AVEVA’s Construction Management

Solution

Jen Rizzo
July 22, 2013
Business Development Manager
What’s the problem ?

Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
What’s the problem ?

 Efficiency
– Reach a defined goal with minimum resource allocation /
consumption
Craftsman’s Work Day

Tool Time
44%
23% Idle

33%
Travelling/gathering
material

Source: Enhanced Work Packaging: Design through Workface Execution (Construction Industry Institute), July 2011

Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
What’s the problem ?

 Predictability
– Where are we? How are we doing? Will we make it?

If you want to know where to go you need to know where you are

Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
How can that challenge be solved?

 Properly Implemented Work Packaging and Workface


Planning
 Early Project Planning that integrates Work Packaging
with
– Engineering
– Procurement
– Construction
– Project Controls

Source: Enhanced Work Packaging: Design through Workface Execution (Construction Industry Institute), July 2011

Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
How can that challenge be solved?

the work and work the plan


Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
How it can be solved

Source: COAA & CII

Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
How does AVEVA address this?
 Vertical Planning
– Rough Cut Planning on the top
• Create and schedule Construction Work Packages
– Workface Planning below Rough Cut Planning
• Create Installation Work Packages
• IWPs shall stay in within he constraints defined during rough cut
planning (time & budget)
– Execution Layer on the bottom
• Provide a task list to the Forman
• Check constraints
• Execute work
• Gather actual data and let the system roll-up

Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
How does AVEVA address this?
 4D / 5D Planning
– Link the schedule with the 3D model
– Simulate construction sequence to verify correct planning
– Integrate with materials management
• Materials are purchased and delivered to support construction
– Communication of tasks is improved at the workface
• “a picture is worth a thousand words”
– Predictability gets increased
 Visualisation
– Visualise material availability
– Visualise status by colour-coding objects in 3D model

Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Vertical Planning
Rough
Reconcile Cut
Planning
Project
Planning

Detail
Roll-up
Planning
Workface Planning

Feedback Release
Execution & Control

Execution

Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Vertical Planning: Loop in the Loop

Rough
Reconcile Cut
Planning

Construction Work Package


Detail
Roll-up Reconcile Planning
IWP
IWP
IWP
IWP

Feedback Release

Execution

Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Application AVI

Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Work Package Building (Kitting)

 Show a 3D Model in Planning


 Assign objects from model to work package
Step1:
Select item in the
model or from a list

Step2:
Assign to Work Pack

Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Timeline Simulation

 Assign objects from a 3D Model to Work Packages


– Can be done on all levels (CWPs, IWPs and jobs)
 Timeline Simulation
– Run through the schedule and simulate construction
– Verify correct construction sequence
– Change sequence of work packages in schedule if required

Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Run a Timeline Simulation

 Simulate construction sequence over time

Timeline running
through he schedule
Adjust speed to
daily, weekly monthly

Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Visualisation

Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Visualisation
 Resource Load
– Man power, machinery
 Material status
– To support the execution of work on-site
– Visualise material availability, i.e. give a warning if material
won’t be available on time
 Project Status
– Colour code objects in a 3D Model depending on their
status
– Status of object gets derived from underlying work
package status
 Project Performance
Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Resource Load

Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Material Status

Red dot indicates


shortage of
material

Detailed list of
material for a work
package

Precise list of
missing items

Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Project Status

Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Project Performance

Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Summarised we’ve come pretty close to this:

Someone tells
me how to put
it together…

AND I CAN
RELY ON
THIS!
… and I have
everything I …and where it
need to do it has to be
installed …

Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
What do we get?

 Communication of tasks is improved at the Workface


 Predictability gets increased
 Constraints such as craft availability, material,
scaffolding and drawings are better managed
 Engineering is able to support the construction
sequence and schedule
 Vendor-supplied equipment remains on schedule
 Materials are purchased and delivered to support
construction