The aim of the present document is to provide a procedure for performing Scaffolding for erection &
dismantle of access platform in HRSG-2.
Risk Assessment
PTW (Permit to Work)
Scope of Work:
Scaffolding Install/Dismantle required and Perform Insulation removal/fixing work: HRSG-2 BFP-A
RECIRCULATION LINE VALVE (P22LAC11AA001) PASSING.
Prepared by Approve by