You are on page 1of 221
EMAAR POM Par< con PROJECT EOF - CONSTRUCTION OF THE VIEWS TOWERS MAIN-CONTRACT WORKS ssrer ef Lao mew Feces ON MATERIAL SUBMITTAL reve 2 ovenetoo stmt ae: Selun-2023 end ca ep [athe os, Electrical Dept [Subject of Submittal: SAR RISER /BUS TIE DUCT BY EAE eter oescrinion —puianne os over ofc eh eed oe = Section: 262500 > Jott commie 200) nt 008 aoa meme won7 mwa ra ee terre oo js ti oes ott Seccicd TBISBAR TIGER /OUSTIE DUCT Jesmetince Set / Vendor company rote | Moterial Proposed _BUSBAR RISER /BUS TIE DUCT. |v |authoriation etter sn Ata [7 fem ctryoe i na raceme paw ae [TEE ron spate Ramer Tana GEER [ongoing Conny [TURKEY ted erm tare [ers Satara Wo ry at Designer's Comments: J>Aporoved J-approves as notes levee & Resutm Jo-not aporoved Designer’ Re Sign, ‘Dae: a S ne ‘Employer's Rep Comments: consTRUCTERS TLIO Sic 19 Dated: 3 ane 2023, M/s. EMAAR Pastor, ‘he Views Ste office maar crescent 059 DMA Phase Vil~Extensen OC Ref EK RPDS. MCW.OCL EMS. 946 (Re92 Subject: Submit, BUSBA RISER/BU TE DUET BY EAE Technical Submit Rel EL RPO MCW-PCL-LE-MS-O4 (Ro Dated: 20" may 2028 Designer’s Comments Response 1. nainers Comment: rovidalofered equipment techni deta, county for, ating 2s pertende speciation and ighlahted the tures vith erence to vate as ond Stampoall pages, complete techni detail need tobe submited and it shoul be complied ‘wah the spectcto, Pct Response: Atarhed herth, please see Seton N02 2. Engineer's Comment fered busway rating shouldbe revised as pratt SL, PCL Response: Atshed herewith lease sce Section No.O1 3. Engineers Comment sway voltage drop allan with lengths to very and reqied3¢ eras perlatest SLD Need athe tie of shop rowing & submittal 4 gine’ Commer: Tap of unit’ cect braker country of rg ising shal be submited was per approvec manufacture st. PCL Response: Aitthed heel, lease see Seton No.02 5. Engineer's Comment:3prty test certian /epotsefallofered tems shallbasubmted wth reference toate, PCL Respone: taco herewith, plate see Seton Not 6. gincer's Comment: Al busbar horizontal length exceeding 20 meters shall be required PL Response: Noto wo wil provide oxpansion jit afte 20 meters sper speciation. 17. engineer's Comment xgansion it aa eaton where the Busway crosses bldg jot andthe spacing recommended by the manufacture conformation requied G S PCL ResponceNotee PAR..GON ey spt cic constavcToRs PVT LTD. ‘She 1291 A. Engineer's Comment: Busway fhe cating. shall be provided as per manufcture recommendation, et Response: tad ret eae see Seton Mood 9. Engines Comme: The bbe pes stn st wi cls product nd being Cerf othe see one 28 cbfomaton eter egie. Sopot spe reed for Pet nspons: ted oct pase Seton Noo 10, Engine’ Comment Fx ange connection ei to trnsormer ree PCLResponse: Attached herewith phase see Section No.2 1, nginersComman: Manufacture gunante fo busbar plating against pel missing nd req 2 per spesicaton PoLResponse:Aached herewith, please see Section No.1 12, fnginer’s Commer: stalin, testig and commissioning sal be done by manufacture reparative ané waranty shall be start from the banding over the roe. PoLResponse: Hote 13, Gnginers Comment FAT and SAT potocl ae not subaited PCL Response: tached here, las seo Section No 08 14, Engineers Comment Busway site stalin, TRC shouldbe as per SMC specication Pct Response: Noted 15, Engines Commen: Busway stem cordinatedshop drawings with al det equpment, snport snd siento equ at the tne of shop drawing subtl Pex Response: Noted 16. Engineer's Comment: Provide eter of eonformty, document of aning, Devry calla t the ine of materia aebuery on ste {17 gineer's Comment: The subsmital/sarpe review is fr tho purpose of ascertain general conformity wth the design concep of the project nd general complance withthe formation [nen inthe Contract Documents. Correction or comments made spar ofthisrevew do nat Feleve the upplir/ ast /Contracor of respensibity fom conformance with the Contract ‘ocuments, appli codes and awe lle which ave party veri subrta PCL Response: Noted. PAR..GON ont constaucTORS PUTT, Spec Clie Libra & Quality Go Together caer Fy LIBRA ENGINEERING Panels And Dison Boards Ref: QLE # QT-088/22 ate: 01" June, 2023, ‘At, Mr. Masood ‘Mls, Paragon Constructors Pvt. Lid SUBJECT: Submission ynittal of LY Busway Syste VIEWS, With Reference to the above stbject, please find enclosed No, 01 set of technical submits for you kind review and consideration. [Enclosed dacuments areas fol ows: ‘A. Response to comments eview sheet 1B, Complianee statement of Specification C. Project Reference lst, you have any query fea eto contact undersign. DOM Engineering & Sales Libea Engineering Prana (92:29) 26960198, 26989197, 26976424 Fae (62:21) 96963135 Ea ‘ealeaDiorsechgoarcom Web ww orale = west suicerS0t0s! ease cri mana Schecider AN) EDGE OVER OTHERS. PLOT NO. DP-S4,(ST-5), SECTOR 12-D, INDUSTRIAL AREA, NORTH KARACHL-75400, PAKISTAN, [roe rd pment mbit Cont forge eaten [stata famed te cine lo. caneyoterdn st a ey lease opciones eda tea op amr om en i'l eect Gn ig hal esa We [atscatonaunerotaane spy et eons allroad ree 5 [testosaeronsigracetig ZO mee dorberqurtepanin —[OKCony were mon Joven sie [panera pation [pinot oat nesta oneal nd eg [somerset theme nrton ie lt rtnio pepsi ern rel poe eon recomend Pima seems eee Sit eee rai loth rerncton 8 [nda oun bb a ng foe terse jst ig camming sal cn yh mana et [ney sist tome op meaner inh il fee sara fiver etnes Fe tr oy doen a i Oy Sante cipal grace nt [iene fomcaeie [: MAAR (ouwea 1 ‘10-May-2028 Electrical Dept: JBUSBAR RISER /BUS TIE DUCT BY EAE sen mane Se: 262508 Jota a 9 fe ees roscoe 7 Jerre ng 1 aE Haan gOS over [mnt Set vere coi ol either fo AE ge ver totter == ecm nya meine | | tae | rare ese = SE eres —— a iene —T ee a te | footages Sap py Pc Sgnatve: a ‘ae: |PROMAG (PVT) LID, eo Comments = Pile face z er oe = © [Dre ‘Designer's Comment [esr ie —_ (401) ese ents Eo) < Joaaagponee oer tes i ws [Jv eee ey ae cbr her rol Coaresls ; a pier ep Sn: eters sIMIC ‘Seba Te Airy pa Fac (sa Commer stot ms rove al eee al ees, any fei aim pe der "geeaten nds here ah nas ose opt tarot ‘pace ac ets odo hes nd et a wh terme, le oy ng ol be eins priate Sn eve ted Me 38 Nos Tepe tc ae county fr mn le ein pad yay tartare of ee ams she ted three ‘Abarat ath eigen hl be gies eg jn, ter reveal ‘pain ‘cer by he mnt cotati eae eva eae le roe ‘eas pases es wat pe ose ig edo he ‘Stone 2 rat ater eel it See ete Mo bl ange onto deals overeat utc poo os ba ting et eng ising rege nan nao i ie ey racine roan can here hs ses ly oo hepa 3MIC Page oft "mays gated an ving wal ta mt, a reat o tpi 1 Rielle rter ss faces aye ee Sere po a oan whe om ee Steinert weeny am sntorance nthe (nts, alle chan NsTRUCTORS ETD ote 10 ay 2003 Thevws se oes” Dia hac = atenson OC Re: LAVOE MCP MS-06 6.0) subject: Suet, BUSBARRSE/AUS TE DUEL YEE “echnical Submit Re: KL-RPOL-MCW-PCLELEAS 046 (Rev. ‘ated 269 Api 2023, Designer’s Comments Response 1. tnginoer’s Comment Type ested report if busbar requed a per specication (cL Response Attached hereith,pleve se Section No.8 2. nner’ Comment Stic est report forthe busway syst requie 3 per speciation, x Response Asad hero, plese se Section No.8 2, Engineer’ Comments spay test report missing and requted as par spectiation. cL Response: Aitathed herewith pls se Seton No.8 rating voltage ad impulse voltage tenia deta cabal technical detas ising and required 4 engineer's Comment: Busway dsign required 3s per speiation. Tap ff un 235 per speciation PCL Response: Atala herith, please se Section No.0 and Tap off unit details attached hereith Section Ho.2 5. Enginge’s Comment eile lag connection deta to transformer require. Pct nesponse:Atacedhereith, please se Section No? 6, neers Comment usa joins tecical deta msn shal be requied, Pct Response: Atacnd herewith, please se Section Noo? 7. nginee’s Comment: Manufacture gusrante for busbar plating agst pling msing and required as par spectation, ‘PL Response Atacnd herewith, please see Section Hoos PG@RAGON ly spe tS 1 CONSTRUCTORS (7) LTD. Engineer's Comment Busway system complete support details requed with highlghtsd "tems; Busway suppor ale requled for approval. C7 ji Pct Responce: itch ereith plese see Section No? Engineer’ Comment Busway veltage dop clean with lengths to very mising and ‘equred Need at the tne of shop ewig submta Pct Response: Atcha herewith, please see Section No.8 Engineer’ Comment: Busway system nstlavon TAC shoul be spar SMS specication cL response: tached herewith, please ee Seton No.0? Engineer's Comment! Buxway system coordinated shop drawings with ell details of ‘equipment, suppor, end caluation eqied 9 the time of shop drawing subi. Pct nesponse: Noted, ngnce's Comment: FAT and SAT potas are not submited PcLResponse: itch herewith, please see Section No.2 Engineer’ comment: The submita/sampl rele te for the purpose of ascertaining general conformity withthe design concept othe project and general compliance wih the infrmtion ‘ven inthe Contract Documents. Corrections or coments mae separ of ths review do ek "elie the Supper /nstaler/Contactor of esposibiy fom conformance with the Cont Document, applable codes, an awsallof which ave pron ver his submit Pot Response: Noted, Libra Engineerin, PROTECT EMAAR CRESCENT BAY TE VIEWS TOWERS ‘COMPLIANCE STATEMENT ine meatan “onto ar = ine 7 Rome RT ws sj ee = Telos ch re a i va freed per ecco ‘essere 5 ge a I a pe ANT — | — = 7 esercenaces napa Ranma | — =e viz 06-05-2073 Of) ojne22 GA Veeck EMAAR |_PrcMi™ ram con MATERIAL SUBMITTAL [scl 0 ornncora mat Engr Za tote FApr-2023 Leoteeae nee — Sy Bestia Den suvectorsubmivar [BUSBAR RISER BUS TIE DUCT BYEAE [suf \! nin [asa mr Telia = ec 262500 [opr cms cre ni esate suv anwin [7 ree oe me rt amas a ood anit si UT tree = 7 Pretec cette | nto a Freer, | county of te ter pcttniowttsetenetvee | arte Tx ma | Designer's Comma Rohe. allathed. Joon ranstd (APL) st Flerevie ase Sy WO Joneeareoed smc Page tot Submits! Review Shoat from: Tes er ery, Yoga cna [SEE yey Tea Ga Tron Ahan ‘bl Fo aia Toa TB ‘toma Ret ence Busbar Risers Tle Duct by EAE (bra Engineering, 1. pe tte babar ed spect 2, Sao rt oti oes ect, 4 Bay dopa alge and ips lec ta ee pr cnn 5. outa er ecole lig aes ppeteto 4 Api ingecmecion Stason pe 2. aay tac eta sins eae 1. race ure kang epee msn teed apr erent 9. may ogee pet tals ge i hd Hn; ae et se ldap 10, bay eatin hong ning an ec, Hed a hi ep ‘ont a 12 a sn cs vn i el tne, pa mt catin 1a ao A oar et nied, 4 Meter ear be pa of eta ura cram with ‘Sagi pe pal care tion genta San ‘Stic Cet mi pt a he as ewe he pt aCe ‘termi ome as amt spat tm loo Status: Dsgprove oeubmisan fe requed with comments compe \ = INDEX ‘SECTION NO, ‘DOCUMENT “ek The elated Doe o ‘HL OF QUANTTTIES/ TEN LST Vv w PRODUCT TECHNICAL LTERATURE ‘APPROVEC VENDOR UST ‘PROJECT T=CHWICAL SPECIFICATION ‘COMPLIANCE SHEET ‘VENDOR'S COMPANY PROFLE ‘AUTHORIZATION LETTER PRODUCT EST CERTIFICATES & ‘Conronnay LETTER WARRANT LETTER ‘CLIENT US"/ UST OF PREVIOUS PROJECTS DONE SECTION NO.1 BILL OF QUANTITIES/ ITEM LIST 26 00 00 levecrrucaL [SECTION Iv: BUSBAR RISERS 25.0100 |Suppiy.nstalation eslng & commlsconing of below raings Auminian] 28 0126 {TPN 4726 pig in ype Bos Bar Risor 1P64 a2 por specication &] 2625.00 |erawings. Werk to include supply and fing of all shor supporting &| loading devices oc. [From Teansfrmers to LV Panel 4, 2,3 84 wot }s2000 ru | 6 From 1600KVA Generators to LV Panel 1, 2,3 84 EWors [22000 eu | oe 26 01 00 [SUPD}. nation, testing & commisionng of below range Auiniu) 2s 010° fTPNY4i2E plug in ype Bus Bar Riser IP-S6 with fing. provision Jezson \tous size of Tap off soll feeding diferent oars as per speciation & drawings. Wark to include supply and xing of al busbay [supporting & nading vies oe [rrom Lv Panal 3 & 4 to SouthTower Riser (Upto Root) Wor [azo0n rm | 376 Ewo20 [aaooa, rm | 525 wort [aon nos [1 woz leon nos | 22 woz 00 nos | 26) ewozs 258, nos] 8 Ewo2s fissa nos] 7 Ewozs 08 nos] 3 Ewoxr fso0% nos | 3 Ewo2e [aooa Ewo2s [soon sl elslelslelelalalelels slelelalelg Ns] aa] |s |e EMAAR SECTION NO.2 PRODUCT TECHNICAL LITERATURE ELINEKX-I! Technical Characteristics ‘Aluminum Conductor) ih tne wd FE veer Y, kT # lt a oF isi ee as a 7 MEO PHASE CONDUCT CHARACTERSTICSATRATED CURRENT Saas) en Bn ae) Bs aa 7 ua co ano 018 cae ao 5 tus 7 ‘i “ow ss or on os. as a te ‘no is ma ane aos ues {toe 9 clon ena wlage op of aay in ‘cece ne ning oma. A VLU C908) 102M ocean in caret os) esr ) eat ai) '5= Sip Point Sige meer erat Ps ELINEKX-II >> Technical Features sgcina tte Fetes eee Beaker armament = ‘tet owes ih ‘horas cosa aes Heatran rcpt sac hei ro pce ed ith stsedfet easy tare testament he ‘cing wats hs re ge). aes a mec yo dt ‘etter penn he FF rex sues (an ELINEKX-II Riser & Vertical Applications tnt tester peo ot mera ‘ue egal oneatona (hich semen. iam ig a ing | Pret in “he dee elo te oar Propet De Laan sn ein of Ma eran au wb nt ghar exing els of te. ‘yt eer be a. seomatonto eyo wane bal alae or nce eta pn iste brn pan stesso terse tics te Teptomes ene oo pot cr sn, ney sad canoae 9 mah ea ELINEKX-II — fue ELINEKX-II $= — . j woloboeS Same, ‘ested —. ines = cm aay ELINEKX- Il Teall te nee shea bea IID ec 8 ELINEKX-II SS >> end closers Uitte os" Sant ope: oe Suc ‘amr cope son, ech rar fede ELINEKX-II » ELINEKX-II jae >» Panel Connection Dimensions Flange Omens ‘Panel Comments re supped with ase flange as tad a | pee pee a Se a ee eee ele at ana} Saar — as tae 4} ee gee ae — ae asta [a1 [5 [att ig 1 ae eee 7 i "Ble aet_| a8 —| 0} Ve see ae op | a} sere | oa ma} ae os i age [a ELINEKX-II ->iinsfomet Connéstions met pone ed For cnet dnensons peer touleconsae ae a] Be aot ‘0 con ELINEKX-II >>> Vertical and Horizontal usbar Appliations ELINEKX-II >> Vertical and Horizont Z| - i Fe a a j= = = a ELINEKX-II >> Feeder Boxes ELINEKX-II lane >> Joint structure, > “a B ELINEKX-II >> xing Elements ELINEKX-II ELINEKX-II iment) >> Fixing Elements, -1 _|__ ooo - 0000 weovin ly ty mE i iS a é | a ELINEKX-II >>Fxing Elements Goo - 6000 om 2 on Swine ‘ant SGiesirom a) ——— eo “aoe KXMANUAL, >> Handling & Storage ‘vei 4 ptt son te tc ing ‘ha npr posse aa erage {dt cmare tt he pret cnet praca it ondigtnnt er ay heme are Jonas ‘at od dy an oe Sooo KXMANUAL, >> Handling & Storage ein ieee pees 6: Te mang of rds hm ne foro Scot icrut epee to 1-Th Bs hat re dese coe Sialeckensmedarsalcmesrdeotr sclaatwethepa! nents ‘Sebse angeles panto aan merit choad be seemed ‘enka tel instanton deen) ‘ioc xan (heat oc) KXMANUAL >> Installation >> Point tbe taken into consideration beforeinstalation x 1 Pat ted tin mare ere ‘aetna 2 tat of utes slg fy cam ier andes ane ht exp al eset {So weer lor Scoring stiepiesdaveas featance tected belo ship ‘hi sme el Und Sod ‘eons pn pt commences, thee chien! Bobat frosceoyale conan ae ee sna nl and ear) i ec ft 10 A). ie) Mano A "ot an asgetnmay bens, exits may tes fom cya cy oe etm os topo ory cre ‘ie duce ae Har A) ht opr ean oom ‘niigh tak carb sez. Poe comact ‘Ile nls sta er dete ot 5 07 ws ta adn ence Aeorshalsbepsoned omer Sem ones rpg Lazatmararmirace enone Sereeh RSEEEt when etstng a val Say nie at hl easy 2 Ft heb gat at andes (evn ote aoe ag Pease cove vepotine shat KXMANUAL > installation > Garr Over FT Joint op BortaanigPint i ap ian rete IP55 KX-Il BUSBAR EK MONTAJ TALIMATI MOUNTING INSTRUCTIONS FOR JOINTS ut ZE6. INTERNATIONAL CERTIFICATES ae enter stmcimmomcrenee Fmeren | | erie o themed lor veto To echne estan ete, neha ote ecielereasha ‘toon EC C1996, HL gay €) Doekra ge OTHER TEST CERTIFICATES Sime a 0889.9 enn (wt stolen Fea sists Tests 0 60231-1 (Grammer Retr e-UNE “feo 6m991-1 1oore-a Hows BRE UK Tecemat-1 sure Howe Singapur “emt-1 Teor ors and “Senn othe an {EtSne ode Sate ee 75 Fe sistance ce ty Test {or Lie wth Pag no ae Ecos 0 6 - er 3 hours, Magne MC - Des Haan TEGCOSI-T 650 = ovr 9 ous, a Fuses DA, Hota ‘Flame Propaptin Test 1c c002-2( 61439-10101) Fe rir Tat 2 os 0894-1 (G46 610.102) QUALITY CERTIFICATES CERTIFICATE cenniricate | — Clicert 150 4001 Managemen sytem 20 9001 Managenent yee 16027001 Management Ste CERTIFICATE | f QUTDOOR APPLICA oto tplestinne AE Cost ena uri exten cena nd cata appson,Chbuar fsa wide range of caret ating forhorerar verte mong wih Po8poacton Sores, {AE Une hie ol een se cpl and bie to comet ih Le bb je by Une GL Transition Module, ee (kc tanaton adler th poet fradsig cnt and proving vale suntan roo ap) \ wes7ness ‘SEISMIC SUPP Support systems re supp nd bush sytems fr pret ‘hisses talons ler ectopic Seong tes tos 27 Ec gone, Ee cond, IGF amn 208 Soc apr noc be pe en ‘Thanks tothe aecessee ign for Sta a at Fe eae eerie dt nee rb ey ‘standards 60-90-120 minutes. ee See assume mae otto te Lae een ee ee ac integrity ‘heaim ate br sti yale he caect puaton of te cca tem ant ene tate iil ya oo aren bhing and tesa jtems ron sonal fer angeoughto ran essen th ene tec a8 stands Einar ego det ore snp oro pniion Bsr must oat the churettace AeA Integy sang a: ens tr anton 1,654, BS BT Sey EAE CABLE MANAGEMENT SYSTEMS : E-LINE TKS »Pre-galvanized or Painted Trunking System E-LINE CT. »Range Hot-Dip Galvanized Cable Trays E-LINE KC. x Range Hot-bip Galvanized Cable Trays ( E-LINE TLS Wire Mesh Gable Tray Systems ELINEKX-II > Taproff Boxes: saline of Tasos ‘hepato tog tenis rgd ante tan na loess ae enhy hing yt fo ests Libra Engineering TAP OFF BOX BREAKERS ste neanans ‘Moves no. counravor Onin 1am reccesocact | as eon Ta 2 fase Mce@sorno| | 3S Tr mae “pm race soen nor [asa Ta 5 san Te MccB SoH AO) [#5 250/08 wa foo renccosoax aor [T3507 mae 7 fa Tenceasomx aor | saa TA 3 [ison meee som nor [Tes ao ae SACE Tmax XT automatic circuit-breakers for alternating current (AC) distribution a ss SACE Tmax XT circuit breakers for alternating current (AC) distribution cor ET eN'd (STEMS ) 88400 8 yop wey PHS MESH TSS Fewmag | i “ae ico 000) TEST] ZS 7H SHH 00 =O =o So = Sanwa eos ame neaewee Ton car) = owawea "SROSISN GSETIOSE OL a Hep ® SUMEUBIS AMOK YIM SYALOVANNVW OL G3300%d , S}201pul pue peeu Soe/oud anos 1ed se wo} S4y esinad JO anaidde eseaid 335 2 oy) _SXS1d INNGWY WIL NOILdTaoS30 on uv alg INADAY, Dea TW ¥ © 3ais _ y ars naval ToT q Dat] avasna UE a90lue WWOVd = wOOST ~ POSLT YY FARR RE aeaaaranaars f f f i i 1 i i i i i i i i i 1 1 i 1 | H i iN ) } y} | " 5] SAVIA HL f f t SAVHIA IHL SOVIATHL FOE RRP PPP Tia STIR oan ( SAHA HL = a - - - -——- ails ( 5 a A PP I I PL I PI LI PI IL LIAS ISL LLL LL PDI L SS SAMIAHL, jr SNA JHL EMAAR SECTION NO.3 APPROVED VENDOR LIST fF i ¥ Ti i| il ae] at aT oo] ell ele EMAAR ran SECTION NO.4 PROJECT TECHNICAL SPECIFICATION Osmc eee Aad THE VS DA EACH PLUGIN BUSWAY "Sel nore Site tent ees oe corm ‘a ners y ko certo par mnfocae commando, heb hn talento 4 Hoan Ret “nolan ott ha Sposa eens ESS cee ann Seceigeat estate nat we cr nw! ove ro ep rs "eho mel he ect oui a ic ech a bra ate oe , SS y Eerie Steere SScSee eosennasn tenemos oo EEE ace amncamentnoionp OSMG LEN ‘Su ado compte at kngon cole wp baum oe, hroet pein SS rei omer oo as Teta lo ond We concn ane kre opts ono a Sen be laos or ean ore roar We tan hcl sc be Sotgnod Gd Imrie campy nee CG Shtttbclsntetioccndenemomonteandstbe Ricans {capa etnvgeylengremeves hut civtng he aoc ct om hee ead ond vt oe on tnpaonce going when ap ‘Eipheciroh bes osiopomar tae pana cohasiepe tr Set "eum on ay creo ona be pases wna nm pen seem eee Ceeeeeg en rr a ht a tig mien rece oe teee ee biantesecrcr on meres eter Cormeen ncn (Soon Pee menue Bowe fre bebwen erect of hgh lomeerie ot eee Coercion nn een Roepeaerersmmnsreanrtes tenet ‘Me ancien crore pe marion tregna he ter wring cous SSeS see eeee sears Siansces oem Schhiesaemnaree eas = Scag gant na ne oo Toney erate Shaner ” ‘aaah eves, KABA “)Afettnpatieonpcine pop nse Petter be 81 po nanny in ig cn ee 49 Song ro ten in Spesoeercanacts 1 porte: «mcd in tt tarts to Me toupee cunning acu eataverncoln the aon 4 ovwnlainemsinacrgl 0 Fe econ Bt mie 8 “ sommes rte 1 memignes ie ci nc oct abs inhe pak bot ke ce poco ‘ ung tb hon at pe wk ty 9 gh era ‘Sveti wen nso ome oe Es cs osme ba (2 he crt h cextod by be mppots a pe rantocluers tcammanton Pe Sounyom ote wegen sana han * Sonlcinerlacarenanton Rese spaton to nets whee det ‘Sona bianca ang scam by hme A) Seem dconacam ah led cp waar grad by aan wane ender 1M edtanseemictcaso peter sone aul eulna Cont ttuidchne weotemat myc aretoe 20 eet Sete hana waa be agg ond ones ‘reve Motte} mates open acta eens tga cn em lee rd ren i etre soe cued oF on ae pt lath ed ta ta nara eran (Zalmirsnael pions une pa hah bwin carr onsyat ‘Seater hate case ei ea ha at ‘e"p tegen nd ch st a od 4) Sena ning penal cuandedundr kane the mento aes "Reet that Wb asetiod ty 2. Ra ahs Nps Te topo 1 bo ‘ries dbgah coma haycatcaan 41 Rta pne nes oct ppd nd certo ER SECTION NO.5 COMPLIANCE SHEET ee ‘eon apse ee pop me] “Soon gn eases sn na an TEWSIVIS DNYTIENOD le Anaad on] a | Seen Raman memat aan DEvaIvis DNTGNOS NOSIS = Tomi ap aa ae RN SUeTRAAT | | ~ | mens « TDEWAIvIS DWINOD -TRIPEIVIS SRYTNGD WOO ~ RWELvIS SINVTIBMOD Saas pardcon | SECTION NO.6 VENDOR’S COMPANY PROFILE COMPANY PROFILE LIBRA ENGINEERING: Libra Engineering was established in 1982 with a pioneering vision of design. Erruiiteastie hacen e ta SniecRes Esse Co vias dctru AD Ven Eetirvonitiicy meri tcaeenn in) Nectar cnr nee rear cn vn stoana 2018. It is known for manufacturing of Reem volietastana tee GuereUarees our neni Cie ener : “10 BE THE LEADING DESIGNER, MANUFACTURER AND SUPPLIER OF Low! VOLTAGE & MEDIUM VOLTAGE! SWITCHGEAR EQUIPMENT IN VISION & MISSION STATEMENT LOCAL AND. INTERNATIONAL’ MARKETS HEIGHTS TO BETTER EQUIP OUR CUSTOMERS WITH CAPABILITIES WHICH DRIVE THEIR AND OUR BUSINESS CWE AIM AT TAKING TECHNOLOGY TO NEW FORWARD. “FACILITY ” “With our advance machinery center we are able to measure our growth and ability by providing our customer with the best. Our company immense intentions are, to advance on technology part, upgrading to the most modern range of machineries & enlisneing its capability at the par“ i KEY ATTRIBUTES OF PRODUCT RANGE: “A strong focus on Design & Manufacturing is a key objective of our company. All products are designed and manufactured in compliance to IEC standards, buyers specific requirements and specification * LOW VOLTAGE PRODUCTS " We provide High quality , Reliable, safe to operate, easy handling and economical products * FT-SET TYPE F Fixed) FT-SET TYPE C (Capacitor) FT-SET TYPE D (Drive) {Priv FT-SET TYPE P (Power) Q_ FT-SETRANGE IEC Compliances: IEC 61439- 182 TEC 60529 IEC 60947-2 Rated Insulation Voltage: 1000VAC Q Busway by EAE Type Tested Low Voltage Busway by EAE. (1 EAE Busway provides transfer and ‘Type Tested Low Voltage Busway by WESTINGHOUSE Power busway adopts ‘two-pleces aluminum alloy housing, distribution of energy up to 6300A and is available with maximum protection class of IP65 with canopy ‘which is light in weight and high in mechanical strength; effectively avoids the influence of eddy current and hysteresis loss, sultable for various application. hysteresis loss, suitable for various application. ODP) LONE VOLTAGE PRODUCT. 1 Pv-12 & PV-17 by Westinghouse Modium Voltage Switchgear Metal clad/ Compartmentalized up to A75KV + Air insulated switchgear of compact design + Safe and reliable indoor general purpose switchgear + Tested to be compliant with applicable GB and IEC Standard ae eee QO Westinghouse Transformer ‘Type Tested Dry Type ctr ‘Transformer up 10 36 KV BY Conductors Copper or Aluminum Q. RMU by Westinghouse Frequency (a) so Medium Voltage Gas Insulated Ring Main Unit Technical Specificat Rated voltage: up to Rated current: 630 Rated powor Froquoncy: S0kV om Seon Rated lighting impulse: 125kV_ Imsulation lass F(155.C) oF H(480 c) Connection yns, Dyna vi OUR VALUED AUN U HAS OXFORD. yanus UNIVERSE SS I ucKy On: Fe ropckmatcenis | PEL (Eta HBL sss VY sf TEFEN institute of ha Mf if | Business Administration WAttas Batt Karachi Hs tia tas or E5\Dawiance «iD S TA PARS al pe f Nadeem.) ‘GENERA telenor GROUP TYRE € > BAHRIATOWN SUZUKI Saad “PLOT # 03, SECTOR 2, STREET PocuneNc esithG Eueemrate neue) +92 318 2070520 PRODUCTS iCTORY BINDER ‘sk fmt cA act A are eta yp | ‘hens nmr ecneponsckc Nese wae rus 2 Conon Prone 3 raeeustan syste “ FA ousuan syStENs FEATURES. é ‘iv Enzeusnan sySTENS : ‘ArALOOUE be CaS Awan 920 Suen VERSUS CABLE MESTALLAION. By susan aPPuearons ry “ap-oFe UNS Pa ieeapuionva cerns 2 ‘OTHE TEST CEATFICATES (UL Gren Gud Fe Seem) a ‘Quast ceeneare® (30 LHD onsn t). Z ‘ourooan aPruicatons. By ‘SauMe SuePonT SYSTEMS FINE FESISTANCE ey ‘USBAN FUNCTIONAL AREAS & MAJCR REFERENCES 3233 EAE PLANTS Busbar Factory Cable Tray Factory COMPANY PROFILE EAE Group AE oup of Cmparies: started is jour wiih dey scorn 19734 the EAE tr aman EA wie as been ‘einai since rs day is eoesannen hos ray expanded ron ale att yng FAELigingia 1289 EAE Mocinyn 185, EAE catenin 2004 ad AE Tecaly 208. EAE BALA. (maleic com) ‘hing and Power Bar reg Disbton Systems Cable adr Systeme Undarto vein Syatens/ FNS ‘rete share Suppo St, EAE Ayana A. alin som) {ED acadet set ing? EVD eh sein skons EAE Heute ., (ou eneaaebdkom) Mod Bectcl Cabs) stanton Rss Panel routes FA Teton AS. (ently con) PER nc AE ae (asain A USAte. (omens) PRR rcrcrertttagemar eae ratate ea Aaa PTY trncesemncomay) AE Geman GmbH. weaeconce) Sale nd Mig Contr of Aro reds GF Sentsedreceng caine srt seteanineret dapaanecimmef AE rou caries ons acts in acurduce with 1S 9001 Cully Managemen, 10 4001 Emonmentaliargamet and |S0 201 omaton Sect Menapenet Satan Sonar Conformance of manufactured wectel peur To he wal sande cid a a eat he et cond by KEMA nd CE beratie, IMadaion tal tere, substan curnovteinef vo ihe 20 pater 300 brands and 10 instil exgo. EAE BUSBAR SYSTEM FEATURES rkcnow-How sek mecha eo ‘etal spinon tna Flexibility 1 cosemmoteopeis donk sobalivery cs yas wih 30 1 24a ny epi Spencer, ‘ays eta te 1 See ap Boe Se os a sig fe pandonens Wt anald wne ot ccna ince tape uatng ran niet ree ‘Sessa a WHYEAEBUSBARSYSTEMS baal 1. AEs completed hounds of prota mary counties. [ear apiea sprig 20018100 £2001 & ONS TO} sandr ns aces nr, EAL Groups ge iin fs eni00n2 arts sea race os ape a EA can design any te of pete wth 0 mec ravings by ug ts patent ary Bsr sofwae wich an 4 vas he manufacturing capo 0 pro astesdlvay nA in the ala 8 fra cosine 55 AE loo san aveueney manta ea thet cn oe a ous or ay nee eqiment fs ew pies 5 fac ating of EA usar ae rete according tC 61439-16 nhiday ora equied tp estan each ating ‘ed corte te yee by EMA/DEKRA Ta Hana “TERE 1 campet bus are alo cet by KEMADEXRA Holand a Tet Canes whie carbines all equled ype Act ampet usr re UL elas 9, TheMEMA EUR roam canbe card the AE baat. 10, EAE Kx str at tested an aad gant re reste a par E6231 ad 50 834 12 Ratenstion a petal age is 1000eN fx men nigh en power busbar tre 18 Hous for 1s mated of nium exuded pale of 2 rn teknese a canted wh pry peter poner "4 enue ttt rn 99% aap gat nnn cnt eed {tam tancet Takes wb ral ree eet tea. 15, Ta inet system of 1c usr consist of epry coating «poet fl nin Btwn conductors. The apa Fuitn le ne wt fly atoms oboe plat tna pl m smear. Tw ley nd wo ler ot ‘ich mst pate roche tenes for stag ile ape. 16 Peet a he housings tnd sP88 min. PS nd PT proce cn la eal ro KOANDEIRA ee ‘eats oa rng re staan EAC so arsacee he 68 cat we ange) 690 1 600K 17.646 Tp Oboe canbe ped wth ny id a and ype of eer pr he ancl’ specfeaton No eed 6 {pend on 2 tan bad. Dens oe Oboes en lobe change es per Seeger. 18 Rating ofplogn pe tates infor 1604 upto GOA Panty apo toueshve lei & mecha ina ‘ccna ach eases at ap-otboxeamot ie renove cacy am he busar whe fe beat poston ‘Eeeeconnet plugin Tap Oboe se lie Tap ef boner re manfred shea sel rd wen aed RAL Plugin pit ton an be aang st any llstane of lao ih presale nmr of babar pes taper oj vequtenentTepoboes canbe aed a ny eee hgh dnc aque epochal ‘veered Pen pots hinged coe that pode 3 prtecton eng ypu ee ees dormer have "3 up-otovson mbotlces The cstoloy-nputs ie) weed seperately Iida ded nthe sana ee 20. EAE tos eythane you al wth the exptened engine eign see penis neg 21, A dealers egies ve cts ro he Eat nd aor EAE oro EAE BUSBAR SYSTEMS A AD) E-LINE MV 7” | ” s+ Medium Voltage Busbar Systems 12kV/24KV 950...5700 A E-LINE KX »»Compact Busbar Distibution System 400,,6300 A E-LINE CCR Compact Busbar Distribution System 600.6300 A E-LINE CR Compact Busha Distibution System 630...6300 A ( E-LINE KD Data Center Busbar Distribution System V60A..1000 A E-LINE KO-i Plug-in Busbar Distribution System 160..800 A LINE MK. »»Plug-in Busbar Distribution System 100-160-226 A E-LINE KAP Plug-in Busbar Distribution System 40-63 A fl E-LINE KY. Lighting and Low-Power Busbar System 25-40-63 A E:LINE TROLLEY BUSBAR (rex-e,Tex-s, 6, 78S, 79) lulti Conductor Trolley Busbar System 35..250 A E-LINE DK. Underfloor Ducting Systeme DABLINE Underfloor Busbar Systems 63-00 A BUSBAR PRODUCTS ‘The Eine MY Sess Buca Systems, athe nest ion Bsr pdt ange feed wih 124 and 24 oon ties neti power anamsnen MY Cite mance il arate bay wt A or Cu conaitrstmbedaed in DURACOM Inston veh opt ate et pay ae nce Protest ccd wi he etna sand “Skier ee “gna sont “thot stack ee Miran sh ct “Iasrestess lle opin carparion th cable ystems “ihe creat resatnce deo crac tues Sosy ay se td oh he ruing INE MV tedium Voltage Busbar System 124V/24kV 960...6700 A ‘une rariNgs SFr Copp Cand 9504/1150 13804 esDK (7250727808 >For 24K Alain Condor: >for 244 Cope Cantor: "Won 21804, 2904/4000 SONA, 700K BUSBAR PRODUCTS. E-LINE KX »»Compact Busbar Distibution System 400.6300 A The pele deen ox ignearent bunbaeyemeistbe compact CURCUT RATINGS ‘rut he ingle nase cantare realy ens ‘ote thew meta nous, Tocaneact sure reine, >For Aku Conte: seqyscvssvena cor aan 307 on/2900) a Fe Copper Condes: Epo contd aio orcppercandaar tet pnedandieatd s5cs0/ta/ ona 25/1 9597 60200280) th avs pester fm _0/S0 260/00 80/se00esaek pony plete A 708 puted eta hin hung ihsey pew per Realy. made sanded carpe ity fo soph emery cer om hei oY the po pat (eat-onersea =) Hh este ond mecorizl endronce “Fart say onl tal y oneal contin “Lantetage erp “Campoet sci “Sher pang an as pester fn ar calsbe BUSBAR PRODUCTS eal E-LINE CCR »+compact Busbar Distribution System 600.6300 A . ‘usando te IP68-OUROCON campaieateilhst CURRENT RATINGS teats by sped oseced psn wir open idiwahghtenpertacandmesianicalpreonfesrespelecs >For Auman Const LINE coRbator om enteral cement Sayan a enema nite 9 ForCopper Contos: sIeCatanderd apo ‘asa ena 2s cnz000 9502007 SIEEG195-0 strc prone ‘Sten atoavesorscorsstve0 “otc dee ontinees andes “Protas aga cine fete “higher cat tian “est tore epagaton “Hetil entry aig ee. utableto comet wi re KX Db yes oon yet sana kets ange ste BUSBAR PRODUCTS E-LINE CR »+Compact Busbar Distrib ‘The bd he ct buted sn DURACOMP a eompaite mate f pony ane pre albon mira hos ge Tegeraute Juaity mecha! wo eaten psi Poetng LINE ER burbs tomenrainences Fens, *Tinplated conc P68 oteston Cues lean Earth opton Sus Cat ah de Fe, casi 600-1 "me Conplonee Gute te tnt: EG Ga 2.6 sna o8 Rx oeted System 630..6300 A cummeaaris Fo Amin Conc: ayavon coo aan coyaon22s0/2500) Saors200eo0/a00/sonn Fer copper Conc: manage 240 gorznrasnra0n2007 E-LINE KD — »»Data Center Susbar Distribution Systems 160A..1000 A Toe he ison ia nas on he ‘ume narincs Inet he Salty” chategen the Ol energy» or Akan Gondor: (es " ‘ay254016204 Tilted rama cope esnctns §steatgmen’ mecha ensues cra! etalon and opeaon Spell ocho eine we en epletine ‘aos 3 PRODUCTS E-LINE KO-t>> gin Bassa Distribution System 160.800 A “EEE See mim ange sheen poe ithe GRBAC eater" ap ff box ttre corse sheet tet bes wih ert bere boves sal carer sorasrss4neoevsones08004 sab Seana Semaine Scones BUSBAR PRODUCTS E-LINE MK »+Plug-in Busbar Distribution System 100-160-225 A ‘Theo power ange bsbu ays E-ine MK sees poide CURRENT RATINGS ode até ua checve alten Ue Unenieatn and Setihuten of ect homaszed eros wotahop ad» Fer Anam Conductors indus oobes For copper Condes ‘apo pit at ey 2m ed gin pat covers “Flower nana ewe “P's petecntee “plats ‘Shollearersee pact rae infctores BUSBAR PRODU E-LINE KY »»Lighting and Low-Power Busbar System 26-40°63 A ne K-50 Bsr ston hase ela ulns and infu ee whichhave ging a outers ‘mth sma elect actin and equpmans trade thes phase ander ing pase sery needs wh kar 80 y'8 74D busbar wt 1OkVektpl pug and 24 go bots me ng pos ly net aces te ‘es most eo ecolgynocorae with 0 01 an wih gual aeauance sytem carson Preuss bn sina ncccoderce ih EC 61450 outetea Susor hain bong odin ee ganze eh ea ages Copper contr wth caret tings 21254, 40h anak ‘inte oar housing sere mamber onde pans un ta Gone ie, “iteqesed RAL 1036 cesta ever ed baba Nowy on tego see “ihe sf Seuout wine stone edeea saneard Str ngh asa a] ata wind tape nde on metro arb «Sid pet cap at ampli on fe Dabur ean cave mentage paces witout a nee of riscoated il wh eae ropapcngielaion mate tated coppe concer rin th ves plated sing coo Tapa ps and toes se eles prev misuse and shock by lec by teen fase eath GF option rss prtecton ds. EAE CABLE MANAGEMENT SYSTEMS CERTIFICATES a | ISO 9001 & 14001 Hl SEISMIC TEST CERTIFICATE | FIRE E-90 li TSE TSEK | ml KEMA CE DECLERATION m™ GosT UKRAINE STANDARDS i LEED-GOLD mUL ap EAE ELECTRI INESS UNIT >+0ilRGas Industries ACen sy Bess i cabin FA Hel ts reste sper qty ees ad pret by inh soapet eves we provie airing postin a docuentatin that reread the Neer Pevocelcas Insta anmertl ‘ey inorseicses “Slo secede ot specie blo Vlage an aan Valag neta Dan sta (Cn esi) skrun nomen Focusing on theming the eo te po CAO Wie Span calle der an provi elie 10 20% of ‘hesuppong system ose iy engin sop wi bt pan Alm eh AL Sb eX tari 0 Geld oeerKCAGRE Fea nexacon >>Data Centres AE buss ae rung succestty nhazands ef peje fram en etn rth 100 coutes. = irae seep et cain te soe “Serf Seat et Ropero a to a Fins etre BUSE AR FUNCTIONAL AREAS & MAJOR REFERENCES EAE busbars are running succesfully in thousands of projects from different sectors in more than 100 countries. >> Data Centres (EAE Business Unit) >> oilaGas industries (EAE Business Uni) > Industral Plants Textil Industry / Automotive Industry / Manufacturing Facies / Heavy Industy >» Commercial Buildings Office Towers / Residential Towers / Hotels / Shopping Malls / >> Energy Utilities Power Pants / Solar Pants / Cooling Plants > Service Compounds Hospitals / Universities / Publi tities / Government Buildings >> Transportation Infrastrcta Highway Tunnels / Railway Turnes / Metro Stations/ Airports > oilaGas Industries (EAE Bus ness Unit) | sracteclunemewon —rmsrmma anemone BUSBAR FUNCTIONAL AREAS & MAJOR REFERENCES >> Data Center (EAE Business Unit) > Industiial Plants Complete / Automotive Induty/ Manueetuing Flies Heavy industy BUSBAR FUNCTIONAL AREAS & | eameoworurosci omc [Shem >> Tene Indust / Automotive Indy /Manufactutng Facies Heavy industy es cnn nes BUSBAR FUNC; >> Energy Utilities | >> Commercial Bui > oe Towers Re | ce rm nun oer | ees ca | ifetavron noc sana IONAL AREAS & MAJOR REFERENCES b> ofie Towers / Residence Tower / Hotels / shopping Malls [Seaiacttsame “Soanemaceaces "Remaencrcrcae | {recent See SSeS Sone [mene Sooo” ay | BUSBAR FUNCTIONAL AREAS & MAJOR REFERENCES _ >> Service Compounds >> Hospital /Unnerates / Public ities / Government Buings | cratic une “incor smmece frewmoraenint RELATE FLD = ATOLUDME FS CE enn ‘ALoTowtea exSeEAL STAN ROM. rer aera | eaters “xan ana .ann Etaeeareaeet 2 BUSBAR FUNCTION: AS & MAJOR REFERENCES eae >> Hooptls / Univers / Publis / Goverment Buildings Le £¥% t ‘tam nn oy Seeman Sn orem ot > Transportation Infrastructure > tighway Tunnels Railay Tunnel ‘SXchacuconsecrsser — omanmcsaamansanne aor ren B EAE LV PANEL ENCLOSURES a nub § Moder Sting Erle PS [nab Dy Modu Fo sting Ereloaues 41-55 Fuh Monotoc Encl P 66 ‘Eta E Disb wtetiond PS ‘Bua K canal Syste PES [Eun Temi oes P67 [Enh H Osdoor Enos P55. [bh X sien te endosues P5567 Ech A. Aunt Eosures P5567 sbi B psba Suppo HIGHLIGHTS Ewubh X ur Sein Sailer Stes rocco of PSST Sele a Ceasar Sth Surface optent tases Stel Locke Rast en ge ‘nde Kab ner seston -Foarn-lce Poyurehane ashe, Exabir © Exabind See IN Mond forindoor apetns| me (FS a. 10" Hoge casey ‘Easy Mouming racket \Foan-tn-PlacePojuethaneGabet ‘cburgs Mahal S14 Sok. N= 24522 tone ::90212 66620009) sma inodeoeup cr aa ‘zn ay e298 ap shale Tu Oa ales 2044 Phone :+9021241921 00629) Par" aoai2 500 750, Ema ayeoporigeas ect ssemr EAE LV PANEL ENCLOSURES "htt craze Sany Bogs Za tap sates Tog Oral ads Na 2094490 t eso ISTANBUL Phone :+90212 54926 9s) Foes :vg0212519 3730, Ema: toeanpralepeccgoupcon a EAE AUTOMATION SYSTEMS. i ps. a ed i hb ep en 8800 tata Phone 1090212 51097 13a) Far'" 23021264 3790, Email cenecinbgyeesauppoeegeupcom EAE ELEKTRIK mem accecti.com EAE LIGHTING SYSTEMS veueaelghting.com mo eaecetotkeecom meweaetechnology.com a FAB ec comes Uc rsh Car a @ HH 01:0 Tt emits nd Sa i a eke on Pat Vera ae A. tacos * Ucn hep Qn. ck, ea. nse. tan aceon Novem Pan nar Se Sr sor Si en Scan Dm ee ani Lala + Noa ae hors otis Mae Tas. + Sta aa ein. Oman sa Sa tn Ue Ab te + fab ns arti Tit Ue gia + Sarin ain ke + Sore Tht san, ean oh Mio EAE is in more than 100 countries 2. etc ets ts DEKRA TEST CERTIFICATE tesued EAE Elaik Asana Edu nat San vo Tic AS. ‘Acabugae Mahates 3114 Sokak No 10 54840" Een Itnbul, Tory Fortheprodict — Busbors “rads name “Typatdet Ratings: onufacured by. EAE ElerkAsan6r Enis inasat Sve Te, A ‘Acura Mahal 3114 Soak 4810 aarti, Trey ‘Subject eciroments: Remarks: HH | a Zaaares 1-016, The et tt a “ris Tes Cente old eos Pialearceeh ase “This Tet Corie fant on account ‘Te examination hasbeen ctr at on on sng rode sub manufac. The Ateaton des not lus an ssessrant oth manele Corfermy eis prodcton va the speciale by BEKEA nl he feponsty of Be ‘Annem, 10 Noverber 2022 Number 2270429 02.070 DEKRA Conaton . SL vasjyevs ateston Manager eboney pn "T3188 2000 F 3168.9 43100 weeps tc Coney repaaon lesa SEISMIC QUALIFICATION TESTS FOR EAE ELEKTRIK A.S.’S BUSBAR ENERGY DISTRIBUTION SYSTEMS ‘Technical Report for EAE Elektrik A. Istanbul, TURKEY Prepared by Prof. Dr. E. Safak; Assoc. Prof. A. Kaineliler; Oktay Cirag Shake Table Laboratory Earthquake Engineering Department Kandilli Observatory and Earthquake Research Institute Bogazici University Istanbul, Turkey October, 2009 SEISMIC QUALIFICATION TESTS FOR EAE ELEKTRIK A.$S BUSBAR ENERGY DISTRIBUTION SYSTEMS INTRODUCTION “This report summariesthe resis f seismic qualifiation tests that have been completed ‘onthe Busbar Energy Disribusion Systems manufacuwed by EAE Ella, AS. in Istnbul, Turkey. The tests ae sil in progress, and will continue for additonal seismic inputs and component. AAD ste rae strstr was I forthe tests and all he test specimens were attached {o the frame. The frame was installed on top of the uni-trectonal shake table atthe Deparment of Earthquake Engineering of the Kandi Observatory and Earthquake Research Instiute of Bogavct Univesity in Istanbul, Tukey. The shake table can ‘mle real earthquake motions between O to 30 He for payloads up 1010 tons. 13, Secelerton sensors ane 3 displacement sensors were installed on the test specimens 10 ‘measur thar esponse during the et Figures 1 and 2 show the components of the Busbar Energy Disibution Systems tat were tested, and Figures and 4 the locations of seasors used to measure the response. ‘Tes INPUTS. The tests were performed forfour diferent sets of input motions and only in ve of the rinepal desions. Their motions used ae described below. Input Set Impule-response tests for resonance frequencles and damping rato: Each test specimen was hit hy # hammer in he dietin of table shaking, and its natal frequeney and the damping rao were determined by analyzing the recorded fee vibration. Te astral fresuencies are dtemined by vsing Fourier spec analysis, ‘whereas the damping raion ae eteined by using the logarthnic decrement technique (he, the rate of amplitude decay of tee-vibeaion displacement) Input Set 2» Sine-eat sts based on the TS EN 60068-3-3 Standard: ‘This set uilizessine-bect acceleration inputs based on the recommendations given inthe {nvrnaional SLJEC 69068-3-3. Te patter of sine beat signal shown in Figure 5 Different ‘sine-beat signs sve generated foreach test specimen. The frequency of the sinusoid i the resonant frequency of the specimen determined from Input Set 1. The tnoulating eency is selected such that there are five cycles of resonance freqcy thin each modulating Yequeney. The length ofthe signal includes at least ie axees of based on the worsteaie scenario, assuming a very song earthquake with Richer ‘magnitudes greater than 7, UBC Zone 4, and MSK Intensity IX. The eoresponding peak ‘round acceleration vale, based onthe HC 60068.3-3 5 ns, By incorporating the ‘ructural amplification and directional factor, the peak acceleration vale ofthe test signal is taken as 15 mi ll sine-beat tess. Seismic test cctficats forthe Busbar Energy Distibution Sysiems manufactured by EAE Elektrik AS are given in Appendix a Input Set - Tests base onthe “Certificate of Seemie Compliance” ‘Thies wilizes inputs based on the recommendations given in IEEF-693-1997 and IBC- 2006. ‘The seismic input in the Seismic Compliance requires is defined by the response specta shown in Figure 6 Acceleration time series, whose response spect ‘match to that given inthe figure have been generated by asing spectral matching techniques. The seceleraon are then given tothe shake able ab the stm input for the tests. RESULTS Intaly, minor damage was observed in the connections of two specimens 10 the test frame. The dantaged connections are specific to the laboratory esting, and 8 not represent the acta field applications. Once they were fixed, no damage was observed in any ofthe specimens under test inputs E-Line Busbar Products he “ene rea | AES | woe | ane Stine [Dove otsonins| S| es | seg | ney ae | epee [ss | | om ae | ines [3 | sa-70 [9 [vam Figure 5 pt for Tea Set, snes! seo the TEC 6008-33 Standard the {able for selecting peak asceleration amplitudes (gleannclZ io Xx (CERTIFICATE OW SEISMIC COMPLLANCE oats BE 197 oats a Figure 6p for Tex Se ised nthe Seismic Compliance APPENDIX A SEISMIC TEST CERTIFICATE for BUSBAR ENERGY DISTRIBUTION SYSTEMS }) VIRLAB,S.A SEISMIC Qualification Certificate Delivered on; Wednestay, U1 April 2012 References + VIRLAB test procedure umber 12040282, tse 0, dated 2042012: “Standard Test Procedure for the Seizmic Quaificaion of an Assembly of a PANEINASTER type Elecric Cabinet om "EAB ELEKTROTEKNIK SAN VE TIC AS” and a KXC ope Busbar from "EAE ELEKTRIK ASANSOR END, INSAA SAN. VE TIC. A$" according to IEEE Standard 683-2005 and Europa Stosdard ENGOOBY-33:1993". + Baropein standard EN 60068-%3: 1993: Eavronmental testing ~ Part 3 Guidance, Seismic ests methods or equipments. + North American sandard IEE-693/2008: “IEEE Recommended Practice for Salome Design of Substations European standard EN 60068-2-57: 2000: Entronmantl testing - Part 257 Tests fest FY bration, tine hisory method + Bnropsn stmndard EN 60068-2-6: 2008: Environmental testing Part 2: Test Re Bbraion(imasoldal ‘+ Eiropean standard EN 60068-2-47: 2005: “Fsironmental testing - Par 247: Tests. ountng of specimens fr vibration, impact and similar dynamite fests” Assembly ofa PANELMASTER pp Blcric Cabin! fam “BAB ELEKTROTERNI AS" aed a EXC ge Bashar fom EAE ELEKTRIK ASANSOR END. INS4AT SAN. VETIC. A$." Laboratory Name: VIRLAB, S.A. (cei by ENAC Spanish Natal Accson Ei). ENAC ceificate number S4/LEI3I Laboratory Address: Poligono Industral de Asteasy, Zona B44 Apartado 247 20139 ASTEAU (SPAIN) Equipment tested: An“ ASSEMBLY of a PANELMASTER type Electrical Swi “EAE Beliotelnik SAN ve Tica." anda KXC ope Busbar from "EAE ELERTRIK Asa End Ig San eT A$." 0g ving “Seismic Test Assembly’, dated 18/1221 ~ s Photog included ere below shows the Astembyon the tet lao X Soe Certeate number “12172 Paget 4 ) viniaB,s VIRLAB, S.A, cenifies tht his Assembly has boon tested between the 2 and the 4th of April 2012, sccording to test procedure 204022, issue 0, dated 2104/2012, elaborated in areement with IEEE Standard 693-2005 and Enropean Standard EN6ON6--3:199, slo considering the level applicable (0 GERZE KOCAELI and the Recommended Desig Spectum fo use in TUPRAS RESID Upgrading Project tow clferen levels have been applic + the evel eomesponing to he “igh Required Response Spectrum, 015g" according o THER-693 of 208, that considers a Zr» Period Acceleration, 2PA, of 0.5 pin horizontal direction and 0.4 gin vertical dretion and + the level aoconling to the envelope of GEBZE KOCAELL andl TUPRAS Ri Project that considers ZPA of approximately 0,65 in both horizontal and vf "he havizootal 7PA af oth tere higher than the eomespoing to the AGS AG Reference” defied in Table 3c European standrd EN 60068-3-3: 1993, 05g. The vitcal ZPA of both eves is sso highcr than the coresponding tothe AGS “Ground deceleration Reference” defined in Table 3c European standard EN 60068-3-3: 1993, 025g. {keel le wi fo Is is eed yh Re Regs Sp ind dawn for the 2% danping the comesponding othe HERE-@83 of 2005 and for the ‘ouresponding to he envelope af GEBZE KOCARL an TUPRAS RI 1D Upgrading P yrmee agen 42 (H) vintan.s.a « For boi levels, previously desribed, this Assembly has been submited to five (5) St ($0% $2) ow teste pls ano (1) 82 lve ext, cared out inthe wo main hoezonaldzetons,fon- ack and side side with regan othe Assemiy,simaltanersly with the vertical dretion ) VIRLAR,S.A ‘On the other hand, esonance sec less have ben performed before andar the seismic test performed withthe lve comesponding to IEER-693 of 2008, in the three mains directions ofthe Assembly. 'Novatations higher than the 2% have been found in the resonance frequencies ofthe Assembly “The Assembly has swecessily passed the Seismic Qualification Tests to which it as been subjected, without ny anornay srt deterioration having been detected. “The “Qualification Criterion defined in point 43 of European standard RN 6006833: 1993 has been satisfied tn tet report umber 121732 of VIRLAB, S.A, wl be included al she infermation obtained, with ables, ‘photogmpks and soon ‘VIRLAB representative Cera number 1217320" age VIRLAB —Vibrotion Test Lab VIBRATION Qualification Certificate ENAC supa Delivered on: Monday, 25 March 2020, References: + VIRLAB test procedure number 20031081, isue 0, dated 1003/2020: Test proceae for stsmic qualification of "ELECTRICAL EQUIPMENT" according {0 UBC 1997 (ZONE 4), IEC60068-3-3 (cone 4), IEC 60068-257 an IEC6O98O Iinerotiona Standards” + Unitom Building Code 1997, “UBCI99T" * Intemational Standard IBC6OO68-3-91991: Environmental texting ~ Part 3 Guidance. Seismic texts methods for equpmens. Last eton ofthis standard, edition 20, dated august 2019, which does not include relevant changes relating to “Gevral Seine Clas te", has also been considered in the elaboration oF this te proedare, “+ Ineraiona Standard 1:C60068-2-572013: “Environmental esting ~ Part 2~ 37: Tea FF Vibration -Time-hisory metho? ‘+ Inverational Staiard IECEOBS0/1989: "Recommended Pracice for Seismic Qualification of Class 1E Eauipmen for Nuclear Power Generating Staion + Inversion Standard TECSD068.2-62007: Environmental testing ~ Part 26: Tes Fe: Vbetion (nusoidal ‘+ Ineraiona Standard 1EC6068-2-17/200S: “Environmental testing - Part 2-47 Tes, Mounting of specimens fr vibration, impact and similar dmanietet Laboratory Name: YIRLAB, S.A. (sce by ENAC, Sais Notional Acceso ENAC cenificate number S4/LEL3I Pi Laboratory Address: Poigono Industal de Asteasu, Zona B 44 ‘Apariad 247 20159 ASTEAU (SPAIN) EAE ELEKTRIK ASANSOR END. INSAATSANAYI VB TICARETAS. Equipment tested:One (1) Busbar Assembly manufactured by EAE ELEKTRIK ASANSOR END. INSAATSANAYI VE-TICARET AS “which consis ofthe following items: ents wanber 80370" (SPIE Aig in 73 f Sade C7, te eprom st ina VIRLAB Vibration Test Laborstory ofthe Type: EXC, KXC TL KXC IE © KXA, KXAI, KXA IL = KDC-KDA. OC I-KOA I KM vCMVA CCRE-CCRA, Pictures included here below show the Busbar Assembly on the test platform, in “X" dtetion, licoton, before and after having reinforced the Busbar Assembly. VIRLAB, S.A. centfes th the Busbar Assembly described here sbove has been tested in its oratory of ASTEASU (Spein) on March 11® 2020, a5 described in VIRLAB test procedure number 20031081, issue 0, dtd 1072020, elaborated acoeding to UBC 1997 (Zoe d), ECADOGE33 Zone £9, HEC6068-2 Sand IEC60S80 INTERNATIONAL STANDARDS. ‘The Level applied will be the envelope of + 1EC60068-257 (ZPA-05 2), 201, considers a ZarePexod Acceleration of 0.5 in horigntal.detion, reeching maximum ‘spect acoltations of 15g fr 5% damping (Pie 4! of ICH0068-257 & Fe 1 of CO Sone 20) al 0.25 in vertical oe dec ator of05") {scone the mos i Page 2/5 Ma hg Sn ?42 1 Si DAE E307. Abs reef ‘ie cetiee VIRLAB. “The Rusbar Assembly has ben submitted tothe tests described here below: > Resonance search ts, between | and 35 Hz, with an acceleration level of 0.1 g ata ate of ‘octave per minute, Inependently performed in each one of the thee main directions ofthe Equipment, Horizon, "X",Netical"Z" and Horzomal,"¥". corresponding (0 UBC 1997 ZONE 4, AGS an level, 30 secon duration, applied in beth "XZ" and "YZ" dretons. ‘The applicable Requzed Response Spoctea, RRS (5 danping) for bth he horizontal (7 and ‘vertical dretons, re the described in figures included here below number 2030970" Page 15 NOI ri cn 342 fd C87, ta i ethene Siu aie sass VIRLAB. Vibration Test Laboratory ‘RRS in Vera recon (eve XS oa cn 1 eh i Sy co i OTE dy mitn 43S BONSCI2S307 wmf tenet Se msn oe VIRLAB. Vibration Test Latiorstory ‘Alter performing the Resonance Search tests in Horizontal “X rection (re manbr 1) ad in Vertical “2° direction (Te mmr 2, its observed that the suctre is wt egid enough to perform the setante ‘ess comet, so itis decided to reinforce the Equipment, scan be sez in pitaes below: Alter reinforcing the Eguipment, the Busbar Assembly has sucessfully passed the Seismic Tess to Which i has teen subjected, 0 structural anomaly being detected inthe final visual inspection eeformed atthe Laboratory Test report number 203037 of VIRLAB, S.A. includes all the information obtained, with tables, photographs, used measuring devices calibration setifcates, and othe elvan! information, VIRLAB, S.A. Division of URBAR INGENIEROS, 5. Revised and ashorized by: Canted out by mado mado Stee Sainte or ae 1. tm ‘cha 2020.08.23 2020.03.28 Juan Antonie PEREZ Laboratory Manager (ran, / es %) ahh Crteat umber “2000070 NSES Page 515 ME: gs Sein 421 mind SOC 9497 el the free eg tenes ae ‘set sail) “st EAE ELEKTRIK ASAN.END.INS.SAN.TIC.AS. TEST REPORT ‘scoPe oF WORK ‘Coon Sale Tet (Materia: 1A 8 KX HAE KXCI, KXA BKC, CCRC CERAM) REPORT NUMBER zonodosseTuR-co2 ISSUE DATE 25.12.2020 PAGES 1“ PROJECT NUMBER TuRE-a20.621.1 TESTING LABORATORY PREPARING THE REPORT INTERTEX TEST HIZMETLERI A ELECTRIC LABORATORY (© 2020 TEREX tintertek “ota Quay Asse Fem UPTEMEATRCOP-O7Y Ree W127. 052020, ‘TEST RAPORU (/TESTING REPORT as2a0%0 {casio at tet or painted ain (C5 lai) ao x, 49 AANA EH, CORE CHA (rd Tan Produc Description Fea si ‘oman Nome Fema Adres Aeompany adaess onal Kis & Ponisyonu: Hontact Poston ayn Marve Yen Bushar Sytem fEnergy dstrbutlon systems EAE ELEKTIK ASAUEND.NSSANZTICAS. Akgaburgaz Mab, 314 Sk Nos10 34522 tsenjut anu TURKEY Merve Yin &Tecical Research Engineer Ieins dratusinds,ntetekorkie ork ellen Getler said standart kapsamnda tester uygulanmtr: ‘180 9227:2017 (2 edton + TSENISO 12910.6:2018 SSONUG: Yukandaistandortra re test elon itn grup CS sin gegmi Dear Merve Yen sper yourreques, wea Inert Tarkey have performed the est fr the meationed product according tothe stordards dow bet ‘180 92272017 (th Edn) + TSewis0 1254862018 RESULT: The product groups teed tthe above standordsbove passed the CS cos (MernanaerSn es Fuca tis ewsowestoy ‘mateccoms raschoyam ioe ‘tartan Sah te wn A 0028 tintertek “ota uay Assured FomLFTEMEA TROP a7 Re. ¥27 05.2020 ‘Bq; VURU SAO TARAFINDAN sAGLANAW tAOHENDISLc NUMMUNELERINE iN BILLER: (AMFORMATIONS FOR ENGINEERWG SAMPLES PROVIDED BY APPLICANT. roy pry Pn Tah s.ssax "EAE(e) specen——_ Engeeting sample 28082020 AZO AE(sie specmen__Enpnecring sample 25082000 4 160922722017 2. TSEISO 12944.65:2038 tans ee ‘rowers wn Esme. pass fen tec ea rym SS acer intertek Tot! ality Asie. Foon LF-EMEA-TROF Or Rev V27 05.200 “TesT METODU VEVARIS: (TEST METHOD AND APPLICATION 7. Method for evaluating catinet corrosivity 7A General Te clk threo and ety fhe est reste ae pace of appara. Stent ere rss ees eh parte gle iris doer Z2i0 Se, De sri tine he tect “Todetrnie th consi othe tts. ference pedinens mse seca bese ‘Ava compe tn elas simon eo ate gh pity ae re cies a ‘Soebremovel ute stein cto termine coro api his het eed ‘exe 712. Reterence specimens “pvt th parte tes ree pce 0m +02 hos ak ‘Bohm oath gnc cesta snk nee ea rae ‘Sc3a all stnea wendevino ote po s-08 05} eter ‘Secon rm lle ines ‘ean he sce secs cau, ney ert eg Bes the speci eek Se a ect a “tool ean th ec pins th an apap nec lvat uaydctbon Taltaratfaet esa fair ae sean dere Cary ott angina) SEMURSE Ars Seheeee speincns teksten ren ‘Siiemowtlesoutag rsa an these tim Tired ee retro cts imcepoteced teste sob 72. Arrangement othe relerence specimens TEL Lt cen ms ing enka) eth oo ce are the Rerireestend eee ere face ie etna Hebei icine demure ‘TELatartie specimens donor ech ther overs the bie shale ie wi vse ‘cine te lic hme he et Th tin pede al be pred ‘Shatin snme seta rte ns tintertek Total Quay Asued Fao LFT-EMEA TROP.079 Rew 27052000 7A Determination of mas loss (mass perarea) At the en ofthe est with dation acordig to Tale 2, amet take the reference spetnens oat ‘the test eabne and cenore the proce coating eave the corrosion rods mechan Schema eaing, as dese in 6407 An option or heal deans the wse os salon setae cto 20% st ammonim crate fH) Her] Ocoee sai ea) ‘After each siping thoroughly death reference specinens at ambient temperature veh water ‘hth than lowed dying Weigh the referenc specnens tothe nearest mg Dvie the determined mas las y the area the "posed surtaceaeaot terrence specoen horde assess the etal ass oss per square metre Silnereremes oprcoone es recommeded that sly prepared solution be wd during etch procede fr the rmnval of ‘oresion prods 7.5. Satisuctory performance ofeabinet ‘The cabinet has performed atistetorly the mass lst of te reference specinen fs within the allowed ranges given in ae? ‘Table — Allowed range cfmnes oa ofthe tes reference specimens during verification of the corvosivity ofthe cabinet on gma cs 7038 NOTE See Ase fr we tsnerfrence specs chelsea eta ese ae ‘enavanemactenn eae itor yo ocean ‘tng PRN Mma vv He tintertek “oa quay Assured FomUPTeMea TR OF or Rev2708.200 8 Test specimens S81 The number and typeof tet specitens, their shape ater dimensions shal be sete in accordance With the specication forthe ater or product elng tested, Whe ot specte, thse rameters shal be tutaly aged between the interested aries Unless there speed fr agreed, test specimens with an onpante coating to be tested shall be nude fom bused seo! ‘omying with 80 1514, an of pprotnatedannsions iso qn x 100 hs 1 unex deserts lowest spectene th organ coatings ae to be prepared fr testing Anes ies supplementary ‘hforstation needed for estngtest species wit organic ote 182 the test specimens shal be thoroughly cleaned efore testing ot otherwise specied. The ‘leans metiodeaspayed sal depend othe state of he mtr te surface athe conta $n shal ot ine the we ony abrssvesor oes which map tac the surf of he pees ‘Cae sha be taken that test specinens arenot contaminated after leaning by careless handing 83 Ifthe test specimens arcat out fom a larger coated arti cttng sal be carved out in such ay that the contig Isnt camage in the area aaceat fo the cut Unless otherwise spete, the ‘xt egos shall be adequstely roteted by coating them wh a suable tera which remain stable “der the conditions ofthe teat suchas palit wax rset tape. 9 Arrangement ofthe test specimens ‘he sway om theatomtaee test specimen shall in principle be flat and placed in the cabinet facing upwards at an angle as close 2, Possible to20"tothevertea Tis angle shal alee, be wt the ints of 15" 025" n he case of [regu surtaces, for esampl ete components, heels salle adeedto as ose 5 posse 93 the test specimens al be araed so tht they donot come ito contact with he cabinet ae {otha stufee ube tested seesposed to ee cation of spray Theta specie nay be placed tae eel tn te cabinet as lng asthe sltion doe ot dip om est speciexs othe Sports ston lve oto tet tet spetns placed below Hovrerey fra nw exanation fo Tests witha total dation exeting 6h locaton periutation ote specimens sper ‘94 the suppors othe tet specimens shal be made of er non-metal ata fi neces” {ovsspend et species the tetera oa sal ot be metal bt sal be syne fe, cotton theater ier inslstng water See prose Eee E3SSe Prod

You might also like