Professional Documents
Culture Documents
Microsoft PowerPoint - BLCP Training Cource F Turbine 5
Microsoft PowerPoint - BLCP Training Cource F Turbine 5
TRAINING PROGRAM
COURCE - F
ITEM - TURBINE & AUXILIARY
CONTENTS - TURBINE
No. 5 TURBINE BEARING AND THRUST BEARING
MAINTENANCE
TERMINAL OBJECTIVES:
Upon completion of the lesson, the trainee will be able to describe the main
components of construction of the turbine bearing & thrust bearing. In
addition, the trainee will be able to state the different categories of
maintenance as applied to BLCP Power Project and some of the
maintenance procedures applicable to the turbine bearing & thrust bearing.
Objectives PAGE 2
ENABLING OBJECTIVES:
• Explain the function of the main items of turbine bearing & thrust bearing.
Objectives PAGE 3
ENABLING OBJECTIVES:
Objectives PAGE 4
OVERVIEW
• The turbine has three rotors each supported on two main (journal)
bearings.
• Main bearing No. 1 and 2 are multiple tilting pad type with a spherical
bearing shell seating.
PAGE 5
OVERVIEW
• This design produces pressure film (of oil) between bearing shell and
journal.
• Turbine set has only one multiple rocking shoe thrust bearing
assembly.
PAGE 6
L of HP-IP/LP1 COUPLING
L of THRUST BEARING
FACE OF TURBINE COUPLING
L of No. 5 BEARING
L of No. 4 BEARING
L of No. 3 BEARING
L of No. 2 BEARING
L of No.1 BEARING
L of LP2 TURBINE
L of LP1 TURBINE
L of IP EXHAUST
C
C
C
C
C
VIBRATION PICKUP
PHASE
DETECTOR PICKUP
REHEAT STEAM INLET MAIN STEAM INLET
VIBRATION PICKUP
ZERO SPEED
& SPEED PICKUP
DIFFERENTIAL
EXPANSION PICKUP
ECCENTRICITY PICKUP
VIBRATION PICKUP
VIBRATION PICKUP ROTOR
TE TE POSITION PICKUP
OPERATING FLOOR
No. 1 EXTRACTION No. 1 EXTRACTION No. 1 EXTRACTION No. 1 EXTRACTION No. 5 EXTRACTION HP EXHAUST (No. 7 EXT.)
GLAND STEAM INLET
GLAND STEAM INLET
No. 3 EXTRACTION No. 3 EXTRACTION No. 4 EXTRACTION No. 4 EXTRACTION REHEAT STEAM INLET MAIN STEAM INLET
PAGE 7
B
A
15 5
GEN END GOV END C 3
13
10 8
14
C
7 22
1
ROTATION
C
CL OF NO. 1 BRG.
C
HORIZONTAL JOINT
16
2 12
9
18
DRAIN
DRAIN
17 3
11
5
14
OIL INLET
OIL INLET
6
4
B A
A-A B-B
DCN-4-0311
PAGE 8
B
A
15 5
GEN END GOV END C 3
13
10 8
14
C
7 22
1
ROTATION
C
CL OF NO. 2 BRG.
C
HORIZONTAL JOINT
2 16
12
9
18
DRAIN
DRAIN
17 3
11
5
14
OIL INLET
OIL INLET
6
4
B A
A-A B-B
PAGE 9
DCN-4-0317
PAGE 10
A B 3
4 8
5
1 BEARING SHELL (LOWER HALF)
2 BEARING SHELL (UPPER HALF)
3 BEARING KEY
2
4 STOP DOWEL PIN
5 CAP SCREW
7 6 BEARING DOWEL
7 BEARING KEY DOWEL
4 8 BEARING KEY LINER
10
9 SET SCREW
10 KEY FIXING BOLT
A B
VIEW A - A
PLAN
PAGE 11
10
12
7 11
PAGE 12
10 8
3
A
B
ROTATION 6
ET
TL
L OU
OI
9
O
IL
A
IN
LE
T
B 1 B-B
11
A-A
DCN-4-0313
PAGE 13
23 19 21 18 23
16
1 12
11
B B
25
5 15
14 13
4 6
20
17 22
SECTION A - A
24 7
2 A
19
20
21 22 SECTION C - C
DCN-4-0314
PAGE 14
PAGE 15
PAGE 16
3 2
TO EARTH TERMINAL
1 13
9 8
6
7
TO EARTH
TERMINAL
10 11 12
7
ROTATION
°
60
10 11 12
A
CL OF TURBINE CL OF TURBINE
1 VIEW A-A
FROM EARTH
BRUSH ASSEMBLY
GEN. END GOV. END
10 12 14 4
14
CL OF TURBINE
14
EARTH NET
5
14
SECTION B - B
B B
4
1 GENERATOR ROTOR
2 NO. 6 BEARING HOUSING
3 OIL BAFFLE
4 LP2 CASING
5 LP CASING BASE PLATE
6 BRACKET
7 SUPPORT
8 SPRING
9 BRUSH
10 BOLT
11 U NUT
12 WASHER
13 FITTING BOLT
DCN-4-0316 14 EARTH TERMINAL
PAGE 17
MAINTENANCE
Preventive Maintenance:
• Routine.
• Annual outage.
Prerequisites:
• Scheduling.
• Notification.
• Isolation.
• Safety.
PAGE 18
ROUTINE MAINTENANCE
• Reduces costs.
Preparation:
• Documentation.
PAGE 19
Preparation:
• Documentation.
PAGE 20
UPPER HALF
BEARING COVER
UPPER HALF
// 1
STOPPER PIN
LOWER HALF
LOWER HALF
// 2 // 3
NEW
REMOVE
STOPPER PIN
// 2 // 3 // 2 // 3
// 1
// 1
// 2
// 3
PAGE 21
'A '
' 'A
o
45
o
10
o
45 INNER LINER
SURFACE 'X'
'B '
' 'B
SURFACE 'Y'
A SECTION B - B
SECTION A - A
B
FOR BEARING NO. 1 C = (B-A-0.81+0.1)+0.02
FOR BEARING NO. 2 C = (B-A-0.86+0.1)+0.02
FLAT FACE
GAP
DEPTH TIGHT CONTACT
MICROMETER
ROTOR
GAP
'D' 'D'
ROTOR
PAGE 22
PAGE 23
PEDESTAL MEMBER
SUPPORTING
THRUST BEARNG THE THRUST BEARING
DISASSEMBLY AND CASING LUG LOCATING MECHANISM
REASSEMBLY
Xc Xc
XB XB
XB XB
Xc Xc
DIAL INDICATOR
MGL-4-7907
THRUST BEARING CLEARANCE
PAGE 24
PAGE 25