Free OEE Calculator Template Excel Download
Free OEE Calculator Template Excel Download
In Lean Six Sigma, OEE stands for Overall Equipment Effectiveness, and is generally considered to refer to
a measurement in “Total Productive Maintenance” programs. The measure looks at effectiveness and
efficiency of machinery or processes and is commonly referred to in reference to Lean Manufacturing.
OEE seeks to answer three machine performance related questions:
- How often is the machine available to run?
- How fast does it run when it’s running?
- How many acceptable parts were produced in the allotted time?
The formula used to calculate OEE is as follows: OEE = Availability x Performance x Quality
Availability 108%
Operating Time (hours) 14 Enter Data Here
Planned Production Time (Hours) 13 Enter Data Here
Performance 75%
Pieces Produced 1500 Enter Data Here
Ideal Speed (products per hour) 50 Enter Data Here
Operating Time (hours) 40 Enter Data Here
Quality 95%
Acceptable Pieces 950 Enter Data Here
Total Pieces 1000 Enter Data Here