You are on page 1of 1
OFFICE OF THE PRESIDENT — NATIONAL HOUSING AUTHORITY ALA are Eliptical Road, Diliman, Quezon City MATERIAL ACCEPTANCE REQUEST ____MARNO. 089_ ssbiaisatatiassiasian PROJECT NAME: PROPOSED 19-STOREY NHA OFFICE TOWER LOCATION: "—_|__ SELLIPTICAL ROAD DILMAN, QUEZONCTTY DATE. =) May 20,2022 PROJECTTYPE: HIGH-RISE BUILDING TIME: 9:00 am IMPLEMENTING OFFICE: | NHAHTTRD LOCATION: | FDC Malakas St. a.c. CONTRACTOR: | "NEW SAN JOSE BUILDERS,ING. ‘SPECIFICATIONS: ASTM C38 | C1 shop Orawings 0 Bit ofMaterle (Test Reauts ATTACHMENTS: - = | rotners (epeciy) 1 Mill Cerfcate ae — Noro | zs ~. COMPLIANCE Test Test. |}—~—] ——]_ REMARKS UNIT | QTY | MATERIAL DESCRIPTION | SAMPLE | REQUIREMENT | RESULTS | PASSED | FAILED Set 2 | 280 S0d0psi Concrete Cyinder | 6 Standard Test | Mar #068-7 8x12" Grade BoamfRetainng etod for ays WeliroctngiCotumn (Apri 22 Compressive MAR #072—14 202) Strength of cays Syinaest Concrete spoamens | COMMENTS Contractor's Representative) i D-Aviador————) ‘Company : New San Jose Builders, Inc. Date: May 19, 2022 lled up by NHA Implementing Team APPROVED: CDISAPPROVED Signature Date Name : ANNA ROCHELLE T. DE VERA Signature Designation : HEAD, SPECIFICATIONS AND MATERIAL STANDARDS, — Date IMPLEMENTING TEAM/ PRINCIPAL ARCHITECT 8, HOD-HTTRD APPR Name JOVITA G. PANOPIO Signature Designation : TECHNICAL TEAM HEAD, IMPLEMENTING TEAM) 5.1, REGIONAL MANAGER, NCR-NORTH SECTOR OFFICE.

You might also like