Professional Documents
Culture Documents
Catalogo de Sistemas para Barandales 2020
Catalogo de Sistemas para Barandales 2020
Print Jan,2020.
Product Catalogue
Post Railing Systems Typical
GUANGDONGKINLONGHARDWAREPRODUCTSCO.,LTD.
No.3, Jian Lang Rd., Daping,Tangxia Town, Dongguan City, china.
T:0086-769-8216666682136666
F:0086-769-82955240 82955241
E:mail@kinlong.com www.kinlong.com
H:www.kinlong.com
Content Introduction for Product Material
一 、Selection of Stainless Steel Material
The followings are primary material properties
Balustrade Pillar Series 06
Single-plate Pillar 07 Stainless steel hot-rolled sheet is mainly made of material 316L、304 which
Double-plate Pillar 15 conform to standard ASTM A666;
Circular Tube Pillar 23 Stainless steel cold rolled sheet is mainly made of material 316L、304 which
Square Tube Pillar 27 conform to standard ASTM A240/240M;
Rectangular Tube Pillar 29 Stainless steel decoration tube is mainly made of material 316L、304 which
Flagpole Pillar 31 conform to standard ASTM A240/240M、ASTM A 269;
Lighting Pillar 33 Stainless steel industrial tube(or seamless tube is mainly made of material
Installation Instructions 35 TP316L、304 which conform to standard ASTM A269;
Stainless steel rod is mainly made of material 316、304 which
conform to standard ASTM A276;
Pillar Fitting Series 39
Casted stainless steel is mainly made of material CF8M、CF8 which
Point-supported Balustrade Bracket 41
conform to standard ASTM A743/A743M;
Fin-supported Balustrade Bracket 45
Glass Clamp 50 Note: Please note the requirement of material when you place the order.
01/02
30
⑤ Rainbow-like stripes emerged on surface of stainless still are caused by excessive use of
detergent or oil, and they could be washed up by warm water.
STAINLESS STEEL ⑥ Rust caused by contaminants could be washed up with liquid contains 10% of nitric acid or with
MAINTENANCE ELUCIDATION special detergent.
⑦ Cement and mortar splashed onto stainless steel should be washed away before they get
solidified, or it will be difficult to eliminate them with stainless steel intact.
Ⅰ Precautions for Storage and installation
⑧ Contaminants such as scum caused by using of tools, dusts produced by using of
① Goods should be avoided being scratched and bruised when unloading; abrasive cut-off wheel, splashed slag created when oxyacetylene flaming, and carbon steel
contaminant caused by long-time-contact with carbon steel, could be eliminated with
② Goods should be stored in dry and ventilated place, and avoid being caught in the rain, being
special glue or liquid contains 10% of phosphoric acid, then ammonium hydroxide, and at
struck, or being corroded by corrosive medium;
last cold water; or with oxalic acid wets stainless steel for 15 minutes, then wash up with
③ Measures need to be taken to protect the surface of pillars and their accessories from being cold water, and dry at last.
contaminated by cement mortar and dust. Pack the products with paper or cloth that can resist
water and dust. Acidic or alkaline liquid is forbidden to contact with the goods; Ⅲ Precautions for daily maintenace
④ Fix pillars onto ground with expansion bolt or through welding on embedded parts, and fix pillar ① Wipe surface of stainless steel, especially mirror-finished stainless steel, with soft cloth to avoid
accessories onto pillars with rivet or screws, or through welding on the pillars. damaging products. Wipe along the grain on the surface when it comes to drawbench-surface
⑤ Insure there is no mounting pads and gaskets been neglected. ② It should be avoided to use scrubbing solution with bleaching composition, steel-wire-ball or
⑥ Coat expansion bolts with anaerobe in advance when screw nuts in case they get loosened; lapping tool to wash up stainless steel. Do not forget to clean up with water after washing up.
⑨ Stainless steel products should be cleaned and maintained regularly, as they will get rusted in
terrible environment.
Ⅳ Maintenance Period
Stainless steel products should be cleaned once to twice one year. Different maintenance
Ⅱ Common contaminants and clearning methods of stainless steel period could be adopted according to local environment the products applied.
① Soap and some other weak detergents could be used for dusts and other contaminants which
could be eliminated easily; Environment Industrial District Coastal District
④ If there are decolorizer and other acid liquid stick onto surface, wash up immediately with water, without
Contaminants 1~2 2~3 3~4 4~5 3~4 4~5
and then with ammonia solution or neutral soda liquid, and at last with neutral detergent or Accumulated
In-Door
warm water. with
Contaminants 2~3 4~5 4~5 5~6 4~5 5~6
Accumulated
03/04
30
Stainless Steel Balustrade Pillar Series
Product Features:
05/06
30
Single-plate Pillar: HLBD2AB
∅5
0
160
1100
600
8
55
Material: 304
Surface Finish: Satin
Glass Thickness: 12~17.5mm
230
Bilateral Pillar
Stone Material
07/08
30
Single-plate Pillar:HLBD2
∅5
0
1100
600
80
10
Unilateral Pillar
09/10
30
Single-plate Pillar:HLBD12
∅5
0
45
1100
600
8
Stone Material
Stainless Steel Baseboard
100
90
11/12
30
Single-plate Pillar:HLBD13 Single-plate Pillar:HLGD1
Material: 304/316L
Surface Finish: Satin
Glass Thickness: 12~17.5mm Material:304/316L
Surface Finish: Satin
Troughed Rod Diameter: φ10
Bilateral Pillar
Stainless Steel Buckle YM17
13/14
30
Double-plate Pillar: HLBS15
55
1100
600
8
Material: 304/316L
230
Bilateral Pillar:HLBS15-M
Unilateral Pillar:HLBS15-L/HLBS15-R
15/16
30
Double-plate Pillar: HLBS16
60
1100
8
550
8
LJW02 Elbow
Base Plate LJG01
17/18
30
Double-plate Pillar: HLBS17
Material:304/316L
Surface Finish: Satin
Glass Thickness: 13.5/17.5mm
19/20
30
Double-plate Pillar: HLBS18
Material: 304/316L
Surface Finish: Satin
Glass Thickness: 12~17.5mm
Note: The pillar doesn't contain baseboard.
Stone Material
21/22
30
Circular Tube Pillar:
HLBY1
∅5
0
1100
530
∅50.8*2.0
Bilateral Pillar:HLBY1-B04AFM
Unilateral Pillar:HLBY1-B04AF
23/24
30
Circular Tube Pillar:
HLGY1
Material: 304/316L
Surface Finish: Satin
Note: The pillar doesn't contain cover plate,
but it can be matched additionally.
LJW01Elbow
25/26
30
Square Tube Pillar:
HLBF1
∅50
530
1100
40*40*2.0
300
Material: 304/316L
Surface Finish: Satin
Glass Thickness: 12~17.5mm
Note: The pillar doesn't contain cover plate,
but it can be matched additionally.
Unilateral Pillar
27/28
30
Rectangular Tube Pillar:HLBJ5
25
1100
75
Material: 304/316L
Surface Finish: Satin
Glass Thickness: 12~18mm
Bilateral Pillar:HLBJ5-LT14M
Unilateral Pillar:HLBJ5-LT14
29/30
30
Flagpole Balustrade Pillar:
HLQB1
Material: 304/316L
Surface Finish: Satin
Glass Thickness: 12~17.5mm
Product Features:
Flagpole staircase pillar is commonly used in the place like
shopping mall, atrium, etc; .The post railing fits together
perfectly with flagpole which makes the appearance simple and
generous. It is convenient to change AD flag.
31/32
30
Lighting Pillar: HLMD2
Material: 304/316L
Surface Finish: Satin
Glass Thickness: 12~17.5mm
33/34
30
Installation of
Step 3: Installation of Handrail
Post Railing on Ground Step 3
a. Measure the needed length of handrail ,and determine the fitting needed.
b. Drill holes to screw in bolt, and fix handrail on the wall.
c. Sleeve cover plate around the handrail, and sleeve the handrail around the base
plate, then place the handrail onto the handrail supporter, adapt the handrail to
Step 1 :Setting-out Route and Drilling Hole supporter, and then connect them through welding or with bolt.
d. Weld handrails with elbow at turning, and welding is adopted when connecting two
Ⅰ. Fixation of Expansion Bolt pieces of handrail.
35/36
30
Installation of
Post Railing on Staircase Step 3 Step 3: Installation of Handrail
Step 4
Step 4 : Middle Pillars Installation
a.Determine the installation sites of middle pillars by closing the pillars on handrails,
and mark on the determined sites.
b.Drill holes and fix pillars, then connect handrails.
Step 2
1 2 3
4 5 Step 5
Step 5 :Glass Installation
37/38
Calculation of axial and radial load for model selection
Pillar Fitting Series
2、Axial Force
F x =q*B*H/n x
3、Radial Force
F y =1.2G k /n y
39/40
30
Point-supported Balustrade Bracket Point-supported Balustrade Bracket
1 2 3 4
T06M Material: CF8/CF8M T06 Material: CF8/CF8M
Surface Finish: Satin/Mirror Surface Finish: Satin/Mirror
Glass Thickness: 12~17.5mm Glass Thickness:12~17.5mm
Fx Recommended value≤550N Fx Recommended value≤550N
Fy Recommended value≤500N Fy Recommended value≤500N
41/42
Point-supported Balustrade Bracket Point-supported Balustrade Bracket
T11L
43/44
Fin-supported Balustrade Bracket Fin-supported Balustrade Bracket
45/46
Fin-supported Balustrade Bracket Fin-supported Balustrade Bracket
LT08 Material: CF8/CF8M LT09 Material: CF8/CF8M LT14 Material: 304/316L LT15 Material:CF8/CF8M
Surface Finish: Satin/Mirror Surface Finish: Satin/Mirror Surface Finish: Satin/Mirror Surface Finish: Satin/Mirror
Glass Thickness: 12~17.5mm Glass Thickness: 12~17.5mm Glass Thickness: 12~17.5mm Glass Thickness: 17~22mm
Fx Recommended value≤600N Fx Recommended value≤600N Fx Recommended value≤400N Fx Recommended value≤2000N
Fy Recommended value≤600N Fy Recommended value≤600N Fy Recommended value≤300N Fy Recommended value≤800N
47/48
Fin-supported Balustrade Bracket Glass Clamp
LT19M Material: CF8/CF8M LT19 Material: CF8/CF8M B03AP Material: CF8/CF8M B03AF Material: CF8/CF8M
Surface Finish: Satin/Mirror Surface Finish: Satin/Mirror Surface Finish: Satin/Mirror Surface Finish: Satin/Mirror
Glass Thickness: 12~17.5mm Glass Thickness: 12~17.5mm Glass Thickness: 12~17.5mm Glass Thickness: 12~17.5mm
Fx Recommended value≤600N Fx Recommended value≤600N Fx Recommended value≤600N Fx Recommended value≤600N
Fy Recommended value≤800N Fy Recommended value≤800N Fy Recommended value≤600N Fy Recommended value≤600N
1 2 3
49/50
Glass Clamp Glass Clamp
Glass Hole Opening Diagram Glass Hole Opening Diagram Glass Hole Opening Diagram Glass Hole Opening Diagram
(for reference only) (for reference only) (for reference only) (for reference only)
玻 璃开 孔图
Glass Hole Opening Diagram Glass Hole Opening Diagram
(for reference only) (for reference only) (仅 供参考 )
玻璃 开孔图
( 仅 供参 考)
51/52
Glass Clamp Glass Support Fitting Series
Handrail Tube
Handrail Connector
1 2 3 4
53/54
Glass Partition Support Fitting Glass Partition Support Fitting
Step 2
Step 1 Step 3
Step 4
YM03B Material:304/316
Surface Finish: Satin/Mirror
Glass Thickness: 12~17.5mm
Step 5 Step 6
55/56
Glass Partition Support Fitting Aluminum Alloy U Groove
YM18
1 2 3 4 5 6
Cover Plate U groove Gasket Gasket Cylinder Head Screw Nut Rod End cap
(YM18-02) (YM18-04) (YM18-03) (YM18-01) (CAM-D-10N) (YM18-07)
Material: 304/316L Material:6063-T6 Material: ABS Material: ABS Material: 304+Q345B Material: 304/316L
Surface Finish: Satin/Mirror Glass Thickness: 13.5/17.5mm Quantity:4 pcs/m Quantity:4 pcs/m Quantity: 4 pcs/m. Surface Finish: Satin/Mirror
Length: L≤3000mm Length :L≤6000mm Note: It doesn't contain chemical medicament, please consult anchor
product department for chemical medicament (CAG-12)
57/58
Aluminum Alloy U Groove Aluminum Alloy U Groove
YM19 YM21A
1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7
Front Decoration Panel U-groove Accessories U-groove Base Plate Shim Shim Self-tapping Screw Back Decorative Panel Cylinder Head Screw Nut Rod End cap Gasket Cover Plate U-groove Accessories Shim Shim Countersunk Screw Nut Rod End cap
(YM19-03) (YM19-02) (YM19-04) (YM18-03) (YM18-03) (GB/T 846 ST5.5) (YM19-05) (SZP-Y-M10) (YM19-07) (HJT01-1/-2/-3) (YM21A1-3A) (YM21A1-1) (YM21-2) (YM21-1) (CAM-D-10C) (YM21A1-4)
Material: 304/316L Material: 6063-T6 Material:6063-T6 Material: ABS Material: ABS Material: 304 Material: 304/316L Material: Stainless Steel Material: Stainless Steel Material: EPDM Material: 304/316L Material:6063-T6 Material: ABS Material: ABS Material: 304+Q345B Material: 304/316L
Surface Finish: Satin/Mirror Glass Thickness: 13.5/17.5mm Length :L≤6000mm Quantity:4 pcs/m Quantity:4 pcs/m Surface Finish: Satin/Mirror Quantity: 8 pcs/m Surface Finish: Satin/Mirror Surface Finish: Satin/Mirror Glass Thickness 13.5/17.5/21.5mm Quantity:4 pcs/m Quantity:4 pcs/m Quantity:4 pcs/m Surface Finish: Satin/Mirror
Length: L≤3000mm Length :L≤6000mm Length :L≤3000mm Length: L≤3000mm Length :L≤6000mm Note: It doesn't contain chemical medicament, please consult anchor
product department for chemical medicament (CAG-12)
59/60
Aluminum Alloy U Groove Aluminum Alloy U Groove
YM21B HCU01
1 2 3 4 5 6 7
Gasket Cover Plate U-groove Accessories Shim Shim Countersunk Screw Nut Rod End cap
(HJT01-1/-2/-3) (YM21B1-3A) (YM21B1-1) (YM21-2) (YM21-1) (CAM-D-10C) (YM21A1-4)
Material: EPDM Material: 304/316L Material:6063-T6 Material: ABS Material: ABS Material: 304+Q345B Material: 304/316L
Surface Finish: Satin/Mirror Glass Thickness 13.5/17.5/21.5mm Quantity:4 pcs/m Quantity:4 pcs/m Quantity:4 pcs/m Surface Finish: Satin/Mirror
Length: L≤3000mm Length :L≤6000mm Note: It doesn't contain chemical medicament, please consult anchor
product department for chemical medicament (CAG-12)
Installation Method
1 2 3 4 5 6
Gasket Back Decorative Panel Front Decoration Panel U-groove Accessories Shim Shim
(HJT01-1/-2/-3) (HCU01A1-3) (HCU01A1-2) (HCU01A1-1) (YM21-2) (YM21-1)
Material: EPDM Material: 304/316L Material: 304/316L Material: 6063-T6 Material: ABS Material: ABS
Surface Finish: Satin/Mirror Surface Finish: Satin/Mirror Glass Thickness: 13.5/17.5/21.5mm Quantity:4 pcs/m Quantity:4 pcs/m
Length: L≤3000mm Length: L≤3000mm Length :L≤6000mm
Steps 1 Steps 2 Steps 3
7 8 9 10 11
Cylinder Head Expansion Bolt Cylinder Head Expansion Bolt Self-tapping Screw Cap Liner 1 Cap Liner 1
(SZP-Y-M10) (SZP-C-M8) (GB/T 845 ST5.5) (HCU01A1-4) (HCU01A1-5)
Material: Stainless Steel Material: Stainless Steel Material: Stainless Steel Material: 304/316L Material: 304/316L
Quantity: 4 pcs/m. Quantity: 4 pcs/m. Surface Finish: Satin/Mirror Surface Finish: Satin/Mirror
61/62
Aluminum Alloy U Groove Aluminum Alloy U Groove
Glass Height(mm)
Load Capacity
1000 1100 1200 1300 1400 Glass Height(mm)
Load Capacity
Wind Load (KPa) 4 3.2 2.8 2.4 2 1000 1100 1200 1300 1400
Live Load(KN/m) 2 1.6 1.4 1.2 1 Wind Load (KPa) 0.8 0.64 0.56 0.64 0.4
The load capacity is for U groove system, not glass Live Load(KN/m) 0.4 0.32 0.28 0.23 0.2
Structural calculation required for suitable solution
Live load is assumed to apply on the top edge of glass The load capacity is for U groove system, not glass
The load capacity is for wind load or live load,not a combination Structural calculation required for suitable solution
Live load is assumed to apply on the top edge of glass
The load capacity is for wind load or live load,not a combination
NO. Name Code Qty Material Remarks
1 Gasket INH203A 1 EPDM NO. Name Code Qty Material Remarks
8 Anchor Bolt CAM-D-10C 4 Pcs/m 304+Q235B 7 Anchor Bolt CAM-D-10C 4 Pcs/m 304+Q235B
Glass Height(mm)
Load Capacity Glass Height(mm)
1000 1100 1200 1300 1400 Load Capacity
1000 1100 1200 1300 1400
Wind Load (KPa) 3 2.4 2 1.8 1.4
Wind Load (KPa) 6 5 4 3.4 2.8
Live Load(KN/m) 1.5 1.2 1 0.9 0.7
Live Load(KN/m) 3 2.5 2 1.7 1.4
The load capacity is for U groove system, not glass
Structural calculation required for suitable solution The load capacity is for U groove system, not glass
Live load is assumed to apply on the top edge of glass Structural calculation required for suitable solution
The load capacity is for wind load or live load,not a combination Live load is assumed to apply on the top edge of glass
The load capacity is for wind load or live load,not a combination
65/66
Handrail Supporting Connected to Glass Handrail Supporting Connected to Glass
ZCF16R
ZCF02 Material: CF8/CF8M ZCF03 Material: CF8/CF8M ZCF16M Material: CF8/CF8M ZCF16L Material: CF8/CF8M
Surface Finish: Satin/Mirror Surface Finish: Satin/Mirror Surface Finish: Satin/Mirror Surface Finish: Satin/Mirror
Glass Thickness: 12~17.5mm Glass Thickness: 12~17.5mm Glass Thickness: 10/12 mm Glass Thickness: 10/12 mm
ZCF05 Material: CF8/CF8M ZCF06 Material: CF8/CF8M ZCF30 Material: 304/316L ZCF31 Material: 304/316L
Surface Finish: Satin/Mirror Surface Finish: Satin/Mirror Surface Finish: Satin/Mirror Surface Finish: Satin/Mirror
Glass Thickness: 12~17.5mm Glass Thickness: 12~17.5mm Glass Thickness: 12~17.5mm Glass Thickness: 12~17.5mm
67/68
Handrail Supporting Connected to Glass Handrail Supporting Connected to Wall
ZCF34 Material: 304/316L ZCF36 Material: 304/316L ZCF18 Material: CF8/CF8M ZCF20 Material: CF8/CF8M
Surface Finish: Satin/Mirror Surface Finish: Satin/Mirror Surface Finish: Satin/Mirror Surface Finish: Satin/Mirror
Glass Thickness: 12~17.5mm Glass Thickness: 12~17.5mm
69/70
Handrail Supporting Connected to Wall End Cap
71/72
Connector Elbow
50.8 50.8
44.5 1.2/1.5/2.0 44.5 26 1.2/1.5/2.0
38.1 38.1
73/74
Elbow Base Plate
LJG01 Φ D LJG02 Φ
Φ50.8 85 Φ50.8
Φ44.5 80 Φ44.5
Φ50.8 1.2/1.5/2.0
Weld
LJG06
HSJG01
75/76
Cover Plate Cable-strut Accessories
LJZ01 Φ D LJZ02
45
90
52
LJZ03 LJZ04
Steps 1 Steps 2 Steps 3 Note: Above content quoted from GB/T 9944 《stainless steel wire ropes》
77/78
Micro Cable Accessories Anchor
A-W
XS01 XS02 XS03 XS04 XS05 XS06 XS07 XS08 XS09 XS10 XS11 XS12
79/80
Anchor Micro Bar Accessories
Note:5mm L 7mm
D01-W
A08-W
B02-W
XG01 XG02
XG03 XG04
G-W LJ-6
XG03
XG02
XG01
T-W LJ-7
12
14
14 18
18
81/82
Installation Diagram of Micro Cable Post Railing System
(Vertical Line) Pillar
Handrail
Note: The platform is not recommended to use the horizontal steel cable post railing system.
This type of post railing is suggested to be used at the staircase and slope places.
Steel Bar
Steel Bar
Handrail
Connector
Clamp Plate
Bayonet Lock
Anchor
83/84
Assembled Staircase Accessories Series Assembled Staircase N01
85/86
Assembled Staircase N02 Assembled Staircase N03
Note: Adjacent steps must be connected with connecting rod. Note: Adjacent steps must be connected with connecting rod.
87/88
Assembled Staircase Accessories Assembled Staircase Accessories
89/90
Canopy Beam Metro Products
DTD03 Blind sidewalk plate (Prompt Block) DTT02 Blind sidewalk plate (Travel Block)
Material: CF8 /CF8M Material: CF8 /CF8M
Surface Finish: S a t i n Surface Finish: S a t i n
91/92
Sheet Metal Products Commonly Used Pipe Specifications
Stainless Steel Material: 304/316L Note: Sheet metal unfolding size is less than
Column Covers Surface Finish: Satin/Mirror 1500mm and the length of the size is less than
Panel Thickness T: 1.2/1.5/2.0/2.5mm 3000mm. All products should be customized
according to the project requirement.
a*b a*b
10 15.9 25.4 30*60 40*80 30*60 40*75
31.8 38.1 50.8 46*100 50*120 50*110
60.3 63.5 76.2
Circular Tube Elliptical Tube Flat Elliptical Tube
a*b 40*60
a*b 40*80
t*h 24*24 t*h 15*15 (40*40) t*h 24*24
常⽤壁厚 1.0 / 1.2 / 1.5 常⽤壁厚 1.0 / 1.2 / 1.5 常⽤壁厚 1.2 / 1.5
Elliptical U Tube Square U Tube Rectangular U Tube
Note: Above specifications are for your reference only. Any other specification is required, please consult us.
93/94
Common Fasteners Matching Table Post Railing Project Cases
Bracket Fastener
Hexagon Socket Countersunk Screw (DIN 7991) Beijing Capital International Airport Chengdu Metro Line 5, 7,10 Beijing Chaoyang Joy City
Screw Nominal Length L:12、16、20、25、30、35 Guangzhou Baiyun International Airport Fuzhou rail Transit Line 1,2 Beijing Huazheng Building
Mark Example: Screw DIN 7991 M10*12
Tianjin Binhai International Airport Shenzhen Metro Line 11 Beijing COFCO Plaza
Yunnan Kunming International Airport Wuxi Metro Line 2 Wangfujing Department Store
Subway
Shanxi Taiyuan International Airport Xi'an Metro Shanghai jinhongqiao International Center
Stationetc
Jiangxi Nanchang International Changzhou Railway Station Shanghai Shopping Center
Chongqing Jiangbei International Airport Terminal T3 Zhengzhou East Station Guangzhou Zhujiang New Town
Taiwan Taoyuan International Airport Tianjin Railway Station Shenzhen Vanke One City
Singapore Changi Airport Xi'an North Railway Station Shenzhen Yitian Holiday Shopping Center
Thailand Suvarnabhumi Airport Hong Kong West Kowloon High-speed Railway Station Shenyang Heng Long square
Airport
Kenya International Airport Chengdu Second Ring Road Bus Rapid Transit System Shenyang Joy City
Bracket Fastener Threaded Bolt (GB/T 15389) Cap Nut(DIN 1587)
CommercialSyntheses
Tokyo International Airport Shenyang glory Plaza
Mark Example: Mark Example:
Threaded Bolt GB/T 15389 M8*40 Nut DIN1587 M8 Doha International Airport Hangzhou Ginkgo Biloba Shenyang Pengli Square
OMAN Muscat International Airport Hainan Island Shenyang Henglong Middle Street
Abu Dhabi Airport Zhuhai Renheng Peninsula Garden Capitaland Raff City Chengdu
The Emirates Aviation Building Yunnan Mountain bay Chengdu Maoye Center
Abu Dhabi International Airport Tianjin Jewelry Garden Yunnan Qujing Commercial Building
Cairo International Airport Terminal 2, Xiamen Contemporary Heaven Kuming Jialianhua Square
Residential
Abuja Nnamdi Azikiwe International Airport Xiamen Hangho Qishang Kunming Shuncheng Shopping Center
The Queen Alia International Airport Fuzhou East Lake·Yue Rong Bay Lanzhou New World Shopping Square
Las Vegas casino International Airport Chengdu Central Iron Rose Art City Zhenzhou MIXC
Kuwait new international airport administrative building Qinhuangdao Golden Dream Bay Wuhan IKEA
Bracket Fastener Algeria Airport New Terminal Project Zhongshan Longshan Hua Fu Hangzhou MIXC
Hexagon Socket Cap Screw(DIN 912)
Guangzhou Time Bund Kuwait University City Project
Screw Nominal Length L:10、12、16、20、25、30、35、40、45、50、55、60
Tianjin Olympic Sports Center Flower capital of Guiyang Forest City Algeria Oran Shopping Mall
Mark Example: Screw DIN 912 M10*16
Shanghai Expo Center Zhongshan Xinghui Bay Bulgarian Varna Shopping Center
Ningbo International Financial Services Center Fujian Radio and Television Center Australian Top West Mansion
Xi'an Baliu (Xi'an Horticultural Exposition) Xi'an Radio and Television Center Wenzhou a Wai Lou Resort Hotel
Shenzhen Pingshan Cultural Center Guangzhou Mobile Branch Doha Grand Hyatt Hotel
Ningbo Cultural Center Comprehensive Dispatching Building of Henan Electric Power Company Xi'an Shenguang Hotel
Office Building
Ningbo International Financial Center Russian State Building Sheraton Zhanjiang Minda Hotel
Hotel
Glass Clamp Fastener Xiamen Straits Conference Center Guangzhou Jinhai Mansion Zhuhai Sheraton Hotel
Hexagon Socket Cap Screw(DIN 912) Hexagon Thin Nut(GB/T 6172.1)
Wuxi World Trade Center Wuhu Huadian Complex Building Beijing Zhongcheng Hotel
Mark Example: Mark Example:
Kunming Dianchi Exhibition Center Beijing Petro China Building Chengdu Maowen Hotel
Screw DIN 912 M8*L Nut GB/T 6172.1 M8
The Observation Deck of Beijing Olympic sports park Wuxi World Trade Center Ningbo Crown Plaza Hotel
Hong Kong Asia International Expo National Development Bank Hyatt Hotels
Xiamen Jiageng Stadium Wuxi Radio and Television Media Dali Hilton Hotel
Thai parliament project Office Building Of Zigong Yun Machine Group Hong Kong West Kowloon Hotel
95/96
Airport Station
Chengdu Metro Line 7 Jinsha Station Chengdu Metro Line 7 Jinsha Station
Kenya International Airport Kenya International Airport Kunming Changshui International Airport
Chongqing Jiangbei International Airport Terminal T3 Chongqing Jiangbei International Airport Terminal T3 Chengdu Metro Line 7 Fuzhou Rail Transit Line 1 Chengdu Metro Line 7
97/98
Commercial Complex Commercial Complex
Shenyang Henglong Middle Street Chengdu Fuse Noble House Store Inlet Tube Zhuhai Huafa Shangdu Zhuhai Huafa Shangdu
99/100
Public Building Others
Zhenjiang Sports Center Zhenjiang Sports Center Chengdu High-tech Zone Management Committee Guangzhou Mobile Branch
101/102
Others Others
Shanghai Disneyland Bridge Shanghai Disneyland Bridge Ningbo Crowne Holiday Hotel
103/104
Others Others
Beijing Zhongyou Department Store First Lobby of Zhongguancun Ningbo International Financial Center The Singapore Fengshu Commercial City
105/106