLERS AND DEVICES
SHALL BE TURNED OVER TO THE OWNER IN WORKING ORDER. ALL CONTROL AND POWER WIRING SHALL BE DISCONNECTED BY VE# ADD/DEDUCT DESCRIPTION
THIS CONTRACTOR AND REMOVED BY OTHERS. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR UPDATING THE DATABASE AND
GRAPHICS AS NECESSARY TO REFLECT THESE CHANGES. BUILDING NUMBER
M-01 ADD PROVIDE BTU METERS AT ALL TENANT HAND-OFF LOCATIONS FOR SCHWS&R AND HWS&R
EQUIPMENT TYPE
RISER 1 & 2. REFER TO M-411 FOR ALL METER SIZES. INCLUDE ALL REQUIRED BMS WIRING
BACK TO BMS PANEL. FLOOR LEVEL
1 11/16/2022 BULLETIN 01
EQUIPMENT NUMBER A REV DATE DESCRIPTION
DESIGN
DELIVERABLE: BULLETIN 01
1
ABC-AHU-2-1 ISSUE DATE: NOVEMBER 16, 2022
CODE AND STANDARD COMPLIANCE Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_M22_690 Canton.rvt
DRAWN BY: AP
PROJECT SHALL COMPLY WITH THE FOLLOWING CODES AND STANDARDS: CHECKED BY: SWC
1. ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES. PROJECT NUMBER: 28047.E.001
SHEET TITLE:
2. THE NINTH EDITION OF 780 CMR
3. 2018 INTERNATIONAL ENERGY CONSERVATION CONSTRUCTION CODE. PER SECTION C302.1:
MECHANICAL COVER
3.1 INDOOR MINIMUM DESIGN TEMPERATURE (COOLING): 75 DEG. F. SHEET & DRAWING
3.2 INDOOR MINIMUM DESIGN TEMPERATURE (COOLING): 75 DEG. F.
INDEX
11/15/2022 10:40:18 PM
SHEET NUMBER:
5 4 3 2 1 M-001
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
ABBREVIATIONS ABBREVIATIONS
A AIR HWH HOT WATER HEATER
ABD AUTOMATIC BALL DRIP HZ HIGH ZONE
AD AREA DRAIN INV INVERT
ADJ. ADJUSTABLE JAN JANITOR
AFF ABOVE FINISHED FLOOR JC JANITOR'S CLOSET
AFP AUTOMATIC FIRE PUMP JP JOCKEY PUMP
KEY OF SYMBOLS AFWPH ANTI-FREEZE POST HYDRANT JT JOINT T 617.848.9511
AFWH ANTI-FREEZE WALL HYDRANT L LEADER BOSTON, MA
CONNECT NEW WORK TO EXISTING (POINT AI AIR INTAKE LAB LABORATORY 250 SUMMER STREET
REDUCER AP ACCESS PANEL LAV LAVATORY
DUCTWORK OF CONNECTION)
AR ARGON LP LOW POINT ci-designinc.com
DIRECTION OF FLOW FLOW REVERSING VALVE @ AT LV LOCAL VENT (W/ BEDPAN WASHERS)
FLAT OVAL DUCTWORK AUTO AUTOMATIC LVR LOUVER
E EXPANSION LINE POINT OF DISCONNECT AV ACID VENT LZ LOW ZONE
AW ACID WASTE MA MEDICAL AIR D
DUCTWORK WITH ACOUSTICAL LINING (1" BFP BACKFLOW PREVENTER MACH MACHINE
D DRAIN LINE THICK, U.O.N.) LOUVERED DOOR (SQ. FT.)
BLDG BUILDING MAX MAXIMUM
BLKHD BULKHEAD MECH MECHANICAL
V VENT FIRE RATED DUCT CONSTRUCTION (1-1/2 UNDERCUT DOOR (1") BMS BUILDING MANAGEMENT SYSTEM MEMB MEMBRANE
HOURS, U.O.N.) BOP BOTTOM OF PIPE MER MECHANICAL EQUIPMENT ROOM
UNION FLOW MEASURING STATION BOT BOTTOM MEZZ MEZZANINE
2 HOUR FIRE RATED DUCT BR BRANCH MFR MANUFACTURE
REFRIGERANT RELIEF FLEXIBLE DUCT BSMNT BASEMENT MH MANHOLE
2 HOUR FIRE RATED BLAST RESISTANT DUCT BW BLACK WATER MIN MINIMUM
HPS HIGH PRESSUERE STEAM SYSTEM ("DURA-DUCT" AS STD.) SEE SPEC BWV BLACK WATER VENT MISC MISCELLANEOUS
FAN BWW BLACK WATER WASTE MTD MOUNTED
STAINLESS STEEL DUCTWORK (WELDED, CAB CABINET MTG MEETING
MPS MEDIUM PRESSUERE STEAM
PAN TYPE CONSTRUCTION) CONSTANT/VARIABLE AIR VOLUME BOX OR CB CATCH BASIN MTL METAL
EXHAUST BOX CEM CEMENT(ITIOUS) MV MEDICAL VACUUM
LPS LOW PRESSUERE STEAM CF CUBIC FEET MZ MID ZONE
MEDIUM PRESSURE DUCTWORK WITH CONSTANT/VARIABLE AIR VOLUME BOX WITH
PERFORATED CONE WITH INTEGRAL BAFFLE REHEAT COIL CI CAST IRON NC NORMALLY CLOSED
HPR HIGH PRESSUERE RETURN CLG CEILING N.I.C. NOT IN CONTRACT
FAN POWERED AIR VOLUME BOX CLOS CLOSET No. NUMBER
EXISTING DUCTWORK CO CAPPED OUTLET NO NORMALLY OPEN
MPR MEDIUM PRESSUERE RETURN
FAN POWERED VARIABLE AIR VOLUME BOX CO2 CARBON DIOXIDE NOM NOMINAL
W/HEATING COIL COL COLUMN NPW NON-POTABLE WATER
LPR LOW PRESSUERE RETURN
COMP'T COMPARTMENT NTS NOT TO SCALE
PUMP CONC CONCRETE N2 NITROGEN
LOW PRESSUERE STEAM TRAP ASSEMBLY CONF CONFERENCE N2O NITROUS OXIDE
EXISTING DUCTWORK TO BE DEMOLISHED CORR CORRIDOR OC ON CENTER
MEDIUM/HIGH PRESSUERE STEAM TRAP DUPLEX CONDENSATE PUMP W/RECEIVER
CONST CONSTRUCTION OD OVERFLOW DRAIN
ASSEMBLY
CON'T CONTINUATION OF OVERFLOW
UNIT HEATER CONV CONVECTOR OFF OFFICE
PC PUMPED CONDENSATE
COWP CLEAN OUT WALL PLATE OPNG OPENING
MOTOR CPVC CHLORINATED POLYVINYL CHLORIDE OPP OPPOSITE
SHUT OFF VALVE (NORMALLY OPEN)
CT COOLING TOWER O2 OXYGEN
WORK OF OTHER TRADES CTMU COOLING TOWER MAKE UP OVHD OVERHEAD
DISCONNECT SWITCH
SHUT OFF VALVE (NORMALLY CLOSED) CTPD COOLING TOWER PUMP DISCHARGE P PNEUMATIC
CV CHECK VALVE PA PREACTION
F FUTURE DUCTWORK DOAS
FUSIBLE LINK SAFETY SHUT-OFF VALVE CW COLD WATER PAN. PANEL
OFFSET IN DUCT ELEVATION CWPD COLD WATER PUMP DISCHARGE PAV PREACTION VALVE
M
MOTORIZED VALVE BACK DRAFT DAMPER CWVO COLD WATER VALVED OUTLET PD PLAZA DRAIN
TRANSITION (RECTANGULAR TO ROUND)
DCDA DOUBLE CHECK DETECTOR ASSEMBLY PE PASSENGER ELEVATOR
SHEET METAL PLENUM DCTIRN DUCTILE IRON PERF PERFORATED
BUTTERFLY VALVE
DCV DOUBLE CHECK VALVE. PL PLATE C
M HEATING COIL FIRE DAMPER DET DETAIL PLBG PLUMBING
MOTORIZED BUTTERFLY VALVE DF DRINKING FOUNTAIN PO PLUGGED OUTLET
DI DEIONIZED POC POINT OF CONNECTION
BALANCEING VALVE DIAG DIAGONAL POE POINT OF ENTRY
COOLING COIL
DIAM DIAMETER POL POLISH(ED)
AUTOMATIC CONTROL VALVE AUTOMATIC LOUVER DAMPER DIM DIMENSION PR PAIR
DIR DEIONIZED RETURN PRV PRESSURE REDUCING VALVE
ARCHITECTURAL GRATING DN DOWN PSI POUNDS PER SQUARE INCH
THREE WAY AUTOMATIC CONTROL VALVE
DP DRY PIPE PTN PARTITION
DPV DRY PIPE VALVE PVC POLYVINYL CHLORIDE
SOLENOID VALVE BEAM CUT
SMOKE DAMPER DR DRAIN RA RETURN AIR
DRW DRINKING WATER RCV RISER CONTROL VALVE
PRESSURE REDUCING VALVE VAPORIZED HYDROGEN PEROXIDE HOOKUP DW DISHWASHER RD ROOF DRAIN
DWG DRAWING REF REFRIGERATOR
SAFETY RELIEF VALVE BTU METER DWPD DOMESTIC WATER PUMP DISCHARGE REINF REINFORCEMENTS
DIFFERENTIAL PRESSURE MAGNEHELIC COMBINATION FIRE/SMOKE DAMPER EA. EACH REQT'S REQUIREMENTS
STRAINER WITH BLOW OFF VALVE AND HOSE GAUGE (M) ED. EJECTOR DISCHARGE REV REVISED
ADAPTER EL ELEVATION RM ROOM
DUCT MOUNTED AIRCUITY SENSOR ELEC ELECTRICAL RODI REVERSE OSMOSIS DEIONIZED
CHECK VALVE
ELEV ELEVATOR RODIR REVERSE OSMOSIS DEIONIZED RETURN
STATIC PRESSURE TRANSMITTER
EMER EMERGENCY ROP ROUGH OPENING
DUPLEX FUEL OIL STRAINER VOLUME DAMPER
WALL MOUNTED AIRCUITY SENSOR
EMR ELEVATOR MACHINE ROOM ROR REVERSE OSMOSIS RETURN
ENCL ENCLOSURE RPDA REDUCED PRESSURE ZONE DETECTOR ASSEMBLY
PRESSURE GAUGE LOCAL DIFFERENTIAL PRESSURE GAUGE ENGR ENGINEER RPZ REDUCED PRESSURE ZONE ASSEMBLY
ENTR ENTRANCE s SOIL, SANITARY
ACCESS DOOR
PIPE ANCHOR PRESSURE TRANSMITTER EOS END/EDGE OF SLAB SCHED SCHEDULE
EQUIP EQUIPMENT SD SUMP DISCHARGE
TEMPERATURE SENSOR DUCT SETTING UP EX EXISTING SE SERVICE ELEVATOR
PIPE GUIDE
EXH EXHAUST SECT SECTION
DIFFERENTIAL PRESSURE SWITCH EXP EXPRESS SH SHOWER
DUCT SETTING DOWN
ORIFICE PLATE EXP.JP. EXPANSION JOINT SHT SHEET
STATIC PRESSURE SENSOR
EXT EXTERIOR SIM SIMILAR (TO)
SOUND TRAP
MANUAL AIR VENT F FIRE SLV SLEEVE
HUMIDITY SENSOR
FAI FRESH AIR INTAKE SPFCA SPRINKLER FLOOR CONTROL ASSEMBLY
OXYGEN SENSOR AXIAL CONE SILENCER FD FLOOR DRAIN SPO SANITARY PLUGGED OUTLET
AUTOMATIC AIR VENT WITH PLUG COCK
FDN FOUNDATION SPR SPRINKLER
CARBON MONOXIDE SENSOR FH FIRE HYDRANT SQ SQUARE
FLEXIBLE CONNECTION
VACUUM BREAKER FHC FIRE HOSE CABINET SQ.FT. SQUARE FEET
CARBON DIOXIDE SENSOR FHR FIRE HOSE RACK SS STAINLESS STEEL
B
CLIENT: J. CALNAN
GAL GALLONS TTB TIGHT TO BEAM
ELECTRICALLY HEAT TRACED PIPE GALV GALVANIZED TW TEPID WATER
WESTWOOD, MA
TEMPERATURE GAUGE GC GENERAL CONTRACTING TWC TEPID WATER CIRCULATION
690 CANTON
CAPPED PIPE GD GARAGE DRAIN TYP TYPICAL
GEN GENERAL UR URINAL
THERMOSTAT IN HUNG CEILING AT RETURN G (HP) GAS HIGH PRESSURE UON UNLESS OTHERWISE NOTED
CAPPED PIPE BLIND FLANGE AIR OPENING (SLOT OR GRILLE)
G (MP) GAS MEDIUM PRESSURE V VACUUM
SUPPLY AIR DUCT UP GR GREASE VCO VALVED, CAPPED OUTLET
COMBINATION THERMOSTAT AND ON/OFF GRD GRADE VE VACUUM EXHAUST
SWITCH FOR FAN CONTROL
EXHAUST OR RETURN AIR DUCT UP GT GRAVITY TANK VEX VTR
GV GAS VENT VERT VERTICAL
SUPPLY AIR DUCT DOWN BMS HORN AND STROBE
GW GRAY WATER VEST VESTIBULE
EXHAUST OR RETURN AIR DUCT DOWN GWV GRAY WATER VENT VO VALVED OUTLET
FAN START/STOP SWITCH W/PILOT LIGHT GWW GRAY WATER WASTE VPO VENT PLUGGED OUTLET
HB HOSE BIB VTR VENT THRU ROOF
AC UNIT START/STOP W/ THERMOSTAT HC HOSE CABINET W WASTE
He HELIUM W/ WITH
HGT HEIGHT WAGD WASTE ANESTHETIC GAS DISPOSAL
HORIZ HORIZONTAL WC WATER CLOSET
HP HORSEPOWER WCO WALL CLEAN OUT
HR HOUR WE WASTE ANESTHETIC GAS DISPOSAL EXHAUST
H2 HYDROGEN WF WIDE FLANGE
HTG HEAT(ING) WH WALL HYDRANT 1 11/16/2022 BULLETIN 01
MECHANICAL
ABBREVIATION,
SYMBOLS, ETC
11/15/2022 10:40:20 PM
SHEET NUMBER:
5 4 3 2 1 M-002
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
6 7 8 9
D
C
1 2 3 4 5 10 11 12 13 14
E STOR.
EXISTING HVAC
TO REMAIN
GENERATOR
029
CLIENT: J. CALNAN
WESTWOOD, MA
690 CANTON
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN
SHEET NOTES DELIVERABLE: BULLETIN 01
ISSUE DATE: NOVEMBER 16, 2022
1. VOLUME DAMPERS HAVE BEEN INTENTIONALLY OMITTED FROM THE DUCTWORK PLANS TO
IMPROVE GRAPHIC QUALITY OF THE DRAWINGS. HOWEVER, VOLUME DAMPERS ARE REQUIRED Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_M22_690 Canton.rvt
AT EVERY LOW PRESSURE SUPPLY, RETURN AND EXHAUST DIFFUSER AS INDICATED IN THE DRAWN BY: AP
SPECIFICATIONS AND DETAILS.
1 2. ALL FCU'S SHALL BE PROVIDED WITH 1" AL FOR FIRST 10'-0" DOWNSTREAM OF FCU. PROVIDE CHECKED BY: SWC
LINED RETURN AIR BOOT. PROJECT NUMBER: 28047.E.001
3. EXHAUST DUCTWORK SERVING FUME HOODS ARE TO BE 316L WELDED STAINLESS STEEL BACK SHEET TITLE:
TO EXHAUST HEADER (MINIMUM OF 10'-0"). PITCH DUCT WORK FROM HEADER BACK TO FUME
HOOD. GROUND FLOOR
4. ALL OFFICE AND CONFERENCE ROOMS SHALL BE PROVIDED WITH TRANSFER DUCTS W/
1 ACOUSTICAL LINING. MECHANICAL FLOOR
5. ALL LAB EXHAUST SHALL BE PROVIDED WITH FIRE WRAP FROM THE FIRST RATED WALL
PENETRATED BACK TO THE RISER PLAN (OVERALL)
11/15/2022 10:40:24 PM
SHEET NUMBER:
5 4 3 2 1 M-100
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
1
1 2 3 4 5 6 7 8
6ø 6''ø DROP TO HOT
6ø TR TR
6ø WATER HEATER
12ø 6ø (380) 12x8 (380) M-102
3
E
M-352 STOR.
TG 8x8
TG TG TG TG TG 018
12x8 12x12 (380) (200) (200) (200) (200) (200)
B-G-1 8x8 10x8 TR TR
B-G-2 B-G-3 PLANS (320)
ELEC 18x12 (320)
BOILER ROOM TEL MENS
2 GX-G-1 12x8 12x6 12x6 12x6 12x6 12x6 TR
ALD 012 TR TR GAME ROOM
M-352 006 007 010 013 (150) (320) (150)
(3405) 32x12 28x12 24x10 10x8 019 10x8
FCU-G-1
12x8 12x8
20x10 18x10 16x10 14x10 12x10
6ø
STORAGE
26x10 14x12
ALD GX-G-2 12x10
18x12
TG TG 8x8
(380) (380) 004
18x18 FD W/ AD
12x8 TG TR TG
PH ROOM (485) (485) WOMENS 10x8 (300)
TR
TG (380) 16x12 014
005 10x10 10x10
PROVIDE 72''x36''x18'' (295) DW & FIRE SERVICE ROOM
TR TR TR TR TR TG TR CD
INTAKE PLENUM BOX 6ø ELEC.
10x8 6''ø DROP TO (200) (200) (200) (200) (200) 009 (485) (485) CD (150)
CELL SITE CLOSET
TO ENGAGE LOUVER HOT WATER 6ø MECH MAIL
CLEANING CLOSET 10x10 011 10x10 (170) 020
HEATER 6ø
PROVIDE 7.5 FT2 NFA 10x8 FSD 008 017
003 FSD TG TR
STORM PROOF LOUVER GU- DSD (E)UH CR 6x6 8x6 14x6
GU- O 12x6 12x6 12x6 12x6 (485) (485) C
GX-G-2 12x6 (75)
F SF-G-1 BLDG MGMT
LOADING 10ø 6ø
TG (E)UH CD
6x6 6x6 015
002 10ø (295) TD 18x10 16x8 12x8 TR (75)
20x12 EMR.
(150)
TR FD W/ AD 12x10 021
(150) 26x10 FD/W AD
LOBBY
CORRIDOR 14x10
8x8 14x12
016 14x6
28x14 033
10ø ELEV.
CR
20x12 ACE-G-1 8x6 (300) 102
8x8
FOUR (4) 6" BOILER INTAKES
W/ 45 DEGREE GOOSENECK & CD
EMR FREIGHT ELEVATOR ELEV LOBBY
SF-G-1 INSECT SCREEN (150)
RH-G-1
034 146 035 CD FSD
STORAGE (150) GU- O
THREE (3) 10" BOILER INTAKES SF-G-1
1 STAIR
030 W/ 45 DEGREE GOOSENECK &
INSECT SCREEN 032
ALD
(3265) PROVIDE 60"x18"x18"
INTAKE PLENUM
STORAGE BOX TO ENGAGE
LOUVER
031
G
EXISTING HVAC
TO REMAIN
B
CLIENT: J. CALNAN
WESTWOOD, MA
690 CANTON
I
GENERATOR
029
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN
SHEET NOTES DELIVERABLE: BULLETIN 01
ISSUE DATE: NOVEMBER 16, 2022
1. VOLUME DAMPERS HAVE BEEN INTENTIONALLY OMITTED FROM THE DUCTWORK PLANS TO
IMPROVE GRAPHIC QUALITY OF THE DRAWINGS. HOWEVER, VOLUME DAMPERS ARE REQUIRED Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_M22_690 Canton.rvt
AT EVERY LOW PRESSURE SUPPLY, RETURN AND EXHAUST DIFFUSER AS INDICATED IN THE DRAWN BY: AP
SPECIFICATIONS AND DETAILS.
1 2. ALL FCU'S SHALL BE PROVIDED WITH 1" AL FOR FIRST 10'-0" DOWNSTREAM OF FCU. PROVIDE CHECKED BY: SWC
LINED RETURN AIR BOOT. PROJECT NUMBER: 28047.E.001
3. EXHAUST DUCTWORK SERVING FUME HOODS ARE TO BE 316L WELDED STAINLESS STEEL BACK SHEET TITLE:
TO EXHAUST HEADER (MINIMUM OF 10'-0"). PITCH DUCT WORK FROM HEADER BACK TO FUME
HOOD. GROUND FLOOR
4. ALL OFFICE AND CONFERENCE ROOMS SHALL BE PROVIDED WITH TRANSFER DUCTS W/
1 ACOUSTICAL LINING. MECHANICAL PARTIAL
5. ALL LAB EXHAUST SHALL BE PROVIDED WITH FIRE WRAP FROM THE FIRST RATED WALL
PENETRATED BACK TO THE RISER FLOOR PLAN (WEST)
11/15/2022 10:40:28 PM
SHEET NUMBER:
5 4 3 2 1 M-101
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
8 9
D
10 11 12 13 14
M-101
E
8x8 14x12
18x12 1
TG
(300)
C
CD CELL SITE CLOSET
(150) MAIL
020
017
14x6 UH-G-1 UH-G-2
8x6
F TR
(700) TG TG CORRIDOR
EMR. (350) (350)
STORAGE PH ROOM 10x8 026
ALD
021
CELL SITE CLOSET 023 SF-G-2 024 STORAGE
10x10 GX-G-3 ALD
022 STORAGE STORAGE
LOBBY 025
016 027 028
ELEV.
EXISTING HVAC
TO REMAIN B
CLIENT: J. CALNAN
WESTWOOD, MA
690 CANTON
I
GENERATOR
029
1 11/16/2022 BULLETIN 01
A REV DATE DESCRIPTION
DESIGN
SHEET NOTES DELIVERABLE: BULLETIN 01
ISSUE DATE: NOVEMBER 16, 2022
1. VOLUME DAMPERS HAVE BEEN INTENTIONALLY OMITTED FROM THE DUCTWORK PLANS TO
IMPROVE GRAPHIC QUALITY OF THE DRAWINGS. HOWEVER, VOLUME DAMPERS ARE REQUIRED Copyright (c) by CI Design,Inc. All Rights Reserved.
Autodesk Docs://690 Canton/JBB_M22_690 Canton.rvt
AT EVERY LOW PRESSURE SUPPLY, RETURN AND EXHAUST DIFFUSER AS INDICATED IN THE DRAWN BY: AP
SPECIFICATIONS AND DETAILS.
1 2. ALL FCU'S SHALL BE PROVIDED WITH 1" AL FOR FIRST 10'-0" DOWNSTREAM OF FCU. PROVIDE CHECKED BY: SWC
LINED RETURN AIR BOOT. PROJECT NUMBER: 28047.E.001
3. EXHAUST DUCTWORK SERVING FUME HOODS ARE TO BE 316L WELDED STAINLESS STEEL BACK SHEET TITLE:
TO EXHAUST HEADER (MINIMUM OF 10'-0"). PITCH DUCT WORK FROM HEADER BACK TO FUME
HOOD. GROUND FLOOR
4. ALL OFFICE AND CONFERENCE ROOMS SHALL BE PROVIDED WITH TRANSFER DUCTS W/
1 ACOUSTICAL LINING. MECHANICAL PARTIAL
5. ALL LAB EXHAUST SHALL BE PROVIDED WITH FIRE WRAP FROM THE FIRST RATED WALL
PENETRATED BACK TO THE RISER FLOOR PLAN (EAST)
11/15/2022 10:40:30 PM
SHEET NUMBER:
5 4 3 2 1 M-102
ARCHITECTURE PLANNING INTERIORS
LANDSCAPE ARCHITECTURE GRAPHICS
T 617.848.9511
BOSTON, MA
250 SUMMER STREET
ci-designinc.com
6 7 8 9
DN
D
1 2 3 4 5 10 11 12 13 14 C
E
M-111 M-112
ST ST IDF ST ST
SUPPORT SUPPORT
111
1 142 112
ST
ST
ST
ST
SA
UP ST
OFFICE ST SA