Work order No, + 105441
Date of issue 08/20/2020 Planned schedule: 08/21/2020 ~ 10/08/2000
Design Dept. Mechanical (ARVANACUSP? Ngintgnance Dept. : Mechanical
Work order name: P-CLASS_PM Y1 Mech. PIPING. SUPPORT AND HANGER (Main Steam, Aux Stea
‘Work request
(2 Target equipment: 12L84/10140311: Main Steam System Unite +
Coveniow
Work type Quality grade Work tsk Environmental work |
Praverive makasnence (|S orasa |
(Work Order Oescrintion
“a, Pipe & Support inspection
list See on drawing
slaitach inspection result.”
Dasianei7 Team Leader
Superisor__| Section Head | (Hanae
AGUS TRIONO [Steven Aoolos Swab) LEE 1EONG DU
09/10/2020, 09/10/2020, 09/10/2020,
PT Tanjung Power indonesia
~ 44/53 ~WORK ORDER RESULT
EupmentName | Png, Supper ane Hanger
Stat DetMTine:28 Sept 2020 00.0 WTA
Fish DaeTene : 1 Ot 2020/1890 TA
‘ pe and Supper npecton 0 ~ | Rapon | creed rainWORK CHECK SHEET INSPECTION oar
Piping, Support And Hanger -Feed Water
am acre |
1
CONDITION
Eom GoOD_[Dawace[ wa] "EMARKS
1 [Load Gotunn’ a oa oa
2 |Lo0d indicator eT oO o
3 [Load Soote & Name Piste Reo
4 [Four Sots (Bolt Circe) = o_o
5 [Load Colurn to be greased asso
6 [Visual inspection a eal
7 [Detect clearance a Boo
& [Tension Bot a eee
or oS
a Sa
o Salas
SI Seer
a reef
GETRACON SAUTRACON 7
Peper By Cheated By Teen
Parner i Tighaned Tor iba
serene oo
Das TET bawees
lie] | 2g iH
| aie) | iL
i toner et ve li |
ALSEL COAL FRED POWER PLANT
FOR INFORMATION
Qreetnas
AHuoed
=Tgp. °
St tee
vol si louse aa
| _Sombucer@
e134 A IBBORAH W,
lead
gee
a —
anes
weve
a
EF] 4
wt | eerDOCUMENTATION / ATTACHMENT a
During Aust Load ineator
Inspection With Adar TB