METHOD STATEMENT
WORK ORDER NO: 1179146
The aim of the present document is to provide procedure for performing shoring of the excavated area to
protect collapsing in the remin plant.
AMANCO team will carry out this activity.
‘ork will be Undertaken in accordance with the following documents
> Risk Assessment
>PTW Access (Permit to Work)
SUMMARY OF EQUIPMENT CAN BE USED
Common Tools
>All PPE as per safety requirements
DESCRIPTION OF THE WORK
PRODECDURE:
Obtain work permit from the shift controller.
‘Make Sure Method statement and Risk Assessment in place
Ensure that the work is being carried out on correct location.
Before starting shoring hard barrication required and put some sign board that are
visible from the distance.
Existing excavation required proper shoring to protect collapsing.
Back filling of excavated area after MMD clearance.
Make sure the housekeeping activities is done at workplace.
Inform the fire station CCR and field operator after completi
9. Close the work permit,
SAFE METHOD OF WORK
Before work will commence Acceptor will prepared POWRA.
pene
of the activity,
All personnel should carry the following PPE
> Safety shoes. Safety glasses
> Hardhat — >coverall
> Appropriate gloves ® Face Mask f UA