OFFICE OF THE PRESIDENT —
NATIONAL HOUSING AUTHORITY ALA are
Eliptical Road, Diliman, Quezon City
MATERIAL ACCEPTANCE REQUEST
____MARNO. 089_ ssbiaisatatiassiasian
PROJECT NAME: PROPOSED 19-STOREY NHA OFFICE TOWER
LOCATION: "—_|__ SELLIPTICAL ROAD DILMAN, QUEZONCTTY DATE. =) May 20,2022
PROJECTTYPE: HIGH-RISE BUILDING TIME: 9:00 am
IMPLEMENTING OFFICE: | NHAHTTRD LOCATION: | FDC Malakas St. a.c.
CONTRACTOR: | "NEW SAN JOSE BUILDERS,ING.
‘SPECIFICATIONS: ASTM C38
| C1 shop Orawings 0 Bit ofMaterle (Test Reauts
ATTACHMENTS: - =
| rotners (epeciy) 1 Mill Cerfcate
ae — Noro | zs ~. COMPLIANCE
Test Test. |}—~—] ——]_ REMARKS
UNIT | QTY | MATERIAL DESCRIPTION | SAMPLE | REQUIREMENT | RESULTS | PASSED | FAILED
Set 2 | 280 S0d0psi Concrete Cyinder | 6 Standard Test | Mar #068-7
8x12" Grade BoamfRetainng etod for ays
WeliroctngiCotumn (Apri 22 Compressive MAR #072—14
202) Strength of cays
Syinaest
Concrete
spoamens |
COMMENTS
Contractor's Representative)
i D-Aviador————) ‘Company : New San Jose Builders, Inc.
Date: May 19, 2022
lled up by NHA Implementing Team
APPROVED: CDISAPPROVED
Signature
Date
Name : ANNA ROCHELLE T. DE VERA Signature
Designation : HEAD, SPECIFICATIONS AND MATERIAL STANDARDS, — Date
IMPLEMENTING TEAM/ PRINCIPAL ARCHITECT 8, HOD-HTTRD
APPR
Name JOVITA G. PANOPIO Signature
Designation : TECHNICAL TEAM HEAD, IMPLEMENTING TEAM) 5.1,
REGIONAL MANAGER, NCR-NORTH SECTOR OFFICE.