adaro ee some (#1 Unit [Reouiar order Work order No, + 105441 Date of issue 08/20/2020 Planned schedule: 08/21/2020 ~ 10/08/2000 Design Dept. Mechanical (ARVANACUSP? Ngintgnance Dept. : Mechanical Work order name: P-CLASS_PM Y1 Mech. PIPING. SUPPORT AND HANGER (Main Steam, Aux Stea ‘Work request (2 Target equipment: 12L84/10140311: Main Steam System Unite + Coveniow Work type Quality grade Work tsk Environmental work | Praverive makasnence (|S orasa | (Work Order Oescrintion “a, Pipe & Support inspection list See on drawing slaitach inspection result.” Dasianei7 Team Leader Superisor__| Section Head | (Hanae AGUS TRIONO [Steven Aoolos Swab) LEE 1EONG DU 09/10/2020, 09/10/2020, 09/10/2020, PT Tanjung Power indonesia ~ 44/53 ~ WORK ORDER RESULT EupmentName | Png, Supper ane Hanger Stat DetMTine:28 Sept 2020 00.0 WTA Fish DaeTene : 1 Ot 2020/1890 TA ‘ pe and Supper npecton 0 ~ | Rapon | creed rain WORK CHECK SHEET INSPECTION oar Piping, Support And Hanger -Feed Water am acre | 1 CONDITION Eom GoOD_[Dawace[ wa] "EMARKS 1 [Load Gotunn’ a oa oa 2 |Lo0d indicator eT oO o 3 [Load Soote & Name Piste Reo 4 [Four Sots (Bolt Circe) = o_o 5 [Load Colurn to be greased asso 6 [Visual inspection a eal 7 [Detect clearance a Boo & [Tension Bot a eee or oS a Sa o Salas SI Seer a reef GETRACON SAUTRACON 7 Peper By Cheated By Teen Parner i Tighaned Tor iba serene oo Das TET ba wees lie] | 2g iH | aie) | iL i toner et ve li | ALSEL COAL FRED POWER PLANT FOR INFORMATION Qreetnas AHuoed = Tgp. ° St tee vol si louse aa | _Sombucer@ e134 A IBBORAH W, lead gee a — anes weve a EF] 4 wt | eer DOCUMENTATION / ATTACHMENT a During Aust Load ineator Inspection With Adar TB

You might also like