"REPARACION DE VIAS VECINALES; EN EL(LA) TRAYECTORIA EMP.HV-806 (DV. CHOPCCAPAMPA) – EMP.HV-105 (TINQUERCCASA) – EMP.

HV-798 (HUACHHUA), EN LA LOCALIDAD HUACHHUA, DISTRITO DE PAUCARA, PROVINCIA ACOBAMBA, DEPARTAMENTO


HUANCAVELICA" CON CUI N° 2590548
Id EDT Nombre de tarea Duración Costo 29 may '23 05 jun '23 12 jun '23 19 jun '23 26 jun '23 03 jul '23 10 jul '23 17 jul '23 24 jul '23 31 jul '23 07 ago '23 14 ago '23 21 ago '23 28 ago '23
X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D
1 "REPARACION DE VIAS VECINALES; EN EL(LA) TRAYECTORIA 90 días S/. 592,154.33
EMP.HV-806 (DV. CHOPCCAPAMPA) – EMP.HV-105
(TINQUERCCASA) – EMP.HV-798 (HUACHHUA), EN LA
LOCALIDAD HUACHHUA, DISTRITO DE PAUCARA,
PROVINCIA ACOBAMBA, DEPARTAMENTO HUANCAVELICA"
CON CUI N° 2590548
2 INICIO 0 días S/. 0.00 01/06
3 01 OBRAS PROVICIONALES 7 días S/. 46,537.99

4 01.01 CAMPAMENTO Y ALMACEN 1 día S/. 11,416.18

5 01.02 MOVILIZACION DE MAQUINARIAS Y EQUIPOS 2 días S/. 33,364.80

6 01.03 CARTEL DE IDENTIFICACION DE LA OBRA 3.60 X 2.40 MTS 1 día S/. 1,226.83

7 01.04 MONTAJE Y DESMONTAJE DE ZARANDA 1 día S/. 530.18

8 02 TRABAJOS PRELIMINARES 88 días S/. 20,105.18

9 02.01 LIMPIEZA DE TERRENO MANUAL 2 días S/. 304.56

10 02.02 DEFORESTACION 1 día S/. 1,016.04

11 02.03 TOPOGRAFIA Y GEOREFERENCIACION 2 días S/. 2,355.22

12 02.04 TRAZO Y REPLANTEO DURANTE EL PROCESO 57 días S/. 2,383.16

13 02.05 MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL 88 días S/. 3,020.68

14 02.06 ACCESO A CANTERAS Y FUENTES DE AGUA 2 días S/. 5,574.70

15 02.07 ALCANTARILLAS EXISTENTES 7 días S/. 5,450.82

16 02.07.01 DEMOLICION DE ALCANTARILLA RECTANGULAR DE 3 días S/. 455.60


CONCRETO 1 UND

17 02.07.01.01 DEMOLICION DE ALCANTARILLA RECTANGULAR DE 3 días S/. 455.60


CONCRETO

18 02.07.02 MEJORAMIENTO DE ALCANTARILLAS RESTANGULAR 7 días S/. 4,995.22


DE CONCRETO 3 UND

19 02.07.02.01 LIMPIEZA DE TERRENO MANUAL 1 día S/. 29.26

20 02.07.02.02 PICADO DE TARRAJEOS INTERIORES Y EXTERIORES PARA 4 días S/. 1,320.72


RESANES

21 02.07.02.03 TARRAJEO EN EXTERIORES C/MORTERO 1:5 X 1.5 CM 3 días S/. 2,074.29

22 02.07.02.04 PINTURA EXTERIOR 1 día S/. 1,570.95

23 03 EQUIPO DE PROTECCION COLECTIVA 1 día S/. 11,408.40

24 03.01 IMPLEMENTOS DE PROTECCION PERSONAL 1 día S/. 11,408.40

25 04 EXPLANACIONES 53 días S/. 255,933.31

26 04.01 CORTE DE MATERIAL SUELTO 30 días S/. 84,930.25

27 04.01.01 CORTE EN MATERIAL SUELTO CON MAQUINARIA (INC. 30 días S/. 84,930.25
PEINADO TALUD)

28 04.02 CORTE EN ROCA SUELTA 3 días S/. 417.76

29 04.02.01 CORTE EN ROCA SUELTA (PERFORACION Y DISPARO) 1 día S/. 337.79

30 04.02.02 LIMPIEZA DE PLATAFORMA Y DESQUINCHE DE TALUD EN 1 día S/. 79.97


ROCA SUELTA

31 04.03 CORTE ROCA FIJA 3 días S/. 188.32

32 04.03.01 CORTE EN ROCA FIJA (PERFORACION Y DISPARO) 1 día S/. 182.21

33 04.03.02 LIMPIEZA DE PLATAFORMA Y DESQUINCHE DE TALUD EN 1 día S/. 6.11


ROCA FIJA

34 04.04 CONFORMACION DE TERRAPLENES O RELLENOS 9 días S/. 44,824.33

35 04.04.01 PERFILADO Y COMPACTACION DE LA SUB RASANTE EN ZONAS 9 días S/. 44,824.33


DE CORTE

36 04.05 ELIMINACION DE MATERIAL EXCEDENTE 15 días S/. 125,572.65

37 04.05.01 ELIMINACION DE MATERIAL EXCEDENTE 15 días S/. 125,572.65

38 05 PAVIMENTOS 23 días S/. 132,302.89

39 05.01 EXTRACCION Y APILAMIENTO CON MAQUINARIA EN CANTERA 2 días S/. 49,712.49

40 05.02 ZARANDEADO DE AFIRMADO 2 días S/. 3,042.38

41 05.03 CARGUIO CON MAQUINARIA DE MATERIAL DE CANTERA 5 días S/. 8,001.46

42 05.04 TRANSPORTE DE MATERIAL PARA AFIRMADO 17 días S/. 25,708.11

43 05.05 AFIRMADO BASE GRANULAR (E=15 CM) 12 días S/. 45,838.45

44 06 CUNETAS 9 días S/. 53,939.92

45 06.01 EXCAVACION MANUAL EN MATERIAL SUELTO 6 días S/. 36,744.12

46 06.02 EXCAVACION MANUAL EN ROCA SUELTA 1 día S/. 9.24

47 06.03 EXCAVACION EN ROCA FIJA (PERFORACION Y DISPARO) 1 día S/. 3.53

Tarea Resumen del proyecto Tarea manual solo el comienzo Fecha límite Progreso manual
Proyecto: REPARACION DE VIAS VECINALES EMP. HV-806
División Tarea inactiva solo duración solo fin Tareas críticas
(DV. CHOPCCAPAMPA) – EMP. HV-105 (TINQUERCCASA) – EM
Fecha: mar 25/04/23 Hito Hito inactivo Informe de resumen manual Tareas externas División crítica

Resumen Resumen inactivo Resumen manual Hito externo Progreso

Página 1
"REPARACION DE VIAS VECINALES; EN EL(LA) TRAYECTORIA EMP.HV-806 (DV. CHOPCCAPAMPA) – EMP.HV-105 (TINQUERCCASA) – EMP.HV-798 (HUACHHUA), EN LA LOCALIDAD HUACHHUA, DISTRITO DE PAUCARA, PROVINCIA ACOBAMBA, DEPARTAMENTO
HUANCAVELICA" CON CUI N° 2590548
Id EDT Nombre de tarea Duración Costo 29 may '23 05 jun '23 12 jun '23 19 jun '23 26 jun '23 03 jul '23 10 jul '23 17 jul '23 24 jul '23 31 jul '23 07 ago '23 14 ago '23 21 ago '23 28 ago '23
X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D
48 06.04 ELIMINACION DE MATERIAL EXCEDENTE 3 días S/. 17,183.03

49 07 OBRAS DE ARTE 17 días S/. 14,590.42

50 07.01 ALCANTARILLA TMC TIPO I Ø=36" (01 UND) 12 días S/. 7,454.21

51 07.01.01 LIMPIEZA DE TERRENO MANUAL 1 día S/. 8.67

52 07.01.02 TRAZO Y REPLANTEO 1 día S/. 18.44

53 07.01.03 EXCAVACION PARA ESTRUCTURAS TERRENO NORMAL 1 día S/. 333.29

54 07.01.04 ELIMINACION DE MATERIAL EXCEDENTE 1 día S/. 237.28

55 07.01.05 RELLENO CON MATERIAL SELECCIONADO 1 día S/. 159.36

56 07.01.06 CONCRETO f`c=175 kg/cm2 1 día S/. 760.31

57 07.01.07 ACERO DE REFUERZO FY=4200 KG/CM2 1 día S/. 623.30

58 07.01.08 ENROCADO Y PROTECCION CON PIEDRA EMBOQUILLADO 1 día S/. 63.53

59 07.01.09 ENCOFRADO Y DESENCOFRADO 2 días S/. 1,242.70

60 07.01.10 INSTALACION Y COLOCACION DE ALCANTARILLA TMC Ø=36" 1 día S/. 2,144.69

61 07.01.11 TARRAJEO EN EXTERIORES C/MORTERO 1:5 X 1.5 CM 1 día S/. 919.23

62 07.01.12 PINTURA EXTERIOR 1 día S/. 696.21

63 07.01.13 ZANJAS DE CORONACION 2 días S/. 247.20

64 07.02 OBRAS COMPLEMETARIAS 6 días S/. 7,136.21

65 07.02.01 SEÑAL INFORMATIVA 1 día S/. 1,398.08

66 07.02.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 1 día S/. 63.64

67 07.02.01.02 CONCRETO F'C= 140 KG/CM2 + 30%P.G. 1 día S/. 428.02

68 07.02.01.03 SEÑAL INFORMATIVA 1 día S/. 906.42

69 07.02.02 SEÑAL PREVENTIVA 3 días S/. 4,142.13

70 07.02.02.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 3 días S/. 134.37

71 07.02.02.02 CONCRETO F'C= 140 KG/CM2 + 30%P.G. 3 días S/. 413.88

72 07.02.02.03 SEÑAL PREVENTIVA 3 días S/. 3,593.88

73 07.02.03 POSTES KILOMETRICOS 2 días S/. 1,596.00

74 07.02.03.01 HITOS KILOMETRICOS 2 días S/. 1,596.00

75 08 CONTROL DE CALIDAD 83 días S/. 2,979.80

76 08.01 ENSAYO DE DETERMINACION DE MAXIMA DENSIDAD SECA 1 día S/. 1,000.00

77 08.02 ENSAYOS DE DENSIDAD DE CAMPO 1 día S/. 495.00

78 08.03 ROTURA DE PROBETAS DE CONCRETO 1 día S/. 84.80

79 08.04 DISEÑO DE MEZCLAS DE CONCRETO 1 día S/. 1,400.00

80 09 FLETE DE MATERIALES 9 días S/. 26,382.57

81 09.01 FLETE DE EXPLOSIVOS Y CUSTODIA POLICIAL 1 día S/. 12,000.00

82 09.02 FLETE TERRESTRE 4 días S/. 12,145.53

83 09.03 FLETE RURAL 1 día S/. 2,237.04

84 10 MITIGACION AMBIENTAL 83 días S/. 4,663.85

85 10.01 RESTAURACION DE AREAS OCUPADAS PARA CAMPAMENTO Y 1 día S/. 1,404.00


PATIO DE MAQUINAS

86 10.02 ACONDICIONAMIENTO DE BOTADEROS 1 día S/. 2,378.81

87 10.03 VEGETACIÓN EN SUPERFICIE 1 día S/. 881.04

88 11 CAPACITACION Y SENSIBILIZACION 1 día S/. 6,000.00

89 11.01 SENSIBILIZACION Y CAPACITACION PARA AUTORIDADES Y 1 día S/. 6,000.00


POBLACION

90 12 PLAN DE MANTENIMIENTO VIAL 6 días S/. 17,310.00

91 12.01 PLAN DE MANTENIMIENTO VIAL 6 días S/. 17,310.00

92 FIN 0 días S/. 0.00 29/08

Tarea Resumen del proyecto Tarea manual solo el comienzo Fecha límite Progreso manual
Proyecto: REPARACION DE VIAS VECINALES EMP. HV-806
División Tarea inactiva solo duración solo fin Tareas críticas
(DV. CHOPCCAPAMPA) – EMP. HV-105 (TINQUERCCASA) – EM
Fecha: mar 25/04/23 Hito Hito inactivo Informe de resumen manual Tareas externas División crítica

Resumen Resumen inactivo Resumen manual Hito externo Progreso

Página 2