ADMF BDS UF-DF-3 Setup and SIP Work Instruction
2 Objectivea
The objective of this work instruction is to detail the setup and Steam In Place (SIP) of
the Ultrafiltration/Diafiltration (UF/DF) 3 Retentate vessel (VE-101713 or VE-101723)in
the Bulk Drug Substance (BDS) at Alexion Dublin Manufacturing Facility (ADMF). This
includes set-up for SIP, the pressure hold test and the SIP operation.
1.5” – ¾” Reducer
Navigate to VE-101713
6.1.6
or VE-101723 on MCS.
As per ALXN-SOP-0005582
As per ALXN-SOP-0005582
Gaskets must either have been cleaned
in place or cleaned out of place in the
parts washer and be within Clean expiry.
Inspect gaskets as per ALXN-SOP-
0005850
Confirm filters to be
6.2.13
installed (Part#100043)
are within expiry on
MES.
Perform visual As per ALXN-SOP-0005603
6.2.14
inspection of filters
prior to installation.
Charge filter
6.2.15
(Part#100043) to
process order.
Signals Step Instruction Guide
As per ALXN-SOP-0005582
Gaskets must either have been cleaned
in place or cleaned out of place in the
parts washer and be within Clean expiry.
Inspect gaskets as per ALXN-SOP-
0005850
Confirm steam-thru
6.3.1
manifold (Part# 101103)
is within expiry on MES.
Figure 2: Port A2
As per ALXN-SOP-0005582
Gaskets must either have been cleaned
in place or cleaned out of place in the
parts washer and be within Clean expiry.
Inspect gaskets as per ALXN-SOP-
0005850
Signals Step Instruction Guide
Additional Information
Table 5: Eculizumab Transfer Panel Configuration
Confirm Novaseptum
6.5.1
sampling bags and Leur
lines to be installed as
per applicable pBR are
within expiry on MES.
Perform Visual As per ALXN-SOP-0005639
6.5.2
inspection of Table 7: Installation of Novaseptum
Novaseptum sampling Sampling Bags and Leur lines for Eculizumab:
bags and Leur lines prior Novaseptum Sampling Vessel
to installation. Units
5x50mL 101165 VE-101713
VE-101716
50mL 101166 VE-101713
Leur Lines 101167 VE-101713
VE-101716
Charge Novaseptum
6.5.3
sampling bags and Luer
lines to the process
order.
VE-101723 S1 Port
As per ALXN-SOP-0005582
Gaskets must either have been cleaned
in place or cleaned out of place in the
parts washer and be within Clean expiry.
Inspect gaskets as per ALXN-SOP-
0005850
Perform Visual
6.5.9
Inspection of
Novaseptum Leur Lines
(Part#101167) prior to
installation
Charge Novaseptum
6.5.10
Leur Line (Part#101167)
to the process order
Signals Step Instruction Guide
VE-101716 S1 Port