Ps-00000-1163-0105-E - Rev.a - Pipeline Transient Study Surge Analysis Report - Crs
Ps-00000-1163-0105-E - Rev.a - Pipeline Transient Study Surge Analysis Report - Crs
2 Page 7 / Fig. 1-1 PIUL to update the name of KLS Field: KLS-1 and KLS-4 CRH Noted and Document is updated
Pipeline aligment sheets are not still available. PIUL shall validate the Study again, once the different Noted. OLGA simulations are updated based on latest revised
3 Page 21 / Section 3.4 routes have been fixed.
CRH
Alignment sheets.
7 Page 26 section 3,7 LP flare drum working volume shall 8,92 as per PDS ITG Noted and Document is updated
Table 4.5 indicates the list of cases for which OLGA simulation is
10 PIUL to explain what is table 4,5 for? ITG
performed.
11 GENERAL PIUL to provide OLGA simulation file related this study ITG Noted.
All Steady state and Transient OLGA simulations are performed for
20%, 40% and 100% design flowrate. Plant turndown capacity of 30%
13 General PIUL is refaring to turndown cases taken the flow of 40% insted of 30% piul to correct ITG
is covered in results of 20% and 40% scenario. Hence dedicated 30%
calculations are not performed.
In the appendicies Figures PIUL to indicate the maximum limite allowence some KPIs for each graph.
14 General E.g for export pipeline velocity to add an additional line for the maximum velocity allowed, max drain ITG Referred graphs are revised in current revision of document.
volum in Slug catcher)