IN THE MATTER OF THE
APPLICATION FOR
AUTHORITY TO DEVELOP,
OWN AND OPERATE
DEDICATED POINT TO
POINT LIMITED
TRANSMISSION
FACILITIES (DEDICATED
LIMITED EXPRESS FEEDER
LINE) TO CONNECT THE 8.0
MW _ DIESEL — _ FIRED
POWER PLANT (DPP) TO
THE TAWI-TAWI ELECTRIC
COOPERATIVE, INC. 13.2 KV
LOAD CENTER, WITH
PRAYER FOR PROVISIONAL
AUTHORITY
ERC CASE NO. 2019-011 MC
KALTIMEX RURAL ENERGY
CORPORATION (KREC), :
‘Applicant. ia
x “x JUN 0.4 219
ORDER
On 7 May 2019, Applicant Kaltimex Rural Energy Corporation
(KREC) filed an Application dated 3 May 2019, seeking the
Commission's approval of the authority to develop, own and operate
dedicated point to point limited transmission facilities which is the
dedicated limited express feeder line to connect the 8.0 MW Diesel
Fired Power Plant (DPP) to the Tawi-tawi Electric Cooperative, Inc.’s
(TAWELCO) 13.2 kV load center, with prayer for provisional
authority.
‘The pertinent allegations of the said Application are hereunder
quoted as follows:
1.0 KREC is a corporation duly formed, organized, and existing
under the laws of Republic of the Philippines, with principal
office address Unit A 6! Floor Glass Tower Building, No. 115
Carlos Palanea Jr. Street, Legaspi Village, Makati City. KRECERC CASE NO. 2019-011 MC.
ORDER/23 MAY 2019
PAGE 2 OF 10
2.0
3.0
4.0
5.0
6.0
is herein represented by its Director, Mr. Oscar A. Torralba,
as evidenced by a Secretary's Certificate herewith attached
and marked as ANNEX “A” of this Application.
For purposes of this Application, KREC may be served with
summons, orders, pleadings, and other processes of this
Honorable Office through the address of the undersigned
counsel hereunder stated.
KREC is a New Power Producer (NPP) pursuant to Republic
‘Act (R.A.) No. 9136 otherwise known as the “Electric Power
Industry Reform Act of 2001" (EPIRA law) registered as
Pioneer Enterprise granted by the Autonomous Region for
Muslim Mindanao (ARMM)-Board of Investment as per its
Certificate of Registration No. PE-61-16 for its new 8
megawatt (MW) Diesel Power Plant (DPP) in Bongao, Tawi
Tawi.
On 26 January 2017, KREC filed with this Honorable Office
for approval its Power Supply Agreement (PSA) with Tawi
Tawi Electric Cooperative (TAWELCO), with prayer for
confidential treatment and issuance of Provisional Authority
(PA). The provision of a Dedicated Limited Express
Feeder Line is part of the original design and construction
of the DPP intended for efficiency in the service of
TAWELCO as sole off-taker. Thus, the Dedicated Limited
Express Feeder Line was embedded in its PSA pursuant to
this Honorable Office’s policy for efficient operation of NPP.
This Honorable Office granted the Provisional Authority (PA)
for the implementation of the PSA between TAWELCO and
KREC as per ERC Order dated July 25, 2017 promulgated
September 17, 2018 (ERC Case No. 2017-005 RC). A copy of
said Order dated July 25, 2017 is herewith attached and
marked as ANNEX “B” of this Application.
Section 9 of R.A. No. 9136 or the EPIRA Law of 2001
expressly provides that:
transmission facilities that are consistent with
the_IDP: Provided, That such facilities are
required only for the purpose of connecting to
the transmission system, and are used solely by
the generating facility, subject to prior
authorization by the ERC: Provided, further,
That in the event that such assets are required
for competitive purposes, ownership of the same
‘shall be transferred to the TRANSCO at a fair
market price: Provided, finally, That in the case
of disagreement on the fair market price, the
ERC shall determine the fair market value of the
asset.”
The Application is for the consideration and approval of
KREC's own, developed, and currently operating DedicatedERC CASE NO. 2019-011
ORDER/23 MAY 2019
PAGE 3 OF 10
7.0
8.0
9.0
10.0
1.0
Limited Express Feeder Line purposely intended to
connect the DPP at Brgy. Pahut, Municipality of Bongao,
Province of Tawi-tawi, Autonomous Region of Muslim
Mindanao (ARMM) to the TAWELCO’s 13.2kV load center,
pursuant to icle IV of 2014 Revised Rules for
Issuance of, i fi neration
Companies, to wit:
“A generation company which develops and
owns or operates a dedicated point -to point
limited transmission or distribution facilities for
the purpose of connecting to the transmission or
distribution system, respectively, should secure
prior authorization by the ERC”
The Dedicated Limited Express Feeder Line was
already an integral part of the DPP original engineering
design and construction submitted to this Honorable Office
in December 2016 as part of documents in support of its
application for approval of the PSA between TAWELCO and
KREC intended for DPP efficiency in compliance with the
technical recommendations by the National Power
Corporation (NAPOCOR) and the underlying Grid/System
Impact Study,
The Dedicated Limited Express Feeder Line is utilized
only by KREC’s DPP to connect and deliver its generated
power directly through the Load Center of Tawelco being the
sole offtaker. There are no connections with any end user of
electricity.
The entire DPP and Dedicated Limited Express Feeder
Line successfully completed testing and commissioning and
passed all technical standards issued by this Honorable
Office as well as all criteria under the Phase-In Phase-Out
(PIPO) Agreement amongst the NAPOCOR, TAWELCO and
KREG, and has been in commercial operation since July 25,
2018. A certificate of successful testing and commissioning
was issued jointly by the NAPOCOR, Tawelco, Kaltimex, and
third-party experts/consultants.
The Dedicated Limited Express Feeder Line part of the
DPP is comprised of approximately 5.5km single circuit
13.2kv overhead line using 336.4 MCM ACSR conductors
extending from the DPP that was constructed by KREC thru
Threefold Cord General Engineering and Services that
connects to TAWELCO’s Load Center.
Below is the actual configuration, to wit:
(The actual configuration is illustrated on the next Page.)ERC CASE NO. 2019-011 MC
ORDER/23 MAY 2019
PAGE 4 OF 10
12.0
13.0
13.2 KV EXPRESS FEEDER LINE *
Bongao, TaviTev
The single-line diagram of the proposed Dedicated
Limited Express Feeder Line shows that the same will be
exclusively used by KREC and is not designed and configured
to serve end-users. A copy of the Single-Line Diagram is
herewith attached and marked as Annex “C” of this
Application.
The actual cost of construction of the Dedicated Limited
Express Feeder Line is PhP27,440,000.00 with the
following major components:
PROJECT COMPONENTS Amount (PhP)
Construction, Installation,
Testing and Commissioning
19,600,000.00
Metering, Protection, Grounding
7,840,000.00
and Take off from Substation
TOTAL PROJECT COST 27,440,000.00
14.0 The Dedicated Limited Express Feeder Line cost is
15.0
included in the total CAPEX of KREC of the project.
An ocular inspection has already been executed by the
Technical Team of this Honorable Office wherein it
confirmed that the metering point of KREC’s DPP is located
near the connection point of the DPP and the Dedicated
Limited Express Feeder Line to Tawelco’s Load CenterERC CASE NO. 2019-011 MC
ORDER/23 MAY 2019
PAGE 5 OF 10
16.0
16.2
17.0
ANNEX | NATURE OF
in compliance with Section 8 of the Philippine Small Grid
Guidelines (PSGG) particularly Section 8.1.3.1, to wit:
“Section 8.1.3.1 Active Energy and Active Revenue
metering shall be required at every Connection Point. The
metering point shall be as close as possible to the
Connection Point, otherwise as separate procedure shall
be established to adjust energy loss between point of
metering and Connection Point.”
KREC identified other options for connection of the DPP to
TAWELCO's grid, as follows:
Tap-connection and piggy-back at TAWELCO's very old
primary line circuit which length is about 5okms. From the
DPP, the distance to farthest 3 phase line is 11.9kms at Brgy.
Lakit-lakit and the distance to farthest single line 19kms at
Brey. Luuk Siabon.;
There is no transmission facility in Bongao, TawiTawi.
After careful review of other options and considering further
the technical recommendation from NAPOCOR as well as the
independent Grid Impact/System Study, KREC resolved to
develop, own and operate its own Dedicated Limited
Express Feeder Line as the most efficient, cost-effective
and viable option for the immediate connection of the DPP to
the TAWELCO load center;
In support of the above assertion, KREC submitted copies of
the following documents:
}CUMENT
‘Additional information
‘System Impact Study
Existing and Projected Load Demand (MW) of
TAWELCO in Bongao
ARMM-BOI Certificate
zo] |)
|
Letter dated 01 February 2019 issued by
TAWELCO expressing their conformity and
appreciation regarding the connection of
TAWELCO to the load center of KREC's express
feeder line for technical efficiency. Also, it was
mentioned therein that KREC’s express feeder line
will not be connected to any end-users or
customers of TAWELCO.
a KREC Organizational Chart evidencing the
capacity of the company to operate and maintain
the dedicated express feeder line.
18.0
Moreover, TAWELCO passed its Board Resolution expressing
its appreciation of new feeder lines. (Annex M-1); and its
approval and confirmation for inter-connection with KREC
Dedicated Limited Express Feeder Line which is NOT
for connection to distribution system of any end user.ERC CASE NO. 2019-011 MC
ORDER/23 MAY 2019
PAGE 6 OF 10
19.0 KREC is herewith attaching the foregoing documents in
support of this Application, thus:
NATURE OF DOCUMENT
Projected Financial and Economic Cost Analysis.
‘Conceptual Engineering Designs and Drawings
Construction Contract
‘Statement of Payment from Threefold
PIPO Agreement
‘TAWELCO Board Resolution
KREC Board Resolution
Environmental Compliance Certificate (ECC) from
DENR-ARMM
KREC GIS 2018
Compliance to PDC
‘Audited Financial Statement =
| Proof of COC Application and ERC OR for payment
of fees
T Letter to ERC Chairman
20.0 KREC in its letter to this Honorable Office on December 2018
further emphasized that the Dedicated Limited Express
Feeder Line is expected to reduce technical losses being
incurred by TAWELCO over the years owing to its old feeder
lines and such Dedicated Line Facility is solely and purposely
to connect the DPP and TAWELCO at the dedicated load
center and NOT for connection to any end user.
21.0 Considering the belated filing of this Application, KREC is
imploring on Article 9, EXCEPTION CLAUSE, of 2014
Revised Rules for Issuance of Certificates of Compliance
(COC) for Generation Companies which states that:
“Where good cause appears, the ERC may allow an
exception from any provision of these Rules, if such is
found to be in the public interest and is not contrary to
aw or any other related rules and regulations.”
P R A Y E R
WHEREFORE, premises considered, Applicant KREC most
respectfully prays that this Honorable Commission issue an Order
granting Provisional Authority for its Dedicated Limited
Express Feeder Line being part of the original design and
construction of the DPP connected to the TAWELCO load center
successfully tested and commissioned together and operational
since July 25, 2018 pursuant to the Phase-In Phase-Out Agreement
with NAPOCOR succeeded by KREC as the only supplier and
generating company in Bongao, Tawi-Tawi.
After due notice and hearing, issue an order making the
provisional authority a permanent authority to develop, own and
operate the said Dedicated Limited Express Feeder Line.ERC CASE NO. 2019-011 MC
ORDER/23 MAY 2019
PAGE 7 OF 10
Further, KREC most respectfully prays for meritorious
consideration for this belated application in the interest of public
service to stakeholders in the remote island of Bongao, TawiTawi
being served by the first NPP in Tawi Tawi and in the ARMM
Other reliefs, just and equitable under the premises, are
likewise being prayed for.
Finding the said Application to be sufficient in form and
substance with the required fees having been paid, the same is hereby
set for determination of compliance with the jurisdictional
requirements, expository presentation, Pre-trial Conference, and
presentation of evidence on 10 July 2019 at two o’clock in the
afternoon (2:00 P.M.), at the ERC Hearing Room, 15" Floor,
Pacific Center Building, San Miguel Avenue, Pasig City.
Accordingly, KREC is hereby directed to:
1) Cause the publication of the attached Notice of Public
Hearing once (1x) in a newspaper of nationwide circulation
in the Philippines at its own expense, with the date of
publication to be made not later than ten (10) days before
the date of scheduled initial hearing;
2) Furnish with copies of this Order and the attached Notice
of Public Hearing the Offices of the Governors and
Municipal Mayor, and the Local Government Unit (LGU)
legislative bodies within the affected areas, for the
appropriate posting thereof on their respective bulletin
boards;
3) Inform the consumers within the affected areas, of the
filing of the Application, the reasons therefor, and of the
scheduled hearing thereon, by any other means available
and appropriate;
4) Furnish with copies of this Order and the attached Notice
of Public Hearing, the Office of the Solicitor General
(OSG), the Commission on Audit (COA), and the
Committees on Energy of both Houses of Congress. They
are hereby requested, if they so desire, to send their duly
authorized representatives at the scheduled hearing; and
5) Furnish with copies of the Application and its attachments
all those making requests therefor, subject
reimbursement of reasonable photocopying costs.ERC CASE NO. 2019-011 MC
ORDER/23 MAY 2019
PAGE 8 OF 10
On the date of the initial hearing, KREC must submit to the
Commission its written compliance with the aforementioned
jurisdictional requirements attaching therewith, methodically
arranged and duly marked the following:
1) The evidence of publication of the attached Notice of Public
Hearing consisting of affidavit of the Editor or Business
Manager of the newspaper where the said Notice of Public
Hearing was published, and the complete issue of the said
newspaper;
2) The evidence of actual posting of this Order and the
attached Notice of Public Hearing, consisting of
certifications issued to that effect, signed by the
aforementioned Governors, Municipal Mayor, and LGU
legislative bodies or their duly authorized representatives,
bearing the seals of their offices;
3) The evidence of other means employed by KREC to inform
the consumers of the filing of the Application, its reasons
therefor, and of the scheduled hearing thereon;
4) The evidence of receipt of copies of this Order and the
attached Notice of Public Hearing by the OSG, the COA,
and the Committees on Energy of both Houses of Congress;
5) The evidence of receipt of copies of the Application and its
attachments by all those making requests therefor, if any;
and
6) Such other proof of compliance with the requirements of
the Commission.
KREC and all interested parties are also required to submit, at
least five (5) days before the date of the initial hearing and pre-trial
conference, their respective Pre-trial Briefs containing, among others:
1) A summary of admitted facts and proposed stipulation of
facts;
2) The issues to be tried or resolved;
3) The documents or exhibits to be presented, stating the
purposes and proposed markings therefor; andERC CASE NO. 2019-011 MC
ORDER/23 MAY 2019
PAGE 9 OF 10
4) The number and names of the witnesses, with their written
testimonies in a Judicial Affidavit form attached to the Pre-
trial Brief.
Failure of KREC to comply with the above requirements within
the prescribed period shall be a ground for cancellation of the
scheduled hearing, and the resetting of which shall be six (6) months
from the said date of cancellation.
KREC must also be prepared to make an expository
presentation of the instant Application, aided by whatever
communication medium that it may deem appropriate for the
purpose, in order to put in plain words and explain, for the benefit of
the consumers and other concerned parties, the nature of the
Application with relevant information and pertinent details
substantiating the reasons and justifications being cited in support
thereof.
SO ORDERED.
Pasig City, 23 May 2019.
FOR AND BY AUTHORITY
OF THE COMMISSION:
JOSEFINA PATRIC » MAGPALE-ASIRIT
Commissioner.
rsAlsnincey sid
Copy furnished:
1, VIVERO TORIO & ASSOCIATES LAW OFFICE
Counsel for Applicant KREC
Unit 1104, Pacific Center Building, San Miguel Avenue,
Ortigas Center, Pasig City
2, Kaltimex Rural Energy Corporation (KREC)
Applicant
Unit A, 6 Floor, Glass Tower Building,
No. 115 Carlos Palanea Je. Street,
Legaspi Village, Makati City
3. Office of the Solicitor General (OSG)
1g4 Amorsolo Street, Legaspi Village, Makati City
4. Commission on Audit (COA)
‘Commonwealth Avenue, Quezon CityERC CASE NO. 2019-011 MC
ORDER/23 MAY 2019
PAGE 10 OF 10
10.
12,
%
4.
Senate Committee on Energy
GSIS Building, Roxas Boulevard, Pasay City
House of Representatives Committee on Energy
Batasan Hills, Quezon City
Philippine Chamber of Commeree and Industry (PCCD)
3° Floor, Chamber and Industry Plaza
1030 Campus Avenue comer Park Avenue
MeKinley Town Center, Fort Bonifacio, Taguig City
Office of the Governor
Province of Tawictawi
Olfice of the LGU legislative body
Province of Tawi-tawi
Office of the Municipal Mayor
Bongzo, Tawi-tawi
Office of the LGU legislative body
Bongzo, Tawi-tawi
Office of the Governor
Autonomous Region in Muslim Mindanao (ARMM)
Office of the LGU legislative body
Autonomous Region in Muslim Mindanao (ARMM)
Regulatory Operations Service (ROS)
Standards and Compliance Monitoring Division (SCMD)
17% Floor, Pacific Center Building, San Miguel Avenue, Pasig City