PLUMBING ESTIMATE
NEW WORK
COLD WATER PIPE (BELOW GRADE)
Type "K", Soft Copper Tubing With Fittings (Assumed)
1 2" Dia Cold Water Pipe 8 10% 9 LFT $ - $ 90 $ - $ -
TEE
1 3/4" Dia Cold Water Pipe Tee 12 0% 12 EA $ - $ 90 $ - $ -
2 1-1/2" Dia Cold Water Pipe Tee 19 0% 19 EA $ - $ 90 $ - $ -
3 2" Dia Cold Water Pipe Tee 5 0% 5 EA $ - $ 90 $ - $ -
4 1-1/2" / 3/4" Dia Cold Water Pipe Tee 13 0% 13 EA $ - $ 90 $ - $ -
5 2" / 3/4" Dia Cold Water Pipe Tee 6 0% 6 EA $ - $ 90 $ - $ -
6 2" / 1-1/2" Dia Cold Water Pipe Tee 4 0% 4 EA $ - $ 90 $ - $ -
REDUCER
1 1-1/2" / 3/4" Dia Cold Water Pipe Reducer 3 0% 3 EA $ - $ 90 $ - $ -
2 2" / 3/4" Dia Cold Water Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
3 2" / 1-1/2" Dia Cold Water Pipe Reducer 5 0% 5 EA $ - $ 90 $ - $ -
TEE
1 3/4" Dia Hot Water Pipe Tee 4 0% 4 EA $ - $ 90 $ - $ -
2 1" / 3/4" Dia Hot Water Pipe Tee 6 0% 6 EA $ - $ 90 $ - $ -
3 1-1/4" / 3/4" Dia Hot Water Pipe Tee 2 0% 2 EA $ - $ 90 $ - $ -
4 1-1/2" / 3/4" Dia Hot Water Pipe Tee 7 0% 7 EA $ - $ 90 $ - $ -
REDUCER
1 1-1/4" / 1" Dia Hot Water Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
2 1-1/2" / 1-1/4" Dia Hot Water Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
WYE
1 2" Dia Sanitary Pipe Wye 37 0% 37 EA $ - $ 90 $ - $ -
2 3" Dia Sanitary Pipe Wye 1 0% 1 EA $ - $ 90 $ - $ -
3 4" Dia Sanitary Pipe Wye 36 0% 36 EA $ - $ 90 $ - $ -
4 4" / 3" Dia Sanitary Pipe Wye 1 0% 1 EA $ - $ 90 $ - $ -
5 4" / 2" Dia Sanitary Pipe Wye 25 0% 25 EA $ - $ 90 $ - $ -
REDUCER
1 2" / 1-1/2" Dia Sanitary Pipe Reducer 16 0% 16 EA $ - $ 90 $ - $ -
2 3" / 2" Dia Sanitary Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
3 4" / 2" Dia Sanitary Pipe Reducer 15 0% 15 EA $ - $ 90 $ - $ -
WYE
1 2" Dia Sanitary Pipe Wye 12 0% 12 EA $ - $ 90 $ - $ -
2 3" Dia Sanitary Pipe Wye 1 0% 1 EA $ - $ 90 $ - $ -
3 4" Dia Sanitary Pipe Wye 5 0% 5 EA $ - $ 90 $ - $ -
4 4" / 2" Dia Sanitary Pipe Wye 2 0% 2 EA $ - $ 90 $ - $ -
REDUCER
1 3" / 2" Dia Sanitary Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
2 4" / 2" Dia Sanitary Pipe Reducer 9 0% 9 EA $ - $ 90 $ - $ -
TEE
1 1-1/2" Dia Vent Pipe Tee 7 0% 7 EA $ - $ 90 $ - $ -
2 2" Dia Vent Pipe Tee 7 0% 7 EA $ - $ 90 $ - $ -
3 2" / 1-1/2" Dia Vent Pipe Tee 7 0% 7 EA $ - $ 90 $ - $ -
REDUCER
1 2" / 1-1/2" Dia Vent Pipe Reducer 6 0% 6 EA $ - $ 90 $ - $ -
WYE
1 4" Dia Storm Drain Pipe Wye 1 0% 1 EA $ - $ 90 $ - $ -
WYE
1 3" Dia Storm Drain Pipe Wye 1 0% 1 EA $ - $ 90 $ - $ -
WYE
1 3" Dia Overflow Storm Drain Pipe Wye 1 0% 1 EA $ - $ 90 $ - $ -
2 4" / 3" Dia Overflow Storm Drain Pipe Wye 1 0% 1 EA $ - $ 90 $ - $ -
TEE
1 3/4" Dia Condensate Drain Pipe Tee 3 0% 3 EA $ - $ 90 $ - $ -
2 1" / 3/4" Dia Condensate Drain Pipe Tee 7 0% 7 EA $ - $ 90 $ - $ -
3 1-1/4" / 3/4" Dia Condensate Drain Pipe Tee 12 0% 12 EA $ - $ 90 $ - $ -
REDUCER
1 1" / 3/4" Dia Condensate Drain Pipe Reducer 2 0% 2 EA $ - $ 90 $ - $ -
2 1-1/4" / 3/4" Dia Condensate Drain Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
3 1-1/4" / 1" Dia Condensate Drain Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
TEE
1 1-1/4" Dia Gas Pipe Tee 5 0% 5 EA $ - $ 90 $ - $ -
2 1-1/4" / 1" Dia Gas Pipe Tee 2 0% 2 EA $ - $ 90 $ - $ -
3 1-1/2" / 1-1/4" Dia Gas Pipe Tee 1 0% 1 EA $ - $ 90 $ - $ -
4 2" / 1-1/4" Dia Gas Pipe Tee 6 0% 6 EA $ - $ 90 $ - $ -
5 2-1/2" / 1-1/4" Dia Gas Pipe Tee 5 0% 5 EA $ - $ 90 $ - $ -
6 3" / 1-1/4" Dia Gas Pipe Tee 5 0% 5 EA $ - $ 90 $ - $ -
7 3" / 1-1/2" Dia Gas Pipe Tee 1 0% 1 EA $ - $ 90 $ - $ -
REDUCER
1 1-1/4" / 3/4" Dia Gas Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
2 1-1/4" / 1" Dia Gas Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
3 1-1/2" / 1-1/4" Dia Gas Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
4 2" / 1-1/4" Dia Gas Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
5 2-1/2" / 2" Dia Gas Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
6 3" / 2-1/2" Dia Gas Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
PLUMBING FIXTURES
WC-1: Water Closet, AMERICAN STANDARD 3451.001 Floor Mounted, Vitreous China, Elongated Bowl, With Syphon Jet action. Provide With Open Front Seat. Complete With SLOAN ROYAL 111-1.28, 1.28 GPF Manual Flush Valve. Refer To Architectural Plans For Mounting Height
1 1: Hand Operated Metering Faucets Shall Remain Open For 10second Minimum 11 0% 11 EA $ - $ 90 $ - $ -
2 WC-2: Water Closet, AMERICAN STANDARD 3461.001 Floor Mounted, Vitreous China, 17Elongated0%Bowl, With Syphon
17 JetEA
action. Provide With Open
$ Front
- Seat.
$ 90 Complete With$ SLOAN- ROYAL
$ 111-1.28,
- 1.28 GPF Manual Flush Valve. Refer To Architectural Plans For Mounting Height
1: Hand Operated Metering Faucets Shall Remain Open For 10second Minimum
3 UR-1: Urinal, AMERICAN STANDARD 6002.001, Wall Hung, High Efficiency Low Consumption 3 Wash0%Down Action 3 VitreousEAChina Bowl. Complete$ With SLOAN
- $ ROYAL
90 186, 0.125
$ GPF Manual
- $ Flush-Valve. Provide Fixture Carrier With Steel Uprights. Refer To Architectural Plans For Mounting Height
1: Hand
UR-2: Operated Metering
Urinal(ACC), AMERICAN Faucets Shall Remain
STANDARD Open
6002.001, For
Wall 10second
Hung, MinimumLow Consumption Wash Down Action Vitreous China Bowl. Complete With SLOAN ROYAL 186, 0.125 GPF Manual Flush Valve. Provide Fixture Carrier With Steel Uprights. Refer To Architectural Plans For Mounting Height
High Efficiency
4 L-1:
1: Hand
Lavatory(ACC),
Operated Metering
AMERICANFaucets
STANDARD
Shall Remain
0356.041,Wall
Open ForHung
10second
Vitreous
Minimum 2
China Bowl With 0% 2 EA $ - $ 90 $ - $ -
5 CHICAGO 3500-4E39VPABCP Metering Faucet, Vandal-Proof Non Aerating 0.35GPM 12 0% 12 EA $ - $ 90 $ - $ -
L-2: Lavatory(ACC), AMERICAN STANDARD 0355.012,Wall Hung Vitreous China Bowl Flow With Control. Provide Fixture Carrier With Steel Uprights, Refer To Architectural Plans For Mounting Height
1: Hand Operated
6 CHICAGO Metering Metering
802-VE2805ABCP Faucets Shall Remain
Faucet, Open For Non
Vandal-Proof 10second Minimum
Aerating 11 Control.0%
0.35GPM Flow 11 CarrierEAWith Steel Uprights, Refer
Provide Fixture $ - $ 90 Plans For
To Architectural $ Mounting
- Height
$ -
7 S-1: Sink(ACC),
1: Hand OperatedJUST SL-ADA-1921-A-GR,
Metering Faucets ShallSingle
RemainCompartment, 18 Ga, Type
Open For 10second 304 Stainless
Minimum 2 Steel, CHICAGO
0% 201-AGN8AE35-317AB,
2 EA 1.5 GPM Faucet,
$ Loose - Key
$ Stops
90 And Stainless
$ Steel- Braided
$ Supplies
- And 17gauge-Tarap
S-2: Sink(ACC), JUST DL-ADA-1933-A-GR, Double Compartment, 18 Ga, Type 304 Stainless Steel, CHICAGO 201-AE35-317ABCP, 1.5 GPM Faucet, Loose Key Stops And Stainless Steel Braided Supplies And 17 Gauge P-Trap
8 1: Hand Operated Metering Faucets Shall Remain Open For 10second Minimum 1 0% 1 EA $ - $ 90 $ - $ -
9 SH-1: Shower(ACC), BRADLEY CORP HN200-T24, Recessed-Mounted, Ada Compliant 3 0% 3 EA $ - $ 90 $ - $ -
10 SS-1: Service Sink, AMERICAN STANDARD 7741, Enameled Cast Iron, Floor Moun 2 0% 2 EA $ - $ 90 $ - $ -
11 DF-1: Drinking Fountain(ACC), ELKAY EZWS-EDFP217K, Bottle Filling Station &Ve 2 0% 2 EA $ - $ 90 $ - $ -
12 DF-2: Bottle Filling Station(ACC), ELKAY LZWSDK, In-Wall Bottle Filling Station 2 0% 2 EA $ - $ 90 $ - $ -
13 CWB-1: (Tag name is not given) 1 0% 1 EA $ - $ 90 $ - $ -
14 CWC-1: (Tag name is not given) 1 0% 1 EA $ - $ 90 $ - $ -
14 DW, Dish Washer 1 0% 1 EA $ - $ 90 $ - $ -
WATER HEATERS
GWH-1: Gas Fired Water Heater, AO SMITH BTH 150, GAL 100, GPM 297, BTY 150, 120V, Phase 1, Weight 990
1 1: With Concentric Vent And Neutralization Kit, See Detail 7/Po-0.3 1 0% 1 EA $ - $ 90 $ - $ -
2 EWH-1: Electric Water Heater, AO SMITH DEL-20S, GAL 19, GPS 27, 4 KW, 208V, Phase
1 1, Weight0%
231 1 EA $ - $ 90 $ - $ -
1: Wall Mounted Unit, See Detail 9/Po-0.3
PUMP
1 CP-1: Circulating Pump, BELL & GOSSET NBF-1OS/LW, Type Inline, GPM 3, RPM 2800,1Watts 52, 120V,
0% Phase 1,1Hertz 60,EAWeight 9 $ - $ 90 $ - $ -
1: All Bronze Construction, Complete W/ Aqua stat And Time Clock. See Detail 7/Po-0.3
TANKS
ET-1: Expansion Tank, AMTROL THERM-X-TROL ST-12-C, GAL 6.4, Weight 67.38
1 1: 175 Psi Asme Construction Sized For 81to 120 Gallon Storage Tank 1 0% 1 EA $ - $ 90 $ - $ -
ET-2: Expansion Tank, AMTROL THERM-X-TROL ST-5-C, GAL 2.1, Weight 22.61
2 1: 175 Psi Asme Construction Sized For Up to 60 Gallon Storage Tank 1 0% 1 EA $ - $ 90 $ - $ -
GARBAGE DISPOSER
1 GD-1: Garbage Disposer, IN-SINK ERATOR BADGER 1, HP 1/3, RPM 1725, 120V, Phase11, Weight 15
0% 1 EA $ - $ 90 $ - $ -
1: Complete With Power Cord, Wall Switch And Sink Adaptor Assembly
HOSE BIBB
1 3/4" Dia HB-1: Hose Bibb, ACORN 8126 Standpipe, Rough Chrome Plated, Complete With
3 0% 3 EA $ - $ 90 $ - $ -
Loose-Key
3/4" Handle
Dia HB-2: And
Hose Vacuum
Bibb, Breaker
ACORN 8104 Wall Hydrant, Recessed Aluminum Box With Built In Drip Lip, Wall Flange, Door With Recessed Cam Lock, Operable By Removable Wheel Handle And Vacuum Breaker
2 1: Hand Operated Metering Faucets Shall Remain Open For 10second Minimum 5 0% 5 EA $ - $ 90 $ - $ -
DRAINS
2" Dia FD-1: Floor Drain, JR SMITH 2005Y-A, Hubless Cast Iron Body, 5" Round Brass Grate With Vandal Proof Screws, P-Trap And Trap Primer Connection
1 1: Hand Operated Metering Faucets Shall Remain Open For 10second Minimum 8 0% 8 EA $ - $ 90 $ - $ -
2 3" Dia RD-1: Roof Drain, J.R. SMITH 1010Y-RCU, Cast Iron Body With Dome Strainer And18 Bottom Outlet
0% 18 EA $ - $ 90 $ - $ -
1: Hand
3" Dia OD-1:
Operated
Overflow
Metering
Drain,Faucets
J.R. SMITH
Shall1080Y-RCU,
Remain Open
Cast
For
Iron
10second
Body With
Minimum
Dome Strainer, Bottom
3 Outlet With 2" High Dam 18 0% 18 EA $ - $ 90 $ - $ -
4 1:
2" Hand Operated
Dia Hub Drain Metering Faucets Shall Remain Open For 10second Minimum 1 0% 1 EA $ - $ 90 $ - $ -
P-TRAPS
1 2" Dia P-Trap 8 0% 8 EA $ - $ 90 $ - $ -
TRAP PRIMER
1 1/2" Dia TP-1: Trap Primer, JR SMITH, BRONZE Construction With Shut-Off Valve And10
Behind Access
0% Panel. 125
10PSIG Minimum.
EA (Size Per Manufacturers
$ - Recommendations)
$ 90 $ - $ -
1: Hand Operated Metering Faucets Shall Remain Open For 10second Minimum
CLEANOUT
1 4" Dia FCO: Floor Cleanout 1 0% 1 EA $ - $ 90 $ - $ -
ACCESS PENAL
1 12"x12" Access Penal 10 0% 10 EA $ - $ 90 $ - $ -
VALVES
1 3/4" Dia Shut-off Valve With Access Panel 2 0% 2 EA $ - $ 90 $ - $ -
2 1-1/2" Dia SOV: Shut-off Valve With Access Panel 8 0% 8 EA $ - $ 90 $ - $ -
3 2" Dia Shut-off Valve With Access Panel 2 0% 2 EA $ - $ 90 $ - $ -
PIPE SUPPORTS
1 1/2" Dia Adjustable Clevis Hanger 2 0% 2 EA $ - $ 90 $ - $ -
2 3/4" Dia Adjustable Clevis Hanger 287 0% 287 EA $ - $ 90 $ - $ -
3 1" Dia Adjustable Clevis Hanger 54 0% 54 EA $ - $ 90 $ - $ -
4 1-1/4" Dia Adjustable Clevis Hanger 128 0% 128 EA $ - $ 90 $ - $ -
5 1-1/2" Dia Adjustable Clevis Hanger 168 0% 168 EA $ - $ 90 $ - $ -
6 2" Dia Adjustable Clevis Hanger 72 0% 72 EA $ - $ 90 $ - $ -
7 2-1/2" Dia Adjustable Clevis Hanger 5 0% 5 EA $ - $ 90 $ - $ -
8 3" Dia Adjustable Clevis Hanger 87 0% 87 EA $ - $ 90 $ - $ -
9 4" Dia Adjustable Clevis Hanger 21 0% 21 EA $ - $ 90 $ - $ -
10 3/8" Dia Threaded Rod W/ Double Lock Nut (1 foot length) 639 0% 639 LFT $ - $ 90 $ - $ -
11 1/2" Dia Threaded Rod W/ Double Lock Nut (1 foot length) 185 0% 185 LFT $ - $ 90 $ - $ -
1 Excavation & Backfilling (3' Deep x 1' Wide Trench) including all labor and 2484 0% 2484 CFT $ 1.25 $ 3,105 $ 90 248 $ 22,356 $ 25,461
material/equipment.
II NOTES
1
PROJECT: EISENHOWER HIGH SCHOOL
1321 N. LILAC AVE.,
ADDRESS:
RIALTO, CA 92376
DATE: 06/01/2023 REV: 0 LABOR RATE $ 90
SR. QTY WITH UNIT MATERIAL LABOR LABOR LABOR TOTAL
DESCRIPTION QUANTITY WASTAGE UNIT
NO. WASTAGE COST COST RATE HOURS COST COST
PLUMBING ESTIMATE
NEW WORK
COLD WATER PIPE (BELOW GRADE)
Type "K", Soft Copper Tubing With Fittings (Assumed)
1 3/4" Dia Cold Water Pipe 9 10% 10 LFT $ - $ 90 $ - $ -
2 2" Dia Cold Water Pipe 19 10% 21 LFT $ - $ 90 $ - $ -
TEE
1 3/4" Dia Cold Water Pipe Tee 9 0% 9 EA $ - $ 90 $ - $ -
2 1-1/2" Dia Cold Water Pipe Tee 2 0% 2 EA $ - $ 90 $ - $ -
3 2" / 3/4" Dia Cold Water Pipe Tee 7 0% 7 EA $ - $ 90 $ - $ -
4 2" / 1-1/2" Dia Cold Water Pipe Tee 3 0% 3 EA $ - $ 90 $ - $ -
REDUCER
1 1-1/2" / 3/4" Dia Cold Water Pipe Reducer 2 0% 2 EA $ - $ 90 $ - $ -
2 2" / 3/4" Dia Cold Water Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
TEE
1 3/4" Dia Hot Water Pipe Tee 7 0% 7 EA $ - $ 90 $ - $ -
WYE
1 2" Dia Sanitary Pipe Wye 9 0% 9 EA $ - $ 90 $ - $ -
2 3" Dia Sanitary Pipe Wye 1 0% 1 EA $ - $ 90 $ - $ -
3 4" Dia Sanitary Pipe Wye 5 0% 5 EA $ - $ 90 $ - $ -
4 4" / 2" Dia Sanitary Pipe Wye 3 0% 3 EA $ - $ 90 $ - $ -
5 4" / 3" Dia Sanitary Pipe Wye 2 0% 2 EA $ - $ 90 $ - $ -
REDUCER
1 2" / 1-1/2" Dia Sanitary Pipe Reducer 3 0% 3 EA $ - $ 90 $ - $ -
2 3" / 2" Dia Sanitary Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
3 4" / 2" Dia Sanitary Pipe Reducer 3 0% 3 EA $ - $ 90 $ - $ -
WYE
1 2" Dia Sanitary Pipe Wye 3 0% 3 EA $ - $ 90 $ - $ -
2 3" Dia Sanitary Pipe Wye 1 0% 1 EA $ - $ 90 $ - $ -
3 4" Dia Sanitary Pipe Wye 2 0% 2 EA $ - $ 90 $ - $ -
REDUCER
1 3" / 2" Dia Sanitary Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
2 4" / 2" Dia Sanitary Pipe Reducer 2 0% 2 EA $ - $ 90 $ - $ -
TEE
1 2" / 1-1/2" Dia Vent Pipe Tee 1 0% 1 EA $ - $ 90 $ - $ -
TEE
1 3/4" Dia Condensate Drain Pipe Tee 9 0% 9 EA $ - $ 90 $ - $ -
2 1" / 3/4" Dia Condensate Drain Pipe Tee 1 0% 1 EA $ - $ 90 $ - $ -
3 1-1/4" / 3/4" Dia Condensate Drain Pipe Tee 0% 0 EA $ - $ 90 $ - $ -
REDUCER
1 1" / 3/4" Dia Condensate Drain Pipe Reducer 2 0% 2 EA $ - $ 90 $ - $ -
TEE
1 3/4" Dia Gas Pipe Tee 1 0% 1 EA $ - $ 90 $ - $ -
2 1" / 3/4" Dia Gas Pipe Tee 2 0% 2 EA $ - $ 90 $ - $ -
3 1-1/4" / 3/4" Dia Gas Pipe Tee 1 0% 1 EA $ - $ 90 $ - $ -
4 1-1/2" / 3/4" Dia Gas Pipe Tee 2 0% 2 EA $ - $ 90 $ - $ -
5 2" / 3/4" Dia Gas Pipe Tee 6 0% 6 EA $ - $ 90 $ - $ -
REDUCER
1 1-1/4" / 1" Dia Gas Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
2 1-1/2" / 1-1/4" Dia Gas Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
3 2" / 1-1/2" Dia Gas Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
PLUMBING FIXTURES
1 WC-2: Water Closet, AMERICAN STANDARD 3461.001 Floor Mounted, Vitreous China,4 Elongated0% Bowl, With Syphon
4 JetEAaction. Provide With Open
$ Front
- Seat.
$ 90 Complete With
$ SLOAN- ROYAL
$ 111-1.28,
- 1.28 GPF Manual Flush Valve. Refer To Architectural Plans For Mounting Height
1: Hand
L-2: Lavatory(ACC),
Operated Metering
AMERICANFaucets
STANDARD
Shall Remain
0355.012,Wall
Open ForHung
10second
Vitreous
Minimum
China Bowl With
2 CHICAGO 802-VE2805ABCP Metering Faucet, Vandal-Proof Non Aerating 0.35GPM Flow 4 Control.0% 4 CarrierEAWith Steel Uprights, Refer
Provide Fixture $ - $ 90 Plans For
To Architectural $ Mounting
- Height
$ -
S-2: Sink(ACC), JUST DL-ADA-1933-A-GR,
Faucets ShallDouble
RemainCompartment, 18 Ga,Minimum
Type 304 Stainless Steel, CHICAGO 201-AE35-317ABCP, 1.5 GPM Faucet, Loose Key Stops And Stainless Steel Braided Supplies And 17 Gauge P-Trap
3 1: Hand Operated Metering Open For 10second
1: Hand Operated Metering Faucets Shall Remain Open For 10second Minimum 2 0% 2 EA $ - $ 90 $ - $ -
4 SS-1: Service Sink, AMERICAN STANDARD 7741, Enameled Cast Iron, Floor Moun 2 0% 2 EA $ - $ 90 $ - $ -
5 DF-1: Drinking Fountain(ACC), ELKAY EZWS-EDFP217K, Bottle Filling Station &Ve 2 0% 2 EA $ - $ 90 $ - $ -
WATER HEATERS
1 EWH-1: Electric Water Heater, AO SMITH DEL-20S, GAL 19, GPS 27, 4 KW, 208V, Phase
2 1, Weight0%
231 2 EA $ - $ 90 $ - $ -
1: Wall Mounted Unit, See Detail 9/Po-0.3
PUMP
CP-1: Circulating Pump, BELL & GOSSET NBF-1OS/LW, Type Inline, GPM 3, RPM
2800, Watts 52, 120V, Phase 1, Hertz 60, Weight 9
1 1: All Bronze Construction, Complete W/ Aqua stat And Time Clock. See Detail 1 0% 1 EA $ - $ 90 $ - $ -
7/Po-0.3
TANK
ET-2: Expansion Tank, AMTROL THERM-X-TROL ST-5-C, GAL 2.1, Weight 22.61
1 1: 175 Psi Asme Construction Sized For Up to 60 Gallon Storage Tank 2 0% 2 EA $ - $ 90 $ - $ -
HOSE BIBB
1 3/4" Dia HB-1: Hose Bibb, ACORN 8126 Standpipe, Rough Chrome Plated, Complete With
3 0% 3 EA $ - $ 90 $ - $ -
Loose-Key Handle And Vacuum Breaker
2 3/4" Dia HB-2: Hose Bibb, ACORN 8104 Wall Hydrant, Recessed Aluminum Box With Built
4 In Drip0%
Lip, Wall Flange,
4 Door EA
With Recessed Cam Lock,
$ Operable
- $ By90
Removable Wheel
$ Handle
- $And Vacuum
- Breaker
1: Hand Operated Metering Faucets Shall Remain Open For 10second Minimum
DRAINS
1 2" Dia FD-2: Floor Drain 1 0% 1 EA $ - $ 90 $ - $ -
3" Dia RD-1: Roof Drain, J.R. SMITH 1010Y-RCU, Cast Iron Body With Dome Strainer And Bottom Outlet
2 3"
1: Hand
Dia OD-1:
Operated
Overflow
Metering
Drain,Faucets
J.R. SMITH
Shall1080Y-RCU,
Remain Open
Cast
For
Iron
10second
Body With
Minimum 14 Bottom0%
Dome Strainer, 14 EA $ - $ 90 $ - $ -
3 Outlet With 2" High Dam 14 0% 14 EA $ - $ 90 $ - $ -
4 1:
3" Hand Operated
Dia Hub Drain Metering Faucets Shall Remain Open For 10second Minimum 1 0% 1 EA $ - $ 90 $ - $ -
P-TRAPS
1 2" Dia P-Trap 1 0% 1 EA $ - $ 90 $ - $ -
TRAP PRIMER
1/2" Dia TP-1: Trap Primer, JR SMITH, BRONZE Construction With Shut-Off Valve And Behind Access Panel. 125 PSIG Minimum. (Size Per Manufacturers Recommendations)
1 1: Hand Operated Metering Faucets Shall Remain Open For 10second Minimum 2 0% 2 EA $ - $ 90 $ - $ -
ACCESS PENAL
1 12"x12" Access Penal 2 0% 2 EA $ - $ 90 $ - $ -
VALVES
1 1-1/2" Dia Shutoff Valve With Access Panel 1 0% 1 EA $ - $ 90 $ - $ -
2 2" Dia Shutoff Valve With Access Panel 1 0% 1 EA $ - $ 90 $ - $ -
PIPE SUPPORTS
1 1/2" Dia Adjustable Clevis Hanger 26 0% 26 EA $ - $ 90 $ - $ -
2 3/4" Dia Adjustable Clevis Hanger 270 0% 270 EA $ - $ 90 $ - $ -
3 1" Dia Adjustable Clevis Hanger 17 0% 17 EA $ - $ 90 $ - $ -
4 1-1/4" Dia Adjustable Clevis Hanger 27 0% 27 EA $ - $ 90 $ - $ -
5 1-1/2" Dia Adjustable Clevis Hanger 63 0% 63 EA $ - $ 90 $ - $ -
6 2" Dia Adjustable Clevis Hanger 25 0% 25 EA $ - $ 90 $ - $ -
7 3" Dia Adjustable Clevis Hanger 109 0% 109 EA $ - $ 90 $ - $ -
8 4" Dia Adjustable Clevis Hanger 1 0% 1 EA $ - $ 90 $ - $ -
9 3/8" Dia Threaded Rod W/ Double Lock Nut (1 foot length) 403 0% 403 LFT $ - $ 90 $ - $ -
10 1/2" Dia Threaded Rod W/ Double Lock Nut (1 foot length) 135 0% 135 LFT $ - $ 90 $ - $ -
1 Excavation & Backfilling (3' Deep x 1' Wide Trench) including all labor and 1314 0% 1314 CFT $ 1.25 $ 1,643 $ 90 131 $ 11,826 $ 13,469
material/equipment.
II NOTES
1
PROJECT: EISENHOWER HIGH SCHOOL
1321 N. LILAC AVE.,
ADDRESS:
RIALTO, CA 92376
DATE: 06/01/2023 REV: 0 LABOR RATE $ 90
SR. QTY WITH UNIT MATERIAL LABOR LABOR LABOR TOTAL
DESCRIPTION QUANTITY WASTAGE UNIT
NO. WASTAGE COST COST RATE HOURS COST COST
PLUMBING ESTIMATE
DEMOLITION WORK
PIPING W/ FITTINGS
1 Remove Existing Storm Drain Pipe 37 0% 37 LFT $ - $ 90 $ - $ -
2 Remove And Relocate Existing Water Pipe And Appurtenances In Its Entirety 29 0% 29 LFT $ - $ 90 $ - $ -
PLUMBING FIXTURES
1 Remove Existing Hose Bibb 1 0% 1 EA $ - $ 90 $ - $ -
NEW WORK
COLD WATER PIPE (BELOW GRADE)
Schedule 40 PVC Pipe With Fittings (Assumed)
1 4" Dia Cold Water Pipe 10 10% 11 LFT $ - $ 90 $ - $ -
WYE
1 6" Dia Sanitary Pipe Wye 5 0% 5 EA $ - $ 90 $ - $ -
2 6" / 4" Dia Sanitary Pipe Wye 1 0% 1 EA $ - $ 90 $ - $ -
3 8" / 6" Dia Sanitary Pipe Wye 2 0% 2 EA $ - $ 90 $ - $ -
REDUCER
1 6" / 4" Dia Sanitary Pipe Reducer 3 0% 3 EA $ - $ 90 $ - $ -
WYE
1 4" Dia Storm Drain Pipe Wye 2 0% 2 EA $ - $ 90 $ - $ -
2 6" Dia Storm Drain Pipe Wye 9 0% 9 EA $ - $ 90 $ - $ -
3 8" Dia Storm Drain Pipe Wye 1 0% 1 EA $ - $ 90 $ - $ -
4 10" Dia Storm Drain Pipe Wye 4 0% 4 EA $ - $ 90 $ - $ -
5 15" Dia Storm Drain Pipe Wye 2 0% 2 EA $ - $ 90 $ - $ -
6 4" / 3" Dia Storm Drain Pipe Wye 4 0% 4 EA $ - $ 90 $ - $ -
7 6" / 3" Dia Storm Drain Pipe Wye 12 0% 12 EA $ - $ 90 $ - $ -
8 6" / 4" Dia Storm Drain Pipe Wye 5 0% 5 EA $ - $ 90 $ - $ -
9 10" / 8" Dia Storm Drain Pipe Wye 1 0% 1 EA $ - $ 90 $ - $ -
10 15" / 10" Dia Storm Drain Pipe Wye 1 0% 1 EA $ - $ 90 $ - $ -
REDUCER
1 6" / 4" Dia Storm Drain Pipe Reducer 3 0% 3 EA $ - $ 90 $ - $ -
2 15" / 10" Dia Storm Drain Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
TEE
1 1-1/2" / 1" Dia Natural Gas (Medium Pressure) Tee 1 0% 1 EA $ - $ 90 $ - $ -
REDUCER
1 1-1/2" / 1-1/4" Dia Natural Gas (Medium Pressure) Reducer 1 0% 1 EA $ - $ 90 $ - $ -
CATCH BASINS
1 18"x18" Catch Basin 2 0% 2 EA $ - $ 90 $ - $ -
2 12"x12" Catch Basin 10 0% 10 EA $ - $ 90 $ - $ -
3 ADS 24" Side Opening Catch Basin 2 0% 2 EA $ - $ 90 $ - $ -
4 Install Bubbler Catch Basin With Filter 1 0% 1 EA $ - $ 90 $ - $ -
CLEANOUT
1 4" Dia Storm Drain Pipe Cleanout 1 0% 1 EA $ - $ 90 $ - $ -
2 6" Dia Storm Drain Pipe Cleanout 4 0% 4 EA $ - $ 90 $ - $ -
3 8" Dia Storm Drain Pipe Cleanout 1 0% 1 EA $ - $ 90 $ - $ -
4 10" Dia Storm Drain Pipe Cleanout 3 0% 3 EA $ - $ 90 $ - $ -
5 15" Dia Storm Drain Pipe Cleanout 2 0% 2 EA $ - $ 90 $ - $ -
6 6" Dia CO, Cleanout For Sanitary Pipe 2 0% 2 EA $ - $ 90 $ - $ -
CURB DRAIN
1 4" Curb Drain 1 0% 1 EA $ - $ 90 $ - $ -
VALVES
1 1-1/4" Dia Shutoff Valve In Yard-Box For B-1 1 0% 1 EA $ - $ 90 $ - $ -
2 1" Dia Shutoff Valve In Yard-Box For B-2 1 0% 1 EA $ - $ 90 $ - $ -
3 1-1/2" Dia Seismic Gas Valve In Compliance With Code (Size Assumed) 1 0% 1 EA $ - $ 90 $ - $ -
1 Excavation & Backfilling (3' Deep x 1' Wide Trench) including all labor and 10719 0% 10719 CFT $ 1.25 $ 13,399 $ 90 1072 $ 96,471 $ 109,870
material/equipment.
MISC. ITEMS
1 Contractor Shall Coordinate With SCGC For Possible Meter Change Out 1 0% 1 EA $ - $ 90 $ - $ -
II NOTES
1
PROJECT: EISENHOWER HIGH SCHOOL
1321 N. LILAC AVE.,
ADDRESS:
RIALTO, CA 92376
DATE: 06/02/2023 REV: 1 LABOR RATE $ 90
SR. DESCRIPTION QUANTITY WASTAGE QTY WITH UNIT UNIT MATERIAL LABOR LABOR LABOR TOTAL
NO. WASTAGE COST COST RATE HOURS COST COST
PLUMBING ESTIMATE
DEMOLITION WORK
PIPING W/ FITTINGS
1 Remove Existing Storm Drain Pipe 37 0% 37 LFT $ - $ 90 $ - $ -
2 Remove And Relocate Existing Water Pipe And Appurtenances In Its Entirety 29 0% 29 LFT $ - $ 90 $ - $ -
PLUMBING FIXTURES
1 Remove Existing Hose Bibb 1 0% 1 EA $ - $ 90 $ - $ -
NEW WORK
COLD WATER PIPE (BELOW GRADE)
Schedule 40 PVC Pipe With Fittings (Assumed)
1 4" Dia Cold Water Pipe 10 10% 11 LFT $ - $ 90 $ - $ -
TEE
1 6" / 4" Dia Cold Water Pipe Tee 3 0% 3 EA $ - $ 90 $ - $ -
REDUCER
1 4" / 2" Dia Cold Water Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
WYE
1 6" Dia Sanitary Pipe Wye 5 0% 5 EA $ - $ 90 $ - $ -
2 6" / 4" Dia Sanitary Pipe Wye 1 0% 1 EA $ - $ 90 $ - $ -
3 8" / 6" Dia Sanitary Pipe Wye 2 0% 2 EA $ - $ 90 $ - $ -
REDUCER
1 6" / 4" Dia Sanitary Pipe Reducer 3 0% 3 EA $ - $ 90 $ - $ -
WYE
1 4" Dia Storm Drain Pipe Wye 2 0% 2 EA $ - $ 90 $ - $ -
2 6" Dia Storm Drain Pipe Wye 9 0% 9 EA $ - $ 90 $ - $ -
3 8" Dia Storm Drain Pipe Wye 1 0% 1 EA $ - $ 90 $ - $ -
4 10" Dia Storm Drain Pipe Wye 4 0% 4 EA $ - $ 90 $ - $ -
5 15" Dia Storm Drain Pipe Wye 2 0% 2 EA $ - $ 90 $ - $ -
6 4" / 3" Dia Storm Drain Pipe Wye 4 0% 4 EA $ - $ 90 $ - $ -
7 6" / 3" Dia Storm Drain Pipe Wye 12 0% 12 EA $ - $ 90 $ - $ -
8 6" / 4" Dia Storm Drain Pipe Wye 5 0% 5 EA $ - $ 90 $ - $ -
9 10" / 8" Dia Storm Drain Pipe Wye 1 0% 1 EA $ - $ 90 $ - $ -
10 15" / 10" Dia Storm Drain Pipe Wye 1 0% 1 EA $ - $ 90 $ - $ -
REDUCER
1 6" / 4" Dia Storm Drain Pipe Reducer 3 0% 3 EA $ - $ 90 $ - $ -
2 15" / 10" Dia Storm Drain Pipe Reducer 1 0% 1 EA $ - $ 90 $ - $ -
TEE
1 1-1/2" / 1" Dia Natural Gas (Medium Pressure) Tee 1 0% 1 EA $ - $ 90 $ - $ -
2 1-1/2" Dia Natural Gas (Medium Pressure) Tee 1 0% 1 EA $ - $ 90 $ - $ -
REDUCER
1 1-1/2" / 1-1/4" Dia Natural Gas (Medium Pressure) Reducer 1 0% 1 EA $ - $ 90 $ - $ -
2 1-1/4" / 1" Dia Natural Gas (Medium Pressure) Reducer 1 0% 1 EA $ - $ 90 $ - $ -
3 1-1/2" / 1" Dia Natural Gas (Medium Pressure) Reducer 1 0% 1 EA $ - $ 90 $ - $ -
4 1-1/2" / 1-1/4" Dia Natural Gas (Medium Pressure) Reducer 1 0% 1 EA $ - $ 90 $ - $ -
DRYWELL
1 Drywell 1 0% 1 EA $ - $ 90 $ - $ -
CATCH BASINS
1 18"x18" Catch Basin 2 0% 2 EA $ - $ 90 $ - $ -
2 12"x12" Catch Basin 10 0% 10 EA $ - $ 90 $ - $ -
3 ADS 24" Side Opening Catch Basin 2 0% 2 EA $ - $ 90 $ - $ -
4 Install Bubbler Catch Basin With Filter 1 0% 1 EA $ - $ 90 $ - $ -
CLEANOUT
1 4" Dia Storm Drain Pipe Cleanout 1 0% 1 EA $ - $ 90 $ - $ -
2 6" Dia Storm Drain Pipe Cleanout 4 0% 4 EA $ - $ 90 $ - $ -
3 8" Dia Storm Drain Pipe Cleanout 1 0% 1 EA $ - $ 90 $ - $ -
4 10" Dia Storm Drain Pipe Cleanout 3 0% 3 EA $ - $ 90 $ - $ -
5 15" Dia Storm Drain Pipe Cleanout 2 0% 2 EA $ - $ 90 $ - $ -
6 6" Dia CO, Cleanout For Sanitary Pipe 2 0% 2 EA $ - $ 90 $ - $ -
CURB DRAIN
1 4" Curb Drain 1 0% 1 EA $ - $ 90 $ - $ -
VALVES
1 1-1/4" Dia Shutoff Valve In Yard-Box For B-1 1 0% 1 EA $ - $ 90 $ - $ -
2 1" Dia Shutoff Valve In Yard-Box For B-2 1 0% 1 EA $ - $ 90 $ - $ -
3 1-1/2" Dia Seismic Gas Valve In Compliance With Code (Size Assumed) 1 0% 1 EA $ - $ 90 $ - $ -
1 Excavation & Backfilling (3' Deep x 1' Wide Trench) including all labor and 13956 0% 13956 CFT $ 1.25 $ 17,445 $ 90 1396 $ 125,604 $ 143,049
material/equipment.
MISC. ITEMS
1 Contractor Shall Coordinate With SCGC For Possible Meter Change Out 1 0% 1 EA $ - $ 90 $ - $ -
II NOTES
1