Professional Documents
Culture Documents
CONTENTS
Standardised MIS Dashboard for all the Services Available on Invest Haryana portal...3
Features:.........................................................................................................................................3
Summary Dashboard available at Home Screen of Single Window:...................................3
Single Window MIS Dashboard Framework...............................................................................3
Objective:........................................................................................................................................4
Process flow: Level 1 to Level 4:..............................................................................................4
MIS Dashboard Format (Level 1 to Level 4):..............................................................................5
Dashboard will show Real Time MIS Status (Date: DD/M/MYYYY, time to show).............5
I. Level – 1: State/District MIS Dashboard...........................................................................5
II. Format for Level 1: State Dashboard- Department Wise/District Wise.....................6
III. Format for Level 1: District Dashboard – Department Wise........................................7
IV. Level – 2: (Department wise, service wise data would display)..................................8
V. Format for Level 2: Dashboard...........................................................................................8
VI. Level – 3 (Application Status, Department wise service wise with action remarks)
9
VII.Format for Level 3 Dashboard...........................................................................................10
VIII...........Level – 4: (Service details with status remarks of application and applicant
details)...........................................................................................................................................10
IX. Format for Level 4 Dashboard...........................................................................................11
Invest Haryana: Common/Unified Service Module for Admin-Department......................12
A) Admin Dashboard and access through Login: Table I................................................12
B) Report displays to action on click on level 2 of “Pending Application” and in
“Show Cause” as:.......................................................................................................................13
C) Report displays to action on click on level 2 of “Under
Process/Approved/Rejected/ Application” as:....................................................................14
2|Page
Standard Operating Procedure (SoP)
Functional Requirement Specification (FRS)
Invest Haryana- MIS dashboard with Parameters
Standardised MIS Dashboard for all the Services Available on Invest Haryana
portal
Features:
Will be Available on: https://invest.in/#/service-dashboard
Department Involved: All Stakeholder Departments on Invest Haryana Portal
Service Module: - MIS Dashboard as per BRAP Recommendations by DPIIT (GoI) under
Ease of Doing Business (EoDB) mandate
Total
Total Integrated Total Submitted Total Total Total
Department Integrated Application Approve Pending Rejected
(L2) Services (L3) (L4) d (L4) (L4) (L4)
27 137 60 20 20 20
% % %
3|Page
Standard Operating Procedure (SoP)
Functional Requirement Specification (FRS)
Invest Haryana- MIS dashboard with Parameters
Objective:
The primarily objective of INVEST HARYANA MIS Online Dashboard is to keep
transparency amongst citizens and allow concerned Government authorities to keep track of
their department performance so that necessary steps can be taken to ensure delivery of
services within mandated timelines and zero pendency on Government.
Detailed working Procedure with formats at each level is defined in Sl. No. 4 of this
document “MIS Dashboard Format”
One level to next level return to previous page option would be there, on click on the
numbers or through Next/Previous page select option would also be made available
4|Page
Standard Operating Procedure (SoP)
Functional Requirement Specification (FRS)
Invest Haryana- MIS dashboard with Parameters
Dashboard will show Real Time MIS Status (Date: DD/M/MYYYY, time to show)
a) First screen will populate the status of all departments incorporated on Invest-INVEST HARYANA under J&K MIS Dashboard (Format –
I as mentioned below)
b) Also, Applicant will also have the provision of selecting below parameters on MIS Dashboard homepage
Department (Dropdown list)
Services (Dropdown list)
District (Dropdown list)
Time Period (Start date - End date / FY wise)
c) Based on the selection of parameters, information will be viewed in the below format
For Level-1 dashboard will be developed as department wise and district wise.
Filter Option to be available as:
Search Your CAF-ID/Application No.
Time Period……… (FY wise or Specific period wise………………)
Department Filter
District Filter
5|Page
Standard Operating Procedure (SoP)
Functional Requirement Specification (FRS)
Invest Haryana- MIS dashboard with Parameters
.. … … … … … …
Total …In no… …In no… …In no… …In no… …In no…
Total number of application status (Approved/Rejected/Under Process) shall be populated in number as mentioned against each service
of Departments (Selected)
District wise graphical representation (Bar-graphs) based on total number of application status (approved/rejected/under
process/reverted to applicant)
At each level there would be a provision for downloading the data in Excel/word/pdf format for the ease of citizens/Govt. Departments.
District Wise applications status for all the line departments below:
6|Page
Standard Operating Procedure (SoP)
Functional Requirement Specification (FRS)
Invest Haryana- MIS dashboard with Parameters
<Dept. Name> <All Services> <From Date> <to Date> as on <current date>
S. District Name Total Submitted Approved Rejected Pending Application
No Application Within Outside Deemed Within Outside Within Outside Pending above 45
Timeline Timeline Approved HRTS HRTS HRTS HRTS days from HRTS
Timeline Timeline Timeline Timeline timeline
1 ABC
2
.. … … … … … …
Total …In no… …In no… …In no… …In no… …In no…
District Performance Report (Ranking)-----<Dept. Name> <All Services> <From Date> <to Date>
Filter for MSME Classification <Micro Type> <Small Type> <Medium Type> <Large Type>
7|Page
Standard Operating Procedure (SoP)
Functional Requirement Specification (FRS)
Invest Haryana- MIS dashboard with Parameters
As per the mandate circulated by DPIIT the timelines shall be given in the below format for the successful compliance pertaining to
Dashboard reforms (BRAP)
Notified PSGA timelines to be added and based on that tab (approved within timelines/exceeded) will be populated.
Min/Max/Avg./Median also needs to be calculated.
Filter option service wise, specific time period wise
Select Time Period…From Date…… To Date……..
Select Financial Year: FY 2021- 2022, FY 2022-2023… etc.
8|Page
Standard Operating Procedure (SoP)
Functional Requirement Specification (FRS)
Invest Haryana- MIS dashboard with Parameters
e ved from
Timelin
HRTS
e
timeline
.. … … … … … …
VI. Level – 3 (Application Status, Department wise service wise with action remarks)
On click on number of Level 2 (Approved, Pending, Under Process, Rejected) the following information would be accessible on MIS Dashboard
(public domain of Single Window), as per below mentioned format
Download option in Excel/PDF would be available at each level of MIS data
S. No Name of Name of the Name of the Address District Date of Date of Name of the Application Status
9|Page
Standard Operating Procedure (SoP)
Functional Requirement Specification (FRS)
Invest Haryana- MIS dashboard with Parameters
In case, the application is approved/pending and exceeded the timelines beyond SLA mentioned under INVEST HARYANA PSGA,
at which authority it is pending that shall be populated in the remarks tab for necessary action by Department HOD and nodal
concerned official.
VIII. Level – 4: (Service details with status remarks of application and applicant details)
Since mandatory application fields like Mobile number and Email can’t be on public domain as per the IT Act, hence log-in
credentials access needs to be created.
Department login, Director Industries/EoDB Team/DM shall be created to view mandatory fields like Mobile Number & Email and
allow registered user to download the complete data in the below format (Excel/Pdf/Word) which will be ready to upload for MIS
feedback exercise conducted by DPIIT for the next assessment year BRAP-2021.
10 | P a g e
Standard Operating Procedure (SoP)
Functional Requirement Specification (FRS)
Invest Haryana- MIS dashboard with Parameters
S. Name of Name of the Name of the Contact Contact Address District Date of Date of Name Application
No Department Firm/ Person No. Email Application Approval/ of the Status
Enterprise/ (Applicant) Rejection Servic Remarks
Establishment e (Approved/
Rejected/
Pending
with
Authority
level name)
11 | P a g e
Standard Operating Procedure (SoP)
Functional Requirement Specification (FRS)
Invest Haryana- MIS dashboard with Parameters
Application details would be displayed in five categories in “Admin Dashboard” after login
and respective admin receives the notification on action through SMS, Email and System to
act on it, as:
12 | P a g e
Standard Operating Procedure (SoP)
Functional Requirement Specification (FRS)
Invest Haryana- MIS dashboard with Parameters
Level 2 - Service 1,2 is indicative it can be more, and Category/Jurisdiction wise list would
be populated in concerned level: Admin Login Home Page Dashboard displays Level 1 and
List of Pending Applications and Pop-Up Highlights the number of applications pending for
taking action as shown in Level 3a
Applic Name Nam Dist Area of Date of Timel Risk Remarks Action
ation of e of rict Jurisdict Applic ine Categor (New
No. Applic Serv ion ation HRS y: Applicati
ant ice (Subdivi GA (High/ on/
sion/ (Withi Medium/ Clarificati
Circle n Low) on/ Show
etc.) Timeli Cause/El
ne/ igible for
Outsi Deemed
de Approval
13 | P a g e
Standard Operating Procedure (SoP)
Functional Requirement Specification (FRS)
Invest Haryana- MIS dashboard with Parameters
Timeli )
ne)
…… …… …… …… …… …… Vi
ew
-
Ta
ke
Ac
tio
n
Re
ply
Sh
ow
Ca
us
e
Level 3b
On Click to Status: All forms, docs and activity logs opens with action taken remarks
Note: This is indicative unified Admin dashboard requirement wherein department level
System Architect may reframe/redesign and align as per unified practices on SW with the
reference of above table.
14 | P a g e
Standard Operating Procedure (SoP)
Functional Requirement Specification (FRS)
Invest Haryana- MIS dashboard with Parameters
Pre-Operation
15 | P a g e
Standard Operating Procedure (SoP)
Functional Requirement Specification (FRS)
Invest Haryana- MIS dashboard with Parameters
Post-Operation / Renewal
Navigation Guide for Applicants to access the services on Single Window (SW) Portal
16 | P a g e
Standard Operating Procedure (SoP)
Functional Requirement Specification (FRS)
Invest Haryana- MIS dashboard with Parameters
service)- Document
Repository would be
created as Digi locker
functions- once uploaded,
not required to reupload-
system would auto display
or applicant can select from
Document repository- if
want to edit/re-upload
revised document (System
would capture all records
as per submission with date
of submission)
Confirm Declaration
Save as Draft
18. Review Details Confirm & Continue / Edit
Submit
19. Online Fee Payment Pay Fee (If, applicable)
20. Download The fee receipt can be The receipt will also be
Acknowledgement downloaded emailed to applicant
21. Notification Alert Notification alert will be sent to Confirmation over Email,
applicant at every stage SMS and Status log
updated on system
22. Status Update on Action taken by Admin at each Status update will include:
Single Window Portal level to be captured through Application submission
the system and notification will status
be sent to concerned applicant Fee payment Status
Action taken status by
Status will be displayed in level 1, 2… upto to
Dashboard and update will be issuing authority
sent to concerned Admin of Clarification asked (if any)
Dept
23. Track Service Go to Project
Select Department
View Status
Respond to queries (if asked)
27. Download NoC/ View and Download option
License/ Permission/ Download will be on Single Window
Approval Letter Portal and Department
portal as well
Activity Draft/Sample
Declaration: I hereby declare that the information given above and in the enclosed
documents is true to the best of my knowledge & belief and nothing has
been concealed therein. I am well aware of the fact that if the information
given by me proves false/not true at any point of time then I shall face
punishment as per the provision of law and the permission obtained by
me shall be summarily cancelled.
17 | P a g e
Standard Operating Procedure (SoP)
Functional Requirement Specification (FRS)
Invest Haryana- MIS dashboard with Parameters
Submission
of Dear Applicant,
Application:
You have successfully submitted your application for
_____________.Your Application no is _________. Please note down
(SMS your Application No/CAF No. for all future references.
Alert/Email
Alert) You are further advised to pay the fee of INR _________ (If, applicable)
Department Name;…………….
HEPC-EoDB, Invest Haryana
Fee Payment
Confirmation Note: This is a system generated mail. Please do not reply it.
:
Dear Applicant,
Department Name;…………….
HEPC-EoDB, Invest Haryana
Clarification
Sought Note: This is a system generated mail. Please do not reply it.
Dear Applicant,
(SMS
Alert/Email You have a query from_________ on your application No________
Alert)
Please click the link _____ to access your application.
Department Name;…………….
HEPC-EoDB, Invest Haryana
Physical
Inspection Note: This is a system generated mail. Please do not reply it.
Scheduled:
Dear Applicant,
Approval Note: This is a system generated mail. Please do not reply it.
Dear Applicant,
(SMS
18 | P a g e
Standard Operating Procedure (SoP)
Functional Requirement Specification (FRS)
Invest Haryana- MIS dashboard with Parameters
Alert/Email This is to inform you that the your Approval against Application
Alert) No________ has been granted by_______ on ______ You can access
the same at_______ and download the signed copy.
Department Name;…………….
HEPC-EoDB, Invest Haryana
Rejection Note: This is a system generated mail. Please do not reply it.
Dear Applicant,
(SMS This is to inform you that the your application for _____ against
Alert/Email Application No________ has been rejected by_______ on ______ You
Alert) can access your application on________ to know the details.
Department Name;…………….
HEPC-EoDB, Invest Haryana
19 | P a g e